(All amounts expressed in U.S. dollars unless otherwise noted)

VANCOUVER, British Columbia, Oct. 28, 2026 (GLOBE NEWSWIRE) — Eldorado Gold Corporation (“Eldorado”, “Eldorado Gold” or “the Company”) today reports the Company’s financial and operational results for the third quarter of 2026. For further information, please see the Company’s Consolidated Financial Statements and Management’s Discussion and Analysis (“MD&A”) filed on SEDAR+ at www.sedarplus.com under the Company’s profile.

Third Quarter 2026 Highlights

Operations

  • Gold production: 106,351 ounces.
  • Gold sales: 107,164 ounces at an average realized gold price per ounce sold(1) of $4,326.
  • Total cash costs(1): $1,415 per ounce sold.
  • All-in sustaining costs (“AISC”)(1): $2,050 per ounce sold.
  • Total capital expenditures: $452.3 million, including $108.6 million of project capital and $84.3 million of accelerated operational capital at Skouries, and $87.5 million project capital invested at McIlvenna Bay. Growth capital(1) at the operating mines totalled $105.1 million and sustaining capital(1) at the operating mines totalled $52.1 million.

Financial

  • Revenue: $511.9 million.
  • Production costs: $199.8 million.
  • Net cash generated from operating activities from continuing operations: $134.8 million.
  • Cash flow from operating activities before changes in working capital(1): $248.8 million.
  • Cash and cash equivalents: $396.8 million as at September 30, 2026, excluding $71.9 million of restricted cash designated for Skouries Term Facility(2) loan repayments.
  • Net earnings attributable to shareholders: $118.0 million, or $0.45 basic earnings per share.
  • Adjusted net earnings(1): $127.0 million or $0.49 per share in Q3 2026. Adjustments in Q3 2026 include a $7.4 million loss on foreign exchange translation of deferred tax balances and a $4.0 million unrealized gain on derivative instruments.
  • Adjusted net earnings before interest, taxes, depreciation and amortization (“Adjusted EBITDA”)(1): $275.2 million in Q3 2026.
  • Free cash flow(1): Consolidated free cash flow was negative $191.1 million in Q3 2026, reflecting the significant level of investment in Skouries and McIlvenna Bay as both operations advance toward commercial production. For additional context free cash flow excluding Skouries and McIlvenna Bay(1) was $98.3 million.

(1) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.
(2) The Skouries Term Facility is defined as the Commercial Loan Facility, the RRF Facility and the Contingent Overrun Facility (“Term Facility”).

Production and Cost Outlook

Production Guidance

Based on year-to-date performance through the third quarter, Eldorado has revised its 2026 production outlook for its operating assets, excluding Skouries and McIlvenna Bay, to 410,000 to 430,000 ounces of gold, compared with original guidance of 430,000 to 490,000 ounces. The revised 2026 production outlook, including Skouries and McIlvenna Bay, is 425,000 to 475,000 ounces of gold, compared with original guidance of 495,000 to 600,000 ounces. Strong performance at Lamaque, supported by increasing contributions from high-grade Ormaque ore, is partially offsetting lower expected production at Kisladag and Olympias as well as the impact of a slower than expected ramp-up at Skouries.

  • Lamaque – Strong operating execution and increasing contributions from high-grade Ormaque ore continue to support strong production performance. Ormaque is becoming an increasingly important source of high-grade ore for Lamaque.
  • Kisladag – Lower production for 2026 primarily reflects lower-grade ore associated with the current mining sequence and slower than planned mining progress during the third quarter, which delayed access to higher-grade material. Higher-grade material is now being stacked on the North Heap Leach Pad; however, given the approximately 300-day leach cycle, the associated production benefit is expected toward the end of the fourth quarter and into 2027.
  • Olympias – Lower production for 2026 primarily reflects the timing of the 650 ktpa expansion, which reduces expected fourth-quarter throughput and production. The targeted 650 ktpa nameplate throughput rate is expected to be achieved in the first half of 2027. In addition, material with elevated lead and zinc content that was expected to be processed during the third quarter was instead stockpiled. This material is expected to be introduced through a controlled blending program during the fourth quarter to maintain stable plant performance and optimize recoveries.
  • Skouries – Gold production guidance for 2026 has been revised to 10,000 to 35,000 ounces, compared with prior guidance of 60,000 to 100,000 ounces, reflecting a slower-than-expected ramp-up. The revision reflects the timing of the ramp-up and does not change the Company’s expectations for Skouries’ longer-term design capacity with commercial production expected in late Q4 2026.
  • McIlvenna Bay – Gold production continues to track within the 5,000 to 10,000 ounce guidance range for 2026. Commercial production is expected in late Q4 2026.

Base metal production ranges, including Skouries and McIlvenna Bay, have also been revised primarily reflecting the slower-than-expected ramp-up at Skouries, and lower production at Olympias:

  • Copper production: 10 to 25 million pounds (previously 20 to 40 million pounds)
  • Silver production: 1.2 to 1.5 million ounces (previously 1.55 to 1.75 million ounces)
  • Lead production: 11 to 14 thousand tonnes (previously 15 to 18 thousand tonnes)
  • Zinc production: 14 to 20 thousand tonnes (previously 16 to 19 thousand tonnes)

Cost Guidance

Consolidated total cash cost guidance for operating assets, excluding Skouries and McIlvenna Bay, has been revised to $1,400 to $1,500 per ounce sold, compared with original guidance of $1,220 to $1,420 per ounce sold. AISC guidance has been revised to $1,975 to $2,125 per ounce sold, compared to original guidance of $1,670 to $1,870 per ounce sold. The revisions primarily reflect:

  • Higher sustaining capital expenditures, including the earlier transition of Ormaque underground development at Lamaque from growth capital to sustaining capital following the earlier-than-expected receipt of the permit and advancement of development activities, as well as higher sustaining capital requirements at Olympias.
  • Lower production at Kisladag and Olympias, partially offset by higher production at Lamaque.
  • Higher royalty expense driven by higher realized metal prices.

Capital Guidance

  • Sustaining capital – Guidance for operating assets, excluding Skouries and McIlvenna Bay, has been revised to $170 to $190 million, compared with prior guidance of $140 to $165 million, primarily reflecting the earlier transition of Ormaque underground development at Lamaque from growth capital to sustaining capital and higher sustaining capital at Olympias due to increased filtration maintenance costs and additional contract support to advance access to higher grade underground zones.
  • Growth capital – Guidance for operating assets, excluding Skouries and McIlvenna Bay, has been revised to $395 to $430 million, compared with prior guidance of $375 to $405 million, primarily reflecting additional investment at Kisladag, including land acquisitions and increased waste movement for the Western Area, and higher capital requirements associated with the 650 ktpa expansion at Olympias. These increases are partially offset by lower growth capital at Lamaque following the earlier transition of Ormaque underground development to sustaining capital.

Skouries – With commercial production expected in late Q4, total project capital for Skouries is estimated at approximately $1.425 billion, an increase that consists of $65 million of projects costs and $45 million of previously guided growth capital that had been expected following commercial production but is now expected to be incurred prior to commercial production and is therefore reported as project capital. The increase primarily reflects higher contractor requirements to complete construction and commissioning activities, the extended use of temporary generator sets prior to connection to permanent grid power, additional owner’s costs and other project execution-related costs associated with the longer commissioning period.

Accelerated operational capital is expected to total $390 million, an increase that consists of $95 million of additional operational costs and $35 million of previously guided sustaining capital that had been expected following commercial production. It is now expected to be incurred and capitalized during the pre-commercial production period and is therefore reported as accelerated operating capital. This increase is separate from the increase in project capital. 

Up to an additional $30 million may be incurred, depending on the exact timing of commercial production. The classification of these expenditures will depend on when commercial production is achieved, with amounts potentially reflected in project capital, AOC, sustaining capital or growth capital.

McIlvenna Bay – The total project capital cost estimate from June 1, 2024 to commercial production is expected to be $975 million, an increase of approximately $23 million following a slower than expected ramp-up toward commercial production. For 2026, growth capital post commercial production is expected to be approximately $15 million and sustaining capital post commercial production is expected to be $10 million.

Depreciation Expense Guidance

Depreciation expense guidance, for operating assets excluding Skouries and McIlvenna Bay, has been reduced to $225 to $235 million, compared to prior guidance of $240 to $260 million, largely due to lower production. Depreciation expense at Skouries is not expected to be significant, compared with prior guidance of $15 to $35 million, as commercial production is expected in late Q4 2026.

Corporate

  • On August 12, 2026 the Company amended the senior secured credit facility, increasing total availability to $600 million, extending the maturity to March 1, 2029 and improving financial flexibility.
  • George Burns retired as Chief Executive Officer of Eldorado Gold, effective September 30, 2026. Following his retirement from management, Mr. Burns will remain on the Company’s Board of Directors.
  • Christian Milau assumed the role of President and Chief Executive Officer and joined the Board of Directors, effective September 30, 2026.
  • Paul Ferneyhough’s role expanded to Executive Vice President, Strategy and Chief Financial Officer, effective September 30, 2026.
  • Carissa Browning stepped down from the Board of Directors effective September 4, 2026.
  • On October 28, 2026, the Company declared a fourth quarter dividend of $0.075 per common share, payable on December 15, 2026 to shareholders of record at the close of business on December 1, 2026.

Commentary

“The third quarter marked an important step forward for Eldorado. Skouries produced first copper-gold concentrate and McIlvenna Bay continued to ramp up following first copper and zinc concentrate. At Skouries, the ramp-up has taken longer and cost more than we expected, and it is important that we acknowledge that directly,” said Christian Milau, President and Chief Executive Officer. “Our focus is on safely completing the remaining commissioning work, achieving commercial production and establishing stable, predictable operating performance.

“As I begin my tenure as CEO, my focus is on building on Eldorado’s high-quality, long-life asset base and the investments already made, while improving execution consistency, enhancing capital discipline and converting those investments into stronger cash flow and per-share value. Shareholders should expect us to set clear expectations, report transparently on our progress and remain disciplined in how we allocate capital.

“Beyond the near-term ramp-ups, we have substantial opportunity within the portfolio. Our focus is on maximizing the value of the assets we already own, maintaining balance-sheet strength and financial flexibility, and investing where expected returns justify the capital. As the new operations ramp up and generate increasing cash flow, we expect to have greater flexibility to balance debt reduction, reinvestment and shareholder returns. With Skouries and McIlvenna Bay advancing through commissioning and ramp-up, our priority is to execute the remaining work and translate the cash flow potential of these investments into stronger, sustainable cash generation and per-share value.”

Skouries Highlights

The Skouries mine, part of the Kassandra Mines Complex, is located within the Halkidiki Peninsula of Northern Greece and is a high-grade copper-gold mine. In January 2022, Eldorado published the results of the Skouries Project Feasibility Study with a 20-year mine life and expected average annual production over the life of the mine of 140,000 ounces of gold and 67 million pounds of copper, or approximately 240,000 gold equivalent ounces(3).

First production of the copper-gold concentrate was achieved on September 8, 2026, and commercial production is expected late in Q4 2026. Expected 2026 gold production was revised to between 10,000 and 35,000 ounces and copper production projected to be between 5 and 15 million pounds.

(3) Gold equivalent ounces: Calculated by converting copper pounds produced into gold equivalent using budgeted commodity prices for the relevant period: 2026-2028: $4,000/oz gold and $5.00/lb copper; 2029 and beyond: $3,000/oz gold and $4.50/lb copper.

Skouries Site Layout

Skouries site layout

Concentrate Off-Take Agreements

The Company has secured concentrate agreements with multiple offtakers for all anticipated Skouries production volumes for the next two years, with additional counterparty agreements in process covering production through to 2029. Market conditions for copper-gold concentrate remain highly competitive.

Capital Estimate and Schedule

With commercial production expected in late Q4, total project capital for Skouries is estimated at approximately $1.425 billion, an increase that consists of $65 million of projects costs and $45 million of previously guided growth capital that had been expected following commercial production but is now expected to be incurred prior to commercial production and is therefore reported as project capital. The increase primarily reflects higher contractor requirements to complete construction and commissioning activities, the extended use of temporary generator sets prior to connection to permanent grid power, additional owner’s costs and other project execution-related costs associated with the longer commissioning period.

Accelerated operational capital is expected to total $390 million, an increase that consists of $95 million of additional operational costs and $35 million of previously guided sustaining capital that had been expected following commercial production. It is now expected to be incurred and capitalized during the pre-commercial production period and is therefore reported as accelerated operating capital. This increase is separate from the increase in project capital.

Up to an additional $30 million may be incurred, depending on the exact timing of commercial production. The classification of these expenditures will depend on when commercial production is achieved, with amounts potentially reflected in project capital, AOC, sustaining capital or growth capital.

Based on the Company’s current schedule and cost assumptions, the project remains fully funded through available cash, operating cash flow and existing debt facilities.

The Term Facility totalling €740.4 million ($840.7 million) is fully drawn (including the Contingent Overrun Facility of €60.0 million which was drawn in Q2 2026).(4)

Project capital totalled $108.6 million in Q3 2026 and $398.9 million during the nine months ended September 30, 2026. Accelerated operational capital cost totalled $84.3 million in Q3 2026, and $192.5 million during the nine months ended September 30, 2026. At September 30, 2026, cumulative project capital invested towards Phase 2 of construction totalled $1.379 billion, and the cumulative accelerated operational capital totalled $285.6 million.

(4) See the section “Financial Condition and Liquidity – Financing Activities” in the Company’s September 30, 2026 MD&A.

Operating Activities

260926 Transfer Tower Pano

View of coarse ore stockpile dome (right), thickeners (left), filtered tailings building (background)

Primary Crusher Building

The primary crusher crushed first ore in July and is now operating as part of the integrated processing circuit. The stockpile dome, ancillary feeders and associated chute work are complete and supporting ongoing operations.

Process Plant

The process plant is substantially complete, and operating as part of the ongoing ramp-up of the operation. Commissioning activities have advanced across the processing circuit, with ore being processed through to concentrate production. Optimization and performance testing of various systems continue as part of the ramp-up to commercial production.

Thickeners

Two of the three tailings thickeners have been commissioned and are supporting current operations. Construction of the third tailings thickener, which is not required to achieve commercial production, is progressing, with completion expected in Q4 2026.

Filtered Tailings Facility

Commissioning of the filtered tailings facility continues to progress with two of the six filter presses operational. With these filter presses online, the plant is operating continuously and progressively increasing throughput as commissioning advances and the remaining filter presses are brought online. Commissioning of the remaining four filter presses is expected to be completed in November 2026.

Associated tailings handling infrastructure continues to be commissioned to support long-term operations.

260926 Tailings Filter Area

Filtered Tailings Facility

Powerline and Substations

The site was successfully energized on September 28, 2026, marking the completion of its connection to permanent grid power. The connection supports the ongoing commissioning and ramp-up of key systems across the site and provides the reliable, long-term power infrastructure required for the operations. All the temporary generators have been demobilized and removed from site.

260926 Main Substation

Process plant substation

Integrated Extractive Waste Management Facility

The initial filtered tailings placement areas are well advanced. The platform for the tailings stacker is complete and ready for assembly, while the access ramp and platform for the mobile (grasshopper) conveyors have been excavated and prepared for placement of the conveyor units. Construction of the rock buttress supporting the downstream embankment of the first filtered tailings placement area in the Karatza Lakkos (“KL”) valley is progressing and will be completed ahead of tailings placement.

Foundation preparation for the first phase of the KL filtered tailings embankment is substantially complete, and placement of engineered fill is underway across the full footprint.

Construction of the low-grade ore stockpile continued advancing. The lower section has been completed and construction is now focusing on the upper section.

Open Pit Mining

The open pit mine is feeding the crusher from both the stockpile and directly from the open pit. At the end of Q3 2026, the stockpiles contained approximately 4.8 million tonnes of open pit and underground ore, representing an estimated 176,000 ounces of gold and 61 million pounds of copper.

Underground Development

The underground mine delivered 179 kt of ore to stockpiles during Q3 2026. Underground development continued according to plan, with a total of 2,101 metres of development during the quarter. The east ramp breakthrough to the underground works was achieved during the quarter and both ramps are now providing access in and out of the underground.

Workforce

As at September 30, 2026, there were approximately 2,297 personnel working on site, including 622 Skouries employees.

McIlvenna Bay Highlights

The McIlvenna Bay mine, located in Saskatchewan, Canada, is a copper-zinc-gold-silver mine that Eldorado acquired through its acquisition of Foran, which closed on April 14, 2026. In March 2025, Foran published a McIlvenna Bay Project Feasibility Study, with an 18-year mine life and expected average annual production over the life of the mine of 41 million pounds of copper, 20,000 ounces of gold, 444,000 ounces of silver and 54 million pounds of zinc.

First production of copper concentrate from McIlvenna Bay was achieved in June 2026 with production of first zinc concentrate achieved in July. The focus is now on optimizing operations and increasing throughput to full design capacity. The crushing, grinding and flotation circuits have been commissioned and are demonstrating increasing throughput as ramp-up progresses. Remaining ramp-up activities are focused primarily on solid-liquid separation in the pyrite and tailings thickeners, reagent control, and improving filtration rates and filter availability. Work in these areas continues to advance, with commercial production expected in late Q4 2026.

The mine is expected to have a long life and is supported by a robust resource base, with highly prospective exploration upside across the broader district, including the nearby Tesla Zone. The inaugural Inferred Mineral Resource for Tesla is expected to be included in our annual Mineral Reserve and Mineral Resource update in the fourth quarter of 2026. Based on the prospectivity of the resource, we have initiated studies to evaluate material handling options for the mine, in addition to the mill expansion study that is underway, with resource conversion drilling planned for the Tesla resource. Once studies and conversion drilling have been advanced, we would expect to update the McIlvenna Bay Technical Report.

Located in one of the world’s most attractive mining jurisdictions, the mine benefits from established infrastructure and is designated by the Government of Canada as a project of national significance to support critical mineral development.

  3 months ended Sept 30, 9 months ended Sept 30,
Operating Data 2026 2026
Tonnes milled 58,832 64,237
Head grade (% copper) 1.06% 1.06%
Head grade (% zinc) 0.83% 0.76%
Head grade (g/t gold) 0.34 0.33
Head grade (g/t silver) 14.57 14.02
Copper produced (lb) 1,023,794 1,089,192
Copper sold (lb) 1,022,964 1,022,964
Zinc produced (t) 35 35
Zinc sold (t) 16 16
Gold produced (oz) 387 411
Gold sold (oz) 380 380
Silver produced (oz) 17,857 18,603
Silver sold (oz) 18,715 18,715


2026 Production and Cost Guidance; Project Capital Estimate

Production at McIlvenna Bay in 2026 is expected to be 5 to 10 million pounds of copper, 3,000 to 6,000 tonnes of zinc, 5,000 to 10,000 ounces of gold and 100,000 to 200,000 ounces of silver. Operating costs are expected to trend toward the previously disclosed range of between $90 and $110 per tonne as throughput increases and the operation progresses toward stable production levels.

The total project capital cost estimate from June 1, 2024 to commercial production is expected to be $975 million, an increase of approximately $23 million following a slower than expected ramp-up toward commercial production. For 2026, growth capital post commercial production is expected to be approximately $15 million and sustaining capital post commercial production is expected to be $10 million.

Project capital totalled $87.5 million during Q3 2026 (and $165.7 million reported from the date of acquisition of April 14, 2026). During the fourth quarter the remaining spend relates to the final commissioning and ramp-up activities required to support commercial production.

McIlvenna Bay Site Layout

McIlvenna Bay Mine Site Overview

Operating Activities

Site 2026 - McIlvenna Bay

McIlvenna Bay Aerial

Primary Crusher Building

More than 400 kt of ore is available on surface for processing. The primary crusher is operating at design capacity, material transfer to the fine ore bin is as expected, and metal separation practices for underground material continue on surface.

Process Plant

The SAG and ball mill circuits continue to demonstrate increasing throughput as commissioning advances. As expected for a new processing plant, we continue to work through equipment, instrumentation and other availability-related challenges associated with ramp-up. Throughput is expected to continue increasing through the fourth quarter as the operation progresses toward commercial production.

SAG n Ball - McIlvenna Bay

SAG and Ball Mills

Flotation

All flotation circuits are fully commissioned and have successfully produced copper, zinc and pyrite concentrates. The regrind circuit is operational and supporting further improvements in concentrate quality as ramp-up progresses.

Thickening & Filtration

The thickening and filtration circuits are key to the ramp-up of production. The key operational focus is on reagent addition and thickener control which has impacted the solid-liquid separation quality and downstream process water clarity. The teams are working to optimize the thickener and filtration processes for long-term stability.

Underground Development

Underground development continues to advance well. In addition to the 409 kt of ore stockpiled on surface, the mine has approximately 63 kt of blasted inventory, more than 400 kt drilled off, and approximately 2.0 Mt of fully developed reserves within Block 1 and Block 2.

Study Commenced on Processing Expansion, Including Throughput Increase and Silver-Lead Circuit

The expansion study is underway to evaluate an increase in processing throughput and the incorporation of a silver‑lead circuit. The expansion will evaluate a potential increase of processing capacity at McIlvenna Bay from 4,900 tonnes per day to approximately 7,000 tonnes per day. The addition of a dedicated silver‑lead circuit into the flowsheet is expected to enable recovery of lead into a separate concentrate and improve payable silver recoveries relative to the current design.

This initial study will assess the technical, economic, environmental and permitting considerations associated with the expansion. Any future development would be subject to completion of the project evaluation, receipt of required permits, Indigenous and Stakeholder engagement, and a positive final investment decision. The Company is targeting commissioning of the silver‑lead circuit in 2028 and the expansion in 2030.

Positioned as the Foundation for Long-Term District Growth

The McIlvenna Bay mine is core to our view of the district-scale geological potential to deliver future satellite development opportunities. Ongoing exploration will target additional resources, which could support further expansion or a separate processing facility over time. The 2026 exploration program includes approximately 14,000 metres of diamond drilling focused on resource expansion, high-grade extensions, and advancing regional targets.                        

In parallel, core scanning programs will enhance geological modelling and orebody characterization. Airborne and ground geophysical surveys are expected to help refine known deposit footprints and identify new targets across the broader land package.

Consolidated Financial and Operational Highlights

  3 months ended September 30,   9 months ended September 30,
    2026     2025       2026     2025  
Revenue $ 511.9   $ 434.7     $ 1,531.7   $ 1,241.7  
Gold produced (oz)   106,351     115,190       311,325     364,852  
Gold sold (oz)   107,164     116,529       310,474     364,281  
Average realized gold price ($/oz sold)(2) $ 4,326   $ 3,527     $ 4,527   $ 3,245  
Production costs   199.8     164.1       572.8     474.6  
Total cash costs ($/oz sold)(2,3)   1,415     1,195       1,438     1,134  
All-in sustaining costs ($/oz sold)(2,3)   2,050     1,679       1,974     1,583  
Net earnings for the period(1)   118.0     56.0       427.2     266.4  
Net earnings per share – basic ($/share)(1)   0.45     0.28       1.80     1.31  
Net earnings per share – diluted ($/share)(1)   0.45     0.27       1.78     1.29  
Net earnings for the period continuing operations(1,4)   118.0     56.5       427.2     267.5  
Net earnings per share continuing operations – basic ($/share)(1,4)   0.45     0.28       1.80     1.31  
Net earnings per share continuing operations – diluted ($/share)(1,4)   0.45     0.28       1.78     1.30  
Adjusted net earnings(1,2,4)   127.0     82.3       451.9     228.8  
Adjusted net earnings per share – basic ($/share)(1,2,4)   0.49     0.41       1.91     1.12  
Net cash generated from operating activities(4)   134.8     170.2       425.7     458.8  
Cash flow from operating activities before changes in working capital(2,4)   248.8     183.5       539.0     522.0  
Free cash flow(2,4)   (191.1 )   (87.4 )     (654.3 )   (178.4 )
Free cash flow excluding Skouries and McIlvenna Bay(2,4,5)   98.3     76.9       202.1     206.3  
Cash and cash equivalents(4)   396.8     1,043.9       396.8     1,043.9  
Restricted cash – current(6)   71.9     —       71.9     —  
Total assets   10,616.9     6,485.4       10,616.9     6,485.4  
Debt   1,985.4     1,258.5       1,985.4     1,258.5  

(1)   Attributable to shareholders of the Company.
(2)   These financial measures or ratios are non-IFRS financial measures or ratios. See the section ‘Non-IFRS and Other Financial Measures and Ratios’ of our MD&A for explanations and discussions of these non-IFRS financial measures or ratios.
(3)   Includes costs allocated to by-products.
(4)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(5)   Amounts presented add back cash-basis capital expenditure on the Skouries mine in the respective periods and the McIlvenna Bay mine only in 2026.
(6)   In accordance with the requirements of the Skouries Term Facility the Company deposited an amount of €63.3 million ($71.9 million) which is equal to at least 50% of the aggregate repayment installments, fees, interest, financing costs and charges of the Term Facility for the next 12 months, into a Debt Service Reserve Account.

In Q3 2026, we produced 106,351 ounces of gold, a decrease from Q3 2025 production of 115,190 ounces. The decrease was driven by decreases at Kisladag, due to the planned lower ore grade stacked, and at Efemcukuru, due to lower ore grade, partially offset by higher production at Lamaque as a result of higher throughput, grade and recoveries, which includes the positive impact of Ormaque ore grades and improving productivity.

Gold sales in Q3 2026 were 107,164 ounces, a decrease from 116,529 ounces sold in Q3 2025. The lower sales volume reflects lower production at Kisladag and Efemcukuru, partially offset by higher production at Lamaque.

The average realized gold price was $4,326 per ounce sold in Q3 2026, an increase from $3,527 per ounce sold in Q3 2025.

Total revenue increased to $511.9 million in Q3 2026 from $434.7 million in Q3 2025 and to $1,531.7 million in the nine months ended September 30, 2026, from $1,241.7 million in the nine months ended September 30, 2025. The increases in both periods were due to the higher average realized gold price, partially offset by lower volumes sold.

Production costs increased to $199.8 million in Q3 2026 from $164.1 million in Q3 2025 and to $572.8 million in the nine months ended September 30, 2026 from $474.6 million in the nine months ended September 30, 2025. Increases in both periods were driven by higher royalties and the inclusion of pre-commercial production costs at McIlvenna Bay, together which accounted for approximately 32% and 45% of the increase to production costs for Q3 2026 and the nine months ended September 30, 2026, respectively. The remainder relates primarily to increases at Lamaque, due to increased volumes produced, higher maintenance costs and deepening the production centre of the Triangle Mine, and at Olympias due to higher labour, contractor and materials costs as well as higher volumes sold.

Production costs include royalty expense, which increased to $31.8 million in Q3 2026 from $28.8 million in Q3 2025 and increased to $115.7 million in the nine months ended September 30, 2026 from $79.6 million in the nine months ended September 30, 2025. Increases in both periods were due to higher average realized gold prices and higher royalty rates, partially offset by lower volumes sold.

Total cash costs(5) averaged $1,415 per ounce sold in Q3 2026, an increase from $1,195 in Q3 2025, and $1,438 in the nine months ended September 30, 2026 from $1,134 in the nine months ended September 30, 2025. The increases in both the three and nine-month periods were primarily due to higher production costs and lower volumes sold, partially offset by higher costs allocated to by-products.

AISC per ounce sold(5) averaged $2,050 in Q3 2026, an increase from $1,679 in Q3 2025, and $1,974 in the nine months ended September 30, 2026 from $1,583 in the nine months ended September 30, 2025. The increases in both periods were driven by higher total cash costs, higher sustaining capital expenditures and lower volumes sold.

The Company reported net earnings attributable to shareholders from continuing operations of $118.0 million ($0.45 earnings per share) in Q3 2026 compared to net earnings of $56.5 million ($0.28 earnings per share) in Q3 2025 and net earnings of $427.2 million ($1.80 earnings per share) in the nine months ended September 30, 2026 compared to net earnings of $267.5 million ($1.31 earnings per share) in the nine months ended September 30, 2025. The increase in net earnings in both periods were driven by higher average realized gold prices, foreign exchange gains and lower depreciation, partially offset by lower volumes sold, higher production costs and higher income tax expense.

Adjusted net earnings(5) was $127.0 million ($0.49 adjusted earnings per share) in Q3 2026 compared to adjusted net earnings of $82.3 million ($0.41 adjusted earnings per share) in Q3 2025. Adjustments of non-recurring items in Q3 2026 include a $7.4 million loss on foreign exchange translation of deferred tax balances and a $4.0 million unrealized gain on derivative instruments.

Adjusted net earnings(5) was $451.9 million ($1.91 adjusted earnings per share) in the nine months ended September 30, 2026 compared to adjusted net earnings of $228.8 million ($1.12 adjusted earnings per share) in the nine months ended September 30, 2025. Adjustments of non-recurring items in the nine months ended September 30, 2026 include a reversal of $100.6 million of unrealized losses on derivative instruments, a $97.6 million realized loss on gold and copper commodity swaps relating to the Term Facility, a $41.5 million loss on foreign exchange due to the translation of deferred tax balances, a $47.4 million gain on deferred tax due to changes in the Turkish corporate income tax rate, and a $21.3 million expense relating to acquisition and integration costs.

(5) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.

Quarterly Operations Update

  3 months ended September 30, 9 months ended September 30,
    2026   2025   2026   2025
Consolidated        
Gold produced (oz)(3)   106,351   115,190   311,325   364,852
Gold sold (oz)(4)   107,164   116,529   310,474   364,281
Production costs(5) $199.8 $164.1 $572.8 $474.6
Total cash costs ($/oz sold)(1,2) $1,415 $1,195 $1,438 $1,134
All-in sustaining costs ($/oz sold)(1,2) $2,050 $1,679 $1,974 $1,583
Sustaining capital expenditures(2) $52.1 $38.3 $120.0 $115.2
Kisladag        
Gold produced (oz)   22,713   37,184   70,160   127,561
Gold sold (oz)   21,274   37,300   68,974   126,928
Production costs $51.1 $50.1 $149.4 $150.3
Total cash costs ($/oz sold)(1,2) $2,328 $1,309 $2,072 $1,152
All-in sustaining costs ($/oz sold)(1,2) $2,832 $1,545 $2,396 $1,324
Sustaining capital expenditures(2) $9.2 $7.3 $18.3 $16.0
Lamaque        
Gold produced (oz)   52,748   46,823   147,394   137,901
Gold sold (oz)   55,475   46,013   150,142   137,665
Production costs $50.5 $36.0 $136.5 $107.9
Total cash costs ($/oz sold)(1,2) $897 $767 $889 $772
All-in sustaining costs ($/oz sold)(1,2) $1,436 $1,199 $1,335 $1,270
Sustaining capital expenditures(2) $29.4 $19.2 $65.7 $67.3
Efemcukuru        
Gold produced (oz)   17,073   17,586   50,486   57,986
Gold sold (oz)   15,908   20,031   49,426   58,600
Production costs $33.8 $32.3 $110.1 $85.5
Total cash costs ($/oz sold)(1,2) $1,928 $1,522 $2,013 $1,405
All-in sustaining costs ($/oz sold)(1,2) $2,313 $1,791 $2,356 $1,674
Sustaining capital expenditures(2) $5.8 $4.9 $16.1 $14.3
Olympias        
Gold produced (oz)   13,430   13,597   42,874   41,404
Gold sold (oz)   14,127   13,185   41,552   41,088
Production costs $56.0 $45.8 $168.4 $130.9
Total cash costs ($/oz sold)(1,2) $1,493 $1,869 $1,688 $1,910
All-in sustaining costs ($/oz sold)(1,2) $2,067 $2,421 $2,199 $2,367
Sustaining capital expenditures(2) $7.6 $6.9 $19.9 $17.6

(1)   Includes costs allocated to by-products.
(2)   These financial measures or ratios are non-IFRS financial measures or ratios. See the section ‘Non-IFRS and Other Financial Measures and Ratios’ of our MD&A for explanations and discussions of these non-IFRS financial measures or ratios.   
(3)   Includes 387 and 411 pre-commercial gold ounces produced at McIlvenna Bay for the three and nine months ended September 30, 2026 respectively.
(4)   Includes 380 pre-commercial gold ounces sold at McIlvenna Bay for the three and nine months ended September 30, 2026.
(5)   Includes $8.4 million of pre-commercial production costs for McIlvenna Bay for the three and nine months ended September 30, 2026.

Kisladag

Kisladag produced 22,713 ounces of gold in Q3 2026 compared to 37,184 ounces in Q3 2025, with the decrease due to lower planned grades associated with the current cutback and slower-than-planned mining progress, which delayed access to higher-grade material during the third quarter. Ore grade decreased to 0.55 grams per tonne in Q3 2026 from 0.70 grams per tonne in Q3 2025, partially offset by higher stacked tonnage, resulting in lower recoverable ounces during the quarter.

Revenue decreased to $93.1 million in Q3 2026 from $130.5 million in Q3 2025, reflecting a decrease in gold ounces sold that was partially offset by the higher average realized gold price.

Production costs increased to $51.1 million in Q3 2026 from $50.1 million in Q3 2025, driven by higher labour and contractor costs, higher maintenance and higher reagent costs for water management, offset by lower gold sales and lower royalty costs. Lower gold production and higher production costs were primarily responsible for the increase in total cash costs per ounce sold to $2,328 in Q3 2026 from $1,309 in Q3 2025.

AISC per ounce sold increased to $2,832 in Q3 2026 from $1,545 in Q3 2025, primarily due to higher cash costs per ounce sold and higher sustaining costs.

Sustaining capital expenditures were $9.2 million in Q3 2026 and $18.3 million in the nine months ended September 30, 2026, which primarily included a new 300 tonne haul truck purchase, planned equipment rebuilds (including primary crusher refurbishment), interlifts for the leach pad and geotechnical drilling. Growth capital investment of $38.9 million and $122.7 million in the three and nine months ended September 30, 2026 was primarily due to waste stripping and associated equipment costs, continued construction of the North Heap Leach Pad (“NHLP”) Phase 3, construction of the whole-ore agglomeration circuit and upgrades to the secondary crusher. Growth capital in the nine months ended September 30, 2026, also included one-time land purchases totalling $23.9 million required for the construction of the NHLP and North Rock Dump.

Kisladag incurred higher reagent costs as a result of increased water management activities, predominantly in the second quarter following a period of higher‑than‑average precipitation in the first half of 2026, that resulted in elevated water levels within site ponds. The Company continues to actively manage water balances across the operation, with a focus on continuing to maximize on‑site water capture and reuse in support of its sustainability objectives, and has constructed additional water storage capacity to enhance operational flexibility.

The Company continues to evaluate a pit shell based on gold price sensitivity analysis, which is expected to support further expansion into the western area of the pit and support resource expansion. New geological and metallurgical information will be incorporated into the life-of-mine optimization that will form part of the Mineral Reserve and Mineral Resource update expected in Q4 2026. As part of this optimization work, the Company expects to evaluate an investment decision on additional screening before year-end.

Progress on construction of the whole ore agglomeration circuit, which is configured to increase permeability and reduce leach time, is on track with earthworks well underway and all long-lead items procured. Commissioning and ramp-up are expected in H1 2027.

Overall, this mine optimization plan is expected to support improved sequencing of ore and waste movement, and with implementation of whole ore agglomeration, is expected to contribute to more consistent year‑over‑year operating performance and higher production over the longer term.

Lamaque

Lamaque produced 52,748 ounces of gold in Q3 2026, an increase of 13% from 46,823 ounces in Q3 2025. The increase was due to higher throughput, head grade and recoveries, benefiting from strong mill performance and ore from Ormaque following receipt of the operating authorization in March.

Revenue increased to $239.7 million in Q3 2026 from $160.7 million in Q3 2025, driven by the combination of higher gold ounces sold and higher average realized price.

Production costs increased to $50.5 million in Q3 2026 from $36.0 million in Q3 2025, reflecting higher costs and higher volume sold. As the centre of production at the Triangle Mine deepens, additional costs are incurred for haulage, equipment (including maintenance) and personnel requirements. Total cash costs per ounce sold increased to $897 in Q3 2026 from $767 in Q3 2025 due to higher production costs, including mining costs for Ormaque, and higher royalties, partially offset by higher number of ounces sold.

AISC per ounce sold was $1,436 in Q3 2026 compared to $1,199 in Q3 2025, primarily due to higher sustaining capital driven by the inclusion of the non-ramp capitalized development at Ormaque commencing from July 2026, but also impacted by higher total cash costs partially offset by higher ounces sold.

Sustaining capital expenditures of $29.4 million in Q3 2026 and $65.7 million in the nine months ended September 30, 2026 primarily included underground development (including Ormaque non-ramp underground development from July onwards), equipment rebuilds, delineation drilling and purchases. Growth capital investment of $41.5 million in Q3 2026 and $107.5 million in the nine months ended September 30, 2026 was primarily related to Ormaque development (up to the end of June, following which Ormaque non-ramp development is being reported as sustaining capital), construction of the paste plant, construction of the north basin water management structure, and continued ramp development at both the Triangle Mine and Ormaque.

Efemcukuru

Efemcukuru produced 17,073 ounces of gold in Q3 2026 compared to 17,586 ounces in Q3 2025. The decrease was primarily due to planned lower ore grade, which decreased to 4.44 grams per tonne in Q3 2026 from 4.71 grams per tonne in Q3 2025, partially offset by higher mill throughput and recovery.

Revenue decreased to $72.8 million in Q3 2026 from $77.8 million in Q3 2025. The decrease was driven by lower gold ounces sold impacted by a concentrate shipment delayed to October, partially offset by higher average realized gold prices.

Production costs increased to $33.8 million in Q3 2026 from $32.3 million in Q3 2025, primarily due to higher royalty expense as a result of higher gold prices, as well as increased labour and maintenance costs. On a per ounce sold basis, higher royalties and direct operating costs combined with lower gold sold resulted in an increase to total cash costs per ounce sold to $1,928 in Q3 2026 from $1,522 in Q3 2025.

AISC per ounce sold increased to $2,313 in Q3 2026 from $1,791 in Q3 2025, primarily due to lower gold ounces sold, slightly higher total cash costs and slightly higher sustaining capital expenditures.

Sustaining capital expenditures of $5.8 million in Q3 2026 and $16.1 million in the nine months ended September 30, 2026 were primarily underground development and equipment rebuilds. Growth capital investment of $9.4 million in Q3 2026 and $17.6 million in the nine months ended September 30, 2026 related to development costs at Bati, portal development at Kokarpinar, construction of a water pond and mine rock storage facility, and equipment purchases.

Olympias

Olympias produced 13,430 ounces of gold in Q3 2026 compared to 13,597 ounces in Q3 2025, driven by lower gold grades, partially offset by higher mill throughput combined with a stable ore blend and flotation performance which resulted in increased metal recoveries. Grades were lower than planned as a result of material with elevated lead and zinc content that had been expected to be processed during the third quarter and was stockpiled and is expected to be blended through a controlled blending program during the fourth quarter to maintain process stability and optimize recoveries.

Revenue increased to $96.7 million in Q3 2026 from $65.8 million in Q3 2025, due to the higher average realized gold price, higher by-product sales on higher production, and higher gold ounces sold.

Production costs increased to $56.0 million in Q3 2026 from $45.8 million in Q3 2025 driven by higher labour costs and royalties as a result of higher gold prices combined with higher metal volumes sold. On a per ounce sold basis, higher by-product credits and modestly higher ounces sold, partially offset by higher direct operating costs and higher royalties, decreased total cash costs per ounce sold to $1,493 in Q3 2026 from $1,869 in Q3 2025.

AISC per ounce sold decreased to $2,067 in Q3 2026 from $2,421 in Q3 2025 primarily due to lower total cash costs and slightly higher gold ounces sold.

Sustaining capital expenditures of $7.6 million in Q3 2026 and $19.9 million in the nine months ended September 30, 2026 primarily included underground development, underground resource classification drilling, upgraded underground electrical and ventilation control, filter press refurbishment, and mobile mining equipment rebuilds and purchases. Growth capital investment of $15.3 million in Q3 2026 and $37.7 million in the nine months ended September 30, 2026 was primarily related to the mill expansion project and to a lesser extent, underground development and equipment purchases.

At Olympias, production has stabilized over the past four quarters, with flotation recoveries returning to modelled levels. Completion of the 650 ktpa expansion, including the new greenfield infrastructure (commissioning of the tower mill, gold thickener, zinc filter and flotation circuit extension), is ongoing. The final circuit tie-ins will require a full plant shutdown which is expected in Q1 2027, with ramp‑up to nameplate capacity anticipated in H1 2027.

For further information on the Company’s operating results for the third quarter of 2026, please see the Company’s MD&A filed on SEDAR+ at www.sedarplus.com under the Company’s profile.

Conference Call

A conference call to discuss the details of the Company’s Third Quarter 2026 Results will be held by senior management on Thursday, October 29, 2026 at 9:00 AM ET (6:00 AM PT). The call will be webcast and can be accessed at Eldorado’s website: www.eldoradogold.com or via this link:
https://event.choruscall.com/mediaframe/webcast.html?webcastid=XFFI5roL

Participants may elect to pre-register for the conference call via this link: https://dpregister.com/sreg/10211449/104b751968a

Upon registration, participants will receive a calendar invitation by email with dial in details and a unique PIN. This will allow participants to bypass the operator queue and connect directly to the conference. Registration will remain open until the end of the conference call.

Conference Call Details   Replay (available until December 10, 2026)
Date: October 29, 2026   Vancouver: +1 412 317 0088
Time: 9:00 AM ET (6:00 AM PT)   Toll Free: +1 855 669 9658
Dial in: +1 647 846 2782   Access code: 4538447
Toll free: +1 833 752 3325      


About Eldorado

Eldorado is a gold, copper and base metals producer with mining, development and exploration operations in Canada, Greece and Turkiye. The Company has a highly skilled and dedicated workforce, safe and responsible operations, a portfolio of high-quality assets, and long-term partnerships with local communities. Eldorado’s common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).

Contact

Investor Relations

Lynette Gould, VP, Investor Relations, Communications & External Affairs
647 271 2827 or 1 888 353 8166
lynette.gould@eldoradogold.com

Media

Chad Pederson, Director, Communications and Public Affairs
236 885 6251 or 1 888 353 8166
chad.pederson@eldoradogold.com

Non-IFRS and Other Financial Measures and Ratios

Certain non-IFRS financial measures and ratios are included in this news release, including earnings before interest, taxes, depreciation and amortization (“EBITDA”), adjusted earnings before interest, taxes, depreciation and amortization (“Adjusted EBITDA”), adjusted net earnings/(loss) attributable to shareholders, adjusted net earnings/(loss) per share attributable to shareholders, total cash costs and total cash costs per ounce sold, all-in sustaining costs (“AISC”) and AISC per ounce sold, sustaining and growth capital, average realized gold price per ounce sold, free cash flow, free cash flow excluding Skouries and McIlvenna Bay, and cash flow from operating activities before changes in working capital.

Please see the September 30, 2026 MD&A for explanations and discussion of these non-IFRS and other financial measures and ratios. The Company believes that these measures and ratios, in addition to conventional measures and ratios prepared in accordance with International Financial Reporting Standards (“IFRS”), provide investors an improved ability to evaluate the performance of our gold mining operations and its ability to generate positive cash flow. These non-IFRS and other financial measures and ratios are intended to provide additional information and should not be considered in isolation or as a substitute for measures or ratios of performance prepared in accordance with IFRS. These measures and ratios do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers.

We believe that our use of total cash costs per ounce sold and all-in sustaining costs per ounce sold will assist analysts, investors and other stakeholders of the Company in understanding the costs associated with producing gold, assessing our operating performance, and our ability to generate free cash flow from gold operations. Due to the capital-intensive nature of the industry and the long useful lives over which these assets are depreciated, there can be a significant timing difference between net earnings calculated in accordance with IFRS and the amount of free cash flow that is generated by a mine, and therefore we believe these measures are useful non-IFRS operating metrics and supplement our IFRS disclosures. These measures are not representative of all of our cash expenditures as they do not include income tax payments, interest costs or dividend payments. These measures do not include depreciation or amortization. Certain additional disclosures for these and other financial measures and ratios have been incorporated by reference and can be found in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the September 30, 2026 MD&A available on SEDAR+ at www.sedarplus.com and on the Company’s website under the ‘Investors’ section.

EBITDA, Adjusted EBITDA

Our reconciliation of EBITDA and Adjusted EBITDA to earnings from continuing operations before income tax, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Earnings before income tax(1) $209.4   $110.1   $683.3   $324.6  
Depreciation and amortization(2)   59.2     63.3     168.3     190.4  
Interest income   (2.5 )   (8.6 )   (15.6 )   (25.8 )
Finance costs   13.5     8.2     37.7     21.1  
EBITDA $279.6   $173.1   $873.7   $510.3  
Realized loss on gold and copper derivative instruments   —     —     97.6     —  
Unrealized (gain) loss on derivative instruments   (4.0 )   22.2     (100.6 )   66.8  
Acquisition and integration costs   0.6     —     21.3     —  
(Gain) loss on disposal of assets   (1.5 )   0.4     (0.8 )   (6.6 )
Share of loss from associate   0.5     —     0.9     —  
Loss on recognition of deferred consideration(3)   —     0.5     —     0.5  
Adjusted EBITDA $275.2   $196.3   $892.0   $571.1  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(2)   Includes depreciation within general and administrative expenses.
(3)   In Q3 2025, transaction costs of $0.5 million were recognized against the $60 million gain in Q3 2024 related to deferred consideration from the sale of the Tocantinzinho property to G Mining Ventures in 2021.

Adjusted Net Earnings Attributable to Shareholders

Our reconciliation of adjusted net earnings (loss) and adjusted net earnings (loss) per share to net earnings (loss) from continuing operations attributable to shareholders of the Company, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Net earnings attributable to shareholders of the Company(1) $ 118.0   $ 56.5   $ 427.2   $ 267.5  
Loss (gain) on foreign exchange translation of deferred tax balances   7.4     3.7     41.5     (22.6 )
Decrease (increase) in fair value of redemption option derivatives   3.7     (0.7 )   11.0     (8.6 )
Realized loss on gold and copper derivative instruments   —     —     97.6     —  
Unrealized (gain) loss on derivative instruments   (4.0 )   22.2     (100.6 )   66.8  
Acquisition and integration costs   0.6     —     21.3     —  
Gain on deferred tax due to changes in tax rates   —     —     (47.4 )   —  
Tax recovery on recognition of deferred tax asset   —     —     —     (73.5 )
Discount on sale of marketable securities   —     —     (0.1 )   5.1  
Gain on sale of mining licenses   —     —     —     (6.5 )
Share of loss from associate   0.5     —     0.9     —  
Loss on deferred consideration, net of tax(2)   —     0.5     —     0.5  
Tax effect on adjustments   0.9     —     0.7     —  
Total adjusted net earnings $ 127.0   $ 82.3   $ 451.9   $ 228.8  
Weighted average shares outstanding (thousands)   260,942     202,743     236,945     204,130  
Adjusted net earnings per share ($/share) $ 0.49   $ 0.41   $ 1.91   $ 1.12  

(1)  2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(2)  In Q3 2025, transaction costs of $0.5 million were recognized against the $60 million gain in Q3 2024 related to deferred consideration from the sale of the Tocantinzinho property to G Mining Ventures in 2021.

Reconciliation of Total Cash Costs, Total Cash Cost per Ounce Sold, AISC, and AISC per Ounce Sold to Production Costs

Our reconciliation of total cash costs, total cash costs per ounce sold, AISC, and AISC per Ounce Sold to production costs, the most directly comparable IFRS measure, is presented below.

For the three months ended September 30, 2026:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total excluding McIlvenna Bay McIlvenna Bay Total
Direct operating costs $49.6   $43.6   $21.4   $44.1   $— $158.7   $9.8   $168.5  
Transportation and selling costs 0.1   0.2   3.1   2.4   — $5.9   1.3   $7.1  
Inventory change(1) (7.7 ) 2.5   (1.2 ) 1.5   — ($4.9 ) (2.7 ) ($7.6 )
Royalty expense 9.2   4.2   10.4   7.9   — $31.8   —   $31.8  
Production costs $51.1   $50.5   $33.8   $56.0   $— $191.4   $8.4   $199.8  
Costs allocated to by-products (1.6 ) (0.7 ) (3.1 ) (36.2 ) — ($41.7 )    
Treatment and refining costs(2) —   —   —   1.3   — $1.3      
Total cash costs $49.5   $49.8   $30.7   $21.1   $— $151.1      
Corporate & allocated G&A —   —   —   —   13.0 $13.0      
Exploration costs —   0.2   —   —   — $0.2      
Reclamation costs and amortization 1.5   0.2   0.3   0.5   — $2.5      
Sustaining capital 9.2   29.4   5.8   7.6   — $52.1      
All-in sustaining costs $60.3   $79.7   $36.8   $29.2   $13.0 $218.9      
Gold oz sold 21,274   55,475   15,908   14,127   —   106,784   380     107,164  
Total cash costs/oz $2,328   $897   $1,928   $1,493   $— $1,415      
AISC/oz $2,832   $1,436   $2,313   $2,067   $122 $2,050      

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.

For the nine months ended September 30, 2026:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total excluding McIlvenna Bay McIlvenna Bay Total
Direct operating costs $140.0   $124.0   $65.1   $126.5   $— $455.6   $9.8   $465.4  
Transportation and selling costs 0.5   0.4   9.2   8.1   — $18.1   1.3   $19.4  
Inventory change(1) (28.1 ) 2.2   (1.1 ) 2.1   — ($24.9 ) (2.7 ) ($27.6 )
Royalty expense 37.1   9.9   37.0   31.7   — $115.7   —   $115.7  
Production costs $149.4   $136.5   $110.1   $168.4   $— $564.4   $8.4   $572.8  
Costs allocated to by-products (6.5 ) (3.0 ) (10.6 ) (101.5 ) — ($121.7 )    
Treatment and refining costs(2) —   —   —   3.3   — $3.3      
Total cash costs $142.9   $133.4   $99.5   $70.1   $— $446.0      
Corporate & allocated G&A —   —   —   —   38.5 $38.5      
Exploration costs —   0.7   —   —   — $0.7      
Reclamation costs and amortization 4.0   0.6   0.8   1.4   — $6.9      
Sustaining capital 18.3   65.7   16.1   19.9   — $120.0      
All-in sustaining costs $165.3   $200.5   $116.5   $91.4   $38.5 $612.1      
Gold oz sold 68,974   150,142   49,426   41,552   — 310,094   380   310,474  
Total cash costs/oz $2,072   $889   $2,013   $1,688   $— $1,438      
AISC/oz $2,396   $1,335   $2,356   $2,199   $124 $1,974      

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.


For the three months ended September 30, 2025:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total
Direct operating costs $43.5   $34.3   $19.5   $38.5   $— $135.8  
Transportation and selling costs 0.2   0.1   2.4   2.4   — $5.1  
Inventory change(1) (5.8 ) (0.3 ) 2.1   (1.5 ) — ($5.5 )
Royalty expense 12.3   1.8   8.2   6.4   — $28.8  
Production costs $50.1   $36.0   $32.3   $45.8   $— $164.1  
Costs allocated to by-products (1.3 ) (0.7 ) (2.4 ) (22.7 ) — ($27.0 )
Treatment and refining costs(2) —   —   0.6   1.6   — $2.1  
Total cash costs $48.8   $35.3   $30.5   $24.6   $— $139.3  
Corporate & allocated G&A (0.3 ) —   0.3   —   15.1 $15.2  
Exploration costs —   0.6   —   —   — $0.6  
Reclamation costs and amortization 1.8   0.1   0.2   0.4   — $2.4  
Sustaining capital 7.3   19.2   4.9   6.9   — $38.3  
All-in sustaining costs $57.6   $55.2   $35.9   $31.9   $15.1 $195.7  
Gold oz sold 37,300   46,013   20,031   13,185   — 116,529  
Total cash costs/oz $1,309   $767   $1,522   $1,869   $— $1,195  
AISC/oz $1,545   $1,199   $1,791   $2,421   $129 $1,679  

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.


For the 
nine months ended September 30, 2025:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total
Direct operating costs $126.4   $101.2   $56.9   $111.5   $— $395.9  
Transportation and selling costs 0.6   0.3   7.7   6.6   — $15.2  
Inventory change(1) (12.8 ) 1.2   0.4   (5.0 ) — ($16.2 )
Royalty expense 36.2   5.1   20.4   17.9   — $79.6  
Production costs $150.3   $107.9   $85.5   $130.9   $— $474.6  
Costs allocated to by-products (4.2 ) (1.6 ) (5.7 ) (56.9 ) — ($68.4 )
Treatment and refining costs(2) —   —   2.5   4.5   — $7.0  
Total cash costs $146.2   $106.2   $82.4   $78.5   $— $413.2  
Corporate & allocated G&A 0.4   —   1.0   —   38.6 $40.1  
Exploration costs —   1.0   —   —   — $1.0  
Reclamation costs and amortization 5.4   0.2   0.5   1.1   — $7.3  
Sustaining capital 16.0   67.3   14.3   17.6   — $115.2  
All-in sustaining costs $168.0   $174.8   $98.1   $97.2   $38.6 $576.8  
Gold oz sold 126,928   137,665   58,600   41,088   —   364,281  
Total cash costs/oz $1,152   $772   $1,405   $1,910   $— $1,134  
AISC/oz $1,324   $1,270   $1,674   $2,367   $106 $1,583  

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.

Reconciliations of adjustments within AISC to the most directly comparable IFRS measures are presented below.

Reconciliation of general and administrative expenses included in All-in Sustaining Costs:

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
General and administrative expenses(from consolidated statement of operations) $11.2   $9.5   $34.5   $28.2  
Add:        
Share-based payments expense   3.8     6.8     10.2     15.3  
Less:        
Integration costs   —     —     (1.1 )   —  
Depreciation in general and administrative expenses   (0.4 )   (0.5 )   (1.4 )   (1.4 )
Business development   (0.7 )   (0.2 )   (1.8 )   (0.8 )
Development projects   (0.7 )   (0.4 )   (1.9 )   (1.3 )
Corporate and allocated general and administrative expenses per AISC $13.0   $15.2   $38.5   $40.1  


Reconciliation of exploration and evaluation costs included in All-in Sustaining Costs:

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Exploration and evaluation expense(from consolidated statement of operations)(1) $17.1   $11.0   $41.4   $25.2  
Add:        
Capitalized exploration cost related to operating gold mines   0.2     0.6     0.7     1.0  
Less:        
Exploration and evaluation expenses related to non-gold mines and other sites   (17.1 )   (11.0 )   (41.4 )   (25.2 )
Exploration and evaluation costs per AISC $0.2   $0.6   $0.7   $1.0  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.


Reconciliation of reclamation costs and amortization included in All-in Sustaining Costs:

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Asset retirement obligation accretion(from notes to the consolidated financial statements)(1) $1.6   $1.5   $4.6   $4.4  
Add:        
Depreciation related to asset retirement obligation assets   1.2     1.1     3.1     3.5  
Less:        
Asset retirement obligation accretion related to non-gold mines and other sites   (0.4 )   (0.2 )   (0.9 )   (0.7 )
Reclamation costs and amortization per AISC $2.5   $2.4   $6.9   $7.3  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.


Sustaining and Growth Capital

Our reconciliation of growth capital investment and sustaining capital expenditure at operating gold mines to additions to property, plant and equipment, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Additions to property, plant and equipment
(from segment note in the consolidated financial statements)(1)
$452.3   $255.6   $1,211.6   $669.8  
Growth and development project capital investment – gold mines   (107.6 )   (58.0 )   (293.1 )   (143.7 )
Growth and development project capital investment – other   (288.4 )   (159.5 )   (787.5 )   (408.0 )
Sustaining capital exploration   (0.2 )   (0.6 )   (0.7 )   (1.0 )
Sustaining capitalized depreciation   (2.9 )   —     (9.1 )   —  
Sustaining leases   (1.0 )   0.8     (1.2 )   (1.8 )
Sustaining capital expenditure at operating gold mines $52.1   $38.3   $120.0   $115.2  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.


Average Realized Gold Price per Ounce Sold

Our reconciliation of average realized gold price per ounce sold to revenue, the most directly comparable IFRS measure, is presented below.

For the three months ended September 30, 2026:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $93.1 $— ($1.6 ) $91.5 21,274 $4,301
Lamaque   239.7 —   (0.7 )   239.0 55,475   4,308
Efemcukuru   72.8 —   (3.1 )   69.6 15,908   4,376
Olympias   96.7 1.3   (36.2 )   61.8 14,127   4,376
McIlvenna Bay   9.6 —   (8.0 )   1.6 380   4,314
Total consolidated $511.9 $1.3 ($49.7 ) $463.5 107,164 $4,326

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


For the nine months ended September 30, 2026:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $327.4 $— ($6.5 ) $320.9 68,974 $4,653
Lamaque   682.7 —   (3.0 )   679.7 150,142   4,527
Efemcukuru   228.2 —   (10.6 )   217.5 49,426   4,401
Olympias   283.8 3.3   (101.5 )   185.6 41,552   4,467
McIlvenna Bay   9.6 —   (8.0 )   1.6 380   4,314
Total consolidated $1,531.7 $3.3 ($129.7 ) $1,405.4 310,474 $4,527

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


For the three months ended September 30, 2025:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $130.5 $ — ($1.3 ) $129.2 37,300 $3,463
Lamaque   160.7   —   (0.7 )   160.0 46,013   3,478
Efemcukuru   77.8   0.6   (2.4 )   76.0 20,031   3,794
Olympias   65.8   1.6   (21.5 )   45.8 13,185   3,473
Total consolidated $434.7 $2.1 ($25.9 ) $411.0 116,529 $3,527

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


For the nine months ended September 30, 2025:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $410.1 $ — ($ 4.2 ) $405.9 126,928 $3,198
Lamaque   447.5   —   (1.6 )   445.9 137,665   3,239
Efemcukuru   205.9   2.5   (5.7 )   202.8 58,600   3,460
Olympias   178.2   4.5   (55.2 )   127.4 41,088   3,102
Total consolidated $1,241.7 $7.0 ($ 66.7 ) $1,182.0 364,281 $3,245

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


Free Cash Flow and Free Cash Flow Excluding Skouries and McIlvenna Bay

Our reconciliations of free cash flow and free cash flow excluding Skouries and McIlvenna Bay to net cash generated from operating activities from continuing operations, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Net cash generated from operating activities(1) $134.8   $170.2   $425.7   $458.8  
Less: Cash used in investing activities   (495.7 )   (212.1 )   (1,087.1 )   (434.1 )
Less: Proceeds from sale of mining licenses   —     —     (2.0 )   (2.5 )
(Less) add: (Proceeds from sale) purchase of marketable securities   (0.3 )   14.0     (37.4 )   (141.1 )
Less: Cash received from acquisition of subsidiary   —     —     (159.1 )   —  
Add: Cash settlement of gold and copper derivative instruments   97.6     —     97.6     —  
Add: Acquisition and integration costs   0.6     —     21.3     —  
Add: Purchase of investment in associate   —     —     14.7     —  
Add: Increase in restricted cash   71.9     —     71.9     —  
Less: Cash received from deferred consideration(2)   —     (59.5 )   —     (59.5 )
Free cash flow ($191.1 ) ($87.4 ) ($654.3 ) ($178.4 )
Add: Skouries cash capital expenditures   205.9     155.9     622.6     356.2  
Add: McIlvenna Bay cash capital expenditures   68.7     —     187.9     —  
Add: Capitalized interest paid(3)   14.9     8.4     45.9     28.5  
Free cash flow excluding Skouries and McIlvenna Bay $98.3   $76.9   $202.1   $206.3  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(2)   Deferred consideration received from G Mining Ventures of $60 million, net of transaction costs of $0.5 million.
(3)   Includes interest from the Senior Notes, the Term Facility and the Sprott Credit Facility.

Cash Flow from Operating Activities before Changes in Working Capital

Our reconciliation of cash flow from operating activities before changes in working capital to net cash generated from operating activities from continuing operations, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Net cash generated from operating activities(1) $134.8 $170.2 $425.7 $458.8
Add: Changes in non-cash working capital   114.0   13.3   113.3   63.2
Cash flow from operating activities before changes in working
capital
$248.8 $183.5 $539.0 $522.0

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.

Forward-Looking Statements and Information

Certain of the statements made and information provided in this news release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as “anticipate”, “believe”, “budget”, “continue”, “commitment”, “confident”, “estimate”, “expect”, “focus”, “forecast”, “foresee”, “future”, “goal”, “guidance”, “intend”, “opportunity”, “outlook”, “plan”, “potential”, “project”, “prospective”, “schedule”, “strive”, “target”, “underway”, “working” or the negatives thereof or variations of such words and phrases or similar words or statements that certain actions, events or results “can”, “could”, “likely”, “may”, “might”, “will” or “would” be taken, occur or be achieved.

Forward-looking statements or information contained in this news release include, but are not limited to, statements or information with respect to: the Company’s 2026 outlook, including revised production guidance and timing, production ranges by metal and material property, total cash costs per ounce sold, AISC per ounce sold, sustaining capital and growth capital; the payment of the fourth quarter dividend, including the record and payable dates; continued Board service following retirement from management; our priorities to safely complete the remaining commissioning work at Skouries and McIlvenna Bay, achieve commercial production, establish stable and predictable operating performance, improve execution consistency, enhance capital discipline and balance-sheet strength, convert the investments made into stronger cash flow and per-share value, and balance debt reduction, reinvestment and shareholder returns as cash flow increases; with respect to Skouries: our expectations relating to life of mine and average annual gold, copper and gold equivalent production; expected commercial production in late Q4 2026 and projected gold and copper production; anticipated production volumes covered by concentrate agreements and additional counterparty agreements in process covering production through 2029; our capital estimate and schedule, including project capital, accelerated operational capital and expected post-commercial-production capital expenditures; expected sources and sufficiency of funding; and expected progress on construction, commissioning, optimization and performance testing activities, including completion and operation of the thickeners, filter presses, tailings handling and waste management facilities and related infrastructure, and expected timing thereof; with respect to McIlvenna Bay: our expectations relating to life of mine, resource base and average annual production; operating and ramp-up activities, including optimization of operations, increasing throughput to full design capacity and expected commercial production in Q4 2026; our expectations of exploration upside across the broader district, including the nearby Tesla Zone; inclusion of the inaugural Inferred Mineral Resource for Tesla in our annual Mineral Reserve and Mineral Resource update expected in Q4 2026; studies to evaluate material handling options and mill expansion, planned resource conversion drilling for Tesla, and an updated McIlvenna Bay Technical Report once studies and conversion drilling have been advanced; expected production amounts, operating costs and capital expenditures; expectations of a study to evaluate an expansion of the processing facility and incorporation of a silver-lead circuit, expected benefits thereof and conditions to future development; targeted commissioning of the silver-lead circuit in 2028 and the expansion in 2030; our view of the district-scale geological potential to deliver future satellite development opportunities, further expansion or a separate processing facility; and our exploration program, core scanning programs and geophysical surveys and expected benefits thereof; with respect to Kisladag: expected production from higher-grade material stacked on the North Heap Leach Pad and timing thereof, our water management objectives; our evaluation of a pit shell and expected benefits thereof; expectations relating to life-of-mine optimization to be included in the Mineral Reserve and Mineral Resource update expected in Q4 2026; expectations of an investment decision on additional screening and timing thereof; our expectations and progress of the whole ore agglomeration circuit, including expected benefits and commissioning and ramp-up in H1 2027; and our expectations of the mine optimization plan; with respect to Olympias: expected blending of stockpiled material during the fourth quarter and benefits thereof; completion of the 650 ktpa expansion, including the expected full plant shutdown in Q1 2027 and anticipated ramp-up to nameplate capacity in H1 2027; the date of the conference call on October 29, 2026; and generally our strategy, plans and goals, including our proposed exploration, development, construction, permitting, financing and operating potential, plans and priorities and related timelines and schedules.

Forward-looking statements and forward-looking information by their nature are based on a number of assumptions that management considers reasonable. However, if such assumptions prove to be inaccurate, then actual results, activities, performance, or achievements may be materially different from those described in the forward-looking statements or information. These include assumptions concerning, among other things: timing, costs and results of our construction and development activities, improvements and exploration, including at the Skouries mine, the McIlvenna Bay mine and our other operating mines and development projects; the current or future price of gold, copper and other commodities; the availability of financing for our exploration, development and operating activities and our ability to access existing project funding and remain in compliance with all covenants and contractual commitments related thereto; the geopolitical, economic, permitting and legal climate that we operate in, including recent disruptions to shipping operations in the Strait of Hormuz and Red Sea and any related shipping delays, shipping price increases, or impacts on the global energy market; availability of labour resources, including for construction, development and improvement activities; our ability to integrate the assets of Foran Mining Corporation, advance its exploration and development assets and to realize anticipated synergies and benefits therefrom; general business and economic conditions, including interest rates, inflation, commodity and power prices, credit and financial market conditions and the impact of foreign exchange rates and tax rates and related frameworks; anticipated values, costs, expenses and working capital requirements; production and metallurgical recoveries; Mineral Reserves and Mineral Resources; our ability to develop, finalize and execute on our updated five-year strategic plan through 2030; acts of governments and the outcome of any legal or regulatory proceedings or other disputes that we may be involved in; our ability to continue to make purchases under our normal course issuer bid and to pay dividends; the impact of acquisitions, dispositions, suspensions or delays on our business; our ability to manage and mitigate the risks associated with our use of technology and artificial intelligence; the expected vesting and redemption outcomes under our compensation securities; our ability to address the negative impacts of climate change and adverse weather; consistency of agglomeration and our ability to optimize it in the future; the cost of, and extent to which we use, essential consumables; the impact and effectiveness of productivity initiatives; the time and cost necessary for anticipated overhauls of equipment; expected by-product grades; the effectiveness of our hedging programs; and our ongoing relations with regulators, communities, and our partners.

More specifically, with respect to the Skouries mine and updates, we have made additional assumptions regarding: our ability to continue executing our plans relating to the Skouries mine on the estimated existing project timeline and consistent with the current planned project scope; labour productivity, rates, and expected hours; inflation rates; the timeliness of shipping for important or critical items; our ability to continue accessing our project funding and remain in compliance with all covenants and contractual commitments related thereto; our ability to obtain and maintain all required approvals and permits, both overall and in a timely manner; the absence of further previously unidentified archaeological discoveries which would delay construction of various portions of the project; the future price of gold, copper, and other commodities; and the broader community engagement and social climate in respect of the Skouries mine.

In addition, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis as exists at the time of this news release. Even though we believe that the assumptions and expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statements or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.

Forward-looking statements or information contained in this news release are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements or information, including, but not limited to: commodity price risk; construction and development risks at the Skouries mine, the McIlvenna Bay mine and our other construction and development projects; changing political, economic and social conditions, including changes in governments, political systems or political dynamics, ongoing market uncertainty and global or regional geopolitical events, conflicts or disruptions; risks relating to our operations in foreign jurisdictions; risks relating to production and processing; risks relating to our improvement projects; risks relating to our ability to integrate the assets of Foran Mining Corporation, advance its exploration and development assets and realize anticipated synergies and benefits therefrom on the timelines expected or at all; delays and risks relating to surface construction, commissioning activities, ramp-up, and commercial production at McIlvenna Bay; our ability to obtain reliable supplies of power and water at a reasonable cost; risks relating to prices of commodities and consumables; our reliance on significant amounts of critical equipment; our reliance on infrastructure, commodities and consumables, including risks from volatility and inflationary pressures as a result from the ongoing international conflict in Iran; inflation risk; risks relating to fluctuations in the currency markets, including the Euro, Turkish lira, Canadian dollar and United States dollar; risks relating to community relations, social license and our ability to obtain or maintain required permits; risks relating to environmental matters and environmental monitoring and reporting; geotechnical and hydrogeological structures, conditions or failures, including our ability to completely understand such structures to deal with pre-existing mineralogical, topographical or predecessor activities on or near our sites and to mitigate such conditions or failures at a reasonable cost or at all; regulatory requirements as they relate to mine plan approvals; compliance with the Extractive Sector Transparency Measures Act (Canada); waste disposal; mineral tenure; risks relating to permits, licenses and other authorizations, including our ability to obtain, maintain, and comply with the terms and conditions of such permits, licenses and other authorizations; risks relating to non-governmental organizations; reputational issues; risks relating to climate change, including risks relating to forest fires and water management; water collection, treatment and disposal operations at our mines, including the ability to manage unexpectedly large quantities of water; risk of spills or failure from our tailings operations (including circumstances beyond our control such as extreme weather, seismic events, prolonged droughts or heavy rainfall); environmental risks from our heap leaching operations, including hazardous materials management of our use of cyanide; risks relating to change of control or actions of activist shareholders; estimation of Mineral Reserves and Mineral Resources; risks relating to replacement of Mineral Reserves; regulatory reviews and different standards used to prepare and report Mineral Reserves and Mineral Resources; risks relating to any pandemic, epidemic, endemic or similar public health threats; risks relating to our use of regulated substances; risks relating to acquisitions, including integration risks, and dispositions; risks relating to co-ownership of our properties; risks relating to volatility, volume fluctuations, and dilution risk in respect of our shares; competition risks; reliance on a limited number of smelters, refiners and off-takers, including risks related to accessibility, availability, proximity, and capacity of smelters, refiners and off-takers; information and operational technology systems; liquidity and financing risks; indebtedness, including current and future operating restrictions, implications of a change of control, ability to meet debt service obligations, the implications of defaulting on obligations and changes in credit ratings; risks relating to total cash costs per ounce and all in sustaining costs, including in relation to the market price of gold and the Company’s profitability; interest rate risk; credit risk; tax matters; financial reporting, including relating to the carrying value of our assets and changes in reporting standards; the global economic environment; labour risks (including availability of labour resources, including for construction, development and improvement activities, and labour productivity); and risks relating to employee/union relations, employee and contractor misconduct, key personnel, skilled workforce, expatriates and contractors, reclamation and long-term obligations; turnover and attrition rates of labour, and related impacts thereof; the unavailability of insurance; risks relating to title and surface rights; risks relating to environmental, sustainability, health and safety, and governance matters; technology and cybersecurity risks; corruption, bribery, and sanctions; litigation and contracts, including counterparty risk; conflicts of interest; compliance with applicable laws, regulations, stock exchange rules and permitting requirements and the consequences of non-compliance, including suspension, substantial alteration or termination of our development activities or operations, monetary penalties or criminal proceedings in various jurisdictions; risks relating to tariffs and other trade barriers; and those risk factors discussed in the section titled “Risk Factors in Our Business” in the Company’s most recent Annual Information Form and Form 40-F. The reader is directed to carefully review our most recent Annual Information Form, Form 40-F and other regulatory filings filed on SEDAR+ and EDGAR under our Company name for a fuller understanding of the risks and uncertainties that affect the Company’s business and operations.

With respect to the Skouries mine, these risks, uncertainties and other factors may cause further delays in the completion of the construction and commissioning at the Skouries mine which in turn may cause delays in the commencement of production and further increases to the costs of the Skouries mine. The specific risks, uncertainties and other factors include, among others: our ability to efficiently manage the transitions from construction to commissioning to operations (including EPCM performance and owner team turnover); our ability to increase productivity by, among other things, adding or modifying labour shifts; rising labour costs or costs of key inputs such as materials, power and fuel; risks related to any unanticipated critical equipment defects or failures during the commissioning and ramp-up of operations; risks related to third-party contractors, including reduced control over aspects of the Company’s operations, and/or the ability of contractors to perform at required levels and according to baseline schedules, costs of any engineering rework and any commercial disputes that may arise from a contractor’s failure to meet these requirements; the ability of key suppliers to meet key contractual commitments in terms of schedules, amount of product delivered, cost, or quality and the impact of any vendor data errors; impacts to overhead costs related to the schedule; our ability to construct key infrastructure within the required timelines, including the process plant, filter plant, substation, waste management facilities, embankments, tailings conveyors, and water management infrastructure; the timely receipt of necessary permits and authorizations and our ability to comply with the terms of existing and future permits and authorizations; differences between projected and actual degree of pre-strip required in the open pit; variability in metallurgical recoveries and concentrate quality due to factors such as extent and intensity of oxidation or presence of transition minerals; presence of additional structural features impacting hydrological and geotechnical considerations; variability in minerals or presence of substances that may have an impact on filtered tails performance and resulting bulk density of stockpiles or filtered tails; distribution of sulfides that may dilute concentrate and change the characteristics of tailings; unexpected disruptions to operations including protests, non-routine regulatory inspections, road conditions, on site or labour unrest; unexpected inclement weather and climate events, including wildfires, short and long duration rainfall and floods and other extreme weather events and our site’s ability to respond to those events; our ability to meet pre-commercial producing mining or underground development targets; unexpected results from underground stopes; new archaeological discoveries requiring the completion of a regulatory process; changes in support from local communities; and our ability to meet the expectations of communities, governments, and stakeholders related to the Skouries mine. Our project capital and accelerated operational capital costs at Skouries are incurred primarily in Euros but are reported in US dollars and are therefore sensitive to fluctuations in the EUR/USD exchange rate.

The inclusion of forward-looking statements and information is designed to help you understand management’s current views of our near- and longer-term prospects, and it may not be appropriate for other purposes. There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company’s business contained in the Company’s reports filed with the securities regulatory authorities in Canada and the United States. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein.

Qualified Persons and Disclosure of Mineral Resources

Except as otherwise noted, Simon Hille, FAusIMM, Executive Vice President and Chief Operating Officer, is the Qualified Person under NI 43-101 responsible for preparing and supervising the preparation of the scientific and technical information contained in this news release and verifying the technical data disclosed in this document relating to our operating mines and development projects.

Jessy Thelland, géo (OGQ No. 758), a member in good standing of the Ordre des Géologues du Québec, is the qualified person as defined in NI 43-101 responsible for, and has verified and approved, the scientific and technical disclosure contained in this news release for the Quebec projects.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves.

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Financial Position                                  
As at September 30, 2026 and December 31, 2025
(Unaudited – in thousands of U.S. dollars)

  Note   September 30, 2026   December 31, 2025
           
ASSETS          
Current assets          
Cash and cash equivalents     $ 396,828     $ 869,356  
Restricted cash 8     71,898       —  
Accounts receivable and other 5     219,086       279,212  
Inventories 6     475,726       297,165  
Current derivative assets 17     845       2,051  
        1,164,383       1,447,784  
Deferred tax assets       45,421       37,076  
Other assets 7     86,112       144,479  
Investment in associate       123,275       109,423  
Non-current derivative assets 17     7,848       10,380  
Property, plant and equipment       8,651,071       4,885,564  
Goodwill 4     538,772       92,591  
      $ 10,616,882     $ 6,727,297  
LIABILITIES & EQUITY          
Current liabilities          
Accounts payable and accrued liabilities     $ 658,294     $ 630,310  
Current portion of lease liabilities       5,547       6,024  
Current portion of debt 8     148,472       47,968  
Current portion of asset retirement obligation       5,866       7,886  
Current derivative liabilities 17     4,441       96,879  
        822,620       789,067  
Debt 8     1,836,954       1,227,084  
Lease liabilities       8,656       8,575  
Employee benefit plan obligation       14,514       13,747  
Asset retirement obligation       139,709       135,071  
Non-current derivative liabilities 17     4,068       16,254  
Deferred income tax liabilities       823,664       254,420  
        3,650,185       2,444,218  
Equity          
Share capital 13     5,701,273       3,341,760  
Shares held in trust for restricted share units 13     (18,960 )     (16,035 )
Contributed surplus       2,492,172       2,537,197  
Accumulated other comprehensive loss       (31,156 )     (11,553 )
Deficit       (1,179,293 )     (1,572,080 )
Total equity attributable to shareholders of the Company       6,964,036       4,279,289  
Attributable to non-controlling interests       2,661       3,790  
        6,966,697       4,283,079  
      $ 10,616,882     $ 6,727,297  

Commitments and contractual obligations (Note 16)
Events after the reporting date (Note 13(b))

Approved on behalf of the Board of Directors

(signed) Teresa Conway               Director                        (signed) Christian Milau        Director

Date of approval: October 28, 2026


Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Operations         
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars except share and per share amounts)  

      Three months ended   Nine months ended
      September 30,   September 30,
  Note     2026       2025       2026       2025  
Revenue                  
Metal sales 9   $ 511,860     $ 434,727     $ 1,531,744     $ 1,241,696  
                   
Cost of sales                  
Production costs       199,821       164,140       572,822       474,609  
Depreciation and amortization       58,722       62,829       166,959       188,961  
        258,543       226,969       739,781       663,570  
                   
Earnings from mine operations       253,317       207,758       791,963       578,126  
                   
Exploration and evaluation expenses       17,116       10,975       41,408       25,218  
Mine standby costs       6,318       6,465       17,082       15,252  
General and administrative expenses       11,177       9,503       34,462       28,191  
Share-based payments expense 14     3,763       6,802       10,197       15,347  
Write-down of assets       1,569       3,261       2,672       8,426  
Foreign exchange (gain) loss       (4,029 )     32       (38,262 )     24,840  
Acquisition costs 4     89       —       19,253       —  
Earnings from operations       217,314       170,720       705,151       460,852  
                   
Other income (expense) 10     5,613       (52,406 )     15,821       (115,145 )
Finance costs 11     (13,531 )     (8,221 )     (37,660 )     (21,134 )
Earnings from continuing operations before income tax       209,396       110,093       683,312       324,573  
Income tax expense 12     91,605       53,917       257,114       54,604  
Net earnings from continuing operations       117,791       56,176       426,198       269,969  
Net loss from discontinued operations, net of tax       —       (1,122 )     —       (6,578 )
Net earnings for the period     $ 117,791     $ 55,054     $ 426,198     $ 263,391  
                   
Net earnings (loss) attributable to:                  
Shareholders of the Company       117,954       56,027       427,150       266,438  
Non-controlling interests       (163 )     (973 )     (952 )     (3,047 )
Net earnings for the period     $ 117,791     $ 55,054     $ 426,198     $ 263,391  
                   
Net earnings (loss) attributable to shareholders of the Company:                  
Continuing operations       117,954       56,540       427,150       267,522  
Discontinued operations       —       (513 )     —       (1,084 )
      $ 117,954     $ 56,027     $ 427,150     $ 266,438  
                   
Net (loss) earnings attributable to non-controlling interests:                  
Continuing operations       (163 )     (364 )     (952 )     2,447  
Discontinued operations       —       (609 )     —       (5,494 )
      $ (163 )   $ (973 )   $ (952 )   $ (3,047 )
                   
Weighted average number of shares outstanding:                  
Basic 13     260,941,591       202,742,582       236,944,753       204,129,778  
Diluted 13     263,448,182       205,150,042       239,640,842       206,247,722  
                   
Net earnings per share attributable to shareholders of the Company:                  
Basic earnings per share     $ 0.45     $ 0.28     $ 1.80     $ 1.31  
Diluted earnings per share     $ 0.45     $ 0.27     $ 1.78     $ 1.29  
                   
Net earnings per share attributable to shareholders of the Company – Continuing operations:                  
Basic earnings per share     $ 0.45     $ 0.28     $ 1.80     $ 1.31  
Diluted earnings per share     $ 0.45     $ 0.28     $ 1.78     $ 1.30  

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Comprehensive Income
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars)

      Three months ended   Nine months ended
      September 30,   September 30,
        2026       2025       2026       2025  
                   
Net earnings for the period     $ 117,791     $ 55,054     $ 426,198     $ 263,391  
Other comprehensive (loss) income:                  
Items that will not be reclassified to earnings or loss:                  
Change in fair value of investments in marketable securities       (135 )     32,584       60       62,521  
Income tax expense on change in fair value of investments in marketable securities       —       (4,388 )     (31 )     (8,394 )
Actuarial gain (loss) on employee benefit plans       370       (359 )     142       61  
Income tax expense on employee benefit plans       (89 )     (32 )     (34 )     (133 )
Total other comprehensive income for the period       146       27,805       137       54,055  
Total comprehensive income for the period     $ 117,937     $ 82,859     $ 426,335     $ 317,446  
                   
Total comprehensive income (loss) attributable to:                  
Shareholders of the Company       118,100       83,832       427,287       320,493  
Non-controlling interests       (163 )     (973 )     (952 )     (3,047 )
      $ 117,937     $ 82,859     $ 426,335     $ 317,446  

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Cash Flows
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars)

      Three months ended   Nine months ended
      September 30,   September 30,
  Note     2026       2025       2026       2025  
Cash flows generated from (used in):                  
Operating activities                  
Net earnings from continuing operations     $ 117,791     $ 56,176     $ 426,198     $ 269,969  
Adjustments for:                  
Depreciation and amortization       59,170       63,342       168,317       190,374  
Finance costs 11     13,531       8,221       37,660       21,134  
Interest income 10     (2,505 )     (8,561 )     (15,598 )     (25,782 )
Share of loss from associate       525       —       880       —  
Unrealized foreign exchange (gain) loss       (4,413 )     (694 )     (32,661 )     23,991  
Income tax expense 12     91,605       53,917       257,114       54,604  
(Gain) loss on disposal of assets       (1,453 )     441       (842 )     (6,618 )
Unrealized (gain) loss on derivative contracts 10     (4,028 )     22,194       (100,627 )     66,844  
Write-down of assets       1,569       3,261       2,672       8,426  
Share-based payments expense 14     3,763       6,802       10,197       15,347  
Employee benefit plan expense       1,424       719       3,742       2,820  
        276,979       205,818       757,052       621,109  
Property reclamation payments       (1,683 )     (1,284 )     (4,078 )     (3,688 )
Employee benefit plan payments       (691 )     (298 )     (1,756 )     (1,087 )
Income taxes paid       (28,310 )     (29,316 )     (227,796 )     (120,136 )
Interest received       2,505       8,561       15,598       25,782  
Changes in non-cash operating working capital 15     (113,988 )     (13,273 )     (113,273 )     (63,194 )
Net cash generated from operating activities of continuing operations       134,812       170,208       425,747       458,786  
Net cash (used in) generated from operating activities of discontinued operations       —       (151 )     —       158  
Investing activities                  
Additions to property, plant and equipment       (429,103 )     (242,517 )     (1,210,017 )     (592,207 )
Capitalized interest paid       (14,879 )     (8,437 )     (45,943 )     (28,457 )
Cash from acquisition of Foran Mining Corporation, net of cash paid 4     —       —       159,110       —  
Proceeds from the sale of property, plant and equipment       2,158       244       4,539       3,224  
Purchase of investment in associate       —       —       (14,731 )     —  
Value added taxes related to mineral property expenditures, net       23,445       (5,954 )     68,161       (7,005 )
Cash received from deferred consideration       —       60,000       —       60,000  
Sale (purchase) of investments in marketable securities       287       (13,961 )     37,359       141,117  
Increase in deposits and other investments       (5,707 )     (1,484 )     (13,716 )     (10,750 )
Increase in restricted cash 8     (71,877 )     —       (71,877 )     —  
Net cash used in investing activities of continuing operations       (495,676 )     (212,109 )     (1,087,115 )     (434,078 )
Financing activities                  
Issuance of common shares for cash, net of share issuance costs       2,755       1,575       6,546       9,102  
Net contributions from (distributions to) non-controlling interests       —       53       (177 )     (264 )
Net proceeds from Skouries Project Financing Facility 8     14,630       98,549       47,237       288,314  
Proceeds from Credit Facility, net of transaction costs 8     222,983       —       322,983       —  
Net (repayments) proceeds from other debt 8     (217 )     —       2,469       —  
Term Facility commitment fees       —       —       (474 )     (1,372 )
Dividends paid 13     (19,619 )     —       (54,103 )     —  
Interest paid       (13,165 )     (9,174 )     (28,611 )     (19,601 )
Principal portion of lease liabilities       (1,402 )     (1,401 )     (3,931 )     (3,927 )
Purchase of shares for cancellation 13     —       (78,793 )     (83,895 )     (123,381 )
Purchase of shares held in trust for restricted share units 13     —       (3,955 )     (8,683 )     (8,181 )
Net cash generated from financing activities of continuing operations       205,965       6,854       199,361       140,690  
Effect of exchange rates on cash and cash equivalents       (2,835 )     410       (10,521 )     21,740  
Net (decrease) increase in cash and cash equivalents       (157,734 )     (34,788 )     (472,528 )     187,296  
Cash and cash equivalents – beginning of period       554,562       1,078,572       869,356       856,797  
Change in cash in disposal group held for sale       —       151       —       (158 )
Cash and cash equivalents – end of period     $ 396,828     $ 1,043,935     $ 396,828     $ 1,043,935  

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Changes in Equity
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars)

    Three months ended   Nine months ended
    September 30,   September 30,
  Note   2026       2025       2026       2025  
Share capital                
Balance beginning of period   $ 5,695,878     $ 3,423,439     $ 3,341,760     $ 3,433,778  
Shares issued upon exercise of share options     2,755       1,502       6,546       9,913  
Shares issued upon exercise of performance share units     1,459       —       4,545       5,282  
Shares issued upon acquisition of Foran Mining Corporation 4   —       —       2,385,625       —  
Transfer of contributed surplus on exercise of options     1,181       565       2,847       3,749  
Shares repurchased and cancelled, net of tax     —       (42,467 )     (40,050 )     (68,872 )
Shares repurchased and not yet cancelled     —       (3,892 )     —       (3,892 )
Share issuance costs     —       —       —       (811 )
Balance end of period 13 $ 5,701,273     $ 3,379,147     $ 5,701,273     $ 3,379,147  
                 
Shares held in trust for restricted share units                
Balance beginning of period   $ (19,087 )   $ (9,162 )   $ (16,035 )   $ (12,970 )
Shares purchased and held in trust for restricted share units     —       (3,954 )     (8,683 )     (8,180 )
Shares released for settlement of restricted share units     127       225       5,758       8,259  
Balance end of period 13 $ (18,960 )   $ (12,891 )   $ (18,960 )   $ (12,891 )
                 
Contributed surplus                
Balance beginning of period   $ 2,493,742     $ 2,583,047     $ 2,537,197     $ 2,612,762  
Shares repurchased and cancelled     —       (33,876 )     (42,907 )     (52,950 )
Share-based payment arrangements     1,197       3,055       7,936       8,914  
Option consideration on acquisition of Foran Mining Corporation 4   —       —       3,096       —  
Shares redeemed upon exercise of restricted share units     (127 )     (225 )     (5,758 )     (8,259 )
Shares redeemed upon exercise of performance share units     (1,459 )     —       (4,545 )     (5,282 )
Transfer to share capital on exercise of options     (1,181 )     (565 )     (2,847 )     (3,749 )
Balance end of period   $ 2,492,172     $ 2,551,436     $ 2,492,172     $ 2,551,436  
                 
Accumulated other comprehensive (loss) income                
Balance beginning of period   $ (31,302 )   $ (21,070 )   $ (11,553 )   $ 56,183  
Other comprehensive income for the period attributable to shareholders of the Company     146       27,805       137       54,055  
Reclassification on derecognition of investments in marketable securities     —       —       (19,740 )     (103,503 )
Balance end of period   $ (31,156 )   $ 6,735     $ (31,156 )   $ 6,735  
                 
Deficit                
Balance beginning of period   $ (1,277,628 )   $ (1,879,249 )   $ (1,572,080 )   $ (2,193,163 )
Dividends paid 13   (19,619 )     —       (54,103 )     —  
Net earnings attributable to shareholders of the Company     117,954       56,027       427,150       266,438  
Reclassification on derecognition of investments in marketable securities     —       —       19,740       103,503  
Balance end of period   $ (1,179,293 )   $ (1,823,222 )   $ (1,179,293 )   $ (1,823,222 )
Total equity attributable to shareholders of the Company   $ 6,964,036     $ 4,101,205     $ 6,964,036     $ 4,101,205  
                 
Non-controlling interests                
Balance beginning of period   $ 2,824     $ (10,534 )   $ 3,790     $ (8,143 )
Loss attributable to non-controlling interests     (163 )     (973 )     (952 )     (3,047 )
Net contributions from (distributions to) non-controlling interests     —       53       (177 )     (264 )
Balance end of period   $ 2,661     $ (11,454 )   $ 2,661     $ (11,454 )
Total equity   $ 6,966,697     $ 4,089,751     $ 6,966,697     $ 4,089,751  

(1) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.
(2) The Skouries Term Facility is defined as the Commercial Loan Facility, the RRF Facility and the Contingent Overrun Facility (“Term Facility”).
(3) Gold equivalent ounces: Calculated by converting copper pounds produced into gold equivalent using budgeted commodity prices for the relevant period: 2026-2028: $4,000/oz gold and $5.00/lb copper; 2029 and beyond: $3,000/oz gold and $4.50/lb copper.
(4) See the section “Financial Condition and Liquidity – Financing Activities” in the Company’s September 30, 2026 MD&A.
(5) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.

Please see the condensed consolidated interim financial statements dated September 30, 2026 for notes to the accounts.

(All amounts expressed in U.S. dollars unless otherwise noted)

VANCOUVER, British Columbia, Oct. 28, 2026 (GLOBE NEWSWIRE) — Eldorado Gold Corporation (“Eldorado”, “Eldorado Gold” or “the Company”) today reports the Company’s financial and operational results for the third quarter of 2026. For further information, please see the Company’s Consolidated Financial Statements and Management’s Discussion and Analysis (“MD&A”) filed on SEDAR+ at www.sedarplus.com under the Company’s profile.

Third Quarter 2026 Highlights

Operations

  • Gold production: 106,351 ounces.
  • Gold sales: 107,164 ounces at an average realized gold price per ounce sold(1) of $4,326.
  • Total cash costs(1): $1,415 per ounce sold.
  • All-in sustaining costs (“AISC”)(1): $2,050 per ounce sold.
  • Total capital expenditures: $452.3 million, including $108.6 million of project capital and $84.3 million of accelerated operational capital at Skouries, and $87.5 million project capital invested at McIlvenna Bay. Growth capital(1) at the operating mines totalled $105.1 million and sustaining capital(1) at the operating mines totalled $52.1 million.

Financial

  • Revenue: $511.9 million.
  • Production costs: $199.8 million.
  • Net cash generated from operating activities from continuing operations: $134.8 million.
  • Cash flow from operating activities before changes in working capital(1): $248.8 million.
  • Cash and cash equivalents: $396.8 million as at September 30, 2026, excluding $71.9 million of restricted cash designated for Skouries Term Facility(2) loan repayments.
  • Net earnings attributable to shareholders: $118.0 million, or $0.45 basic earnings per share.
  • Adjusted net earnings(1): $127.0 million or $0.49 per share in Q3 2026. Adjustments in Q3 2026 include a $7.4 million loss on foreign exchange translation of deferred tax balances and a $4.0 million unrealized gain on derivative instruments.
  • Adjusted net earnings before interest, taxes, depreciation and amortization (“Adjusted EBITDA”)(1): $275.2 million in Q3 2026.
  • Free cash flow(1): Consolidated free cash flow was negative $191.1 million in Q3 2026, reflecting the significant level of investment in Skouries and McIlvenna Bay as both operations advance toward commercial production. For additional context free cash flow excluding Skouries and McIlvenna Bay(1) was $98.3 million.

(1) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.
(2) The Skouries Term Facility is defined as the Commercial Loan Facility, the RRF Facility and the Contingent Overrun Facility (“Term Facility”).

Production and Cost Outlook

Production Guidance

Based on year-to-date performance through the third quarter, Eldorado has revised its 2026 production outlook for its operating assets, excluding Skouries and McIlvenna Bay, to 410,000 to 430,000 ounces of gold, compared with original guidance of 430,000 to 490,000 ounces. The revised 2026 production outlook, including Skouries and McIlvenna Bay, is 425,000 to 475,000 ounces of gold, compared with original guidance of 495,000 to 600,000 ounces. Strong performance at Lamaque, supported by increasing contributions from high-grade Ormaque ore, is partially offsetting lower expected production at Kisladag and Olympias as well as the impact of a slower than expected ramp-up at Skouries.

  • Lamaque – Strong operating execution and increasing contributions from high-grade Ormaque ore continue to support strong production performance. Ormaque is becoming an increasingly important source of high-grade ore for Lamaque.
  • Kisladag – Lower production for 2026 primarily reflects lower-grade ore associated with the current mining sequence and slower than planned mining progress during the third quarter, which delayed access to higher-grade material. Higher-grade material is now being stacked on the North Heap Leach Pad; however, given the approximately 300-day leach cycle, the associated production benefit is expected toward the end of the fourth quarter and into 2027.
  • Olympias – Lower production for 2026 primarily reflects the timing of the 650 ktpa expansion, which reduces expected fourth-quarter throughput and production. The targeted 650 ktpa nameplate throughput rate is expected to be achieved in the first half of 2027. In addition, material with elevated lead and zinc content that was expected to be processed during the third quarter was instead stockpiled. This material is expected to be introduced through a controlled blending program during the fourth quarter to maintain stable plant performance and optimize recoveries.
  • Skouries – Gold production guidance for 2026 has been revised to 10,000 to 35,000 ounces, compared with prior guidance of 60,000 to 100,000 ounces, reflecting a slower-than-expected ramp-up. The revision reflects the timing of the ramp-up and does not change the Company’s expectations for Skouries’ longer-term design capacity with commercial production expected in late Q4 2026.
  • McIlvenna Bay – Gold production continues to track within the 5,000 to 10,000 ounce guidance range for 2026. Commercial production is expected in late Q4 2026.

Base metal production ranges, including Skouries and McIlvenna Bay, have also been revised primarily reflecting the slower-than-expected ramp-up at Skouries, and lower production at Olympias:

  • Copper production: 10 to 25 million pounds (previously 20 to 40 million pounds)
  • Silver production: 1.2 to 1.5 million ounces (previously 1.55 to 1.75 million ounces)
  • Lead production: 11 to 14 thousand tonnes (previously 15 to 18 thousand tonnes)
  • Zinc production: 14 to 20 thousand tonnes (previously 16 to 19 thousand tonnes)

Cost Guidance

Consolidated total cash cost guidance for operating assets, excluding Skouries and McIlvenna Bay, has been revised to $1,400 to $1,500 per ounce sold, compared with original guidance of $1,220 to $1,420 per ounce sold. AISC guidance has been revised to $1,975 to $2,125 per ounce sold, compared to original guidance of $1,670 to $1,870 per ounce sold. The revisions primarily reflect:

  • Higher sustaining capital expenditures, including the earlier transition of Ormaque underground development at Lamaque from growth capital to sustaining capital following the earlier-than-expected receipt of the permit and advancement of development activities, as well as higher sustaining capital requirements at Olympias.
  • Lower production at Kisladag and Olympias, partially offset by higher production at Lamaque.
  • Higher royalty expense driven by higher realized metal prices.

Capital Guidance

  • Sustaining capital – Guidance for operating assets, excluding Skouries and McIlvenna Bay, has been revised to $170 to $190 million, compared with prior guidance of $140 to $165 million, primarily reflecting the earlier transition of Ormaque underground development at Lamaque from growth capital to sustaining capital and higher sustaining capital at Olympias due to increased filtration maintenance costs and additional contract support to advance access to higher grade underground zones.
  • Growth capital – Guidance for operating assets, excluding Skouries and McIlvenna Bay, has been revised to $395 to $430 million, compared with prior guidance of $375 to $405 million, primarily reflecting additional investment at Kisladag, including land acquisitions and increased waste movement for the Western Area, and higher capital requirements associated with the 650 ktpa expansion at Olympias. These increases are partially offset by lower growth capital at Lamaque following the earlier transition of Ormaque underground development to sustaining capital.

Skouries – With commercial production expected in late Q4, total project capital for Skouries is estimated at approximately $1.425 billion, an increase that consists of $65 million of projects costs and $45 million of previously guided growth capital that had been expected following commercial production but is now expected to be incurred prior to commercial production and is therefore reported as project capital. The increase primarily reflects higher contractor requirements to complete construction and commissioning activities, the extended use of temporary generator sets prior to connection to permanent grid power, additional owner’s costs and other project execution-related costs associated with the longer commissioning period.

Accelerated operational capital is expected to total $390 million, an increase that consists of $95 million of additional operational costs and $35 million of previously guided sustaining capital that had been expected following commercial production. It is now expected to be incurred and capitalized during the pre-commercial production period and is therefore reported as accelerated operating capital. This increase is separate from the increase in project capital. 

Up to an additional $30 million may be incurred, depending on the exact timing of commercial production. The classification of these expenditures will depend on when commercial production is achieved, with amounts potentially reflected in project capital, AOC, sustaining capital or growth capital.

McIlvenna Bay – The total project capital cost estimate from June 1, 2024 to commercial production is expected to be $975 million, an increase of approximately $23 million following a slower than expected ramp-up toward commercial production. For 2026, growth capital post commercial production is expected to be approximately $15 million and sustaining capital post commercial production is expected to be $10 million.

Depreciation Expense Guidance

Depreciation expense guidance, for operating assets excluding Skouries and McIlvenna Bay, has been reduced to $225 to $235 million, compared to prior guidance of $240 to $260 million, largely due to lower production. Depreciation expense at Skouries is not expected to be significant, compared with prior guidance of $15 to $35 million, as commercial production is expected in late Q4 2026.

Corporate

  • On August 12, 2026 the Company amended the senior secured credit facility, increasing total availability to $600 million, extending the maturity to March 1, 2029 and improving financial flexibility.
  • George Burns retired as Chief Executive Officer of Eldorado Gold, effective September 30, 2026. Following his retirement from management, Mr. Burns will remain on the Company’s Board of Directors.
  • Christian Milau assumed the role of President and Chief Executive Officer and joined the Board of Directors, effective September 30, 2026.
  • Paul Ferneyhough’s role expanded to Executive Vice President, Strategy and Chief Financial Officer, effective September 30, 2026.
  • Carissa Browning stepped down from the Board of Directors effective September 4, 2026.
  • On October 28, 2026, the Company declared a fourth quarter dividend of $0.075 per common share, payable on December 15, 2026 to shareholders of record at the close of business on December 1, 2026.

Commentary

“The third quarter marked an important step forward for Eldorado. Skouries produced first copper-gold concentrate and McIlvenna Bay continued to ramp up following first copper and zinc concentrate. At Skouries, the ramp-up has taken longer and cost more than we expected, and it is important that we acknowledge that directly,” said Christian Milau, President and Chief Executive Officer. “Our focus is on safely completing the remaining commissioning work, achieving commercial production and establishing stable, predictable operating performance.

“As I begin my tenure as CEO, my focus is on building on Eldorado’s high-quality, long-life asset base and the investments already made, while improving execution consistency, enhancing capital discipline and converting those investments into stronger cash flow and per-share value. Shareholders should expect us to set clear expectations, report transparently on our progress and remain disciplined in how we allocate capital.

“Beyond the near-term ramp-ups, we have substantial opportunity within the portfolio. Our focus is on maximizing the value of the assets we already own, maintaining balance-sheet strength and financial flexibility, and investing where expected returns justify the capital. As the new operations ramp up and generate increasing cash flow, we expect to have greater flexibility to balance debt reduction, reinvestment and shareholder returns. With Skouries and McIlvenna Bay advancing through commissioning and ramp-up, our priority is to execute the remaining work and translate the cash flow potential of these investments into stronger, sustainable cash generation and per-share value.”

Skouries Highlights

The Skouries mine, part of the Kassandra Mines Complex, is located within the Halkidiki Peninsula of Northern Greece and is a high-grade copper-gold mine. In January 2022, Eldorado published the results of the Skouries Project Feasibility Study with a 20-year mine life and expected average annual production over the life of the mine of 140,000 ounces of gold and 67 million pounds of copper, or approximately 240,000 gold equivalent ounces(3).

First production of the copper-gold concentrate was achieved on September 8, 2026, and commercial production is expected late in Q4 2026. Expected 2026 gold production was revised to between 10,000 and 35,000 ounces and copper production projected to be between 5 and 15 million pounds.

(3) Gold equivalent ounces: Calculated by converting copper pounds produced into gold equivalent using budgeted commodity prices for the relevant period: 2026-2028: $4,000/oz gold and $5.00/lb copper; 2029 and beyond: $3,000/oz gold and $4.50/lb copper.

Skouries Site Layout

Skouries site layout

Concentrate Off-Take Agreements

The Company has secured concentrate agreements with multiple offtakers for all anticipated Skouries production volumes for the next two years, with additional counterparty agreements in process covering production through to 2029. Market conditions for copper-gold concentrate remain highly competitive.

Capital Estimate and Schedule

With commercial production expected in late Q4, total project capital for Skouries is estimated at approximately $1.425 billion, an increase that consists of $65 million of projects costs and $45 million of previously guided growth capital that had been expected following commercial production but is now expected to be incurred prior to commercial production and is therefore reported as project capital. The increase primarily reflects higher contractor requirements to complete construction and commissioning activities, the extended use of temporary generator sets prior to connection to permanent grid power, additional owner’s costs and other project execution-related costs associated with the longer commissioning period.

Accelerated operational capital is expected to total $390 million, an increase that consists of $95 million of additional operational costs and $35 million of previously guided sustaining capital that had been expected following commercial production. It is now expected to be incurred and capitalized during the pre-commercial production period and is therefore reported as accelerated operating capital. This increase is separate from the increase in project capital.

Up to an additional $30 million may be incurred, depending on the exact timing of commercial production. The classification of these expenditures will depend on when commercial production is achieved, with amounts potentially reflected in project capital, AOC, sustaining capital or growth capital.

Based on the Company’s current schedule and cost assumptions, the project remains fully funded through available cash, operating cash flow and existing debt facilities.

The Term Facility totalling €740.4 million ($840.7 million) is fully drawn (including the Contingent Overrun Facility of €60.0 million which was drawn in Q2 2026).(4)

Project capital totalled $108.6 million in Q3 2026 and $398.9 million during the nine months ended September 30, 2026. Accelerated operational capital cost totalled $84.3 million in Q3 2026, and $192.5 million during the nine months ended September 30, 2026. At September 30, 2026, cumulative project capital invested towards Phase 2 of construction totalled $1.379 billion, and the cumulative accelerated operational capital totalled $285.6 million.

(4) See the section “Financial Condition and Liquidity – Financing Activities” in the Company’s September 30, 2026 MD&A.

Operating Activities

260926 Transfer Tower Pano

View of coarse ore stockpile dome (right), thickeners (left), filtered tailings building (background)

Primary Crusher Building

The primary crusher crushed first ore in July and is now operating as part of the integrated processing circuit. The stockpile dome, ancillary feeders and associated chute work are complete and supporting ongoing operations.

Process Plant

The process plant is substantially complete, and operating as part of the ongoing ramp-up of the operation. Commissioning activities have advanced across the processing circuit, with ore being processed through to concentrate production. Optimization and performance testing of various systems continue as part of the ramp-up to commercial production.

Thickeners

Two of the three tailings thickeners have been commissioned and are supporting current operations. Construction of the third tailings thickener, which is not required to achieve commercial production, is progressing, with completion expected in Q4 2026.

Filtered Tailings Facility

Commissioning of the filtered tailings facility continues to progress with two of the six filter presses operational. With these filter presses online, the plant is operating continuously and progressively increasing throughput as commissioning advances and the remaining filter presses are brought online. Commissioning of the remaining four filter presses is expected to be completed in November 2026.

Associated tailings handling infrastructure continues to be commissioned to support long-term operations.

260926 Tailings Filter Area

Filtered Tailings Facility

Powerline and Substations

The site was successfully energized on September 28, 2026, marking the completion of its connection to permanent grid power. The connection supports the ongoing commissioning and ramp-up of key systems across the site and provides the reliable, long-term power infrastructure required for the operations. All the temporary generators have been demobilized and removed from site.

260926 Main Substation

Process plant substation

Integrated Extractive Waste Management Facility

The initial filtered tailings placement areas are well advanced. The platform for the tailings stacker is complete and ready for assembly, while the access ramp and platform for the mobile (grasshopper) conveyors have been excavated and prepared for placement of the conveyor units. Construction of the rock buttress supporting the downstream embankment of the first filtered tailings placement area in the Karatza Lakkos (“KL”) valley is progressing and will be completed ahead of tailings placement.

Foundation preparation for the first phase of the KL filtered tailings embankment is substantially complete, and placement of engineered fill is underway across the full footprint.

Construction of the low-grade ore stockpile continued advancing. The lower section has been completed and construction is now focusing on the upper section.

Open Pit Mining

The open pit mine is feeding the crusher from both the stockpile and directly from the open pit. At the end of Q3 2026, the stockpiles contained approximately 4.8 million tonnes of open pit and underground ore, representing an estimated 176,000 ounces of gold and 61 million pounds of copper.

Underground Development

The underground mine delivered 179 kt of ore to stockpiles during Q3 2026. Underground development continued according to plan, with a total of 2,101 metres of development during the quarter. The east ramp breakthrough to the underground works was achieved during the quarter and both ramps are now providing access in and out of the underground.

Workforce

As at September 30, 2026, there were approximately 2,297 personnel working on site, including 622 Skouries employees.

McIlvenna Bay Highlights

The McIlvenna Bay mine, located in Saskatchewan, Canada, is a copper-zinc-gold-silver mine that Eldorado acquired through its acquisition of Foran, which closed on April 14, 2026. In March 2025, Foran published a McIlvenna Bay Project Feasibility Study, with an 18-year mine life and expected average annual production over the life of the mine of 41 million pounds of copper, 20,000 ounces of gold, 444,000 ounces of silver and 54 million pounds of zinc.

First production of copper concentrate from McIlvenna Bay was achieved in June 2026 with production of first zinc concentrate achieved in July. The focus is now on optimizing operations and increasing throughput to full design capacity. The crushing, grinding and flotation circuits have been commissioned and are demonstrating increasing throughput as ramp-up progresses. Remaining ramp-up activities are focused primarily on solid-liquid separation in the pyrite and tailings thickeners, reagent control, and improving filtration rates and filter availability. Work in these areas continues to advance, with commercial production expected in late Q4 2026.

The mine is expected to have a long life and is supported by a robust resource base, with highly prospective exploration upside across the broader district, including the nearby Tesla Zone. The inaugural Inferred Mineral Resource for Tesla is expected to be included in our annual Mineral Reserve and Mineral Resource update in the fourth quarter of 2026. Based on the prospectivity of the resource, we have initiated studies to evaluate material handling options for the mine, in addition to the mill expansion study that is underway, with resource conversion drilling planned for the Tesla resource. Once studies and conversion drilling have been advanced, we would expect to update the McIlvenna Bay Technical Report.

Located in one of the world’s most attractive mining jurisdictions, the mine benefits from established infrastructure and is designated by the Government of Canada as a project of national significance to support critical mineral development.

  3 months ended Sept 30, 9 months ended Sept 30,
Operating Data 2026 2026
Tonnes milled 58,832 64,237
Head grade (% copper) 1.06% 1.06%
Head grade (% zinc) 0.83% 0.76%
Head grade (g/t gold) 0.34 0.33
Head grade (g/t silver) 14.57 14.02
Copper produced (lb) 1,023,794 1,089,192
Copper sold (lb) 1,022,964 1,022,964
Zinc produced (t) 35 35
Zinc sold (t) 16 16
Gold produced (oz) 387 411
Gold sold (oz) 380 380
Silver produced (oz) 17,857 18,603
Silver sold (oz) 18,715 18,715


2026 Production and Cost Guidance; Project Capital Estimate

Production at McIlvenna Bay in 2026 is expected to be 5 to 10 million pounds of copper, 3,000 to 6,000 tonnes of zinc, 5,000 to 10,000 ounces of gold and 100,000 to 200,000 ounces of silver. Operating costs are expected to trend toward the previously disclosed range of between $90 and $110 per tonne as throughput increases and the operation progresses toward stable production levels.

The total project capital cost estimate from June 1, 2024 to commercial production is expected to be $975 million, an increase of approximately $23 million following a slower than expected ramp-up toward commercial production. For 2026, growth capital post commercial production is expected to be approximately $15 million and sustaining capital post commercial production is expected to be $10 million.

Project capital totalled $87.5 million during Q3 2026 (and $165.7 million reported from the date of acquisition of April 14, 2026). During the fourth quarter the remaining spend relates to the final commissioning and ramp-up activities required to support commercial production.

McIlvenna Bay Site Layout

McIlvenna Bay Mine Site Overview

Operating Activities

Site 2026 - McIlvenna Bay

McIlvenna Bay Aerial

Primary Crusher Building

More than 400 kt of ore is available on surface for processing. The primary crusher is operating at design capacity, material transfer to the fine ore bin is as expected, and metal separation practices for underground material continue on surface.

Process Plant

The SAG and ball mill circuits continue to demonstrate increasing throughput as commissioning advances. As expected for a new processing plant, we continue to work through equipment, instrumentation and other availability-related challenges associated with ramp-up. Throughput is expected to continue increasing through the fourth quarter as the operation progresses toward commercial production.

SAG n Ball - McIlvenna Bay

SAG and Ball Mills

Flotation

All flotation circuits are fully commissioned and have successfully produced copper, zinc and pyrite concentrates. The regrind circuit is operational and supporting further improvements in concentrate quality as ramp-up progresses.

Thickening & Filtration

The thickening and filtration circuits are key to the ramp-up of production. The key operational focus is on reagent addition and thickener control which has impacted the solid-liquid separation quality and downstream process water clarity. The teams are working to optimize the thickener and filtration processes for long-term stability.

Underground Development

Underground development continues to advance well. In addition to the 409 kt of ore stockpiled on surface, the mine has approximately 63 kt of blasted inventory, more than 400 kt drilled off, and approximately 2.0 Mt of fully developed reserves within Block 1 and Block 2.

Study Commenced on Processing Expansion, Including Throughput Increase and Silver-Lead Circuit

The expansion study is underway to evaluate an increase in processing throughput and the incorporation of a silver‑lead circuit. The expansion will evaluate a potential increase of processing capacity at McIlvenna Bay from 4,900 tonnes per day to approximately 7,000 tonnes per day. The addition of a dedicated silver‑lead circuit into the flowsheet is expected to enable recovery of lead into a separate concentrate and improve payable silver recoveries relative to the current design.

This initial study will assess the technical, economic, environmental and permitting considerations associated with the expansion. Any future development would be subject to completion of the project evaluation, receipt of required permits, Indigenous and Stakeholder engagement, and a positive final investment decision. The Company is targeting commissioning of the silver‑lead circuit in 2028 and the expansion in 2030.

Positioned as the Foundation for Long-Term District Growth

The McIlvenna Bay mine is core to our view of the district-scale geological potential to deliver future satellite development opportunities. Ongoing exploration will target additional resources, which could support further expansion or a separate processing facility over time. The 2026 exploration program includes approximately 14,000 metres of diamond drilling focused on resource expansion, high-grade extensions, and advancing regional targets.                        

In parallel, core scanning programs will enhance geological modelling and orebody characterization. Airborne and ground geophysical surveys are expected to help refine known deposit footprints and identify new targets across the broader land package.

Consolidated Financial and Operational Highlights

  3 months ended September 30,   9 months ended September 30,
    2026     2025       2026     2025  
Revenue $ 511.9   $ 434.7     $ 1,531.7   $ 1,241.7  
Gold produced (oz)   106,351     115,190       311,325     364,852  
Gold sold (oz)   107,164     116,529       310,474     364,281  
Average realized gold price ($/oz sold)(2) $ 4,326   $ 3,527     $ 4,527   $ 3,245  
Production costs   199.8     164.1       572.8     474.6  
Total cash costs ($/oz sold)(2,3)   1,415     1,195       1,438     1,134  
All-in sustaining costs ($/oz sold)(2,3)   2,050     1,679       1,974     1,583  
Net earnings for the period(1)   118.0     56.0       427.2     266.4  
Net earnings per share – basic ($/share)(1)   0.45     0.28       1.80     1.31  
Net earnings per share – diluted ($/share)(1)   0.45     0.27       1.78     1.29  
Net earnings for the period continuing operations(1,4)   118.0     56.5       427.2     267.5  
Net earnings per share continuing operations – basic ($/share)(1,4)   0.45     0.28       1.80     1.31  
Net earnings per share continuing operations – diluted ($/share)(1,4)   0.45     0.28       1.78     1.30  
Adjusted net earnings(1,2,4)   127.0     82.3       451.9     228.8  
Adjusted net earnings per share – basic ($/share)(1,2,4)   0.49     0.41       1.91     1.12  
Net cash generated from operating activities(4)   134.8     170.2       425.7     458.8  
Cash flow from operating activities before changes in working capital(2,4)   248.8     183.5       539.0     522.0  
Free cash flow(2,4)   (191.1 )   (87.4 )     (654.3 )   (178.4 )
Free cash flow excluding Skouries and McIlvenna Bay(2,4,5)   98.3     76.9       202.1     206.3  
Cash and cash equivalents(4)   396.8     1,043.9       396.8     1,043.9  
Restricted cash – current(6)   71.9     —       71.9     —  
Total assets   10,616.9     6,485.4       10,616.9     6,485.4  
Debt   1,985.4     1,258.5       1,985.4     1,258.5  

(1)   Attributable to shareholders of the Company.
(2)   These financial measures or ratios are non-IFRS financial measures or ratios. See the section ‘Non-IFRS and Other Financial Measures and Ratios’ of our MD&A for explanations and discussions of these non-IFRS financial measures or ratios.
(3)   Includes costs allocated to by-products.
(4)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(5)   Amounts presented add back cash-basis capital expenditure on the Skouries mine in the respective periods and the McIlvenna Bay mine only in 2026.
(6)   In accordance with the requirements of the Skouries Term Facility the Company deposited an amount of €63.3 million ($71.9 million) which is equal to at least 50% of the aggregate repayment installments, fees, interest, financing costs and charges of the Term Facility for the next 12 months, into a Debt Service Reserve Account.

In Q3 2026, we produced 106,351 ounces of gold, a decrease from Q3 2025 production of 115,190 ounces. The decrease was driven by decreases at Kisladag, due to the planned lower ore grade stacked, and at Efemcukuru, due to lower ore grade, partially offset by higher production at Lamaque as a result of higher throughput, grade and recoveries, which includes the positive impact of Ormaque ore grades and improving productivity.

Gold sales in Q3 2026 were 107,164 ounces, a decrease from 116,529 ounces sold in Q3 2025. The lower sales volume reflects lower production at Kisladag and Efemcukuru, partially offset by higher production at Lamaque.

The average realized gold price was $4,326 per ounce sold in Q3 2026, an increase from $3,527 per ounce sold in Q3 2025.

Total revenue increased to $511.9 million in Q3 2026 from $434.7 million in Q3 2025 and to $1,531.7 million in the nine months ended September 30, 2026, from $1,241.7 million in the nine months ended September 30, 2025. The increases in both periods were due to the higher average realized gold price, partially offset by lower volumes sold.

Production costs increased to $199.8 million in Q3 2026 from $164.1 million in Q3 2025 and to $572.8 million in the nine months ended September 30, 2026 from $474.6 million in the nine months ended September 30, 2025. Increases in both periods were driven by higher royalties and the inclusion of pre-commercial production costs at McIlvenna Bay, together which accounted for approximately 32% and 45% of the increase to production costs for Q3 2026 and the nine months ended September 30, 2026, respectively. The remainder relates primarily to increases at Lamaque, due to increased volumes produced, higher maintenance costs and deepening the production centre of the Triangle Mine, and at Olympias due to higher labour, contractor and materials costs as well as higher volumes sold.

Production costs include royalty expense, which increased to $31.8 million in Q3 2026 from $28.8 million in Q3 2025 and increased to $115.7 million in the nine months ended September 30, 2026 from $79.6 million in the nine months ended September 30, 2025. Increases in both periods were due to higher average realized gold prices and higher royalty rates, partially offset by lower volumes sold.

Total cash costs(5) averaged $1,415 per ounce sold in Q3 2026, an increase from $1,195 in Q3 2025, and $1,438 in the nine months ended September 30, 2026 from $1,134 in the nine months ended September 30, 2025. The increases in both the three and nine-month periods were primarily due to higher production costs and lower volumes sold, partially offset by higher costs allocated to by-products.

AISC per ounce sold(5) averaged $2,050 in Q3 2026, an increase from $1,679 in Q3 2025, and $1,974 in the nine months ended September 30, 2026 from $1,583 in the nine months ended September 30, 2025. The increases in both periods were driven by higher total cash costs, higher sustaining capital expenditures and lower volumes sold.

The Company reported net earnings attributable to shareholders from continuing operations of $118.0 million ($0.45 earnings per share) in Q3 2026 compared to net earnings of $56.5 million ($0.28 earnings per share) in Q3 2025 and net earnings of $427.2 million ($1.80 earnings per share) in the nine months ended September 30, 2026 compared to net earnings of $267.5 million ($1.31 earnings per share) in the nine months ended September 30, 2025. The increase in net earnings in both periods were driven by higher average realized gold prices, foreign exchange gains and lower depreciation, partially offset by lower volumes sold, higher production costs and higher income tax expense.

Adjusted net earnings(5) was $127.0 million ($0.49 adjusted earnings per share) in Q3 2026 compared to adjusted net earnings of $82.3 million ($0.41 adjusted earnings per share) in Q3 2025. Adjustments of non-recurring items in Q3 2026 include a $7.4 million loss on foreign exchange translation of deferred tax balances and a $4.0 million unrealized gain on derivative instruments.

Adjusted net earnings(5) was $451.9 million ($1.91 adjusted earnings per share) in the nine months ended September 30, 2026 compared to adjusted net earnings of $228.8 million ($1.12 adjusted earnings per share) in the nine months ended September 30, 2025. Adjustments of non-recurring items in the nine months ended September 30, 2026 include a reversal of $100.6 million of unrealized losses on derivative instruments, a $97.6 million realized loss on gold and copper commodity swaps relating to the Term Facility, a $41.5 million loss on foreign exchange due to the translation of deferred tax balances, a $47.4 million gain on deferred tax due to changes in the Turkish corporate income tax rate, and a $21.3 million expense relating to acquisition and integration costs.

(5) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.

Quarterly Operations Update

  3 months ended September 30, 9 months ended September 30,
    2026   2025   2026   2025
Consolidated        
Gold produced (oz)(3)   106,351   115,190   311,325   364,852
Gold sold (oz)(4)   107,164   116,529   310,474   364,281
Production costs(5) $199.8 $164.1 $572.8 $474.6
Total cash costs ($/oz sold)(1,2) $1,415 $1,195 $1,438 $1,134
All-in sustaining costs ($/oz sold)(1,2) $2,050 $1,679 $1,974 $1,583
Sustaining capital expenditures(2) $52.1 $38.3 $120.0 $115.2
Kisladag        
Gold produced (oz)   22,713   37,184   70,160   127,561
Gold sold (oz)   21,274   37,300   68,974   126,928
Production costs $51.1 $50.1 $149.4 $150.3
Total cash costs ($/oz sold)(1,2) $2,328 $1,309 $2,072 $1,152
All-in sustaining costs ($/oz sold)(1,2) $2,832 $1,545 $2,396 $1,324
Sustaining capital expenditures(2) $9.2 $7.3 $18.3 $16.0
Lamaque        
Gold produced (oz)   52,748   46,823   147,394   137,901
Gold sold (oz)   55,475   46,013   150,142   137,665
Production costs $50.5 $36.0 $136.5 $107.9
Total cash costs ($/oz sold)(1,2) $897 $767 $889 $772
All-in sustaining costs ($/oz sold)(1,2) $1,436 $1,199 $1,335 $1,270
Sustaining capital expenditures(2) $29.4 $19.2 $65.7 $67.3
Efemcukuru        
Gold produced (oz)   17,073   17,586   50,486   57,986
Gold sold (oz)   15,908   20,031   49,426   58,600
Production costs $33.8 $32.3 $110.1 $85.5
Total cash costs ($/oz sold)(1,2) $1,928 $1,522 $2,013 $1,405
All-in sustaining costs ($/oz sold)(1,2) $2,313 $1,791 $2,356 $1,674
Sustaining capital expenditures(2) $5.8 $4.9 $16.1 $14.3
Olympias        
Gold produced (oz)   13,430   13,597   42,874   41,404
Gold sold (oz)   14,127   13,185   41,552   41,088
Production costs $56.0 $45.8 $168.4 $130.9
Total cash costs ($/oz sold)(1,2) $1,493 $1,869 $1,688 $1,910
All-in sustaining costs ($/oz sold)(1,2) $2,067 $2,421 $2,199 $2,367
Sustaining capital expenditures(2) $7.6 $6.9 $19.9 $17.6

(1)   Includes costs allocated to by-products.
(2)   These financial measures or ratios are non-IFRS financial measures or ratios. See the section ‘Non-IFRS and Other Financial Measures and Ratios’ of our MD&A for explanations and discussions of these non-IFRS financial measures or ratios.   
(3)   Includes 387 and 411 pre-commercial gold ounces produced at McIlvenna Bay for the three and nine months ended September 30, 2026 respectively.
(4)   Includes 380 pre-commercial gold ounces sold at McIlvenna Bay for the three and nine months ended September 30, 2026.
(5)   Includes $8.4 million of pre-commercial production costs for McIlvenna Bay for the three and nine months ended September 30, 2026.

Kisladag

Kisladag produced 22,713 ounces of gold in Q3 2026 compared to 37,184 ounces in Q3 2025, with the decrease due to lower planned grades associated with the current cutback and slower-than-planned mining progress, which delayed access to higher-grade material during the third quarter. Ore grade decreased to 0.55 grams per tonne in Q3 2026 from 0.70 grams per tonne in Q3 2025, partially offset by higher stacked tonnage, resulting in lower recoverable ounces during the quarter.

Revenue decreased to $93.1 million in Q3 2026 from $130.5 million in Q3 2025, reflecting a decrease in gold ounces sold that was partially offset by the higher average realized gold price.

Production costs increased to $51.1 million in Q3 2026 from $50.1 million in Q3 2025, driven by higher labour and contractor costs, higher maintenance and higher reagent costs for water management, offset by lower gold sales and lower royalty costs. Lower gold production and higher production costs were primarily responsible for the increase in total cash costs per ounce sold to $2,328 in Q3 2026 from $1,309 in Q3 2025.

AISC per ounce sold increased to $2,832 in Q3 2026 from $1,545 in Q3 2025, primarily due to higher cash costs per ounce sold and higher sustaining costs.

Sustaining capital expenditures were $9.2 million in Q3 2026 and $18.3 million in the nine months ended September 30, 2026, which primarily included a new 300 tonne haul truck purchase, planned equipment rebuilds (including primary crusher refurbishment), interlifts for the leach pad and geotechnical drilling. Growth capital investment of $38.9 million and $122.7 million in the three and nine months ended September 30, 2026 was primarily due to waste stripping and associated equipment costs, continued construction of the North Heap Leach Pad (“NHLP”) Phase 3, construction of the whole-ore agglomeration circuit and upgrades to the secondary crusher. Growth capital in the nine months ended September 30, 2026, also included one-time land purchases totalling $23.9 million required for the construction of the NHLP and North Rock Dump.

Kisladag incurred higher reagent costs as a result of increased water management activities, predominantly in the second quarter following a period of higher‑than‑average precipitation in the first half of 2026, that resulted in elevated water levels within site ponds. The Company continues to actively manage water balances across the operation, with a focus on continuing to maximize on‑site water capture and reuse in support of its sustainability objectives, and has constructed additional water storage capacity to enhance operational flexibility.

The Company continues to evaluate a pit shell based on gold price sensitivity analysis, which is expected to support further expansion into the western area of the pit and support resource expansion. New geological and metallurgical information will be incorporated into the life-of-mine optimization that will form part of the Mineral Reserve and Mineral Resource update expected in Q4 2026. As part of this optimization work, the Company expects to evaluate an investment decision on additional screening before year-end.

Progress on construction of the whole ore agglomeration circuit, which is configured to increase permeability and reduce leach time, is on track with earthworks well underway and all long-lead items procured. Commissioning and ramp-up are expected in H1 2027.

Overall, this mine optimization plan is expected to support improved sequencing of ore and waste movement, and with implementation of whole ore agglomeration, is expected to contribute to more consistent year‑over‑year operating performance and higher production over the longer term.

Lamaque

Lamaque produced 52,748 ounces of gold in Q3 2026, an increase of 13% from 46,823 ounces in Q3 2025. The increase was due to higher throughput, head grade and recoveries, benefiting from strong mill performance and ore from Ormaque following receipt of the operating authorization in March.

Revenue increased to $239.7 million in Q3 2026 from $160.7 million in Q3 2025, driven by the combination of higher gold ounces sold and higher average realized price.

Production costs increased to $50.5 million in Q3 2026 from $36.0 million in Q3 2025, reflecting higher costs and higher volume sold. As the centre of production at the Triangle Mine deepens, additional costs are incurred for haulage, equipment (including maintenance) and personnel requirements. Total cash costs per ounce sold increased to $897 in Q3 2026 from $767 in Q3 2025 due to higher production costs, including mining costs for Ormaque, and higher royalties, partially offset by higher number of ounces sold.

AISC per ounce sold was $1,436 in Q3 2026 compared to $1,199 in Q3 2025, primarily due to higher sustaining capital driven by the inclusion of the non-ramp capitalized development at Ormaque commencing from July 2026, but also impacted by higher total cash costs partially offset by higher ounces sold.

Sustaining capital expenditures of $29.4 million in Q3 2026 and $65.7 million in the nine months ended September 30, 2026 primarily included underground development (including Ormaque non-ramp underground development from July onwards), equipment rebuilds, delineation drilling and purchases. Growth capital investment of $41.5 million in Q3 2026 and $107.5 million in the nine months ended September 30, 2026 was primarily related to Ormaque development (up to the end of June, following which Ormaque non-ramp development is being reported as sustaining capital), construction of the paste plant, construction of the north basin water management structure, and continued ramp development at both the Triangle Mine and Ormaque.

Efemcukuru

Efemcukuru produced 17,073 ounces of gold in Q3 2026 compared to 17,586 ounces in Q3 2025. The decrease was primarily due to planned lower ore grade, which decreased to 4.44 grams per tonne in Q3 2026 from 4.71 grams per tonne in Q3 2025, partially offset by higher mill throughput and recovery.

Revenue decreased to $72.8 million in Q3 2026 from $77.8 million in Q3 2025. The decrease was driven by lower gold ounces sold impacted by a concentrate shipment delayed to October, partially offset by higher average realized gold prices.

Production costs increased to $33.8 million in Q3 2026 from $32.3 million in Q3 2025, primarily due to higher royalty expense as a result of higher gold prices, as well as increased labour and maintenance costs. On a per ounce sold basis, higher royalties and direct operating costs combined with lower gold sold resulted in an increase to total cash costs per ounce sold to $1,928 in Q3 2026 from $1,522 in Q3 2025.

AISC per ounce sold increased to $2,313 in Q3 2026 from $1,791 in Q3 2025, primarily due to lower gold ounces sold, slightly higher total cash costs and slightly higher sustaining capital expenditures.

Sustaining capital expenditures of $5.8 million in Q3 2026 and $16.1 million in the nine months ended September 30, 2026 were primarily underground development and equipment rebuilds. Growth capital investment of $9.4 million in Q3 2026 and $17.6 million in the nine months ended September 30, 2026 related to development costs at Bati, portal development at Kokarpinar, construction of a water pond and mine rock storage facility, and equipment purchases.

Olympias

Olympias produced 13,430 ounces of gold in Q3 2026 compared to 13,597 ounces in Q3 2025, driven by lower gold grades, partially offset by higher mill throughput combined with a stable ore blend and flotation performance which resulted in increased metal recoveries. Grades were lower than planned as a result of material with elevated lead and zinc content that had been expected to be processed during the third quarter and was stockpiled and is expected to be blended through a controlled blending program during the fourth quarter to maintain process stability and optimize recoveries.

Revenue increased to $96.7 million in Q3 2026 from $65.8 million in Q3 2025, due to the higher average realized gold price, higher by-product sales on higher production, and higher gold ounces sold.

Production costs increased to $56.0 million in Q3 2026 from $45.8 million in Q3 2025 driven by higher labour costs and royalties as a result of higher gold prices combined with higher metal volumes sold. On a per ounce sold basis, higher by-product credits and modestly higher ounces sold, partially offset by higher direct operating costs and higher royalties, decreased total cash costs per ounce sold to $1,493 in Q3 2026 from $1,869 in Q3 2025.

AISC per ounce sold decreased to $2,067 in Q3 2026 from $2,421 in Q3 2025 primarily due to lower total cash costs and slightly higher gold ounces sold.

Sustaining capital expenditures of $7.6 million in Q3 2026 and $19.9 million in the nine months ended September 30, 2026 primarily included underground development, underground resource classification drilling, upgraded underground electrical and ventilation control, filter press refurbishment, and mobile mining equipment rebuilds and purchases. Growth capital investment of $15.3 million in Q3 2026 and $37.7 million in the nine months ended September 30, 2026 was primarily related to the mill expansion project and to a lesser extent, underground development and equipment purchases.

At Olympias, production has stabilized over the past four quarters, with flotation recoveries returning to modelled levels. Completion of the 650 ktpa expansion, including the new greenfield infrastructure (commissioning of the tower mill, gold thickener, zinc filter and flotation circuit extension), is ongoing. The final circuit tie-ins will require a full plant shutdown which is expected in Q1 2027, with ramp‑up to nameplate capacity anticipated in H1 2027.

For further information on the Company’s operating results for the third quarter of 2026, please see the Company’s MD&A filed on SEDAR+ at www.sedarplus.com under the Company’s profile.

Conference Call

A conference call to discuss the details of the Company’s Third Quarter 2026 Results will be held by senior management on Thursday, October 29, 2026 at 9:00 AM ET (6:00 AM PT). The call will be webcast and can be accessed at Eldorado’s website: www.eldoradogold.com or via this link:
https://event.choruscall.com/mediaframe/webcast.html?webcastid=XFFI5roL

Participants may elect to pre-register for the conference call via this link: https://dpregister.com/sreg/10211449/104b751968a

Upon registration, participants will receive a calendar invitation by email with dial in details and a unique PIN. This will allow participants to bypass the operator queue and connect directly to the conference. Registration will remain open until the end of the conference call.

Conference Call Details   Replay (available until December 10, 2026)
Date: October 29, 2026   Vancouver: +1 412 317 0088
Time: 9:00 AM ET (6:00 AM PT)   Toll Free: +1 855 669 9658
Dial in: +1 647 846 2782   Access code: 4538447
Toll free: +1 833 752 3325      


About Eldorado

Eldorado is a gold, copper and base metals producer with mining, development and exploration operations in Canada, Greece and Turkiye. The Company has a highly skilled and dedicated workforce, safe and responsible operations, a portfolio of high-quality assets, and long-term partnerships with local communities. Eldorado’s common shares trade on the Toronto Stock Exchange (TSX: ELD) and the New York Stock Exchange (NYSE: EGO).

Contact

Investor Relations

Lynette Gould, VP, Investor Relations, Communications & External Affairs
647 271 2827 or 1 888 353 8166
lynette.gould@eldoradogold.com

Media

Chad Pederson, Director, Communications and Public Affairs
236 885 6251 or 1 888 353 8166
chad.pederson@eldoradogold.com

Non-IFRS and Other Financial Measures and Ratios

Certain non-IFRS financial measures and ratios are included in this news release, including earnings before interest, taxes, depreciation and amortization (“EBITDA”), adjusted earnings before interest, taxes, depreciation and amortization (“Adjusted EBITDA”), adjusted net earnings/(loss) attributable to shareholders, adjusted net earnings/(loss) per share attributable to shareholders, total cash costs and total cash costs per ounce sold, all-in sustaining costs (“AISC”) and AISC per ounce sold, sustaining and growth capital, average realized gold price per ounce sold, free cash flow, free cash flow excluding Skouries and McIlvenna Bay, and cash flow from operating activities before changes in working capital.

Please see the September 30, 2026 MD&A for explanations and discussion of these non-IFRS and other financial measures and ratios. The Company believes that these measures and ratios, in addition to conventional measures and ratios prepared in accordance with International Financial Reporting Standards (“IFRS”), provide investors an improved ability to evaluate the performance of our gold mining operations and its ability to generate positive cash flow. These non-IFRS and other financial measures and ratios are intended to provide additional information and should not be considered in isolation or as a substitute for measures or ratios of performance prepared in accordance with IFRS. These measures and ratios do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to other issuers.

We believe that our use of total cash costs per ounce sold and all-in sustaining costs per ounce sold will assist analysts, investors and other stakeholders of the Company in understanding the costs associated with producing gold, assessing our operating performance, and our ability to generate free cash flow from gold operations. Due to the capital-intensive nature of the industry and the long useful lives over which these assets are depreciated, there can be a significant timing difference between net earnings calculated in accordance with IFRS and the amount of free cash flow that is generated by a mine, and therefore we believe these measures are useful non-IFRS operating metrics and supplement our IFRS disclosures. These measures are not representative of all of our cash expenditures as they do not include income tax payments, interest costs or dividend payments. These measures do not include depreciation or amortization. Certain additional disclosures for these and other financial measures and ratios have been incorporated by reference and can be found in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the September 30, 2026 MD&A available on SEDAR+ at www.sedarplus.com and on the Company’s website under the ‘Investors’ section.

EBITDA, Adjusted EBITDA

Our reconciliation of EBITDA and Adjusted EBITDA to earnings from continuing operations before income tax, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Earnings before income tax(1) $209.4   $110.1   $683.3   $324.6  
Depreciation and amortization(2)   59.2     63.3     168.3     190.4  
Interest income   (2.5 )   (8.6 )   (15.6 )   (25.8 )
Finance costs   13.5     8.2     37.7     21.1  
EBITDA $279.6   $173.1   $873.7   $510.3  
Realized loss on gold and copper derivative instruments   —     —     97.6     —  
Unrealized (gain) loss on derivative instruments   (4.0 )   22.2     (100.6 )   66.8  
Acquisition and integration costs   0.6     —     21.3     —  
(Gain) loss on disposal of assets   (1.5 )   0.4     (0.8 )   (6.6 )
Share of loss from associate   0.5     —     0.9     —  
Loss on recognition of deferred consideration(3)   —     0.5     —     0.5  
Adjusted EBITDA $275.2   $196.3   $892.0   $571.1  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(2)   Includes depreciation within general and administrative expenses.
(3)   In Q3 2025, transaction costs of $0.5 million were recognized against the $60 million gain in Q3 2024 related to deferred consideration from the sale of the Tocantinzinho property to G Mining Ventures in 2021.

Adjusted Net Earnings Attributable to Shareholders

Our reconciliation of adjusted net earnings (loss) and adjusted net earnings (loss) per share to net earnings (loss) from continuing operations attributable to shareholders of the Company, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Net earnings attributable to shareholders of the Company(1) $ 118.0   $ 56.5   $ 427.2   $ 267.5  
Loss (gain) on foreign exchange translation of deferred tax balances   7.4     3.7     41.5     (22.6 )
Decrease (increase) in fair value of redemption option derivatives   3.7     (0.7 )   11.0     (8.6 )
Realized loss on gold and copper derivative instruments   —     —     97.6     —  
Unrealized (gain) loss on derivative instruments   (4.0 )   22.2     (100.6 )   66.8  
Acquisition and integration costs   0.6     —     21.3     —  
Gain on deferred tax due to changes in tax rates   —     —     (47.4 )   —  
Tax recovery on recognition of deferred tax asset   —     —     —     (73.5 )
Discount on sale of marketable securities   —     —     (0.1 )   5.1  
Gain on sale of mining licenses   —     —     —     (6.5 )
Share of loss from associate   0.5     —     0.9     —  
Loss on deferred consideration, net of tax(2)   —     0.5     —     0.5  
Tax effect on adjustments   0.9     —     0.7     —  
Total adjusted net earnings $ 127.0   $ 82.3   $ 451.9   $ 228.8  
Weighted average shares outstanding (thousands)   260,942     202,743     236,945     204,130  
Adjusted net earnings per share ($/share) $ 0.49   $ 0.41   $ 1.91   $ 1.12  

(1)  2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(2)  In Q3 2025, transaction costs of $0.5 million were recognized against the $60 million gain in Q3 2024 related to deferred consideration from the sale of the Tocantinzinho property to G Mining Ventures in 2021.

Reconciliation of Total Cash Costs, Total Cash Cost per Ounce Sold, AISC, and AISC per Ounce Sold to Production Costs

Our reconciliation of total cash costs, total cash costs per ounce sold, AISC, and AISC per Ounce Sold to production costs, the most directly comparable IFRS measure, is presented below.

For the three months ended September 30, 2026:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total excluding McIlvenna Bay McIlvenna Bay Total
Direct operating costs $49.6   $43.6   $21.4   $44.1   $— $158.7   $9.8   $168.5  
Transportation and selling costs 0.1   0.2   3.1   2.4   — $5.9   1.3   $7.1  
Inventory change(1) (7.7 ) 2.5   (1.2 ) 1.5   — ($4.9 ) (2.7 ) ($7.6 )
Royalty expense 9.2   4.2   10.4   7.9   — $31.8   —   $31.8  
Production costs $51.1   $50.5   $33.8   $56.0   $— $191.4   $8.4   $199.8  
Costs allocated to by-products (1.6 ) (0.7 ) (3.1 ) (36.2 ) — ($41.7 )    
Treatment and refining costs(2) —   —   —   1.3   — $1.3      
Total cash costs $49.5   $49.8   $30.7   $21.1   $— $151.1      
Corporate & allocated G&A —   —   —   —   13.0 $13.0      
Exploration costs —   0.2   —   —   — $0.2      
Reclamation costs and amortization 1.5   0.2   0.3   0.5   — $2.5      
Sustaining capital 9.2   29.4   5.8   7.6   — $52.1      
All-in sustaining costs $60.3   $79.7   $36.8   $29.2   $13.0 $218.9      
Gold oz sold 21,274   55,475   15,908   14,127   —   106,784   380     107,164  
Total cash costs/oz $2,328   $897   $1,928   $1,493   $— $1,415      
AISC/oz $2,832   $1,436   $2,313   $2,067   $122 $2,050      

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.

For the nine months ended September 30, 2026:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total excluding McIlvenna Bay McIlvenna Bay Total
Direct operating costs $140.0   $124.0   $65.1   $126.5   $— $455.6   $9.8   $465.4  
Transportation and selling costs 0.5   0.4   9.2   8.1   — $18.1   1.3   $19.4  
Inventory change(1) (28.1 ) 2.2   (1.1 ) 2.1   — ($24.9 ) (2.7 ) ($27.6 )
Royalty expense 37.1   9.9   37.0   31.7   — $115.7   —   $115.7  
Production costs $149.4   $136.5   $110.1   $168.4   $— $564.4   $8.4   $572.8  
Costs allocated to by-products (6.5 ) (3.0 ) (10.6 ) (101.5 ) — ($121.7 )    
Treatment and refining costs(2) —   —   —   3.3   — $3.3      
Total cash costs $142.9   $133.4   $99.5   $70.1   $— $446.0      
Corporate & allocated G&A —   —   —   —   38.5 $38.5      
Exploration costs —   0.7   —   —   — $0.7      
Reclamation costs and amortization 4.0   0.6   0.8   1.4   — $6.9      
Sustaining capital 18.3   65.7   16.1   19.9   — $120.0      
All-in sustaining costs $165.3   $200.5   $116.5   $91.4   $38.5 $612.1      
Gold oz sold 68,974   150,142   49,426   41,552   — 310,094   380   310,474  
Total cash costs/oz $2,072   $889   $2,013   $1,688   $— $1,438      
AISC/oz $2,396   $1,335   $2,356   $2,199   $124 $1,974      

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.


For the three months ended September 30, 2025:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total
Direct operating costs $43.5   $34.3   $19.5   $38.5   $— $135.8  
Transportation and selling costs 0.2   0.1   2.4   2.4   — $5.1  
Inventory change(1) (5.8 ) (0.3 ) 2.1   (1.5 ) — ($5.5 )
Royalty expense 12.3   1.8   8.2   6.4   — $28.8  
Production costs $50.1   $36.0   $32.3   $45.8   $— $164.1  
Costs allocated to by-products (1.3 ) (0.7 ) (2.4 ) (22.7 ) — ($27.0 )
Treatment and refining costs(2) —   —   0.6   1.6   — $2.1  
Total cash costs $48.8   $35.3   $30.5   $24.6   $— $139.3  
Corporate & allocated G&A (0.3 ) —   0.3   —   15.1 $15.2  
Exploration costs —   0.6   —   —   — $0.6  
Reclamation costs and amortization 1.8   0.1   0.2   0.4   — $2.4  
Sustaining capital 7.3   19.2   4.9   6.9   — $38.3  
All-in sustaining costs $57.6   $55.2   $35.9   $31.9   $15.1 $195.7  
Gold oz sold 37,300   46,013   20,031   13,185   — 116,529  
Total cash costs/oz $1,309   $767   $1,522   $1,869   $— $1,195  
AISC/oz $1,545   $1,199   $1,791   $2,421   $129 $1,679  

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.


For the 
nine months ended September 30, 2025:

  Kisladag Lamaque Efemcukuru Olympias Corporate(3) Total
Direct operating costs $126.4   $101.2   $56.9   $111.5   $— $395.9  
Transportation and selling costs 0.6   0.3   7.7   6.6   — $15.2  
Inventory change(1) (12.8 ) 1.2   0.4   (5.0 ) — ($16.2 )
Royalty expense 36.2   5.1   20.4   17.9   — $79.6  
Production costs $150.3   $107.9   $85.5   $130.9   $— $474.6  
Costs allocated to by-products (4.2 ) (1.6 ) (5.7 ) (56.9 ) — ($68.4 )
Treatment and refining costs(2) —   —   2.5   4.5   — $7.0  
Total cash costs $146.2   $106.2   $82.4   $78.5   $— $413.2  
Corporate & allocated G&A 0.4   —   1.0   —   38.6 $40.1  
Exploration costs —   1.0   —   —   — $1.0  
Reclamation costs and amortization 5.4   0.2   0.5   1.1   — $7.3  
Sustaining capital 16.0   67.3   14.3   17.6   — $115.2  
All-in sustaining costs $168.0   $174.8   $98.1   $97.2   $38.6 $576.8  
Gold oz sold 126,928   137,665   58,600   41,088   —   364,281  
Total cash costs/oz $1,152   $772   $1,405   $1,910   $— $1,134  
AISC/oz $1,324   $1,270   $1,674   $2,367   $106 $1,583  

(1)   Inventory change adjustments result from timing differences between when inventory is produced and when it is sold.
(2)   Included in revenue.
(3)   Excludes general and administrative expenses related to business development activities and projects. Includes share based payments expense and defined benefit pension plan expense. AISC per ounce sold has been calculated using total consolidated gold ounces sold.

Reconciliations of adjustments within AISC to the most directly comparable IFRS measures are presented below.

Reconciliation of general and administrative expenses included in All-in Sustaining Costs:

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
General and administrative expenses(from consolidated statement of operations) $11.2   $9.5   $34.5   $28.2  
Add:        
Share-based payments expense   3.8     6.8     10.2     15.3  
Less:        
Integration costs   —     —     (1.1 )   —  
Depreciation in general and administrative expenses   (0.4 )   (0.5 )   (1.4 )   (1.4 )
Business development   (0.7 )   (0.2 )   (1.8 )   (0.8 )
Development projects   (0.7 )   (0.4 )   (1.9 )   (1.3 )
Corporate and allocated general and administrative expenses per AISC $13.0   $15.2   $38.5   $40.1  


Reconciliation of exploration and evaluation costs included in All-in Sustaining Costs:

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Exploration and evaluation expense(from consolidated statement of operations)(1) $17.1   $11.0   $41.4   $25.2  
Add:        
Capitalized exploration cost related to operating gold mines   0.2     0.6     0.7     1.0  
Less:        
Exploration and evaluation expenses related to non-gold mines and other sites   (17.1 )   (11.0 )   (41.4 )   (25.2 )
Exploration and evaluation costs per AISC $0.2   $0.6   $0.7   $1.0  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.


Reconciliation of reclamation costs and amortization included in All-in Sustaining Costs:

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Asset retirement obligation accretion(from notes to the consolidated financial statements)(1) $1.6   $1.5   $4.6   $4.4  
Add:        
Depreciation related to asset retirement obligation assets   1.2     1.1     3.1     3.5  
Less:        
Asset retirement obligation accretion related to non-gold mines and other sites   (0.4 )   (0.2 )   (0.9 )   (0.7 )
Reclamation costs and amortization per AISC $2.5   $2.4   $6.9   $7.3  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.


Sustaining and Growth Capital

Our reconciliation of growth capital investment and sustaining capital expenditure at operating gold mines to additions to property, plant and equipment, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Additions to property, plant and equipment
(from segment note in the consolidated financial statements)(1)
$452.3   $255.6   $1,211.6   $669.8  
Growth and development project capital investment – gold mines   (107.6 )   (58.0 )   (293.1 )   (143.7 )
Growth and development project capital investment – other   (288.4 )   (159.5 )   (787.5 )   (408.0 )
Sustaining capital exploration   (0.2 )   (0.6 )   (0.7 )   (1.0 )
Sustaining capitalized depreciation   (2.9 )   —     (9.1 )   —  
Sustaining leases   (1.0 )   0.8     (1.2 )   (1.8 )
Sustaining capital expenditure at operating gold mines $52.1   $38.3   $120.0   $115.2  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.


Average Realized Gold Price per Ounce Sold

Our reconciliation of average realized gold price per ounce sold to revenue, the most directly comparable IFRS measure, is presented below.

For the three months ended September 30, 2026:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $93.1 $— ($1.6 ) $91.5 21,274 $4,301
Lamaque   239.7 —   (0.7 )   239.0 55,475   4,308
Efemcukuru   72.8 —   (3.1 )   69.6 15,908   4,376
Olympias   96.7 1.3   (36.2 )   61.8 14,127   4,376
McIlvenna Bay   9.6 —   (8.0 )   1.6 380   4,314
Total consolidated $511.9 $1.3 ($49.7 ) $463.5 107,164 $4,326

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


For the nine months ended September 30, 2026:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $327.4 $— ($6.5 ) $320.9 68,974 $4,653
Lamaque   682.7 —   (3.0 )   679.7 150,142   4,527
Efemcukuru   228.2 —   (10.6 )   217.5 49,426   4,401
Olympias   283.8 3.3   (101.5 )   185.6 41,552   4,467
McIlvenna Bay   9.6 —   (8.0 )   1.6 380   4,314
Total consolidated $1,531.7 $3.3 ($129.7 ) $1,405.4 310,474 $4,527

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


For the three months ended September 30, 2025:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $130.5 $ — ($1.3 ) $129.2 37,300 $3,463
Lamaque   160.7   —   (0.7 )   160.0 46,013   3,478
Efemcukuru   77.8   0.6   (2.4 )   76.0 20,031   3,794
Olympias   65.8   1.6   (21.5 )   45.8 13,185   3,473
Total consolidated $434.7 $2.1 ($25.9 ) $411.0 116,529 $3,527

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


For the nine months ended September 30, 2025:

  Revenue Add concentrate deductions(1) Less non-gold revenue Gold revenue(2) Gold oz sold Average realized gold price per ounce sold
Kisladag $410.1 $ — ($ 4.2 ) $405.9 126,928 $3,198
Lamaque   447.5   —   (1.6 )   445.9 137,665   3,239
Efemcukuru   205.9   2.5   (5.7 )   202.8 58,600   3,460
Olympias   178.2   4.5   (55.2 )   127.4 41,088   3,102
Total consolidated $1,241.7 $7.0 ($ 66.7 ) $1,182.0 364,281 $3,245

(1)   Treatment charges, refining charges, penalties and other costs deducted from proceeds from gold concentrate sales.
(2)   Includes the impact of provisional pricing adjustments on concentrate sales.


Free Cash Flow and Free Cash Flow Excluding Skouries and McIlvenna Bay

Our reconciliations of free cash flow and free cash flow excluding Skouries and McIlvenna Bay to net cash generated from operating activities from continuing operations, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Net cash generated from operating activities(1) $134.8   $170.2   $425.7   $458.8  
Less: Cash used in investing activities   (495.7 )   (212.1 )   (1,087.1 )   (434.1 )
Less: Proceeds from sale of mining licenses   —     —     (2.0 )   (2.5 )
(Less) add: (Proceeds from sale) purchase of marketable securities   (0.3 )   14.0     (37.4 )   (141.1 )
Less: Cash received from acquisition of subsidiary   —     —     (159.1 )   —  
Add: Cash settlement of gold and copper derivative instruments   97.6     —     97.6     —  
Add: Acquisition and integration costs   0.6     —     21.3     —  
Add: Purchase of investment in associate   —     —     14.7     —  
Add: Increase in restricted cash   71.9     —     71.9     —  
Less: Cash received from deferred consideration(2)   —     (59.5 )   —     (59.5 )
Free cash flow ($191.1 ) ($87.4 ) ($654.3 ) ($178.4 )
Add: Skouries cash capital expenditures   205.9     155.9     622.6     356.2  
Add: McIlvenna Bay cash capital expenditures   68.7     —     187.9     —  
Add: Capitalized interest paid(3)   14.9     8.4     45.9     28.5  
Free cash flow excluding Skouries and McIlvenna Bay $98.3   $76.9   $202.1   $206.3  

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.
(2)   Deferred consideration received from G Mining Ventures of $60 million, net of transaction costs of $0.5 million.
(3)   Includes interest from the Senior Notes, the Term Facility and the Sprott Credit Facility.

Cash Flow from Operating Activities before Changes in Working Capital

Our reconciliation of cash flow from operating activities before changes in working capital to net cash generated from operating activities from continuing operations, the most directly comparable IFRS measure, is presented below.

  Q3 2026 Q3 2025 YTD 2026 YTD 2025
Net cash generated from operating activities(1) $134.8 $170.2 $425.7 $458.8
Add: Changes in non-cash working capital   114.0   13.3   113.3   63.2
Cash flow from operating activities before changes in working
capital
$248.8 $183.5 $539.0 $522.0

(1)   2025 amounts presented are from continuing operations only and exclude the Romania segment which was carried as a discontinued operation and disposed in Q4 2025.

Forward-Looking Statements and Information

Certain of the statements made and information provided in this news release are forward-looking statements or information within the meaning of the United States Private Securities Litigation Reform Act of 1995 and applicable Canadian securities laws. Often, these forward-looking statements and forward-looking information can be identified by the use of words such as “anticipate”, “believe”, “budget”, “continue”, “commitment”, “confident”, “estimate”, “expect”, “focus”, “forecast”, “foresee”, “future”, “goal”, “guidance”, “intend”, “opportunity”, “outlook”, “plan”, “potential”, “project”, “prospective”, “schedule”, “strive”, “target”, “underway”, “working” or the negatives thereof or variations of such words and phrases or similar words or statements that certain actions, events or results “can”, “could”, “likely”, “may”, “might”, “will” or “would” be taken, occur or be achieved.

Forward-looking statements or information contained in this news release include, but are not limited to, statements or information with respect to: the Company’s 2026 outlook, including revised production guidance and timing, production ranges by metal and material property, total cash costs per ounce sold, AISC per ounce sold, sustaining capital and growth capital; the payment of the fourth quarter dividend, including the record and payable dates; continued Board service following retirement from management; our priorities to safely complete the remaining commissioning work at Skouries and McIlvenna Bay, achieve commercial production, establish stable and predictable operating performance, improve execution consistency, enhance capital discipline and balance-sheet strength, convert the investments made into stronger cash flow and per-share value, and balance debt reduction, reinvestment and shareholder returns as cash flow increases; with respect to Skouries: our expectations relating to life of mine and average annual gold, copper and gold equivalent production; expected commercial production in late Q4 2026 and projected gold and copper production; anticipated production volumes covered by concentrate agreements and additional counterparty agreements in process covering production through 2029; our capital estimate and schedule, including project capital, accelerated operational capital and expected post-commercial-production capital expenditures; expected sources and sufficiency of funding; and expected progress on construction, commissioning, optimization and performance testing activities, including completion and operation of the thickeners, filter presses, tailings handling and waste management facilities and related infrastructure, and expected timing thereof; with respect to McIlvenna Bay: our expectations relating to life of mine, resource base and average annual production; operating and ramp-up activities, including optimization of operations, increasing throughput to full design capacity and expected commercial production in Q4 2026; our expectations of exploration upside across the broader district, including the nearby Tesla Zone; inclusion of the inaugural Inferred Mineral Resource for Tesla in our annual Mineral Reserve and Mineral Resource update expected in Q4 2026; studies to evaluate material handling options and mill expansion, planned resource conversion drilling for Tesla, and an updated McIlvenna Bay Technical Report once studies and conversion drilling have been advanced; expected production amounts, operating costs and capital expenditures; expectations of a study to evaluate an expansion of the processing facility and incorporation of a silver-lead circuit, expected benefits thereof and conditions to future development; targeted commissioning of the silver-lead circuit in 2028 and the expansion in 2030; our view of the district-scale geological potential to deliver future satellite development opportunities, further expansion or a separate processing facility; and our exploration program, core scanning programs and geophysical surveys and expected benefits thereof; with respect to Kisladag: expected production from higher-grade material stacked on the North Heap Leach Pad and timing thereof, our water management objectives; our evaluation of a pit shell and expected benefits thereof; expectations relating to life-of-mine optimization to be included in the Mineral Reserve and Mineral Resource update expected in Q4 2026; expectations of an investment decision on additional screening and timing thereof; our expectations and progress of the whole ore agglomeration circuit, including expected benefits and commissioning and ramp-up in H1 2027; and our expectations of the mine optimization plan; with respect to Olympias: expected blending of stockpiled material during the fourth quarter and benefits thereof; completion of the 650 ktpa expansion, including the expected full plant shutdown in Q1 2027 and anticipated ramp-up to nameplate capacity in H1 2027; the date of the conference call on October 29, 2026; and generally our strategy, plans and goals, including our proposed exploration, development, construction, permitting, financing and operating potential, plans and priorities and related timelines and schedules.

Forward-looking statements and forward-looking information by their nature are based on a number of assumptions that management considers reasonable. However, if such assumptions prove to be inaccurate, then actual results, activities, performance, or achievements may be materially different from those described in the forward-looking statements or information. These include assumptions concerning, among other things: timing, costs and results of our construction and development activities, improvements and exploration, including at the Skouries mine, the McIlvenna Bay mine and our other operating mines and development projects; the current or future price of gold, copper and other commodities; the availability of financing for our exploration, development and operating activities and our ability to access existing project funding and remain in compliance with all covenants and contractual commitments related thereto; the geopolitical, economic, permitting and legal climate that we operate in, including recent disruptions to shipping operations in the Strait of Hormuz and Red Sea and any related shipping delays, shipping price increases, or impacts on the global energy market; availability of labour resources, including for construction, development and improvement activities; our ability to integrate the assets of Foran Mining Corporation, advance its exploration and development assets and to realize anticipated synergies and benefits therefrom; general business and economic conditions, including interest rates, inflation, commodity and power prices, credit and financial market conditions and the impact of foreign exchange rates and tax rates and related frameworks; anticipated values, costs, expenses and working capital requirements; production and metallurgical recoveries; Mineral Reserves and Mineral Resources; our ability to develop, finalize and execute on our updated five-year strategic plan through 2030; acts of governments and the outcome of any legal or regulatory proceedings or other disputes that we may be involved in; our ability to continue to make purchases under our normal course issuer bid and to pay dividends; the impact of acquisitions, dispositions, suspensions or delays on our business; our ability to manage and mitigate the risks associated with our use of technology and artificial intelligence; the expected vesting and redemption outcomes under our compensation securities; our ability to address the negative impacts of climate change and adverse weather; consistency of agglomeration and our ability to optimize it in the future; the cost of, and extent to which we use, essential consumables; the impact and effectiveness of productivity initiatives; the time and cost necessary for anticipated overhauls of equipment; expected by-product grades; the effectiveness of our hedging programs; and our ongoing relations with regulators, communities, and our partners.

More specifically, with respect to the Skouries mine and updates, we have made additional assumptions regarding: our ability to continue executing our plans relating to the Skouries mine on the estimated existing project timeline and consistent with the current planned project scope; labour productivity, rates, and expected hours; inflation rates; the timeliness of shipping for important or critical items; our ability to continue accessing our project funding and remain in compliance with all covenants and contractual commitments related thereto; our ability to obtain and maintain all required approvals and permits, both overall and in a timely manner; the absence of further previously unidentified archaeological discoveries which would delay construction of various portions of the project; the future price of gold, copper, and other commodities; and the broader community engagement and social climate in respect of the Skouries mine.

In addition, except where otherwise stated, we have assumed a continuation of existing business operations on substantially the same basis as exists at the time of this news release. Even though we believe that the assumptions and expectations represented by such statements or information are reasonable, there can be no assurance that the forward-looking statements or information will prove to be accurate. Many assumptions may be difficult to predict and are beyond our control.

Forward-looking statements or information contained in this news release are subject to a variety of known and unknown risks, uncertainties and other factors which could cause actual events or results to differ from those expressed or implied by the forward-looking statements or information, including, but not limited to: commodity price risk; construction and development risks at the Skouries mine, the McIlvenna Bay mine and our other construction and development projects; changing political, economic and social conditions, including changes in governments, political systems or political dynamics, ongoing market uncertainty and global or regional geopolitical events, conflicts or disruptions; risks relating to our operations in foreign jurisdictions; risks relating to production and processing; risks relating to our improvement projects; risks relating to our ability to integrate the assets of Foran Mining Corporation, advance its exploration and development assets and realize anticipated synergies and benefits therefrom on the timelines expected or at all; delays and risks relating to surface construction, commissioning activities, ramp-up, and commercial production at McIlvenna Bay; our ability to obtain reliable supplies of power and water at a reasonable cost; risks relating to prices of commodities and consumables; our reliance on significant amounts of critical equipment; our reliance on infrastructure, commodities and consumables, including risks from volatility and inflationary pressures as a result from the ongoing international conflict in Iran; inflation risk; risks relating to fluctuations in the currency markets, including the Euro, Turkish lira, Canadian dollar and United States dollar; risks relating to community relations, social license and our ability to obtain or maintain required permits; risks relating to environmental matters and environmental monitoring and reporting; geotechnical and hydrogeological structures, conditions or failures, including our ability to completely understand such structures to deal with pre-existing mineralogical, topographical or predecessor activities on or near our sites and to mitigate such conditions or failures at a reasonable cost or at all; regulatory requirements as they relate to mine plan approvals; compliance with the Extractive Sector Transparency Measures Act (Canada); waste disposal; mineral tenure; risks relating to permits, licenses and other authorizations, including our ability to obtain, maintain, and comply with the terms and conditions of such permits, licenses and other authorizations; risks relating to non-governmental organizations; reputational issues; risks relating to climate change, including risks relating to forest fires and water management; water collection, treatment and disposal operations at our mines, including the ability to manage unexpectedly large quantities of water; risk of spills or failure from our tailings operations (including circumstances beyond our control such as extreme weather, seismic events, prolonged droughts or heavy rainfall); environmental risks from our heap leaching operations, including hazardous materials management of our use of cyanide; risks relating to change of control or actions of activist shareholders; estimation of Mineral Reserves and Mineral Resources; risks relating to replacement of Mineral Reserves; regulatory reviews and different standards used to prepare and report Mineral Reserves and Mineral Resources; risks relating to any pandemic, epidemic, endemic or similar public health threats; risks relating to our use of regulated substances; risks relating to acquisitions, including integration risks, and dispositions; risks relating to co-ownership of our properties; risks relating to volatility, volume fluctuations, and dilution risk in respect of our shares; competition risks; reliance on a limited number of smelters, refiners and off-takers, including risks related to accessibility, availability, proximity, and capacity of smelters, refiners and off-takers; information and operational technology systems; liquidity and financing risks; indebtedness, including current and future operating restrictions, implications of a change of control, ability to meet debt service obligations, the implications of defaulting on obligations and changes in credit ratings; risks relating to total cash costs per ounce and all in sustaining costs, including in relation to the market price of gold and the Company’s profitability; interest rate risk; credit risk; tax matters; financial reporting, including relating to the carrying value of our assets and changes in reporting standards; the global economic environment; labour risks (including availability of labour resources, including for construction, development and improvement activities, and labour productivity); and risks relating to employee/union relations, employee and contractor misconduct, key personnel, skilled workforce, expatriates and contractors, reclamation and long-term obligations; turnover and attrition rates of labour, and related impacts thereof; the unavailability of insurance; risks relating to title and surface rights; risks relating to environmental, sustainability, health and safety, and governance matters; technology and cybersecurity risks; corruption, bribery, and sanctions; litigation and contracts, including counterparty risk; conflicts of interest; compliance with applicable laws, regulations, stock exchange rules and permitting requirements and the consequences of non-compliance, including suspension, substantial alteration or termination of our development activities or operations, monetary penalties or criminal proceedings in various jurisdictions; risks relating to tariffs and other trade barriers; and those risk factors discussed in the section titled “Risk Factors in Our Business” in the Company’s most recent Annual Information Form and Form 40-F. The reader is directed to carefully review our most recent Annual Information Form, Form 40-F and other regulatory filings filed on SEDAR+ and EDGAR under our Company name for a fuller understanding of the risks and uncertainties that affect the Company’s business and operations.

With respect to the Skouries mine, these risks, uncertainties and other factors may cause further delays in the completion of the construction and commissioning at the Skouries mine which in turn may cause delays in the commencement of production and further increases to the costs of the Skouries mine. The specific risks, uncertainties and other factors include, among others: our ability to efficiently manage the transitions from construction to commissioning to operations (including EPCM performance and owner team turnover); our ability to increase productivity by, among other things, adding or modifying labour shifts; rising labour costs or costs of key inputs such as materials, power and fuel; risks related to any unanticipated critical equipment defects or failures during the commissioning and ramp-up of operations; risks related to third-party contractors, including reduced control over aspects of the Company’s operations, and/or the ability of contractors to perform at required levels and according to baseline schedules, costs of any engineering rework and any commercial disputes that may arise from a contractor’s failure to meet these requirements; the ability of key suppliers to meet key contractual commitments in terms of schedules, amount of product delivered, cost, or quality and the impact of any vendor data errors; impacts to overhead costs related to the schedule; our ability to construct key infrastructure within the required timelines, including the process plant, filter plant, substation, waste management facilities, embankments, tailings conveyors, and water management infrastructure; the timely receipt of necessary permits and authorizations and our ability to comply with the terms of existing and future permits and authorizations; differences between projected and actual degree of pre-strip required in the open pit; variability in metallurgical recoveries and concentrate quality due to factors such as extent and intensity of oxidation or presence of transition minerals; presence of additional structural features impacting hydrological and geotechnical considerations; variability in minerals or presence of substances that may have an impact on filtered tails performance and resulting bulk density of stockpiles or filtered tails; distribution of sulfides that may dilute concentrate and change the characteristics of tailings; unexpected disruptions to operations including protests, non-routine regulatory inspections, road conditions, on site or labour unrest; unexpected inclement weather and climate events, including wildfires, short and long duration rainfall and floods and other extreme weather events and our site’s ability to respond to those events; our ability to meet pre-commercial producing mining or underground development targets; unexpected results from underground stopes; new archaeological discoveries requiring the completion of a regulatory process; changes in support from local communities; and our ability to meet the expectations of communities, governments, and stakeholders related to the Skouries mine. Our project capital and accelerated operational capital costs at Skouries are incurred primarily in Euros but are reported in US dollars and are therefore sensitive to fluctuations in the EUR/USD exchange rate.

The inclusion of forward-looking statements and information is designed to help you understand management’s current views of our near- and longer-term prospects, and it may not be appropriate for other purposes. There can be no assurance that forward-looking statements or information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Except as required by law, we do not expect to update forward-looking statements and information continually as conditions change and you are referred to the full discussion of the Company’s business contained in the Company’s reports filed with the securities regulatory authorities in Canada and the United States. Accordingly, you should not place undue reliance on the forward-looking statements or information contained herein.

Qualified Persons and Disclosure of Mineral Resources

Except as otherwise noted, Simon Hille, FAusIMM, Executive Vice President and Chief Operating Officer, is the Qualified Person under NI 43-101 responsible for preparing and supervising the preparation of the scientific and technical information contained in this news release and verifying the technical data disclosed in this document relating to our operating mines and development projects.

Jessy Thelland, géo (OGQ No. 758), a member in good standing of the Ordre des Géologues du Québec, is the qualified person as defined in NI 43-101 responsible for, and has verified and approved, the scientific and technical disclosure contained in this news release for the Quebec projects.

Mineral resources that are not mineral reserves do not have demonstrated economic viability. Inferred mineral resources are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as mineral reserves.

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Financial Position                                  
As at September 30, 2026 and December 31, 2025
(Unaudited – in thousands of U.S. dollars)

  Note   September 30, 2026   December 31, 2025
           
ASSETS          
Current assets          
Cash and cash equivalents     $ 396,828     $ 869,356  
Restricted cash 8     71,898       —  
Accounts receivable and other 5     219,086       279,212  
Inventories 6     475,726       297,165  
Current derivative assets 17     845       2,051  
        1,164,383       1,447,784  
Deferred tax assets       45,421       37,076  
Other assets 7     86,112       144,479  
Investment in associate       123,275       109,423  
Non-current derivative assets 17     7,848       10,380  
Property, plant and equipment       8,651,071       4,885,564  
Goodwill 4     538,772       92,591  
      $ 10,616,882     $ 6,727,297  
LIABILITIES & EQUITY          
Current liabilities          
Accounts payable and accrued liabilities     $ 658,294     $ 630,310  
Current portion of lease liabilities       5,547       6,024  
Current portion of debt 8     148,472       47,968  
Current portion of asset retirement obligation       5,866       7,886  
Current derivative liabilities 17     4,441       96,879  
        822,620       789,067  
Debt 8     1,836,954       1,227,084  
Lease liabilities       8,656       8,575  
Employee benefit plan obligation       14,514       13,747  
Asset retirement obligation       139,709       135,071  
Non-current derivative liabilities 17     4,068       16,254  
Deferred income tax liabilities       823,664       254,420  
        3,650,185       2,444,218  
Equity          
Share capital 13     5,701,273       3,341,760  
Shares held in trust for restricted share units 13     (18,960 )     (16,035 )
Contributed surplus       2,492,172       2,537,197  
Accumulated other comprehensive loss       (31,156 )     (11,553 )
Deficit       (1,179,293 )     (1,572,080 )
Total equity attributable to shareholders of the Company       6,964,036       4,279,289  
Attributable to non-controlling interests       2,661       3,790  
        6,966,697       4,283,079  
      $ 10,616,882     $ 6,727,297  

Commitments and contractual obligations (Note 16)
Events after the reporting date (Note 13(b))

Approved on behalf of the Board of Directors

(signed) Teresa Conway               Director                        (signed) Christian Milau        Director

Date of approval: October 28, 2026


Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Operations         
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars except share and per share amounts)  

      Three months ended   Nine months ended
      September 30,   September 30,
  Note     2026       2025       2026       2025  
Revenue                  
Metal sales 9   $ 511,860     $ 434,727     $ 1,531,744     $ 1,241,696  
                   
Cost of sales                  
Production costs       199,821       164,140       572,822       474,609  
Depreciation and amortization       58,722       62,829       166,959       188,961  
        258,543       226,969       739,781       663,570  
                   
Earnings from mine operations       253,317       207,758       791,963       578,126  
                   
Exploration and evaluation expenses       17,116       10,975       41,408       25,218  
Mine standby costs       6,318       6,465       17,082       15,252  
General and administrative expenses       11,177       9,503       34,462       28,191  
Share-based payments expense 14     3,763       6,802       10,197       15,347  
Write-down of assets       1,569       3,261       2,672       8,426  
Foreign exchange (gain) loss       (4,029 )     32       (38,262 )     24,840  
Acquisition costs 4     89       —       19,253       —  
Earnings from operations       217,314       170,720       705,151       460,852  
                   
Other income (expense) 10     5,613       (52,406 )     15,821       (115,145 )
Finance costs 11     (13,531 )     (8,221 )     (37,660 )     (21,134 )
Earnings from continuing operations before income tax       209,396       110,093       683,312       324,573  
Income tax expense 12     91,605       53,917       257,114       54,604  
Net earnings from continuing operations       117,791       56,176       426,198       269,969  
Net loss from discontinued operations, net of tax       —       (1,122 )     —       (6,578 )
Net earnings for the period     $ 117,791     $ 55,054     $ 426,198     $ 263,391  
                   
Net earnings (loss) attributable to:                  
Shareholders of the Company       117,954       56,027       427,150       266,438  
Non-controlling interests       (163 )     (973 )     (952 )     (3,047 )
Net earnings for the period     $ 117,791     $ 55,054     $ 426,198     $ 263,391  
                   
Net earnings (loss) attributable to shareholders of the Company:                  
Continuing operations       117,954       56,540       427,150       267,522  
Discontinued operations       —       (513 )     —       (1,084 )
      $ 117,954     $ 56,027     $ 427,150     $ 266,438  
                   
Net (loss) earnings attributable to non-controlling interests:                  
Continuing operations       (163 )     (364 )     (952 )     2,447  
Discontinued operations       —       (609 )     —       (5,494 )
      $ (163 )   $ (973 )   $ (952 )   $ (3,047 )
                   
Weighted average number of shares outstanding:                  
Basic 13     260,941,591       202,742,582       236,944,753       204,129,778  
Diluted 13     263,448,182       205,150,042       239,640,842       206,247,722  
                   
Net earnings per share attributable to shareholders of the Company:                  
Basic earnings per share     $ 0.45     $ 0.28     $ 1.80     $ 1.31  
Diluted earnings per share     $ 0.45     $ 0.27     $ 1.78     $ 1.29  
                   
Net earnings per share attributable to shareholders of the Company – Continuing operations:                  
Basic earnings per share     $ 0.45     $ 0.28     $ 1.80     $ 1.31  
Diluted earnings per share     $ 0.45     $ 0.28     $ 1.78     $ 1.30  

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Comprehensive Income
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars)

      Three months ended   Nine months ended
      September 30,   September 30,
        2026       2025       2026       2025  
                   
Net earnings for the period     $ 117,791     $ 55,054     $ 426,198     $ 263,391  
Other comprehensive (loss) income:                  
Items that will not be reclassified to earnings or loss:                  
Change in fair value of investments in marketable securities       (135 )     32,584       60       62,521  
Income tax expense on change in fair value of investments in marketable securities       —       (4,388 )     (31 )     (8,394 )
Actuarial gain (loss) on employee benefit plans       370       (359 )     142       61  
Income tax expense on employee benefit plans       (89 )     (32 )     (34 )     (133 )
Total other comprehensive income for the period       146       27,805       137       54,055  
Total comprehensive income for the period     $ 117,937     $ 82,859     $ 426,335     $ 317,446  
                   
Total comprehensive income (loss) attributable to:                  
Shareholders of the Company       118,100       83,832       427,287       320,493  
Non-controlling interests       (163 )     (973 )     (952 )     (3,047 )
      $ 117,937     $ 82,859     $ 426,335     $ 317,446  

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Cash Flows
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars)

      Three months ended   Nine months ended
      September 30,   September 30,
  Note     2026       2025       2026       2025  
Cash flows generated from (used in):                  
Operating activities                  
Net earnings from continuing operations     $ 117,791     $ 56,176     $ 426,198     $ 269,969  
Adjustments for:                  
Depreciation and amortization       59,170       63,342       168,317       190,374  
Finance costs 11     13,531       8,221       37,660       21,134  
Interest income 10     (2,505 )     (8,561 )     (15,598 )     (25,782 )
Share of loss from associate       525       —       880       —  
Unrealized foreign exchange (gain) loss       (4,413 )     (694 )     (32,661 )     23,991  
Income tax expense 12     91,605       53,917       257,114       54,604  
(Gain) loss on disposal of assets       (1,453 )     441       (842 )     (6,618 )
Unrealized (gain) loss on derivative contracts 10     (4,028 )     22,194       (100,627 )     66,844  
Write-down of assets       1,569       3,261       2,672       8,426  
Share-based payments expense 14     3,763       6,802       10,197       15,347  
Employee benefit plan expense       1,424       719       3,742       2,820  
        276,979       205,818       757,052       621,109  
Property reclamation payments       (1,683 )     (1,284 )     (4,078 )     (3,688 )
Employee benefit plan payments       (691 )     (298 )     (1,756 )     (1,087 )
Income taxes paid       (28,310 )     (29,316 )     (227,796 )     (120,136 )
Interest received       2,505       8,561       15,598       25,782  
Changes in non-cash operating working capital 15     (113,988 )     (13,273 )     (113,273 )     (63,194 )
Net cash generated from operating activities of continuing operations       134,812       170,208       425,747       458,786  
Net cash (used in) generated from operating activities of discontinued operations       —       (151 )     —       158  
Investing activities                  
Additions to property, plant and equipment       (429,103 )     (242,517 )     (1,210,017 )     (592,207 )
Capitalized interest paid       (14,879 )     (8,437 )     (45,943 )     (28,457 )
Cash from acquisition of Foran Mining Corporation, net of cash paid 4     —       —       159,110       —  
Proceeds from the sale of property, plant and equipment       2,158       244       4,539       3,224  
Purchase of investment in associate       —       —       (14,731 )     —  
Value added taxes related to mineral property expenditures, net       23,445       (5,954 )     68,161       (7,005 )
Cash received from deferred consideration       —       60,000       —       60,000  
Sale (purchase) of investments in marketable securities       287       (13,961 )     37,359       141,117  
Increase in deposits and other investments       (5,707 )     (1,484 )     (13,716 )     (10,750 )
Increase in restricted cash 8     (71,877 )     —       (71,877 )     —  
Net cash used in investing activities of continuing operations       (495,676 )     (212,109 )     (1,087,115 )     (434,078 )
Financing activities                  
Issuance of common shares for cash, net of share issuance costs       2,755       1,575       6,546       9,102  
Net contributions from (distributions to) non-controlling interests       —       53       (177 )     (264 )
Net proceeds from Skouries Project Financing Facility 8     14,630       98,549       47,237       288,314  
Proceeds from Credit Facility, net of transaction costs 8     222,983       —       322,983       —  
Net (repayments) proceeds from other debt 8     (217 )     —       2,469       —  
Term Facility commitment fees       —       —       (474 )     (1,372 )
Dividends paid 13     (19,619 )     —       (54,103 )     —  
Interest paid       (13,165 )     (9,174 )     (28,611 )     (19,601 )
Principal portion of lease liabilities       (1,402 )     (1,401 )     (3,931 )     (3,927 )
Purchase of shares for cancellation 13     —       (78,793 )     (83,895 )     (123,381 )
Purchase of shares held in trust for restricted share units 13     —       (3,955 )     (8,683 )     (8,181 )
Net cash generated from financing activities of continuing operations       205,965       6,854       199,361       140,690  
Effect of exchange rates on cash and cash equivalents       (2,835 )     410       (10,521 )     21,740  
Net (decrease) increase in cash and cash equivalents       (157,734 )     (34,788 )     (472,528 )     187,296  
Cash and cash equivalents – beginning of period       554,562       1,078,572       869,356       856,797  
Change in cash in disposal group held for sale       —       151       —       (158 )
Cash and cash equivalents – end of period     $ 396,828     $ 1,043,935     $ 396,828     $ 1,043,935  

Eldorado Gold Corporation
Condensed Consolidated Interim Statements of Changes in Equity
For the three and nine months ended September 30, 2026 and 2025
(Unaudited – in thousands of U.S. dollars)

    Three months ended   Nine months ended
    September 30,   September 30,
  Note   2026       2025       2026       2025  
Share capital                
Balance beginning of period   $ 5,695,878     $ 3,423,439     $ 3,341,760     $ 3,433,778  
Shares issued upon exercise of share options     2,755       1,502       6,546       9,913  
Shares issued upon exercise of performance share units     1,459       —       4,545       5,282  
Shares issued upon acquisition of Foran Mining Corporation 4   —       —       2,385,625       —  
Transfer of contributed surplus on exercise of options     1,181       565       2,847       3,749  
Shares repurchased and cancelled, net of tax     —       (42,467 )     (40,050 )     (68,872 )
Shares repurchased and not yet cancelled     —       (3,892 )     —       (3,892 )
Share issuance costs     —       —       —       (811 )
Balance end of period 13 $ 5,701,273     $ 3,379,147     $ 5,701,273     $ 3,379,147  
                 
Shares held in trust for restricted share units                
Balance beginning of period   $ (19,087 )   $ (9,162 )   $ (16,035 )   $ (12,970 )
Shares purchased and held in trust for restricted share units     —       (3,954 )     (8,683 )     (8,180 )
Shares released for settlement of restricted share units     127       225       5,758       8,259  
Balance end of period 13 $ (18,960 )   $ (12,891 )   $ (18,960 )   $ (12,891 )
                 
Contributed surplus                
Balance beginning of period   $ 2,493,742     $ 2,583,047     $ 2,537,197     $ 2,612,762  
Shares repurchased and cancelled     —       (33,876 )     (42,907 )     (52,950 )
Share-based payment arrangements     1,197       3,055       7,936       8,914  
Option consideration on acquisition of Foran Mining Corporation 4   —       —       3,096       —  
Shares redeemed upon exercise of restricted share units     (127 )     (225 )     (5,758 )     (8,259 )
Shares redeemed upon exercise of performance share units     (1,459 )     —       (4,545 )     (5,282 )
Transfer to share capital on exercise of options     (1,181 )     (565 )     (2,847 )     (3,749 )
Balance end of period   $ 2,492,172     $ 2,551,436     $ 2,492,172     $ 2,551,436  
                 
Accumulated other comprehensive (loss) income                
Balance beginning of period   $ (31,302 )   $ (21,070 )   $ (11,553 )   $ 56,183  
Other comprehensive income for the period attributable to shareholders of the Company     146       27,805       137       54,055  
Reclassification on derecognition of investments in marketable securities     —       —       (19,740 )     (103,503 )
Balance end of period   $ (31,156 )   $ 6,735     $ (31,156 )   $ 6,735  
                 
Deficit                
Balance beginning of period   $ (1,277,628 )   $ (1,879,249 )   $ (1,572,080 )   $ (2,193,163 )
Dividends paid 13   (19,619 )     —       (54,103 )     —  
Net earnings attributable to shareholders of the Company     117,954       56,027       427,150       266,438  
Reclassification on derecognition of investments in marketable securities     —       —       19,740       103,503  
Balance end of period   $ (1,179,293 )   $ (1,823,222 )   $ (1,179,293 )   $ (1,823,222 )
Total equity attributable to shareholders of the Company   $ 6,964,036     $ 4,101,205     $ 6,964,036     $ 4,101,205  
                 
Non-controlling interests                
Balance beginning of period   $ 2,824     $ (10,534 )   $ 3,790     $ (8,143 )
Loss attributable to non-controlling interests     (163 )     (973 )     (952 )     (3,047 )
Net contributions from (distributions to) non-controlling interests     —       53       (177 )     (264 )
Balance end of period   $ 2,661     $ (11,454 )   $ 2,661     $ (11,454 )
Total equity   $ 6,966,697     $ 4,089,751     $ 6,966,697     $ 4,089,751  

(1) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.
(2) The Skouries Term Facility is defined as the Commercial Loan Facility, the RRF Facility and the Contingent Overrun Facility (“Term Facility”).
(3) Gold equivalent ounces: Calculated by converting copper pounds produced into gold equivalent using budgeted commodity prices for the relevant period: 2026-2028: $4,000/oz gold and $5.00/lb copper; 2029 and beyond: $3,000/oz gold and $4.50/lb copper.
(4) See the section “Financial Condition and Liquidity – Financing Activities” in the Company’s September 30, 2026 MD&A.
(5) These financial measures or ratios are non-IFRS financial measures or ratios. Certain additional disclosure for non-IFRS financial measures and ratios have been incorporated by reference and additional detail can be found at the end of this news release and in the section ‘Non-IFRS and Other Financial Measures and Ratios’ in the Company’s September 30, 2026 MD&A.

Please see the condensed consolidated interim financial statements dated September 30, 2026 for notes to the accounts.

(In United States (“US”) dollars, except where noted otherwise)

TORONTO, Oct. 28, 2026 (GLOBE NEWSWIRE) — First Quantum Minerals Ltd. (“First Quantum” or the “Company”) (TSX: FM) today reports results for the three and nine months ended September 30, 2026 (“Q3 2026” or the “third quarter”).

“We are pleased with the significant improvement in our financial performance this quarter, supported by higher production and full exposure to stronger copper prices, which clearly demonstrates the underlying earnings potential of our business. We delivered another quarter of production growth, supported by continued strong performance from S3 at Kansanshi and the processing of stockpiles at Cobre Panamá, where the recommissioning progressed successfully, with all three trains brought online sequentially during the quarter,” said Tristan Pascall, Chief Executive Officer of First Quantum. “In Panama, we are encouraged by the recommendation made by the Interministerial Commission and remain ready to engage constructively with the Government of Panama to achieve a fair and durable resolution that serves the best interests of the country and its people, as well as our stakeholders.”

Q3 2026 HIGHLIGHTS

  • Financial results for the third quarter include gross profit of $678 million (Q2 2026: $297 million), EBITDA1 of $844 million (Q2 2026: $400 million), net earnings attributable to shareholders of $0.25 per share (Q2 2026: $0.16), and an adjusted earnings per share1 of $0.29 (Q2 2026: $(0.13)). Relative to the second quarter of 2026, third quarter results benefitted from higher sales volumes, improved realized metals prices1, lower fuel costs and the absence of derivative contracts following the completion of the hedging program on June 30, 2026.
  • Total copper production was 108,959 tonnes (Q2 2026: 100,487 tonnes) at C1 cash costs1 of $2.59 per lb (Q2 2026: $2.54). Copper sales totalled 109,841 tonnes. During the quarter, 47,095 ounces of gold (Q2 2026: 32,029 ounces) and 9,831 tonnes of nickel (Q2 2026: 11,246 tonnes) were produced.
  • Copper production guidance has been narrowed from a range of 405,000 – 475,000 tonnes to 405,000 – 435,000 tonnes to reflect lower grades experienced to date at Sentinel and Kansanshi while guidance for Cobre Panamá has been maintained. Gold production guidance has been narrowed from a range of 150,000 – 175,000 ounces to 150,000 – 170,000 ounces. Nickel production guidance has increased from a range of 30,000 – 40,000 tonnes to 40,000 – 45,000 tonnes.
  • Previously provided sensitivity of $0.25 per lb has been incorporated into updated copper C1 cash cost1 guidance of $2.50 – $2.65 per lb to reflect elevated fuel prices and the strong Zambian kwacha to date, which are expected to continue in the fourth quarter. Guidance for total capital expenditure has been narrowed based on spend to date and the latest expected timing of capital expenditures.
  • In Panama, the Interministerial Commission delivered its final report, recommending an assessment of the feasibility of a new agreement that could address outstanding arbitrations and provide for a potential restart of Cobre Panamá to support an orderly, self-financed closure, recognizing that closure and rehabilitation will be a long-term undertaking extending over decades. The President is reviewing the report and will communicate a decision directly to the country.
  • The authorized stockpile processing program (“Processing Program”) at Cobre Panamá advanced materially during the quarter. Following the initial start-up of Train 3, Train 2 commenced operations in July. Train 1 progressed through refurbishment, testing, and commissioning, which was completed without major issues. There are sufficient stockpiles to support the Processing Program until mid-2027.
  • With respect to the environmental findings from the Comprehensive Audit, environmental actions were incorporated into the compliance tracking process at Cobre Panamá, supported by improved evidence management, traceability, and georeferencing.

____________________
1 EBITDA, adjusted earnings (loss), realized metal prices and C1 cash costs are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Q3 2026 OPERATIONAL HIGHLIGHTS

  • Total copper production for the third quarter was 108,959 tonnes, an 8% increase from Q2 2026 mainly attributable to the Processing Program at Cobre Panamá and higher production from Kansanshi.
  • C1 copper cash cost1 was $0.05 higher quarter-over-quarter at $2.59 per lb due to the inclusion of higher cost production from Cobre Panamá. Excluding Cobre Panamá, copper C1 cash cost1 was $0.08 lower quarter-over-quarter at $2.40 per lb due to higher acid by-product credits and lower fuel costs. During the quarter, Kansanshi sold surplus acid, supported by strong regional demand and favourable sulphuric acid pricing.
  • Copper sales volumes totalled 109,841 tonnes, approximately 882 tonnes higher than production as volumes produced at Cobre Panamá in Q2 2026 were sold in the third quarter.
  • For more details, see Operations Review on page 8.

Q3 2026 FINANCIAL HIGHLIGHTS

  • Sales revenues of $2,086 million in Q3 2026 were 38% higher than the previous quarter on higher sales volumes and strong realized metal prices1. Revenues included $33 million from surplus acid sales.
  • Gross profit for the third quarter of $678 million was $381 million higher than Q2 2026 and EBITDA2 of $844 million for the same period was $444 million higher.
  • Cash flow from operating activities of $600 million ($0.72 per share3) for the quarter increased $470 million from Q2 2026 due to higher net earnings attributable to shareholders of $207 million.
  • Net debt4 decreased by $98 million during the quarter to $5,309 million at September 30, 2026, primarily attributable to debt repayment of $171 million.
  • Total liquidity of $2.13 billion as at September 30, 2026, comprised of $781 million in cash and $1.35 billion of undrawn availability under the revolving credit facility.

____________________
1 EBITDA and copper C1 cash cost (copper C1) are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
2 Cash flows from operating activities per share, and realized metal prices are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Net debt is a supplementary financial measure. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

COBRE PANAMÁ UPDATE

On September 30, 2026, the Interministerial Commission formally delivered its final report on Cobre Panamá to President José Raúl Mulino (the “President”), marking the Government of Panama’s (“GOP”) transition from technical assessment to the decision-making phase. The report sets out 17 recommendations and six guiding criteria for consideration in determining the future of the mine. The Interministerial Commission recommended assessing the feasibility of entering into a new agreement with Cobre Panamá / First Quantum that would provide for the settlement of the outstanding arbitration proceedings and establish conditions for a potential restart designed to achieve an orderly, self-financed closure, while complying with the ruling of the Supreme Court of Justice and prioritizing Panama’s environmental, social, and economic interests. The report recognized that the site continues to require active management and monitoring, which is currently being funded by Cobre Panamá / First Quantum at no cost to the Panamanian State, and that maintaining and ultimately closing the site represents significant long-term obligations extending over decades. It recommends that any new framework provide for the site’s activities to fund its own closure, with no appropriation from the General State Budget for either the operation or closure of the mine. The report further documents the economic and social impacts of the shutdown, including effects on employment, Panamanian businesses, exports, and government revenues, and cites public-opinion findings indicating support for a resolution under conditions that include environmental and social safeguards, transparency, and independent oversight. The President is reviewing the report with the Cabinet and legal advisers and will communicate a decision directly to the country. The Company remains ready to engage constructively with the GOP with the objective of achieving a fair and durable resolution for all stakeholders of Cobre Panamá.

Follow-up to the SGS Comprehensive Audit progressed from assessment into corrective-action implementation. Environmental actions were incorporated into the compliance tracking process, with field work focused on reforestation maintenance, compensatory reforestation verification, and protected-flora translocation, supported by improved evidence management, traceability, and georeferencing. Environmental stewardship remains a core priority. All processing activities will continue to be conducted in accordance with the approved Preservation and Safe Management plan, applicable permits, and environmental commitments, while maintaining close coordination with the GOP.

Engagement with the municipalities surrounding the project also advanced during the quarter. The Company is supporting the municipal authorities of Donoso, Omar Torrijos Herrera, and La Pintada to identify and structure priority local development initiatives. These include coordination with relevant Government institutions to explore pathways for projects to be incorporated into formal public investment and municipal development mechanisms. This work is intended to create a more sustainable framework for addressing local development priorities.

Additionally, the Participatory Environmental Monitoring Program was launched, which directly involves communities surrounding the project in water-quality monitoring, from sample collection through to access to laboratory results, strengthening transparency and community participation in environmental oversight.

The Company also graduated the first participants from its community technical training program, with more than 125 people, particularly from coastal communities, completing 100 hours of training in trades including plumbing and electrical work.

Progress continues on the “Suma tu Talento” recruitment initiative to support the hiring of staff for preservation activities. Cobre Panamá participated in a major employment fair organized by the Municipality of Panama, receiving 426 in-person candidate profiles, approximately 64% of which were for operational, technical, and supervisory trades.

Public outreach efforts also continued in the third quarter through Cobre Conecta and other direct-engagement platforms, generating approximately 447,000 in-person stakeholder engagements across Panama since 2024. Digital engagement also expanded, with the Cobre Panamá Virtual Tour surpassing 405,000 visits.

On October 9, Panama experienced an earthquake and subsequent aftershocks. All First Quantum personnel in the country were reported safe and Cobre Panamá’s site inspections have identified no material impacts to site infrastructure or environmental protection systems. Following the earthquake, safety protocols were immediately activated and checks were carried out across the operation. Inspections indicated that facilities and infrastructure at Cobre Panamá remained stable and secure, including the site’s tailings management facilities and water management systems. The site’s infrastructure incorporates design criteria for high-intensity seismicity and this event remained well below design parameters. The processing of stockpiled ore was temporarily suspended following the event while precautionary checks were completed, and operations were returned to service and re-stabilized on October 10. Power generation systems remained operational throughout the event. There was no impact to the Company’s environmental protection and monitoring systems from the event. The earthquake impacted many communities across Panama, particularly in the Penonomé area, and Cobre Panamá was involved in supporting relief efforts, in coordination with local authorities and emergency services, for the provision of essential supplies.

REALIZED METAL PRICES1

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Average LME copper cash price (per lb) $6.40   $6.05   $4.44  
Realized copper price1,3 (per lb) $6.37   $5.34   $4.38  
Treatment/refining charges (“TC/RC”) (per lb) $–   ($0.03 ) ($0.04 )
Freight charges (per lb) ($0.01 ) ($0.01 ) ($0.04 )
Net realized copper price1 (per lb) $6.36   $5.30   $4.30  
Average LBMA cash price (per oz) $4,258   $4,506   $3,455  
Net realized gold price1,2 (per oz) $4,125   $4,113   $3,358  
Average LME nickel cash price (per lb) $7.52   $8.22   $6.81  
Net realized nickel price1 (per lb) $6.90   $7.94   $6.86  

1 Realized metal prices are a non-GAAP ratio which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
2 Excludes gold revenues recognized under the stream arrangements.
3 Realized Copper price includes hedge losses of nil for the three months ended September 30, 2026, $158 million for the three months ended June 30, 2026, and $287 million, for the nine months ended September 30, 2026.

CONSOLIDATED OPERATING HIGHLIGHTS

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Copper production (tonnes)1 108,959 100,487 104,626
Copper sales (tonnes)2 109,841 93,300 118,825
Gold production (ounces) 47,095 32,029 36,463
Gold sales (ounces)3 43,016 32,121 43,658
Nickel production (contained tonnes) 9,831 11,246 5,767
Nickel sales (contained tonnes) 13,516 8,809 2,917

1 Production is presented on a contained basis and is presented prior to processing through the Kansanshi smelter.
2 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 and 10,453 tonnes for the three and nine months ended September 30, 2025), respectively. Sales of copper anode attributable to third-party concentrate purchases were 12,207 and 20,152 tonnes for the three and six months ended June 30, 2026 (2,211 and 8,609 tonnes for the three and six months ended June 30, 2025).
3 Excludes refinery-backed gold credits purchased and delivered under the streaming arrangements.

UNIT CASH COSTS (PER LB)1,2,3

  QUARTERLY
Group Q3 2026 Q2 2026 Q3 2025
Cash cost of copper production (C1) (per lb) $2.59 $2.54 $1.95
C1 (per lb) excluding Cobre Panamá $2.40 $2.48 $1.95
Total cost of copper production (C3) (per lb) $4.14 $4.12 $3.22
Copper all-in sustaining cost (AISC) (per lb) $4.30 $4.27 $3.07
AISC (per lb) excluding Cobre Panamá $4.20 $4.14 $3.00

1 All-in sustaining costs (AISC), C1 cash cost (C1), C3 total cost (C3) are non-GAAP ratios, which do not have standardized meaning prescribed by IFRS and might not be comparable to similar measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
2 Excludes copper concentrate from third parties purchased at Kansanshi.
3 Excludes the sale of copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 tonnes and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 tonnes and 10,453 tonnes for the three and nine months ended September 30, 2025). Sales of copper anode attributable to third-party concentrate purchases were 12,207 tonnes and 20,152 tonnes for the three and six months ended June 30, 2026 (2,211 tonnes and 8,609 tonnes for the three and six months ended June 30, 2025).

CONSOLIDATED FINANCIAL HIGHLIGHTS

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Sales revenues 2,086   1,522   1,346  
Gross profit 678   297   360  
Net earnings (loss) attributable to shareholders of the Company 207   136   (48 )
Basic net earnings (loss) per share $0.25   $0.16   ($0.06 )
Diluted net earnings (loss) per share $0.25   $0.16   ($0.06 )
Cash flows from operating activities 600   130   1,195  
Net debt1 5,309   5,407   4,751  
EBITDA1,2 844   400   435  
Adjusted earnings (loss)1 244   (106 ) (16 )
Adjusted earnings (loss) per share3 $0.29   $(0.13 ) ($0.02 )
Net earnings (loss) attributable to shareholders of the Company 207   136   (48 )
Adjustments attributable to shareholders of the Company:      
Adjustment for expected phasing of Zambian value-added tax (“VAT”) (16 ) –   (8 )
Modification and redemption of liabilities –   –   25  
Total adjustments to EBITDA1 excluding depreciation2 62   (237 ) 16  
Tax adjustments (5 ) 3   –  
Minority interest adjustments (4 ) (8 ) (1 )
Adjusted earnings (loss)1 244   (106 ) (16 )

1 EBITDA and adjusted earnings (loss) are non-GAAP financial measures, and net debt is a supplementary financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. Adjusted earnings (loss) have been adjusted to exclude items from the corresponding IFRS measure, net earnings (loss) attributable to shareholders of the Company, which are not considered by management to be reflective of underlying performance. The Company has disclosed these measures to assist with the understanding of results and to provide further financial information about the results to investors and may not be comparable to similar financial measures disclosed by other issuers. The use of adjusted earnings (loss) and EBITDA represents the Company’s adjusted earnings (loss) metrics. See “Regulatory Disclosures”.
2 Adjustments to EBITDA in 2026 relate principally to a $271 million gain on disposal of group companies, a $19 million foreign exchange gain and $66 million of commissioning costs at Cobre Panamá (2025 – the adjustment for expected phasing of Zambian VAT and the tax effect on unrealized movements in the fair value of derivatives designated as hedging instruments).
3 Adjusted earnings (loss) per share, realized metal prices, copper all-in sustaining cost (copper AISC), copper C1 cash cost (copper C1) and total cost of copper (copper C3) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

GUIDANCE

Guidance provided below is based on a number of assumptions and estimates as of September 30, 2026, including among other things, assumptions about metal prices and anticipated costs and expenditures. Guidance involves estimates of known and unknown risks, uncertainties, and other factors, which may cause the actual results to be materially different.

Copper production guidance has been narrowed to reflect lower grades experienced to date at Sentinel and Kansanshi. Guidance for Cobre Panamá has been maintained.

Gold production guidance has been narrowed to reflect lower grades at Kansanshi. Gold production guidance for Guelb Moghrein has been increased to reflect the transition to production of a gold-copper concentrate from August 2026. Guidance for Cobre Panamá has been maintained.

Enterprise nickel production has been increased based on strong year-to-date grades and recoveries.

The previously provided sensitivity of $0.25 per lb has been incorporated into updated copper C1 cash cost1 guidance to reflect elevated fuel prices and the strong Zambian kwacha to date, which are expected to continue in the fourth quarter. The assumptions underlying this guidance include a gold price of $4,000 per ounce, an average Brent crude oil price of $100 per barrel, a Zambian kwacha to US dollar exchange rate of 18, and royalties based on consensus copper prices.

Copper AISC1 guidance has increased, driven primarily by higher royalties due to stronger copper prices and the impact of narrowing production guidance.

Nickel unit cost guidance for Enterprise has been reduced to reflect strong year-to-date operational performance.

Guidance for total capital expenditure has been narrowed based on spend to date and the latest expected timing of capital expenditures. Increased deferred stripping was offset by lower sustaining capital expenditure. The increase in deferred stripping relates to Kansanshi, with approximately half attributable to higher mining unit costs and the remainder attributable to increased capitalized stripping volumes.

The following guidance for the full year 2026 is unchanged:

  • Interest expense on debt: $500 – $525 million
  • Cash outflow on interest paid: $500 – $525 million
  • Adjusted effective tax rate, excluding Cobre Panamá and share of joint venture, Ravensthorpe, interest expense, losses realized under the Company’s sales hedge program, and one-off adjustments: 35%
  • Depreciation expense: $925 – $975 million

1 C1 cash cost (C1), and all-in sustaining cost (AISC) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

PRODUCTION GUIDANCE

000’s 2026 Previous Guidance 2026 Updated Guidance
Copper (tonnes) 405 – 475 405 – 435
Gold (ounces) 150 – 175 150 – 170
Nickel (tonnes) 30 – 40 40 – 45

PRODUCTION GUIDANCE BY OPERATION1

Copper production guidance (000’s tonnes) 2026 Previous Guidance 2026 Updated Guidance
Cobre Panamá 30 – 40 30 – 40
Kansanshi 175 – 205 175 – 185
Trident – Sentinel 190 – 220 190 – 200
Other sites 10 10
Gold production guidance (000’s ounces)    
Cobre Panamá 10 – 15 10 – 15
Kansanshi 110 – 120 95 – 105
Guelb Moghrein 30 – 40 45 – 50
Nickel production guidance (000’s tonnes)    
Trident – Enterprise 30 – 40 40 – 45

1 Production is stated on a 100% basis as the Company consolidates all operations.

CASH COST1 AND ALL-IN SUSTAINING COST1

Total Copper 2026 Previous Guidance 2026 Updated Guidance
C1 (per lb)1 $2.15 – $2.40 $2.50 – $2.65
AISC (per lb)1 $3.50 – $3.80 $4.10 – $4.25

Total Nickel 2026 Previous Guidance 2026 Updated Guidance
C1 (per lb)1 $3.25 – $4.25 $3.00 – $3.25
AISC (per lb)1 $4.25 – $5.25 $4.00 – $4.25

1 C1 cash cost (C1), and all-in sustaining cost (AISC) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

  2026 Previous Guidance 2026 Updated Guidance
Project capital1 410 – 460 410 – 450
Sustaining capital1 435 – 510 380 – 410
Deferred stripping1 230 – 280 360 – 390
Total capital expenditure 1,075 – 1,250 1,150 – 1,250

1 Deferred stripping, sustaining capital and project capital are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

OPERATIONS REVIEW

Kansanshi

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Waste mined (000’s tonnes) 34,008   34,581   31,092  
Ore mined (000’s tonnes) 4,240   5,195   5,268  
Sulphide – S3 ore milled (000’s tonnes)1,7 6,842   6,462   2,127  
Sulphide – S3 ore grade processed (%) 0.39   0.37   0.39  
Sulphide – S3 copper recovery (%) 80   82   74  
Sulphide – S3 concentrate grade (%) 20.3   21.9   22.7  
Sulphide – Main ore milled (000’s tonnes)1 2,983   3,104   3,367  
Sulphide – Main ore grade processed (%) 0.39   0.41   0.61  
Sulphide – Main copper recovery (%) 81   82   87  
Sulphide – Main concentrate grade (%) 20.2   21.5   22.9  
Mixed ore milled (000’s tonnes)1 1,597   1,754   2,116  
Mixed ore grade processed (%) 0.54   0.56   0.89  
Mixed copper recovery (%) 64   58   78  
Mixed ore concentrate grade (%) 19.4   18.9   23.1  
Oxide ore milled (000’s tonnes)1 1,955   1,685   1,785  
Oxide ore grade processed (%) 0.69   0.71   0.63  
Oxide copper recovery (%) 71   68   72  
Oxide concentrate grade (%) 15.9   16.9   18.1  
Copper production (tonnes)2 45,843   43,997   46,881  
Copper sales (tonnes)4 43,985   44,864   38,170  
Copper sold from third-party concentrate purchased (tonnes) 11,207   12,207   1,844  
Gold production (ounces) 24,690   24,586   27,854  
Gold sales (ounces) 25,110   26,955   24,313  
Copper smelter      
Concentrate processed3 383,053   369,844   310,787  
Copper anodes produced (tonnes)3 86,164   86,930   69,111  
Smelter copper recovery (%) 97   96   98  
Acid tonnes produced (000’s) 316   327   274  
Unit Cash Costs (per lb)5,6      
Mining $0.86   $0.86   $0.58  
Processing $1.46   $1.48   $0.95  
Site administration $0.50   $0.49   $0.33  
TC/RC and freight charges $0.17   $0.17   $0.15  
By-product credits ($1.39 ) ($1.28 ) ($0.76 )
Total smelter costs $0.43   $0.46   $0.34  
Copper cash cost (C1) $2.02   $2.16   $1.34  
Copper all-in sustaining cost (AISC) $4.46   $4.46   $2.77  
Total copper cost (C3) $3.67   $3.76   $2.85  

1 Measured in dry metric tonnes (“DMT”).
2 Production presented on a copper concentrate basis, i.e. mine production only. Production does not include output from the smelter.
3 Concentrate processed in smelter and copper anodes produced are disclosed on a 100% basis, inclusive of Trident and third-party concentrate processed. Concentrate processed is measured in DMT.
4 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 and 10,453 tonnes for the three and nine months ended September 30, 2025).
5 Copper all-in sustaining costs (copper AISC), copper C1 cash cost (copper C1), and total copper cost (copper C3) are non-GAAP ratios. These measures do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
6 Excludes copper concentrate from third parties purchased at Kansanshi.
7 Kansanshi S3 Expansion project declared commercial production on December 1, 2025.

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Financial results ($ millions)      
Copper 773 758 389
Gold 105 118 87
Other 33 12 –
Total sales revenues 911 888 476
Gross profit 260 255 117
EBITDA1 331 330 177

1 EBITDA is a non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Production

Kansanshi reported copper production of 45,843 tonnes in Q3 2026, an increase of 1,846 tonnes from the previous quarter due to improved throughput, while gold production was 24,690 ounces (Q2 2026: 24,586 ounces). Copper C1 cash cost1 of $2.02 per lb was $0.14 lower quarter-over-quarter due to a $0.14 per lb benefit from surplus acid sales. Feed blends and acid inventories were managed to make surplus volumes available for third-party sales where operational requirements permitted. During the quarter, the Kansanshi smelter produced approximately 316,000 tonnes of sulphuric acid, including approximately 70,000 tonnes of surplus acid sold at an average realized price of $462 per tonne, generating $33 million in revenue.

S3 throughput was sustained above design capacity supported by higher operating time, strong utilization, and improved milling rates. S3 continues to take a high proportion of feed from surface stockpiles which are tarnished and lower in grade than fresh mined ore.

Additionally, the oxide circuit throughput benefitted from increased fines feed resulting from screening, which also improved grade by removing barren, high acid-consuming material.

Outlook

Production guidance for 2026 has been narrowed to 175,000 – 185,000 tonnes for copper to reflect performance to date.

S3 will benefit from higher operating availability, mitigating expectations of lower feed grades, and reduced recoveries mostly due to feed quality changes. Stripping at South East Dome is taking longer than originally planned which will result in lower grades continuing into next year. Processing of high-grade, high acid-consuming material was reduced to lower acid-consuming material to maximize value from acid sales with prevailing high prices during the third quarter. This acid sales initiative is expected to continue into 2027 which will also impact copper production next year. A sulphide cleaner recovery improvement strategy is in place and is currently being validated with test work, surveys, and plant trials. Additionally, a crusher concave reline has been rescheduled to next year and higher oxide throughput is expected by processing a higher proportion of screened fines.

Production guidance for 2026 has been reduced to 95,000 – 105,000 ounces for gold to reflect performance to date. This is attributed to lower grades. An optimization program is in place to identify and develop gold recovery improvement opportunities.

During the third quarter, the Company continued the program to evaluate the new near-surface gold zone occurrences in the South East Dome area at Kansanshi. Test work continues with the pilot plant facility.

____________________
1 C1 cash costs are non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Trident

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Sentinel      
Waste mined (000’s tonnes) 25,255 27,641 30,432
Ore mined (000’s tonnes) 13,011 12,628 12,937
Copper ore milled (000’s tonnes)1 13,732 12,836 15,113
Copper ore grade processed (%) 0.39 0.43 0.40
Copper recovery (%) 91 92 85
Concentrate grade (%) 24.3 25.4 23.8
Copper production (tonnes) 48,816 50,335 51,336
Copper sales (tonnes) 50,772 44,779 48,410
Unit Cash Costs (per lb)2      
Mining $1.12 $1.22 $0.92
Processing $1.06 $1.10 $1.07
Site administration $0.32 $0.28 $0.18
TC/RC and freight charges $0.21 $0.24 $0.34
Total smelter costs $– $– $0.02
Copper cash cost (C1) $2.71 $2.84 $2.53
Copper all-in sustaining cost (AISC) $3.95 $3.94 $3.33
Total copper cost (C3) $4.00 $4.13 $3.58
Enterprise      
Waste mined (000’s tonnes) 5,826 5,497 8,019
Nickel ore mined (000’s tonnes) 1,198 737 1,049
Nickel ore milled (000’s tonnes)1 858 702 1,059
Nickel ore grade processed (%) 1.29 1.82 0.72
Nickel recovery (%) 89 88 76
Nickel production (tonnes) 9,831 11,246 5,767
Nickel sales (tonnes) 13,516 8,809 2,917
Unit Cash Costs (per lb)2      
Mining $0.98 $0.86 $2.00
Processing $0.74 $0.60 $1.10
Site administration $0.07 $0.06 $0.08
TC/RC and freight charges $1.43 $1.22 $0.99
Nickel cash cost (C1) $3.22 $2.75 $4.17
Nickel all-in sustaining cost (AISC) $4.19 $3.94 $5.80
Total nickel cost (C3) $4.39 $4.16 $6.15
Financial results ($ millions)      
Sales revenues – Copper 711 587 458
Sales revenues – Nickel 177 132 34
Total sales revenues 888 719 492
Gross profit 377 235 79
EBITDA2 470 329 162

1 Measured in dry metric tonnes (“DMT”).
2 All-in sustaining costs (AISC), C1 cash cost (C1), and total cost (C3) are non-GAAP ratios, and EBITDA is a non-GAAP financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

Sentinel Production

Sentinel reported copper production of 48,816 tonnes in Q3 2026, 1,519 tonnes lower than the previous quarter as lower grades more than offset improved throughput. Grades were lower reflecting the areas mined during the quarter, with delayed access to higher-grade mining areas due to the lower mining volumes as a result of the mid-life overhaul of Rope Shovel 1. Copper C1 cash cost1 of $2.71 per lb was $0.13 lower than the preceding quarter primarily as a result of lower fuel costs.

Sentinel Outlook

Production guidance for 2026 has been updated to 190,000 – 200,000 tonnes of copper to reflect performance to date.

Grades and throughput are expected to improve in the fourth quarter of 2026 as mining progresses within Stage 2. Stage 3 ore will increasingly supplement feed from Stage 1 and Stage 2. The In-Pit Crusher 4 project was completed in October 2026. Ongoing automation and control system enhancements to improve flotation stability are expected to be completed in early 2027. Waste stripping at Stage 4 is progressing to support future ore supply from 2027.

Mitigation strategies for flange bolt fatigue at Ball Mill 2 are ongoing in collaboration with the original equipment manufacturer (“OEM”) and engineering consultants. Planning continues for a major upgrade in 2027, which will involve replacing a section of the discharge end with a new OEM design, providing a permanent engineered solution.

Enterprise Production

Enterprise produced 9,831 tonnes of nickel in the third quarter of 2026, a 13% decrease from the previous quarter due to lower grades, following stronger grades in the first half of this year. Nickel C1 cash cost1 of $3.22 per lb is $0.47 higher than the previous quarter, reflecting lower production volumes.

Enterprise Outlook

Production guidance for 2026 has been increased to 40,000 – 45,000 contained tonnes of nickel based on performance to date.

Ore grades are expected to be lower in the fourth quarter, in line with the mine plan. Following expansion of the ore footprint, the operational priority will now focus on rainy season preparation, with the dewatering stage tank and main pit sump due for completion in October. With the ROM pad nearing capacity, Enterprise is well set up with ore feed for the rainy season.

____________________
1 C1 cash costs are non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Cobre Panamá

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Copper ore milled (000’s tonnes)1 6,615   2,093   –
Copper ore grade processed (%) 0.27   0.23   –
Copper recovery (%) 74   67   –
Concentrate grade (%) 20.3   20.3   –
Copper production (tonnes) 13,229   3,216   –
Copper sales (tonnes) 13,463   –   24,306
Gold production (ounces) 6,355   805   –
Gold sales (ounces)2 5,818   –   11,071
Silver production (ounces) 143,204   17,770   –
Silver sales (ounces)2 121,712   –   216,574
Unit Cash Costs (per lb)3      
Mining $1.12   $–   $–
Processing $2.61   $–   $–
Site administration $0.77   $–   $–
TC/RC and freight charges $0.01   $–   $–
By-product credits ($0.43 ) $–   $–
Copper cash cost (C1) $4.08   $–   $–
Copper all-in sustaining cost (AISC) $5.10   $–   $–
Total copper cost (C3) $6.40   $–   $–
Financial results ($ millions)      
Copper in concentrates 191   –   226
Gold – precious metal stream ongoing cash payments 3   –   5
Gold – other cash 3   –   2
Silver – precious metal stream ongoing cash payments –   –   1
Silver – other cash 3   –   3
Gold and silver – non cash amortization 3   –   8
Total sales revenues 203   –   245
Gross profit (loss) 13   (44 ) 128
EBITDA4 67   (51 ) 110

1 Measured in dry metric tonnes (“DMT”).
2 Excludes refinery-backed gold and silver credits purchased and delivered under the precious metal streaming arrangement (see “Precious Metal Stream Arrangement”).
3 Copper all-in sustaining costs (copper AISC), copper C1 cash cost (copper C1), and total copper cost (copper C3) are non-GAAP ratios, and do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
4 EBITDA is a non-GAAP financial measure, which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

Production

During the third quarter of 2026, 6.6 million tonnes of ore, with an average head grade of 0.27%, were processed at an average recovery rate of 74%, resulting in the production of 13,229 tonnes of copper and 6,355 ounces of gold. The copper C1 cash cost1 was $4.08 per lb for the quarter.

The first copper concentrate shipment represented another important milestone in the Processing Program. In August, 33,000 wet metric tonnes (“wmt”) of copper concentrate was loaded and shipped, demonstrating the restoration of the integrated processing, filtration, storage, and export chain. A second vessel was subsequently loaded and shipped in September with a total of 38,611 wmt of copper concentrate.

Both generating units at the power plant demonstrated reliable operation during the third quarter, meeting the power demands of the site with excess energy sold to the national grid.

The Processing Program advanced materially during the quarter, with the progressive start-up and commissioning of the processing trains. Following the initial start-up of Train 3, Train 2 commenced operations in July and operated without major issues through August. Train 1 progressed through refurbishment, testing, and commissioning, including an operational run test in August of SAG Mill 1, Ball Mill 2, and the associated cyclone feed pumps, which was completed without major issues. Engineering activities progressed from initial recovery toward reliability and asset-integrity management during the quarter. The principal technical focus remained on medium-voltage drive and power-cell reliability, with repairs, operational risk management support, and an independent root-cause investigation progressing during the period. The integrated recovery program also included SAG Mill 3 gearless mill drive segment replacement, mill relines, Ball Mill 6 electrical works, crusher rehabilitation, and the completion of remaining water and flotation scopes.

Workforce priorities remain focused on expanding and maintaining the Train 2 recruitment pipeline, with candidate sourcing, assessment, and pre-employment preparation aligned with anticipated operational requirements. Total site employment increased from approximately 3,000 employees at the end of June to 3,200 employees by the end of September, supporting commissioning, maintenance, and operational activities.

Mobile fleet preservation and maintenance continued in line with OEM recommendations and established maintenance strategies, including the reactivation of certain equipment required to support the reclamation of the stockpiles. As of the third quarter of 2026, 18 of 36 ultra class trucks have been re-commissioned for operations. The ancillary fleet required for a one-train operation was also fully recommissioned.

____________________
1 C1 cash costs are non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Outlook

Copper and gold production from the processing of stockpiled ore at Cobre Panamá is expected to be 30,000 – 40,000 tonnes and 10,000 – 15,000 ounces, respectively, in 2026.

Following the successful commencement of stockpiled ore processing during the second quarter, the Company’s focus has shifted towards stabilizing the additional processing configuration and executing the remaining refurbishment and maintenance program required for sustainable two-train operation. With the power station fully recommissioned, incremental power plant costs are now being partially offset by the sale of excess power to support the national grid. The total stockpile was estimated at approximately 38 million tonnes of mineralized ore at varying grades, containing approximately 70,000 tonnes of recoverable copper, sufficient to support the Processing Program until mid-2027.

Environmental stewardship remains a core priority. All processing activities will continue to be conducted in accordance with the approved P&SM plan, applicable permits, and environmental commitments, while maintaining close coordination with the GOP. The Company remains ready to engage constructively with the GOP with the objective of achieving a fair and durable resolution for all stakeholders of Cobre Panamá.

The required spend for the Processing Program is estimated at approximately $200 million, including plant and equipment recommissioning, warehouse inventory replenishment, and sustaining capital1. Costs are currently estimated at approximately $90 – $100 million for commissioning, $10 – $20 million for inventory, and $70 – $80 million in sustaining capital1. As of the third quarter of 2026, cash outflows in relation to these costs is approximately $80 million.

____________________
1 Sustaining capital is a non-GAAP financial measure, which does not have standardized meanings prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Guelb Moghrein

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Copper production (tonnes) 1,071 2,031 3,508
Copper sales (tonnes) 1,621 2,482 4,085
Gold production (ounces) 16,050 6,310 7,832
Gold sales (ounces) 12,088 4,925 7,575
Magnetite concentrate production (WMT)1 85,799 140,746 124,131
Magnetite concentrate sales (WMT)1 128,676 180,312 136,475
Gold all-in sustaining cost (AISC) (per oz)2 $1,504 $– $–
Financial results ($ millions)      
Sales revenues 86 70 75
Gross profit 35 18 25
EBITDA2 36 19 29

1 Magnetite concentrate production and sales volumes are measured in wet metric tonnes (“WMT”).
2 All-in sustaining costs (AISC) is a non-GAAP ratio, and EBITDA is a non-GAAP financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

Production and Outlook

At Guelb Moghrein, copper and gold production totalled 1,071 tonnes and 16,050 ounces, respectively. The operation transitioned to processing oxide material blend with some sulphide ore in August 2026 to produce a gold-copper concentrate. AISC1 for third quarter was $1,504 per ounce of gold produced.

Production guidance for 2026 is approximately 7,000 tonnes of copper. Production guidance has increased to 45,000 – 50,000 ounces of gold to reflect performance-to-date. Gold production includes output from reprocessed tailings through the CIL plant and ore stockpiles treated via the flotation circuit. Water supply remains stable. Sections of the freshwater pipeline are being replaced or redeployed with improved sealing to reduce leakage and enhance delivery efficiency. Project completion is targeted for early 2027. The freshwater column seal enhancement project will resume in November after a major shutdown in October.

GREENFIELD PROJECTS

Taca Taca

In Argentina, the Company continues to work constructively with the provincial authorities, and approval of the Mine ESIA is expected in 2026, following completion of the public consultation process scheduled for November.

The Company is finalizing its Argentina Incentive Regime for Large Investments (“RIGI”) application with an intention to submit it after receiving ESIA approval and water use concessions.

La Granja

The engineering study is well advanced, and community engagement, baseline environmental program, and resettlement planning activities have commenced in support of permitting activities. The Terms of Reference for the ESIA were filed with the relevant authorities in June 2026. During the quarter, the Company responded to observations received as part of the regulatory approval process. Approval of the Terms of Reference remains pending.

A Technical Report on Reserves is expected to be filed in 2027. Evaluation of the preferred layout options and associated infrastructure requirements continued during the quarter and remains focused on advancing engineering definition while maintaining flexibility for stakeholder and permitting considerations.

____________________
1 Copper all-in sustaining costs (copper AISC), Copper C1 cash cost (copper C1), and realized metal prices are non-GAAP ratios, which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

UPDATES

Fuel Supply and Prices

Diesel supply conditions improved during the third quarter with stronger supply into all major regional ports as traders and oil marketing companies continued to bring diesel cargos into the region, incentivized by higher regional prices and sustained demand. Governments also took measures to moderate delivered prices through reductions in taxes and VAT, although this fiscal support is expected to be withdrawn over the coming months. The Company maintained uninterrupted fuel supply to its Zambian operations through alternative southern African supply routes, contingency inventories, and other supply arrangements. Diesel prices nevertheless remained elevated and impacted operating costs during the third quarter.

Sulphuric Acid

During the third quarter, the Company continued to manage feed blends and acid inventories to make surplus volumes available for third-party sales where operational requirements permitted, supported by strong regional demand and favourable sulphuric acid pricing. The higher gangue acid consuming oxide ore in the plant feed and acid stocks have been actively managed to enable the sale of acid during the third quarter, providing additional opportunistic profit generation and allowing Kansanshi to realize $33 million from acid sales. The Company will continue to monitor the market and opportunistically sell when profitable.

Zambian Power Supply

During the third quarter of 2026, Zambia’s national power supply remained in a materially improved position, although the force majeure declared by ZESCO, the state power utility, in early 2024 remained in effect. Lake Kariba ended the quarter at approximately 39% usable storage, compared with approximately 15% at the same time in 2025, following seasonal drawdown from the levels reached at the end of the wet season. The 2026/2027 rainy season is expected to be influenced by a very strong El Niño, increasing uncertainty around the pace of further hydrological recovery.

The Company experienced no material power-related production impact during the quarter and maintained its diversified power-sourcing strategy. Approximately 80% of the Company’s Zambian power requirements was sourced from imports and domestic independent power producers, with the balance supplied by ZESCO. This diversified approach supports operational reliability and limits reliance on Kariba-based generation.

Progress continued on medium- and long-term power sourcing solutions. Development of the previously announced wind and solar power project, from which the Company intends to offtake power, remains on track. Joint grid-stability initiatives with the state power utility also advanced, including the Kansanshi STATCOM project, for which procurement and factory acceptance testing were completed during the quarter. Site installation is scheduled to commence in early 2027.

The Company’s Trident mining operation is finalizing a power offtake agreement with Solarcentury Africa for the proposed 112 Megawatt-peak (“MWp”) Kusoka Solar Plant. The plant will be owned and operated by Solarcentury Africa, with Trident serving as the anchor offtaker. The project will diversify electricity supply to the Company’s Sentinel copper and Enterprise nickel mines.

SUSTAINABILITY

Health & Safety

The health and safety of the Company’s employees and contractors is a top priority, and the Company is focused on the continuous strengthening and improvement of the safety culture at all of its operations. The Lost Time Injury Frequency Rates (“LTIFR”) is an area of continued focus and a key performance metric for the Company. The Company’s rolling 12-month LTIFR is 0.06 per 200,000 hours worked as at September 30, 2026 (2025: 0.03).

Responsible Mineral Sourcing at Kansanshi

The Kansanshi Copper Smelter successfully completed its first independent third-party assessment and achieved conformance under the Responsible Minerals Initiative’s Responsible Minerals Assurance Process (“RMAP”). The assessment evaluated the Kansanshi smelter’s due diligence management system and responsible mineral sourcing practices through documentation review, interviews and site observations. This achievement demonstrates the Company’s approach to responsible mining and sourcing.

Quantum Electra-Haul Patent and Trademark

In 2026, the Company secured a patent and trademark from the UK Intellectual Property Office for Quantum Electra-Haul, its proprietary trolley-assist solution. The technology enables equipped haul trucks to use electricity on designated sections of mine haul roads, reducing diesel consumption by up to 90% when fully laden trucks travel on equipped up-ramps, and delivering efficiency benefits. Quantum Electra-Haul is a clear example of the Company’s practical approach to improving operational efficiency while delivering reduced greenhouse gas emissions through innovation and tangible implementation of technology in its mining activities.

COMPLETE FINANCIAL STATEMENTS AND MANAGEMENT’S DISCUSSION AND ANALYSIS

The complete Consolidated Financial Statements and Management’s Discussion and Analysis for the three and nine months ended September 30, 2026 are available at www.first-quantum.com and at www.sedarplus.com and should be read in conjunction with this news release.

ANNUAL DISCLOSURE DOCUMENTS

The Company’s 2025 Annual Information Form has been filed on SEDAR+ (www.sedarplus.com) and will also be available on the Company’s website at https://www.first-quantum.com/investors/2026-annual-general-meeting/.

CONFERENCE CALL DETAILS

The Company will host a conference call and webcast to discuss the results on Thursday, October 29, 2026 at 9:00 am (ET).

Conference call and webcast details:
Toll-free North America: 1-800-715-9871
International: +1-646-307-1963
Conference ID 8111752
Webcast: Direct link or on our website

A replay of the webcast will be available on the First Quantum website.

About First Quantum

First Quantum is engaged in the production of copper, nickel and gold, and related activities including exploration and development. The Company has operating mines located in Zambia and Mauritania. The Company’s Cobre Panamá mine was placed into a phase of Preservation and Safe Management in November 2023. The Company’s Ravensthorpe mine was placed into a care and maintenance process in May 2024. The Company is progressing the Taca Taca copper-gold-molybdenum project in Argentina and is exploring the La Granja and Haquira copper deposits in Peru.

For further information, visit our website at www.first-quantum.com or contact:

Investor Relations:
Bonita To, Director, Investor Relations & Capital Markets
(416) 361-6400
Toll-free: 1 (888) 688-6577
E-Mail: info@fqml.com

Media Relations:
James Devas, Manager, Corporate Affairs
+44 207 291 6630
Email: james.devas@fqml.com

REGULATORY DISCLOSURES

Non-GAAP and Other Financial Measures

EBITDA, ADJUSTED EARNINGS (LOSS) AND ADJUSTED EARNINGS (LOSS) PER SHARE

EBITDA, adjusted earnings (loss) and adjusted earnings (loss) per share exclude certain impacts which the Company believes are not reflective of the Company’s underlying performance for the reporting period. These include impairment and related charges, foreign exchange revaluation gains and losses, gains and losses on disposal of assets and liabilities, one-time costs related to acquisitions, dispositions, restructuring and other transactions, revisions in estimates of restoration provisions at closed sites, debt extinguishment and modification gains and losses, the tax effect on unrealized movements in the fair value of derivatives designated as hedged instruments, and adjustments for expected phasing of Zambian VAT.

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Operating profit 549 423   223
Depreciation 233 214   196
Other adjustments:      
Foreign exchange loss (gain) 31 (15 ) 9
Gain on disposal of group companies – (271 ) –
Impairment and impairment reversals – 1   –
Share of results of joint venture 2 4   –
Restructuring expense 5 2   7
Other expense 24 42   –
Total adjustments excluding depreciation 62 (237 ) 16
EBITDA 844 400   435

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Net earnings (loss) attributable to shareholders of the Company 207   136   (48 )
Adjustments attributable to shareholders of the Company:      
Adjustment for expected phasing of Zambian VAT (16 ) –   (8 )
Modification and redemption of liabilities –   –   25  
Total adjustments to EBITDA excluding depreciation 62   (237 ) 16  
Tax adjustments (5 ) 3   –  
Minority interest adjustments (4 ) (8 ) (1 )
Adjusted earnings (loss) 244   (106 ) (16 )
Basic earnings (loss) per share as reported $0.25   $0.16   ($0.06 )
Diluted earnings (loss) per share $0.25   $0.16   ($0.06 )
Adjusted earnings (loss) per share $0.29   ($0.13 ) ($0.02 )

REALIZED METAL PRICES

Realized metal prices are used by the Company to enable management to better evaluate sales revenues in each reporting period. Realized metal prices are calculated as gross metal sales revenues divided by the volume of metal sold in lbs. Net realized metal price is inclusive of the treatment and refining charges (TC/RC) and freight charges per lb.

OPERATING CASHFLOW PER SHARE

In calculating the operating cash flow per share, the operating cash flow calculated for IFRS purposes is divided by the basic weighted average common shares outstanding for the respective period.

NET DEBT

Net debt is comprised of bank overdrafts and total debt less unrestricted cash and cash equivalents.

CASH COST, ALL-IN SUSTAINING COST, TOTAL COST

The consolidated cash cost (C1), all-in sustaining cost (AISC) and total cost (C3) presented by the Company are measures that are prepared on a basis consistent with the industry standard definitions by the World Gold Council and Brook Hunt cost guidelines but are not measures recognized under IFRS. In calculating the C1 cash cost, AISC and C3, total cost for each segment, the costs are measured on the same basis as the segmented financial information that is contained in the financial statements.

C1 cash cost includes all mining and processing costs less any profits from by-products such as gold, silver, zinc, pyrite, cobalt, sulphuric acid, or iron magnetite and is used by management to evaluate operating performance. TC/RC and freight deductions on metal sales, which are typically recognized as a component of sales revenues, are added to C1 cash cost to arrive at an approximate cost of finished metal.

AISC is defined as cash cost (C1) plus general and administrative expenses, sustaining capital expenditure, deferred stripping, royalties and lease payments and is used by management to evaluate performance inclusive of sustaining expenditure required to maintain current production levels.

C3 total cost is defined as AISC less sustaining capital expenditure, deferred stripping and general and administrative expenses net of insurance, plus depreciation and exploration. This metric is used by management to evaluate the operating performance inclusive of costs not classified as sustaining in nature such as exploration and depreciation.

For the three months ended September 30, 2026 Cobre Panamá Kansanshi Sentinel Other Copper5 Copper Corporate & other Enterprise Total
Cost of sales1 (190 ) (651 ) (435 ) (17 ) (1,293 ) (39 ) (76 ) (1,408 )
Adjustments:                
Depreciation 57   76   82   2   217   1   15   233  
By-product credits 12   138   –   13   163   2   –   165  
Royalties –   81   54   –   135   3   9   147  
Treatment and refining charges 6   (4 ) (8 ) 1   (5 ) –   (16 ) (21 )
Freight costs –   –   3   –   3   –   –   3  
Finished goods (5 ) 14   23   –   32   1   2   35  
Other4 6   146   (1 ) 1   152   33   (1 ) 184  
Cash cost (C1)2,4 (114 ) (200 ) (282 ) –   (596 ) 1   (67 ) (662 )
Adjustments:                
Depreciation (excluding depreciation in finished goods) (61 ) (76 ) (80 ) –   (217 ) (3 ) (14 ) (234 )
Royalties –   (81 ) (54 ) –   (135 ) (3 ) (9 ) (147 )
Other (3 ) (4 ) (3 ) (1 ) (11 ) 1   (1 ) (11 )
Total cost (C3)2,4 (178 ) (361 ) (419 ) (1 ) (959 ) (4 ) (91 ) (1,054 )
Cash cost (C1)2,4 (114 ) (200 ) (282 ) –   (596 ) 1   (67 ) (662 )
Adjustments:                
General and administrative expenses (14 ) (14 ) (13 ) (1 ) (42 ) (1 ) (2 ) (45 )
Sustaining capital expenditure and deferred stripping3 (14 ) (143 ) (64 ) (1 ) (222 ) 1   (9 ) (230 )
Royalties –   (81 ) (54 ) –   (135 ) (3 ) (9 ) (147 )
Other –   (1 ) –   –   (1 ) (1 ) –   (2 )
AISC2,4 (142 ) (439 ) (413 ) (2 ) (996 ) (3 ) (87 ) (1,086 )
AISC (per lb)2,4 $5.10   $4.46   $3.95   $–   $4.30   –   $4.19    
Cash cost – (C1)
(per lb)2,4
$4.08   $2.02   $2.71   $–   $2.59   –   $3.22    
Total cost – (C3)
(per lb)2,4
$6.40   $3.67   $4.00   $–   $4.14   –   $4.39    

1 Total cost of sales per the Consolidated Statement of Earnings (Loss) in the Company’s unaudited condensed interim consolidated financial statements.
2 C1 cash cost (C1), total costs (C3), and all-in sustaining costs (AISC) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Sustaining capital and deferred stripping are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
4 Excludes copper concentrate from third parties purchased at Kansanshi.
5 Other Copper includes Mauritania and the gold streaming arrangement with Royal Gold.

For the three months ended June 30, 2026 Cobre Panamá Kansanshi Sentinel Other Copper5 Copper Corporate & other Enterprise Total
Cost of sales1 (44 ) (633 ) (426 ) (60 ) (1,163 ) (4 ) (58 ) (1,225 )
Adjustments:                
Depreciation 30   83   88   3   204   (1 ) 11   214  
By-product credits –   130   –   34   164   4   –   168  
Royalties –   71   49   4   124   –   12   136  
Treatment and refining charges –   (4 ) (9 ) 1   (12 ) –   (7 ) (19 )
Freight costs –   –   2   –   2   –   –   2  
Finished goods (19 ) (33 ) (3 ) 4   (51 ) 2   (8 ) (57 )
Other4 1   184   (1 ) (1 ) 183   (2 ) (1 ) 180  
Cash cost (C1)2,4 (32 ) (202 ) (300 ) (15 ) (549 ) (1 ) (51 ) (601 )
Adjustments:                
Depreciation (excluding depreciation in finished goods) (36 ) (79 ) (84 ) (3 ) (202 ) –   (13 ) (215 )
Royalties –   (71 ) (49 ) (4 ) (124 ) –   (12 ) (136 )
Other (1 ) (4 ) (1 ) –   (6 ) (2 ) 1   (7 )
Total cost (C3)2,4 (69 ) (356 ) (434 ) (22 ) (881 ) (3 ) (75 ) (959 )
Cash cost (C1)2,4 (32 ) (202 ) (300 ) (15 ) (549 ) (1 ) (51 ) (601 )
Adjustments:                
General and administrative expenses (15 ) (13 ) (13 ) (1 ) (42 ) –   (1 ) (43 )
Sustaining capital expenditure and deferred stripping3 (7 ) (137 ) (52 ) (2 ) (198 ) (1 ) (7 ) (206 )
Royalties –   (71 ) (49 ) (4 ) (124 ) –   (12 ) (136 )
Other (1 ) 1   1   (2 ) (1 ) 1   (1 ) (1 )
AISC2,4 (55 ) (422 ) (413 ) (24 ) (914 ) (1 ) (72 ) (987 )
AISC (per lb)2,4 –   $4.46   $3.94   –   $4.27   –   $3.94    
Cash cost – (C1)
(per lb)2,4
–   $2.16   $2.84   –   $2.54   –   $2.75    
Total cost – (C3)
(per lb)2,4
–   $3.76   $4.13   –   $4.12   –   $4.16    

1 Total cost of sales per the Consolidated Statement of Earnings (Loss) in the Company’s unaudited condensed interim consolidated financial statements.
2 C1 cash cost (C1), total costs (C3), and all-in sustaining costs (AISC) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Sustaining capital and deferred stripping are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
4 Excludes purchases of copper concentrate from third parties treated through the Kansanshi Smelter.
5 Other Copper includes Çayeli and Mauritania and gold streaming arrangement with Royal Gold.

For the three months ended September 30, 2025 Cobre Panamá Kansanshi Sentinel Other Copper5 Copper Corporate & other Enterprise Total
Cost of sales1 (117 ) (359 ) (376 ) (70 ) (922 ) (27 ) (37 ) (986 )
Adjustments:                
Depreciation 38   66   75   6   185   1   10   196  
By-product credits 19   86   –   41   146   –   –   146  
Royalties (4 ) 60   35   5   96   –   4   100  
Treatment and refining charges (3 ) (2 ) (18 ) (1 ) (24 ) –   –   (24 )
Freight costs –   –   6   (1 ) 5   –   –   5  
Finished goods 74   (38 ) 1   (1 ) 36   –   (11 ) 25  
Other4 (7 ) 43   4   2   42   26   (2 ) 66  
Cash cost (C1)2,4 –   (144 ) (273 ) (19 ) (436 ) –   (36 ) (472 )
Adjustments:                
Depreciation (excluding depreciation in finished goods) (12 ) (77 ) (76 ) (6 ) (171 ) –   (11 ) (182 )
Royalties 4   (60 ) (35 ) (5 ) (96 ) –   (4 ) (100 )
Other (4 ) (2 ) (3 ) (1 ) (10 ) 5   –   (5 )
Total cost (C3)2,4 (12 ) (283 ) (387 ) (31 ) (713 ) 5   (51 ) (759 )
Cash cost (C1)2,4 –   (144 ) (273 ) (19 ) (436 ) –   (36 ) (472 )
Adjustments:                
General and administrative expenses (15 ) (8 ) (14 ) (1 ) (38 ) –   (2 ) (40 )
Sustaining capital expenditure and deferred stripping3 (1 ) (63 ) (37 ) (2 ) (103 ) 1   (6 ) (108 )
Royalties 4   (60 ) (35 ) (5 ) (96 ) –   (4 ) (100 )
Other (4 ) –   –   (1 ) (5 ) (1 ) –   (6 )
AISC2,4 (16 ) (275 ) (359 ) (28 ) (678 ) –   (48 ) (726 )
AISC (per lb)2,4 –   $2.77   $3.33   –   $3.07   –   $5.80    
Cash cost – (C1)
(per lb)2,4
–   $1.34   $2.53   –   $1.95   –   $4.17    
Total cost – (C3)
(per lb)2,4
–   $2.85   $3.58   –   $3.22   –   $6.15    

1 Total cost of sales per the Consolidated Statement of Earnings (Loss) in the Company’s unaudited condensed interim consolidated financial statements.
2 C1 cash cost (C1), total costs (C3) and all-in sustaining costs (AISC) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Sustaining capital and deferred stripping are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
4 Excludes purchases of copper concentrate from third parties treated through the Kansanshi Smelter.
5 Other Copper includes Çayeli and Mauritania.

EARNINGS (LOSS) BY SEGMENT

For the three months ended September 30, 2026, segmented information for the statement of earnings (loss) is presented as follows:

  Revenue Cost of sales (excluding depreciation) Depreciation Other Operating profit (loss) 1,5 Income tax expense
Cobre Panamá 2 203 (133 ) (57 ) (29 ) (16 ) (4 )
Kansanshi 911 (575 ) (76 ) (21 ) 239   (92 )
Trident 3 888 (414 ) (97 ) (19 ) 358   (119 )
Corporate & other 4 84 (53 ) (3 ) (60 ) (32 ) (3 )
Total 2,086 (1,175 ) (233 ) (129 ) 549   (218 )

1 Operating profit (loss) less net finance costs and taxes equals net earnings (loss) for the period on the consolidated statement of earnings (loss).
2 Cobre Panamá is 17.958% owned by KPMC, a joint venture – See note 7.
3 Trident includes Sentinel copper mine and the Enterprise Nickel mine.
4 Corporate & other revenue includes hedge losses of $— recognized on zero cost collar options.
5 Finance costs of $205 million, including interest expense on debt, are not included within operating profit. See note 16.

For the three months ended June 30, 2026, segmented information for the statement of earnings (loss) is presented as follows:

  Revenue Cost of sales (excluding depreciation) Depreciation Other Operating profit (loss) 1,5 Income tax expense
Cobre Panamá 2 –   (14 ) (30 ) (78 ) (122 ) (1 )
Kansanshi 888   (550 ) (83 ) (3 ) 252   (80 )
Trident 3 719   (385 ) (99 ) 4   239   (79 )
Corporate & other 4 (85 ) (62 ) (2 ) 203   54   (12 )
Total 1,522   (1,011 ) (214 ) 126   423   (172 )

1 Operating profit (loss) less net finance costs and taxes equals net earnings (loss) for the period on the consolidated statement of earnings (loss).
2 Cobre Panamá is 17.958% (March 31, 2025: 20%) owned by KPMC, a joint venture
3 Trident includes Sentinel copper mine and the Enterprise Nickel mine.
4 Corporate & other revenue includes hedge gains and losses recognized on zero cost collar options.
5 Finance costs of $192 million, including interest expense on debt, are not included within operating profit.

For the three months ended September 30, 2025, segmented information for the statement of earnings (loss) is presented as follows:

  Revenue Cost of sales (excluding depreciation) Depreciation Other Operating profit (loss) 1,5 Income tax expense
Cobre Panamá 2 245 (79 ) (38 ) (61 ) 67   (31 )
Kansanshi 476 (293 ) (66 ) (10 ) 107   (36 )
Trident 3 492 (328 ) (85 ) (2 ) 77   (23 )
Corporate & other 4 133 (90 ) (7 ) (64 ) (28 ) (18 )
Total 1,346 (790 ) (196 ) (137 ) 223   (108 )

1 Operating profit (loss) less net finance costs and taxes equals net earnings (loss) for the period on the consolidated statement of earnings (loss).
2 Cobre Panamá is 17.958% owned by KPMC, a joint venture – See note 7.
3 Trident includes Sentinel copper mine and the Enterprise Nickel mine.
4 Corporate & other revenue includes hedge gains and losses recognized on zero cost collar options.
5 Finance costs of $201 million, including interest expense on debt, are not included within operating profit. See note 16.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. The forward-looking information includes estimates, forecasts and statements as to the Company’s production estimates for copper, gold and nickel; C1 cash costs, all-in sustaining costs and capital expenditure estimates; the delivery of gold to Royal Gold pursuant to the gold streaming agreement and the Company’s options to accelerate deliveries and reducing ongoing gold delivered to Royal Gold thereunder; the future production payments from Royal Gold under the gold streaming agreement and the resulting boost in liquidity; the impact on total tax costs resulting from the new mining convention in Mauritania; the Company’s production outlook at its mining projects; the Company’s ability to maintain supplementary power sourcing and import arrangements in Zambia and the availability, sourcing, transportation and pricing of diesel fuel and other critical consumables, including the Company’s ability to maintain alternative supply routes and contingency inventories, related fuel-efficiency initiatives, and the estimated timing of, and annualized impact on costs of, such strategies; the development, timing and expected benefits of medium and long-term power sourcing and grid-stability initiatives in Zambia, including the wind and solar power project and the Kansanshi STATCOM project; the status and future of Cobre Panamá and the P&SM program, including preservation strategies, the Processing Program, the processing and export of stockpiled ore, expected production, costs, cash outflows and operational requirements associated with the Processing Program, remaining refurbishment, maintenance, commissioning and workforce activities, the stabilization of two-train operation, the use of proceeds from sales of copper concentrate and the anticipated timing and effects of governmental reviews, audit reports and ministerial processes; the Company’s expectations regarding replacement and maintenance work, sustained mill performance and reliability at Sentinel, and the effects thereof; the Company’s focus on increasing total throughput at Sentinel and the effect of ongoing initiatives, including the continued operation of the RRC; the expansion of the Quantum Electra-Haul™ trolley-assist network, and the resulting operational and efficiency benefits; the continued optimization, mining sequence, grades, recoveries and operational performance of Enterprise; the Company’s expectations regarding the power supply and water supply system, along with operational adaptations and maintenance efforts at Guelb Moghrein; the expected cessation of copper production at Guelb Moghrein; the C&M activity at Ravensthorpe; the timing of environmental studies and approvals for Shoemaker Levy; the expected use and mine life of Taca Taca and the Company’s community engagement and development initiatives in Tolar Grande; the implementation of data collection programs relating to the water supply at Taca Taca; the timing of receipt of concessions, approvals and permits required for Taca Taca, including the ESIA and water use permits; the Company’s plans to submit an application for the RIGI regime; the expected use and timing of the Company’s expenditures at La Granja, project development activities, updated mineral resource estimates, the potential scale and economics of the project, future engineering studies, mineral reserve estimates, arsenic management strategies, the Company’s plans for community engagement and the completion of engineering studies and an ESIA; the Company’s goals regarding its drilling program at Haquira; the status, commissioning and performance of the Company’s pilot plant at Kansanshi; the expected sources of ore for the S3 feed at Kansanshi and the continued performance, throughput and optimization of the Kansanshi S3 Expansion and associated processing, smelting and acid production facilities; the Company’s efforts to evaluate the new near-surface gold zone occurrences at Kansanshi; the results of the Company’s extensive drill program at Sentinel; the timing, completion and benefits of ongoing infrastructure, processing and mine development initiatives at Sentinel, including flotation optimization projects, tailings infrastructure upgrades, trolley-assist infrastructure and future ore sourcing strategies; the recognition of deferred revenue resulting from the Company’s precious metal streaming arrangement with Franco-Nevada; the development and operation of the Company’s projects; the estimates regarding the interest expense on the Company’s debt, cash outflow on interest paid, capitalized interest and depreciation expense; the expected effective tax rate for the Company for full year 2026; the recoveries of the Company’s VAT receivable balances for the Company’s Zambian operations; the effect of foreign exchange and inflation rates on the Company’s cost of sales; the Company’s hedging programs; the effect of seasonality on the Company’s results; capital expenditures and the Company’s three-year capital expenditure guidance and the expected results thereof; estimates of the future price of certain precious and base metals; the Company’s project pipeline, development and growth plans and exploration and development program, future expenses and exploration and development capital requirements; the Company’s assessment and exploration of targets in the Central African Copper belt, the Andean porphyry belt, Kazakhstan and New Mexico, USA; the timing of publication of the updated NI 43-101 Technical Report in respect of La Granja; the Company’s ESG-related initiatives, including climate-related initiatives, tailings management programs and the planned alignment of the Company’s tailings facilities with the Global Industry Standard on Tailings Management by the end of 2030; and community engagement efforts. Often, but not always, forward-looking statements or information can be identified by the use of words such as “aims”, “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate” or “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.

With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including, among other things, about the geopolitical, economic, permitting and legal climate in which the Company operates; continuing production at all operating facilities (other than Cobre Panamá and Ravensthorpe); the continuation of governmental approvals and authorizations relating to the Processing Program at Cobre Panamá; the successful sale and commercialization of products generated from stockpiled ore processing; the price of certain precious and base metals; exchange rates; inflation rates; anticipated costs and expenditures; the Company’s ongoing commitment to invest in innovative technology and the effects thereof; the impact of acquisitions, dispositions, suspensions or delays in the Company’s business; the Company’s ability to secure sufficient power at its Zambian operations to avoid interruption resulting from the country’s decreased power availability; mineral reserve and mineral resource estimates; the timing and sufficiency of deliveries required for the Company’s development and expansion plans; future exploration results; and the ability to achieve the Company’s goals, including with respect to the Company’s climate and sustainability initiatives. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to, future production volumes and costs, the temporary or permanent closure of uneconomic operations, costs for inputs such as oil, power and sulphur, political stability in Panama, Zambia, Peru, Mauritania, Finland, Argentina and Australia, adverse weather conditions in Panama, Zambia, Finland, Mauritania, and Australia, potential social and environmental challenges (including the impact of climate change), power supply, mechanical failures, water supply, procurement and delivery of parts and supplies to the operations and events generally impacting global economic, political and social stability and legislative and regulatory reform. For mineral resource and mineral reserve figures appearing or referred to herein, varying cut-off grades have been used depending on the mine, method of extraction and type of ore contained in the orebody.

See the Company’s Annual Information Form for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. Although the Company has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forward-looking statements or information, there may be other factors that cause actual results, performances, achievements or events not as anticipated, estimated or intended. Also, many of these factors are beyond the Company’s control. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. All forward-looking statements made and information contained herein are qualified by this cautionary statement.

(In United States (“US”) dollars, except where noted otherwise)

TORONTO, Oct. 28, 2026 (GLOBE NEWSWIRE) — First Quantum Minerals Ltd. (“First Quantum” or the “Company”) (TSX: FM) today reports results for the three and nine months ended September 30, 2026 (“Q3 2026” or the “third quarter”).

“We are pleased with the significant improvement in our financial performance this quarter, supported by higher production and full exposure to stronger copper prices, which clearly demonstrates the underlying earnings potential of our business. We delivered another quarter of production growth, supported by continued strong performance from S3 at Kansanshi and the processing of stockpiles at Cobre Panamá, where the recommissioning progressed successfully, with all three trains brought online sequentially during the quarter,” said Tristan Pascall, Chief Executive Officer of First Quantum. “In Panama, we are encouraged by the recommendation made by the Interministerial Commission and remain ready to engage constructively with the Government of Panama to achieve a fair and durable resolution that serves the best interests of the country and its people, as well as our stakeholders.”

Q3 2026 HIGHLIGHTS

  • Financial results for the third quarter include gross profit of $678 million (Q2 2026: $297 million), EBITDA1 of $844 million (Q2 2026: $400 million), net earnings attributable to shareholders of $0.25 per share (Q2 2026: $0.16), and an adjusted earnings per share1 of $0.29 (Q2 2026: $(0.13)). Relative to the second quarter of 2026, third quarter results benefitted from higher sales volumes, improved realized metals prices1, lower fuel costs and the absence of derivative contracts following the completion of the hedging program on June 30, 2026.
  • Total copper production was 108,959 tonnes (Q2 2026: 100,487 tonnes) at C1 cash costs1 of $2.59 per lb (Q2 2026: $2.54). Copper sales totalled 109,841 tonnes. During the quarter, 47,095 ounces of gold (Q2 2026: 32,029 ounces) and 9,831 tonnes of nickel (Q2 2026: 11,246 tonnes) were produced.
  • Copper production guidance has been narrowed from a range of 405,000 – 475,000 tonnes to 405,000 – 435,000 tonnes to reflect lower grades experienced to date at Sentinel and Kansanshi while guidance for Cobre Panamá has been maintained. Gold production guidance has been narrowed from a range of 150,000 – 175,000 ounces to 150,000 – 170,000 ounces. Nickel production guidance has increased from a range of 30,000 – 40,000 tonnes to 40,000 – 45,000 tonnes.
  • Previously provided sensitivity of $0.25 per lb has been incorporated into updated copper C1 cash cost1 guidance of $2.50 – $2.65 per lb to reflect elevated fuel prices and the strong Zambian kwacha to date, which are expected to continue in the fourth quarter. Guidance for total capital expenditure has been narrowed based on spend to date and the latest expected timing of capital expenditures.
  • In Panama, the Interministerial Commission delivered its final report, recommending an assessment of the feasibility of a new agreement that could address outstanding arbitrations and provide for a potential restart of Cobre Panamá to support an orderly, self-financed closure, recognizing that closure and rehabilitation will be a long-term undertaking extending over decades. The President is reviewing the report and will communicate a decision directly to the country.
  • The authorized stockpile processing program (“Processing Program”) at Cobre Panamá advanced materially during the quarter. Following the initial start-up of Train 3, Train 2 commenced operations in July. Train 1 progressed through refurbishment, testing, and commissioning, which was completed without major issues. There are sufficient stockpiles to support the Processing Program until mid-2027.
  • With respect to the environmental findings from the Comprehensive Audit, environmental actions were incorporated into the compliance tracking process at Cobre Panamá, supported by improved evidence management, traceability, and georeferencing.

____________________
1 EBITDA, adjusted earnings (loss), realized metal prices and C1 cash costs are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Q3 2026 OPERATIONAL HIGHLIGHTS

  • Total copper production for the third quarter was 108,959 tonnes, an 8% increase from Q2 2026 mainly attributable to the Processing Program at Cobre Panamá and higher production from Kansanshi.
  • C1 copper cash cost1 was $0.05 higher quarter-over-quarter at $2.59 per lb due to the inclusion of higher cost production from Cobre Panamá. Excluding Cobre Panamá, copper C1 cash cost1 was $0.08 lower quarter-over-quarter at $2.40 per lb due to higher acid by-product credits and lower fuel costs. During the quarter, Kansanshi sold surplus acid, supported by strong regional demand and favourable sulphuric acid pricing.
  • Copper sales volumes totalled 109,841 tonnes, approximately 882 tonnes higher than production as volumes produced at Cobre Panamá in Q2 2026 were sold in the third quarter.
  • For more details, see Operations Review on page 8.

Q3 2026 FINANCIAL HIGHLIGHTS

  • Sales revenues of $2,086 million in Q3 2026 were 38% higher than the previous quarter on higher sales volumes and strong realized metal prices1. Revenues included $33 million from surplus acid sales.
  • Gross profit for the third quarter of $678 million was $381 million higher than Q2 2026 and EBITDA2 of $844 million for the same period was $444 million higher.
  • Cash flow from operating activities of $600 million ($0.72 per share3) for the quarter increased $470 million from Q2 2026 due to higher net earnings attributable to shareholders of $207 million.
  • Net debt4 decreased by $98 million during the quarter to $5,309 million at September 30, 2026, primarily attributable to debt repayment of $171 million.
  • Total liquidity of $2.13 billion as at September 30, 2026, comprised of $781 million in cash and $1.35 billion of undrawn availability under the revolving credit facility.

____________________
1 EBITDA and copper C1 cash cost (copper C1) are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
2 Cash flows from operating activities per share, and realized metal prices are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Net debt is a supplementary financial measure. These measures do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

COBRE PANAMÁ UPDATE

On September 30, 2026, the Interministerial Commission formally delivered its final report on Cobre Panamá to President José Raúl Mulino (the “President”), marking the Government of Panama’s (“GOP”) transition from technical assessment to the decision-making phase. The report sets out 17 recommendations and six guiding criteria for consideration in determining the future of the mine. The Interministerial Commission recommended assessing the feasibility of entering into a new agreement with Cobre Panamá / First Quantum that would provide for the settlement of the outstanding arbitration proceedings and establish conditions for a potential restart designed to achieve an orderly, self-financed closure, while complying with the ruling of the Supreme Court of Justice and prioritizing Panama’s environmental, social, and economic interests. The report recognized that the site continues to require active management and monitoring, which is currently being funded by Cobre Panamá / First Quantum at no cost to the Panamanian State, and that maintaining and ultimately closing the site represents significant long-term obligations extending over decades. It recommends that any new framework provide for the site’s activities to fund its own closure, with no appropriation from the General State Budget for either the operation or closure of the mine. The report further documents the economic and social impacts of the shutdown, including effects on employment, Panamanian businesses, exports, and government revenues, and cites public-opinion findings indicating support for a resolution under conditions that include environmental and social safeguards, transparency, and independent oversight. The President is reviewing the report with the Cabinet and legal advisers and will communicate a decision directly to the country. The Company remains ready to engage constructively with the GOP with the objective of achieving a fair and durable resolution for all stakeholders of Cobre Panamá.

Follow-up to the SGS Comprehensive Audit progressed from assessment into corrective-action implementation. Environmental actions were incorporated into the compliance tracking process, with field work focused on reforestation maintenance, compensatory reforestation verification, and protected-flora translocation, supported by improved evidence management, traceability, and georeferencing. Environmental stewardship remains a core priority. All processing activities will continue to be conducted in accordance with the approved Preservation and Safe Management plan, applicable permits, and environmental commitments, while maintaining close coordination with the GOP.

Engagement with the municipalities surrounding the project also advanced during the quarter. The Company is supporting the municipal authorities of Donoso, Omar Torrijos Herrera, and La Pintada to identify and structure priority local development initiatives. These include coordination with relevant Government institutions to explore pathways for projects to be incorporated into formal public investment and municipal development mechanisms. This work is intended to create a more sustainable framework for addressing local development priorities.

Additionally, the Participatory Environmental Monitoring Program was launched, which directly involves communities surrounding the project in water-quality monitoring, from sample collection through to access to laboratory results, strengthening transparency and community participation in environmental oversight.

The Company also graduated the first participants from its community technical training program, with more than 125 people, particularly from coastal communities, completing 100 hours of training in trades including plumbing and electrical work.

Progress continues on the “Suma tu Talento” recruitment initiative to support the hiring of staff for preservation activities. Cobre Panamá participated in a major employment fair organized by the Municipality of Panama, receiving 426 in-person candidate profiles, approximately 64% of which were for operational, technical, and supervisory trades.

Public outreach efforts also continued in the third quarter through Cobre Conecta and other direct-engagement platforms, generating approximately 447,000 in-person stakeholder engagements across Panama since 2024. Digital engagement also expanded, with the Cobre Panamá Virtual Tour surpassing 405,000 visits.

On October 9, Panama experienced an earthquake and subsequent aftershocks. All First Quantum personnel in the country were reported safe and Cobre Panamá’s site inspections have identified no material impacts to site infrastructure or environmental protection systems. Following the earthquake, safety protocols were immediately activated and checks were carried out across the operation. Inspections indicated that facilities and infrastructure at Cobre Panamá remained stable and secure, including the site’s tailings management facilities and water management systems. The site’s infrastructure incorporates design criteria for high-intensity seismicity and this event remained well below design parameters. The processing of stockpiled ore was temporarily suspended following the event while precautionary checks were completed, and operations were returned to service and re-stabilized on October 10. Power generation systems remained operational throughout the event. There was no impact to the Company’s environmental protection and monitoring systems from the event. The earthquake impacted many communities across Panama, particularly in the Penonomé area, and Cobre Panamá was involved in supporting relief efforts, in coordination with local authorities and emergency services, for the provision of essential supplies.

REALIZED METAL PRICES1

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Average LME copper cash price (per lb) $6.40   $6.05   $4.44  
Realized copper price1,3 (per lb) $6.37   $5.34   $4.38  
Treatment/refining charges (“TC/RC”) (per lb) $–   ($0.03 ) ($0.04 )
Freight charges (per lb) ($0.01 ) ($0.01 ) ($0.04 )
Net realized copper price1 (per lb) $6.36   $5.30   $4.30  
Average LBMA cash price (per oz) $4,258   $4,506   $3,455  
Net realized gold price1,2 (per oz) $4,125   $4,113   $3,358  
Average LME nickel cash price (per lb) $7.52   $8.22   $6.81  
Net realized nickel price1 (per lb) $6.90   $7.94   $6.86  

1 Realized metal prices are a non-GAAP ratio which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
2 Excludes gold revenues recognized under the stream arrangements.
3 Realized Copper price includes hedge losses of nil for the three months ended September 30, 2026, $158 million for the three months ended June 30, 2026, and $287 million, for the nine months ended September 30, 2026.

CONSOLIDATED OPERATING HIGHLIGHTS

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Copper production (tonnes)1 108,959 100,487 104,626
Copper sales (tonnes)2 109,841 93,300 118,825
Gold production (ounces) 47,095 32,029 36,463
Gold sales (ounces)3 43,016 32,121 43,658
Nickel production (contained tonnes) 9,831 11,246 5,767
Nickel sales (contained tonnes) 13,516 8,809 2,917

1 Production is presented on a contained basis and is presented prior to processing through the Kansanshi smelter.
2 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 and 10,453 tonnes for the three and nine months ended September 30, 2025), respectively. Sales of copper anode attributable to third-party concentrate purchases were 12,207 and 20,152 tonnes for the three and six months ended June 30, 2026 (2,211 and 8,609 tonnes for the three and six months ended June 30, 2025).
3 Excludes refinery-backed gold credits purchased and delivered under the streaming arrangements.

UNIT CASH COSTS (PER LB)1,2,3

  QUARTERLY
Group Q3 2026 Q2 2026 Q3 2025
Cash cost of copper production (C1) (per lb) $2.59 $2.54 $1.95
C1 (per lb) excluding Cobre Panamá $2.40 $2.48 $1.95
Total cost of copper production (C3) (per lb) $4.14 $4.12 $3.22
Copper all-in sustaining cost (AISC) (per lb) $4.30 $4.27 $3.07
AISC (per lb) excluding Cobre Panamá $4.20 $4.14 $3.00

1 All-in sustaining costs (AISC), C1 cash cost (C1), C3 total cost (C3) are non-GAAP ratios, which do not have standardized meaning prescribed by IFRS and might not be comparable to similar measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
2 Excludes copper concentrate from third parties purchased at Kansanshi.
3 Excludes the sale of copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 tonnes and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 tonnes and 10,453 tonnes for the three and nine months ended September 30, 2025). Sales of copper anode attributable to third-party concentrate purchases were 12,207 tonnes and 20,152 tonnes for the three and six months ended June 30, 2026 (2,211 tonnes and 8,609 tonnes for the three and six months ended June 30, 2025).

CONSOLIDATED FINANCIAL HIGHLIGHTS

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Sales revenues 2,086   1,522   1,346  
Gross profit 678   297   360  
Net earnings (loss) attributable to shareholders of the Company 207   136   (48 )
Basic net earnings (loss) per share $0.25   $0.16   ($0.06 )
Diluted net earnings (loss) per share $0.25   $0.16   ($0.06 )
Cash flows from operating activities 600   130   1,195  
Net debt1 5,309   5,407   4,751  
EBITDA1,2 844   400   435  
Adjusted earnings (loss)1 244   (106 ) (16 )
Adjusted earnings (loss) per share3 $0.29   $(0.13 ) ($0.02 )
Net earnings (loss) attributable to shareholders of the Company 207   136   (48 )
Adjustments attributable to shareholders of the Company:      
Adjustment for expected phasing of Zambian value-added tax (“VAT”) (16 ) –   (8 )
Modification and redemption of liabilities –   –   25  
Total adjustments to EBITDA1 excluding depreciation2 62   (237 ) 16  
Tax adjustments (5 ) 3   –  
Minority interest adjustments (4 ) (8 ) (1 )
Adjusted earnings (loss)1 244   (106 ) (16 )

1 EBITDA and adjusted earnings (loss) are non-GAAP financial measures, and net debt is a supplementary financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. Adjusted earnings (loss) have been adjusted to exclude items from the corresponding IFRS measure, net earnings (loss) attributable to shareholders of the Company, which are not considered by management to be reflective of underlying performance. The Company has disclosed these measures to assist with the understanding of results and to provide further financial information about the results to investors and may not be comparable to similar financial measures disclosed by other issuers. The use of adjusted earnings (loss) and EBITDA represents the Company’s adjusted earnings (loss) metrics. See “Regulatory Disclosures”.
2 Adjustments to EBITDA in 2026 relate principally to a $271 million gain on disposal of group companies, a $19 million foreign exchange gain and $66 million of commissioning costs at Cobre Panamá (2025 – the adjustment for expected phasing of Zambian VAT and the tax effect on unrealized movements in the fair value of derivatives designated as hedging instruments).
3 Adjusted earnings (loss) per share, realized metal prices, copper all-in sustaining cost (copper AISC), copper C1 cash cost (copper C1) and total cost of copper (copper C3) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

GUIDANCE

Guidance provided below is based on a number of assumptions and estimates as of September 30, 2026, including among other things, assumptions about metal prices and anticipated costs and expenditures. Guidance involves estimates of known and unknown risks, uncertainties, and other factors, which may cause the actual results to be materially different.

Copper production guidance has been narrowed to reflect lower grades experienced to date at Sentinel and Kansanshi. Guidance for Cobre Panamá has been maintained.

Gold production guidance has been narrowed to reflect lower grades at Kansanshi. Gold production guidance for Guelb Moghrein has been increased to reflect the transition to production of a gold-copper concentrate from August 2026. Guidance for Cobre Panamá has been maintained.

Enterprise nickel production has been increased based on strong year-to-date grades and recoveries.

The previously provided sensitivity of $0.25 per lb has been incorporated into updated copper C1 cash cost1 guidance to reflect elevated fuel prices and the strong Zambian kwacha to date, which are expected to continue in the fourth quarter. The assumptions underlying this guidance include a gold price of $4,000 per ounce, an average Brent crude oil price of $100 per barrel, a Zambian kwacha to US dollar exchange rate of 18, and royalties based on consensus copper prices.

Copper AISC1 guidance has increased, driven primarily by higher royalties due to stronger copper prices and the impact of narrowing production guidance.

Nickel unit cost guidance for Enterprise has been reduced to reflect strong year-to-date operational performance.

Guidance for total capital expenditure has been narrowed based on spend to date and the latest expected timing of capital expenditures. Increased deferred stripping was offset by lower sustaining capital expenditure. The increase in deferred stripping relates to Kansanshi, with approximately half attributable to higher mining unit costs and the remainder attributable to increased capitalized stripping volumes.

The following guidance for the full year 2026 is unchanged:

  • Interest expense on debt: $500 – $525 million
  • Cash outflow on interest paid: $500 – $525 million
  • Adjusted effective tax rate, excluding Cobre Panamá and share of joint venture, Ravensthorpe, interest expense, losses realized under the Company’s sales hedge program, and one-off adjustments: 35%
  • Depreciation expense: $925 – $975 million

1 C1 cash cost (C1), and all-in sustaining cost (AISC) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

PRODUCTION GUIDANCE

000’s 2026 Previous Guidance 2026 Updated Guidance
Copper (tonnes) 405 – 475 405 – 435
Gold (ounces) 150 – 175 150 – 170
Nickel (tonnes) 30 – 40 40 – 45

PRODUCTION GUIDANCE BY OPERATION1

Copper production guidance (000’s tonnes) 2026 Previous Guidance 2026 Updated Guidance
Cobre Panamá 30 – 40 30 – 40
Kansanshi 175 – 205 175 – 185
Trident – Sentinel 190 – 220 190 – 200
Other sites 10 10
Gold production guidance (000’s ounces)    
Cobre Panamá 10 – 15 10 – 15
Kansanshi 110 – 120 95 – 105
Guelb Moghrein 30 – 40 45 – 50
Nickel production guidance (000’s tonnes)    
Trident – Enterprise 30 – 40 40 – 45

1 Production is stated on a 100% basis as the Company consolidates all operations.

CASH COST1 AND ALL-IN SUSTAINING COST1

Total Copper 2026 Previous Guidance 2026 Updated Guidance
C1 (per lb)1 $2.15 – $2.40 $2.50 – $2.65
AISC (per lb)1 $3.50 – $3.80 $4.10 – $4.25

Total Nickel 2026 Previous Guidance 2026 Updated Guidance
C1 (per lb)1 $3.25 – $4.25 $3.00 – $3.25
AISC (per lb)1 $4.25 – $5.25 $4.00 – $4.25

1 C1 cash cost (C1), and all-in sustaining cost (AISC) are non-GAAP ratios, which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

  2026 Previous Guidance 2026 Updated Guidance
Project capital1 410 – 460 410 – 450
Sustaining capital1 435 – 510 380 – 410
Deferred stripping1 230 – 280 360 – 390
Total capital expenditure 1,075 – 1,250 1,150 – 1,250

1 Deferred stripping, sustaining capital and project capital are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

OPERATIONS REVIEW

Kansanshi

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Waste mined (000’s tonnes) 34,008   34,581   31,092  
Ore mined (000’s tonnes) 4,240   5,195   5,268  
Sulphide – S3 ore milled (000’s tonnes)1,7 6,842   6,462   2,127  
Sulphide – S3 ore grade processed (%) 0.39   0.37   0.39  
Sulphide – S3 copper recovery (%) 80   82   74  
Sulphide – S3 concentrate grade (%) 20.3   21.9   22.7  
Sulphide – Main ore milled (000’s tonnes)1 2,983   3,104   3,367  
Sulphide – Main ore grade processed (%) 0.39   0.41   0.61  
Sulphide – Main copper recovery (%) 81   82   87  
Sulphide – Main concentrate grade (%) 20.2   21.5   22.9  
Mixed ore milled (000’s tonnes)1 1,597   1,754   2,116  
Mixed ore grade processed (%) 0.54   0.56   0.89  
Mixed copper recovery (%) 64   58   78  
Mixed ore concentrate grade (%) 19.4   18.9   23.1  
Oxide ore milled (000’s tonnes)1 1,955   1,685   1,785  
Oxide ore grade processed (%) 0.69   0.71   0.63  
Oxide copper recovery (%) 71   68   72  
Oxide concentrate grade (%) 15.9   16.9   18.1  
Copper production (tonnes)2 45,843   43,997   46,881  
Copper sales (tonnes)4 43,985   44,864   38,170  
Copper sold from third-party concentrate purchased (tonnes) 11,207   12,207   1,844  
Gold production (ounces) 24,690   24,586   27,854  
Gold sales (ounces) 25,110   26,955   24,313  
Copper smelter      
Concentrate processed3 383,053   369,844   310,787  
Copper anodes produced (tonnes)3 86,164   86,930   69,111  
Smelter copper recovery (%) 97   96   98  
Acid tonnes produced (000’s) 316   327   274  
Unit Cash Costs (per lb)5,6      
Mining $0.86   $0.86   $0.58  
Processing $1.46   $1.48   $0.95  
Site administration $0.50   $0.49   $0.33  
TC/RC and freight charges $0.17   $0.17   $0.15  
By-product credits ($1.39 ) ($1.28 ) ($0.76 )
Total smelter costs $0.43   $0.46   $0.34  
Copper cash cost (C1) $2.02   $2.16   $1.34  
Copper all-in sustaining cost (AISC) $4.46   $4.46   $2.77  
Total copper cost (C3) $3.67   $3.76   $2.85  

1 Measured in dry metric tonnes (“DMT”).
2 Production presented on a copper concentrate basis, i.e. mine production only. Production does not include output from the smelter.
3 Concentrate processed in smelter and copper anodes produced are disclosed on a 100% basis, inclusive of Trident and third-party concentrate processed. Concentrate processed is measured in DMT.
4 Sales exclude copper anode and cathode produced from third-party concentrate purchased at Kansanshi. Sales attributable to third-party concentrate purchases were 11,207 and 31,359 tonnes for the three and nine months ended September 30, 2026 (1,844 and 10,453 tonnes for the three and nine months ended September 30, 2025).
5 Copper all-in sustaining costs (copper AISC), copper C1 cash cost (copper C1), and total copper cost (copper C3) are non-GAAP ratios. These measures do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
6 Excludes copper concentrate from third parties purchased at Kansanshi.
7 Kansanshi S3 Expansion project declared commercial production on December 1, 2025.

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Financial results ($ millions)      
Copper 773 758 389
Gold 105 118 87
Other 33 12 –
Total sales revenues 911 888 476
Gross profit 260 255 117
EBITDA1 331 330 177

1 EBITDA is a non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Production

Kansanshi reported copper production of 45,843 tonnes in Q3 2026, an increase of 1,846 tonnes from the previous quarter due to improved throughput, while gold production was 24,690 ounces (Q2 2026: 24,586 ounces). Copper C1 cash cost1 of $2.02 per lb was $0.14 lower quarter-over-quarter due to a $0.14 per lb benefit from surplus acid sales. Feed blends and acid inventories were managed to make surplus volumes available for third-party sales where operational requirements permitted. During the quarter, the Kansanshi smelter produced approximately 316,000 tonnes of sulphuric acid, including approximately 70,000 tonnes of surplus acid sold at an average realized price of $462 per tonne, generating $33 million in revenue.

S3 throughput was sustained above design capacity supported by higher operating time, strong utilization, and improved milling rates. S3 continues to take a high proportion of feed from surface stockpiles which are tarnished and lower in grade than fresh mined ore.

Additionally, the oxide circuit throughput benefitted from increased fines feed resulting from screening, which also improved grade by removing barren, high acid-consuming material.

Outlook

Production guidance for 2026 has been narrowed to 175,000 – 185,000 tonnes for copper to reflect performance to date.

S3 will benefit from higher operating availability, mitigating expectations of lower feed grades, and reduced recoveries mostly due to feed quality changes. Stripping at South East Dome is taking longer than originally planned which will result in lower grades continuing into next year. Processing of high-grade, high acid-consuming material was reduced to lower acid-consuming material to maximize value from acid sales with prevailing high prices during the third quarter. This acid sales initiative is expected to continue into 2027 which will also impact copper production next year. A sulphide cleaner recovery improvement strategy is in place and is currently being validated with test work, surveys, and plant trials. Additionally, a crusher concave reline has been rescheduled to next year and higher oxide throughput is expected by processing a higher proportion of screened fines.

Production guidance for 2026 has been reduced to 95,000 – 105,000 ounces for gold to reflect performance to date. This is attributed to lower grades. An optimization program is in place to identify and develop gold recovery improvement opportunities.

During the third quarter, the Company continued the program to evaluate the new near-surface gold zone occurrences in the South East Dome area at Kansanshi. Test work continues with the pilot plant facility.

____________________
1 C1 cash costs are non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Trident

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Sentinel      
Waste mined (000’s tonnes) 25,255 27,641 30,432
Ore mined (000’s tonnes) 13,011 12,628 12,937
Copper ore milled (000’s tonnes)1 13,732 12,836 15,113
Copper ore grade processed (%) 0.39 0.43 0.40
Copper recovery (%) 91 92 85
Concentrate grade (%) 24.3 25.4 23.8
Copper production (tonnes) 48,816 50,335 51,336
Copper sales (tonnes) 50,772 44,779 48,410
Unit Cash Costs (per lb)2      
Mining $1.12 $1.22 $0.92
Processing $1.06 $1.10 $1.07
Site administration $0.32 $0.28 $0.18
TC/RC and freight charges $0.21 $0.24 $0.34
Total smelter costs $– $– $0.02
Copper cash cost (C1) $2.71 $2.84 $2.53
Copper all-in sustaining cost (AISC) $3.95 $3.94 $3.33
Total copper cost (C3) $4.00 $4.13 $3.58
Enterprise      
Waste mined (000’s tonnes) 5,826 5,497 8,019
Nickel ore mined (000’s tonnes) 1,198 737 1,049
Nickel ore milled (000’s tonnes)1 858 702 1,059
Nickel ore grade processed (%) 1.29 1.82 0.72
Nickel recovery (%) 89 88 76
Nickel production (tonnes) 9,831 11,246 5,767
Nickel sales (tonnes) 13,516 8,809 2,917
Unit Cash Costs (per lb)2      
Mining $0.98 $0.86 $2.00
Processing $0.74 $0.60 $1.10
Site administration $0.07 $0.06 $0.08
TC/RC and freight charges $1.43 $1.22 $0.99
Nickel cash cost (C1) $3.22 $2.75 $4.17
Nickel all-in sustaining cost (AISC) $4.19 $3.94 $5.80
Total nickel cost (C3) $4.39 $4.16 $6.15
Financial results ($ millions)      
Sales revenues – Copper 711 587 458
Sales revenues – Nickel 177 132 34
Total sales revenues 888 719 492
Gross profit 377 235 79
EBITDA2 470 329 162

1 Measured in dry metric tonnes (“DMT”).
2 All-in sustaining costs (AISC), C1 cash cost (C1), and total cost (C3) are non-GAAP ratios, and EBITDA is a non-GAAP financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

Sentinel Production

Sentinel reported copper production of 48,816 tonnes in Q3 2026, 1,519 tonnes lower than the previous quarter as lower grades more than offset improved throughput. Grades were lower reflecting the areas mined during the quarter, with delayed access to higher-grade mining areas due to the lower mining volumes as a result of the mid-life overhaul of Rope Shovel 1. Copper C1 cash cost1 of $2.71 per lb was $0.13 lower than the preceding quarter primarily as a result of lower fuel costs.

Sentinel Outlook

Production guidance for 2026 has been updated to 190,000 – 200,000 tonnes of copper to reflect performance to date.

Grades and throughput are expected to improve in the fourth quarter of 2026 as mining progresses within Stage 2. Stage 3 ore will increasingly supplement feed from Stage 1 and Stage 2. The In-Pit Crusher 4 project was completed in October 2026. Ongoing automation and control system enhancements to improve flotation stability are expected to be completed in early 2027. Waste stripping at Stage 4 is progressing to support future ore supply from 2027.

Mitigation strategies for flange bolt fatigue at Ball Mill 2 are ongoing in collaboration with the original equipment manufacturer (“OEM”) and engineering consultants. Planning continues for a major upgrade in 2027, which will involve replacing a section of the discharge end with a new OEM design, providing a permanent engineered solution.

Enterprise Production

Enterprise produced 9,831 tonnes of nickel in the third quarter of 2026, a 13% decrease from the previous quarter due to lower grades, following stronger grades in the first half of this year. Nickel C1 cash cost1 of $3.22 per lb is $0.47 higher than the previous quarter, reflecting lower production volumes.

Enterprise Outlook

Production guidance for 2026 has been increased to 40,000 – 45,000 contained tonnes of nickel based on performance to date.

Ore grades are expected to be lower in the fourth quarter, in line with the mine plan. Following expansion of the ore footprint, the operational priority will now focus on rainy season preparation, with the dewatering stage tank and main pit sump due for completion in October. With the ROM pad nearing capacity, Enterprise is well set up with ore feed for the rainy season.

____________________
1 C1 cash costs are non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Cobre Panamá

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Copper ore milled (000’s tonnes)1 6,615   2,093   –
Copper ore grade processed (%) 0.27   0.23   –
Copper recovery (%) 74   67   –
Concentrate grade (%) 20.3   20.3   –
Copper production (tonnes) 13,229   3,216   –
Copper sales (tonnes) 13,463   –   24,306
Gold production (ounces) 6,355   805   –
Gold sales (ounces)2 5,818   –   11,071
Silver production (ounces) 143,204   17,770   –
Silver sales (ounces)2 121,712   –   216,574
Unit Cash Costs (per lb)3      
Mining $1.12   $–   $–
Processing $2.61   $–   $–
Site administration $0.77   $–   $–
TC/RC and freight charges $0.01   $–   $–
By-product credits ($0.43 ) $–   $–
Copper cash cost (C1) $4.08   $–   $–
Copper all-in sustaining cost (AISC) $5.10   $–   $–
Total copper cost (C3) $6.40   $–   $–
Financial results ($ millions)      
Copper in concentrates 191   –   226
Gold – precious metal stream ongoing cash payments 3   –   5
Gold – other cash 3   –   2
Silver – precious metal stream ongoing cash payments –   –   1
Silver – other cash 3   –   3
Gold and silver – non cash amortization 3   –   8
Total sales revenues 203   –   245
Gross profit (loss) 13   (44 ) 128
EBITDA4 67   (51 ) 110

1 Measured in dry metric tonnes (“DMT”).
2 Excludes refinery-backed gold and silver credits purchased and delivered under the precious metal streaming arrangement (see “Precious Metal Stream Arrangement”).
3 Copper all-in sustaining costs (copper AISC), copper C1 cash cost (copper C1), and total copper cost (copper C3) are non-GAAP ratios, and do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.
4 EBITDA is a non-GAAP financial measure, which does not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

Production

During the third quarter of 2026, 6.6 million tonnes of ore, with an average head grade of 0.27%, were processed at an average recovery rate of 74%, resulting in the production of 13,229 tonnes of copper and 6,355 ounces of gold. The copper C1 cash cost1 was $4.08 per lb for the quarter.

The first copper concentrate shipment represented another important milestone in the Processing Program. In August, 33,000 wet metric tonnes (“wmt”) of copper concentrate was loaded and shipped, demonstrating the restoration of the integrated processing, filtration, storage, and export chain. A second vessel was subsequently loaded and shipped in September with a total of 38,611 wmt of copper concentrate.

Both generating units at the power plant demonstrated reliable operation during the third quarter, meeting the power demands of the site with excess energy sold to the national grid.

The Processing Program advanced materially during the quarter, with the progressive start-up and commissioning of the processing trains. Following the initial start-up of Train 3, Train 2 commenced operations in July and operated without major issues through August. Train 1 progressed through refurbishment, testing, and commissioning, including an operational run test in August of SAG Mill 1, Ball Mill 2, and the associated cyclone feed pumps, which was completed without major issues. Engineering activities progressed from initial recovery toward reliability and asset-integrity management during the quarter. The principal technical focus remained on medium-voltage drive and power-cell reliability, with repairs, operational risk management support, and an independent root-cause investigation progressing during the period. The integrated recovery program also included SAG Mill 3 gearless mill drive segment replacement, mill relines, Ball Mill 6 electrical works, crusher rehabilitation, and the completion of remaining water and flotation scopes.

Workforce priorities remain focused on expanding and maintaining the Train 2 recruitment pipeline, with candidate sourcing, assessment, and pre-employment preparation aligned with anticipated operational requirements. Total site employment increased from approximately 3,000 employees at the end of June to 3,200 employees by the end of September, supporting commissioning, maintenance, and operational activities.

Mobile fleet preservation and maintenance continued in line with OEM recommendations and established maintenance strategies, including the reactivation of certain equipment required to support the reclamation of the stockpiles. As of the third quarter of 2026, 18 of 36 ultra class trucks have been re-commissioned for operations. The ancillary fleet required for a one-train operation was also fully recommissioned.

____________________
1 C1 cash costs are non-GAAP financial measure which does not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Outlook

Copper and gold production from the processing of stockpiled ore at Cobre Panamá is expected to be 30,000 – 40,000 tonnes and 10,000 – 15,000 ounces, respectively, in 2026.

Following the successful commencement of stockpiled ore processing during the second quarter, the Company’s focus has shifted towards stabilizing the additional processing configuration and executing the remaining refurbishment and maintenance program required for sustainable two-train operation. With the power station fully recommissioned, incremental power plant costs are now being partially offset by the sale of excess power to support the national grid. The total stockpile was estimated at approximately 38 million tonnes of mineralized ore at varying grades, containing approximately 70,000 tonnes of recoverable copper, sufficient to support the Processing Program until mid-2027.

Environmental stewardship remains a core priority. All processing activities will continue to be conducted in accordance with the approved P&SM plan, applicable permits, and environmental commitments, while maintaining close coordination with the GOP. The Company remains ready to engage constructively with the GOP with the objective of achieving a fair and durable resolution for all stakeholders of Cobre Panamá.

The required spend for the Processing Program is estimated at approximately $200 million, including plant and equipment recommissioning, warehouse inventory replenishment, and sustaining capital1. Costs are currently estimated at approximately $90 – $100 million for commissioning, $10 – $20 million for inventory, and $70 – $80 million in sustaining capital1. As of the third quarter of 2026, cash outflows in relation to these costs is approximately $80 million.

____________________
1 Sustaining capital is a non-GAAP financial measure, which does not have standardized meanings prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.

Guelb Moghrein

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Copper production (tonnes) 1,071 2,031 3,508
Copper sales (tonnes) 1,621 2,482 4,085
Gold production (ounces) 16,050 6,310 7,832
Gold sales (ounces) 12,088 4,925 7,575
Magnetite concentrate production (WMT)1 85,799 140,746 124,131
Magnetite concentrate sales (WMT)1 128,676 180,312 136,475
Gold all-in sustaining cost (AISC) (per oz)2 $1,504 $– $–
Financial results ($ millions)      
Sales revenues 86 70 75
Gross profit 35 18 25
EBITDA2 36 19 29

1 Magnetite concentrate production and sales volumes are measured in wet metric tonnes (“WMT”).
2 All-in sustaining costs (AISC) is a non-GAAP ratio, and EBITDA is a non-GAAP financial measure. These measures do not have a standardized meaning under IFRS and might not be comparable to similar measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

Production and Outlook

At Guelb Moghrein, copper and gold production totalled 1,071 tonnes and 16,050 ounces, respectively. The operation transitioned to processing oxide material blend with some sulphide ore in August 2026 to produce a gold-copper concentrate. AISC1 for third quarter was $1,504 per ounce of gold produced.

Production guidance for 2026 is approximately 7,000 tonnes of copper. Production guidance has increased to 45,000 – 50,000 ounces of gold to reflect performance-to-date. Gold production includes output from reprocessed tailings through the CIL plant and ore stockpiles treated via the flotation circuit. Water supply remains stable. Sections of the freshwater pipeline are being replaced or redeployed with improved sealing to reduce leakage and enhance delivery efficiency. Project completion is targeted for early 2027. The freshwater column seal enhancement project will resume in November after a major shutdown in October.

GREENFIELD PROJECTS

Taca Taca

In Argentina, the Company continues to work constructively with the provincial authorities, and approval of the Mine ESIA is expected in 2026, following completion of the public consultation process scheduled for November.

The Company is finalizing its Argentina Incentive Regime for Large Investments (“RIGI”) application with an intention to submit it after receiving ESIA approval and water use concessions.

La Granja

The engineering study is well advanced, and community engagement, baseline environmental program, and resettlement planning activities have commenced in support of permitting activities. The Terms of Reference for the ESIA were filed with the relevant authorities in June 2026. During the quarter, the Company responded to observations received as part of the regulatory approval process. Approval of the Terms of Reference remains pending.

A Technical Report on Reserves is expected to be filed in 2027. Evaluation of the preferred layout options and associated infrastructure requirements continued during the quarter and remains focused on advancing engineering definition while maintaining flexibility for stakeholder and permitting considerations.

____________________
1 Copper all-in sustaining costs (copper AISC), Copper C1 cash cost (copper C1), and realized metal prices are non-GAAP ratios, which do not have a standardized meaning under IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures” for further information.

UPDATES

Fuel Supply and Prices

Diesel supply conditions improved during the third quarter with stronger supply into all major regional ports as traders and oil marketing companies continued to bring diesel cargos into the region, incentivized by higher regional prices and sustained demand. Governments also took measures to moderate delivered prices through reductions in taxes and VAT, although this fiscal support is expected to be withdrawn over the coming months. The Company maintained uninterrupted fuel supply to its Zambian operations through alternative southern African supply routes, contingency inventories, and other supply arrangements. Diesel prices nevertheless remained elevated and impacted operating costs during the third quarter.

Sulphuric Acid

During the third quarter, the Company continued to manage feed blends and acid inventories to make surplus volumes available for third-party sales where operational requirements permitted, supported by strong regional demand and favourable sulphuric acid pricing. The higher gangue acid consuming oxide ore in the plant feed and acid stocks have been actively managed to enable the sale of acid during the third quarter, providing additional opportunistic profit generation and allowing Kansanshi to realize $33 million from acid sales. The Company will continue to monitor the market and opportunistically sell when profitable.

Zambian Power Supply

During the third quarter of 2026, Zambia’s national power supply remained in a materially improved position, although the force majeure declared by ZESCO, the state power utility, in early 2024 remained in effect. Lake Kariba ended the quarter at approximately 39% usable storage, compared with approximately 15% at the same time in 2025, following seasonal drawdown from the levels reached at the end of the wet season. The 2026/2027 rainy season is expected to be influenced by a very strong El Niño, increasing uncertainty around the pace of further hydrological recovery.

The Company experienced no material power-related production impact during the quarter and maintained its diversified power-sourcing strategy. Approximately 80% of the Company’s Zambian power requirements was sourced from imports and domestic independent power producers, with the balance supplied by ZESCO. This diversified approach supports operational reliability and limits reliance on Kariba-based generation.

Progress continued on medium- and long-term power sourcing solutions. Development of the previously announced wind and solar power project, from which the Company intends to offtake power, remains on track. Joint grid-stability initiatives with the state power utility also advanced, including the Kansanshi STATCOM project, for which procurement and factory acceptance testing were completed during the quarter. Site installation is scheduled to commence in early 2027.

The Company’s Trident mining operation is finalizing a power offtake agreement with Solarcentury Africa for the proposed 112 Megawatt-peak (“MWp”) Kusoka Solar Plant. The plant will be owned and operated by Solarcentury Africa, with Trident serving as the anchor offtaker. The project will diversify electricity supply to the Company’s Sentinel copper and Enterprise nickel mines.

SUSTAINABILITY

Health & Safety

The health and safety of the Company’s employees and contractors is a top priority, and the Company is focused on the continuous strengthening and improvement of the safety culture at all of its operations. The Lost Time Injury Frequency Rates (“LTIFR”) is an area of continued focus and a key performance metric for the Company. The Company’s rolling 12-month LTIFR is 0.06 per 200,000 hours worked as at September 30, 2026 (2025: 0.03).

Responsible Mineral Sourcing at Kansanshi

The Kansanshi Copper Smelter successfully completed its first independent third-party assessment and achieved conformance under the Responsible Minerals Initiative’s Responsible Minerals Assurance Process (“RMAP”). The assessment evaluated the Kansanshi smelter’s due diligence management system and responsible mineral sourcing practices through documentation review, interviews and site observations. This achievement demonstrates the Company’s approach to responsible mining and sourcing.

Quantum Electra-Haul Patent and Trademark

In 2026, the Company secured a patent and trademark from the UK Intellectual Property Office for Quantum Electra-Haul, its proprietary trolley-assist solution. The technology enables equipped haul trucks to use electricity on designated sections of mine haul roads, reducing diesel consumption by up to 90% when fully laden trucks travel on equipped up-ramps, and delivering efficiency benefits. Quantum Electra-Haul is a clear example of the Company’s practical approach to improving operational efficiency while delivering reduced greenhouse gas emissions through innovation and tangible implementation of technology in its mining activities.

COMPLETE FINANCIAL STATEMENTS AND MANAGEMENT’S DISCUSSION AND ANALYSIS

The complete Consolidated Financial Statements and Management’s Discussion and Analysis for the three and nine months ended September 30, 2026 are available at www.first-quantum.com and at www.sedarplus.com and should be read in conjunction with this news release.

ANNUAL DISCLOSURE DOCUMENTS

The Company’s 2025 Annual Information Form has been filed on SEDAR+ (www.sedarplus.com) and will also be available on the Company’s website at https://www.first-quantum.com/investors/2026-annual-general-meeting/.

CONFERENCE CALL DETAILS

The Company will host a conference call and webcast to discuss the results on Thursday, October 29, 2026 at 9:00 am (ET).

Conference call and webcast details:
Toll-free North America: 1-800-715-9871
International: +1-646-307-1963
Conference ID 8111752
Webcast: Direct link or on our website

A replay of the webcast will be available on the First Quantum website.

About First Quantum

First Quantum is engaged in the production of copper, nickel and gold, and related activities including exploration and development. The Company has operating mines located in Zambia and Mauritania. The Company’s Cobre Panamá mine was placed into a phase of Preservation and Safe Management in November 2023. The Company’s Ravensthorpe mine was placed into a care and maintenance process in May 2024. The Company is progressing the Taca Taca copper-gold-molybdenum project in Argentina and is exploring the La Granja and Haquira copper deposits in Peru.

For further information, visit our website at www.first-quantum.com or contact:

Investor Relations:
Bonita To, Director, Investor Relations & Capital Markets
(416) 361-6400
Toll-free: 1 (888) 688-6577
E-Mail: info@fqml.com

Media Relations:
James Devas, Manager, Corporate Affairs
+44 207 291 6630
Email: james.devas@fqml.com

REGULATORY DISCLOSURES

Non-GAAP and Other Financial Measures

EBITDA, ADJUSTED EARNINGS (LOSS) AND ADJUSTED EARNINGS (LOSS) PER SHARE

EBITDA, adjusted earnings (loss) and adjusted earnings (loss) per share exclude certain impacts which the Company believes are not reflective of the Company’s underlying performance for the reporting period. These include impairment and related charges, foreign exchange revaluation gains and losses, gains and losses on disposal of assets and liabilities, one-time costs related to acquisitions, dispositions, restructuring and other transactions, revisions in estimates of restoration provisions at closed sites, debt extinguishment and modification gains and losses, the tax effect on unrealized movements in the fair value of derivatives designated as hedged instruments, and adjustments for expected phasing of Zambian VAT.

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Operating profit 549 423   223
Depreciation 233 214   196
Other adjustments:      
Foreign exchange loss (gain) 31 (15 ) 9
Gain on disposal of group companies – (271 ) –
Impairment and impairment reversals – 1   –
Share of results of joint venture 2 4   –
Restructuring expense 5 2   7
Other expense 24 42   –
Total adjustments excluding depreciation 62 (237 ) 16
EBITDA 844 400   435

  QUARTERLY
  Q3 2026 Q2 2026 Q3 2025
Net earnings (loss) attributable to shareholders of the Company 207   136   (48 )
Adjustments attributable to shareholders of the Company:      
Adjustment for expected phasing of Zambian VAT (16 ) –   (8 )
Modification and redemption of liabilities –   –   25  
Total adjustments to EBITDA excluding depreciation 62   (237 ) 16  
Tax adjustments (5 ) 3   –  
Minority interest adjustments (4 ) (8 ) (1 )
Adjusted earnings (loss) 244   (106 ) (16 )
Basic earnings (loss) per share as reported $0.25   $0.16   ($0.06 )
Diluted earnings (loss) per share $0.25   $0.16   ($0.06 )
Adjusted earnings (loss) per share $0.29   ($0.13 ) ($0.02 )

REALIZED METAL PRICES

Realized metal prices are used by the Company to enable management to better evaluate sales revenues in each reporting period. Realized metal prices are calculated as gross metal sales revenues divided by the volume of metal sold in lbs. Net realized metal price is inclusive of the treatment and refining charges (TC/RC) and freight charges per lb.

OPERATING CASHFLOW PER SHARE

In calculating the operating cash flow per share, the operating cash flow calculated for IFRS purposes is divided by the basic weighted average common shares outstanding for the respective period.

NET DEBT

Net debt is comprised of bank overdrafts and total debt less unrestricted cash and cash equivalents.

CASH COST, ALL-IN SUSTAINING COST, TOTAL COST

The consolidated cash cost (C1), all-in sustaining cost (AISC) and total cost (C3) presented by the Company are measures that are prepared on a basis consistent with the industry standard definitions by the World Gold Council and Brook Hunt cost guidelines but are not measures recognized under IFRS. In calculating the C1 cash cost, AISC and C3, total cost for each segment, the costs are measured on the same basis as the segmented financial information that is contained in the financial statements.

C1 cash cost includes all mining and processing costs less any profits from by-products such as gold, silver, zinc, pyrite, cobalt, sulphuric acid, or iron magnetite and is used by management to evaluate operating performance. TC/RC and freight deductions on metal sales, which are typically recognized as a component of sales revenues, are added to C1 cash cost to arrive at an approximate cost of finished metal.

AISC is defined as cash cost (C1) plus general and administrative expenses, sustaining capital expenditure, deferred stripping, royalties and lease payments and is used by management to evaluate performance inclusive of sustaining expenditure required to maintain current production levels.

C3 total cost is defined as AISC less sustaining capital expenditure, deferred stripping and general and administrative expenses net of insurance, plus depreciation and exploration. This metric is used by management to evaluate the operating performance inclusive of costs not classified as sustaining in nature such as exploration and depreciation.

For the three months ended September 30, 2026 Cobre Panamá Kansanshi Sentinel Other Copper5 Copper Corporate & other Enterprise Total
Cost of sales1 (190 ) (651 ) (435 ) (17 ) (1,293 ) (39 ) (76 ) (1,408 )
Adjustments:                
Depreciation 57   76   82   2   217   1   15   233  
By-product credits 12   138   –   13   163   2   –   165  
Royalties –   81   54   –   135   3   9   147  
Treatment and refining charges 6   (4 ) (8 ) 1   (5 ) –   (16 ) (21 )
Freight costs –   –   3   –   3   –   –   3  
Finished goods (5 ) 14   23   –   32   1   2   35  
Other4 6   146   (1 ) 1   152   33   (1 ) 184  
Cash cost (C1)2,4 (114 ) (200 ) (282 ) –   (596 ) 1   (67 ) (662 )
Adjustments:                
Depreciation (excluding depreciation in finished goods) (61 ) (76 ) (80 ) –   (217 ) (3 ) (14 ) (234 )
Royalties –   (81 ) (54 ) –   (135 ) (3 ) (9 ) (147 )
Other (3 ) (4 ) (3 ) (1 ) (11 ) 1   (1 ) (11 )
Total cost (C3)2,4 (178 ) (361 ) (419 ) (1 ) (959 ) (4 ) (91 ) (1,054 )
Cash cost (C1)2,4 (114 ) (200 ) (282 ) –   (596 ) 1   (67 ) (662 )
Adjustments:                
General and administrative expenses (14 ) (14 ) (13 ) (1 ) (42 ) (1 ) (2 ) (45 )
Sustaining capital expenditure and deferred stripping3 (14 ) (143 ) (64 ) (1 ) (222 ) 1   (9 ) (230 )
Royalties –   (81 ) (54 ) –   (135 ) (3 ) (9 ) (147 )
Other –   (1 ) –   –   (1 ) (1 ) –   (2 )
AISC2,4 (142 ) (439 ) (413 ) (2 ) (996 ) (3 ) (87 ) (1,086 )
AISC (per lb)2,4 $5.10   $4.46   $3.95   $–   $4.30   –   $4.19    
Cash cost – (C1)
(per lb)2,4
$4.08   $2.02   $2.71   $–   $2.59   –   $3.22    
Total cost – (C3)
(per lb)2,4
$6.40   $3.67   $4.00   $–   $4.14   –   $4.39    

1 Total cost of sales per the Consolidated Statement of Earnings (Loss) in the Company’s unaudited condensed interim consolidated financial statements.
2 C1 cash cost (C1), total costs (C3), and all-in sustaining costs (AISC) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Sustaining capital and deferred stripping are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
4 Excludes copper concentrate from third parties purchased at Kansanshi.
5 Other Copper includes Mauritania and the gold streaming arrangement with Royal Gold.

For the three months ended June 30, 2026 Cobre Panamá Kansanshi Sentinel Other Copper5 Copper Corporate & other Enterprise Total
Cost of sales1 (44 ) (633 ) (426 ) (60 ) (1,163 ) (4 ) (58 ) (1,225 )
Adjustments:                
Depreciation 30   83   88   3   204   (1 ) 11   214  
By-product credits –   130   –   34   164   4   –   168  
Royalties –   71   49   4   124   –   12   136  
Treatment and refining charges –   (4 ) (9 ) 1   (12 ) –   (7 ) (19 )
Freight costs –   –   2   –   2   –   –   2  
Finished goods (19 ) (33 ) (3 ) 4   (51 ) 2   (8 ) (57 )
Other4 1   184   (1 ) (1 ) 183   (2 ) (1 ) 180  
Cash cost (C1)2,4 (32 ) (202 ) (300 ) (15 ) (549 ) (1 ) (51 ) (601 )
Adjustments:                
Depreciation (excluding depreciation in finished goods) (36 ) (79 ) (84 ) (3 ) (202 ) –   (13 ) (215 )
Royalties –   (71 ) (49 ) (4 ) (124 ) –   (12 ) (136 )
Other (1 ) (4 ) (1 ) –   (6 ) (2 ) 1   (7 )
Total cost (C3)2,4 (69 ) (356 ) (434 ) (22 ) (881 ) (3 ) (75 ) (959 )
Cash cost (C1)2,4 (32 ) (202 ) (300 ) (15 ) (549 ) (1 ) (51 ) (601 )
Adjustments:                
General and administrative expenses (15 ) (13 ) (13 ) (1 ) (42 ) –   (1 ) (43 )
Sustaining capital expenditure and deferred stripping3 (7 ) (137 ) (52 ) (2 ) (198 ) (1 ) (7 ) (206 )
Royalties –   (71 ) (49 ) (4 ) (124 ) –   (12 ) (136 )
Other (1 ) 1   1   (2 ) (1 ) 1   (1 ) (1 )
AISC2,4 (55 ) (422 ) (413 ) (24 ) (914 ) (1 ) (72 ) (987 )
AISC (per lb)2,4 –   $4.46   $3.94   –   $4.27   –   $3.94    
Cash cost – (C1)
(per lb)2,4
–   $2.16   $2.84   –   $2.54   –   $2.75    
Total cost – (C3)
(per lb)2,4
–   $3.76   $4.13   –   $4.12   –   $4.16    

1 Total cost of sales per the Consolidated Statement of Earnings (Loss) in the Company’s unaudited condensed interim consolidated financial statements.
2 C1 cash cost (C1), total costs (C3), and all-in sustaining costs (AISC) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Sustaining capital and deferred stripping are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
4 Excludes purchases of copper concentrate from third parties treated through the Kansanshi Smelter.
5 Other Copper includes Çayeli and Mauritania and gold streaming arrangement with Royal Gold.

For the three months ended September 30, 2025 Cobre Panamá Kansanshi Sentinel Other Copper5 Copper Corporate & other Enterprise Total
Cost of sales1 (117 ) (359 ) (376 ) (70 ) (922 ) (27 ) (37 ) (986 )
Adjustments:                
Depreciation 38   66   75   6   185   1   10   196  
By-product credits 19   86   –   41   146   –   –   146  
Royalties (4 ) 60   35   5   96   –   4   100  
Treatment and refining charges (3 ) (2 ) (18 ) (1 ) (24 ) –   –   (24 )
Freight costs –   –   6   (1 ) 5   –   –   5  
Finished goods 74   (38 ) 1   (1 ) 36   –   (11 ) 25  
Other4 (7 ) 43   4   2   42   26   (2 ) 66  
Cash cost (C1)2,4 –   (144 ) (273 ) (19 ) (436 ) –   (36 ) (472 )
Adjustments:                
Depreciation (excluding depreciation in finished goods) (12 ) (77 ) (76 ) (6 ) (171 ) –   (11 ) (182 )
Royalties 4   (60 ) (35 ) (5 ) (96 ) –   (4 ) (100 )
Other (4 ) (2 ) (3 ) (1 ) (10 ) 5   –   (5 )
Total cost (C3)2,4 (12 ) (283 ) (387 ) (31 ) (713 ) 5   (51 ) (759 )
Cash cost (C1)2,4 –   (144 ) (273 ) (19 ) (436 ) –   (36 ) (472 )
Adjustments:                
General and administrative expenses (15 ) (8 ) (14 ) (1 ) (38 ) –   (2 ) (40 )
Sustaining capital expenditure and deferred stripping3 (1 ) (63 ) (37 ) (2 ) (103 ) 1   (6 ) (108 )
Royalties 4   (60 ) (35 ) (5 ) (96 ) –   (4 ) (100 )
Other (4 ) –   –   (1 ) (5 ) (1 ) –   (6 )
AISC2,4 (16 ) (275 ) (359 ) (28 ) (678 ) –   (48 ) (726 )
AISC (per lb)2,4 –   $2.77   $3.33   –   $3.07   –   $5.80    
Cash cost – (C1)
(per lb)2,4
–   $1.34   $2.53   –   $1.95   –   $4.17    
Total cost – (C3)
(per lb)2,4
–   $2.85   $3.58   –   $3.22   –   $6.15    

1 Total cost of sales per the Consolidated Statement of Earnings (Loss) in the Company’s unaudited condensed interim consolidated financial statements.
2 C1 cash cost (C1), total costs (C3) and all-in sustaining costs (AISC) are non-GAAP ratios which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
3 Sustaining capital and deferred stripping are non-GAAP financial measures which do not have a standardized meaning prescribed by IFRS and might not be comparable to similar financial measures disclosed by other issuers. See “Regulatory Disclosures”.
4 Excludes purchases of copper concentrate from third parties treated through the Kansanshi Smelter.
5 Other Copper includes Çayeli and Mauritania.

EARNINGS (LOSS) BY SEGMENT

For the three months ended September 30, 2026, segmented information for the statement of earnings (loss) is presented as follows:

  Revenue Cost of sales (excluding depreciation) Depreciation Other Operating profit (loss) 1,5 Income tax expense
Cobre Panamá 2 203 (133 ) (57 ) (29 ) (16 ) (4 )
Kansanshi 911 (575 ) (76 ) (21 ) 239   (92 )
Trident 3 888 (414 ) (97 ) (19 ) 358   (119 )
Corporate & other 4 84 (53 ) (3 ) (60 ) (32 ) (3 )
Total 2,086 (1,175 ) (233 ) (129 ) 549   (218 )

1 Operating profit (loss) less net finance costs and taxes equals net earnings (loss) for the period on the consolidated statement of earnings (loss).
2 Cobre Panamá is 17.958% owned by KPMC, a joint venture – See note 7.
3 Trident includes Sentinel copper mine and the Enterprise Nickel mine.
4 Corporate & other revenue includes hedge losses of $— recognized on zero cost collar options.
5 Finance costs of $205 million, including interest expense on debt, are not included within operating profit. See note 16.

For the three months ended June 30, 2026, segmented information for the statement of earnings (loss) is presented as follows:

  Revenue Cost of sales (excluding depreciation) Depreciation Other Operating profit (loss) 1,5 Income tax expense
Cobre Panamá 2 –   (14 ) (30 ) (78 ) (122 ) (1 )
Kansanshi 888   (550 ) (83 ) (3 ) 252   (80 )
Trident 3 719   (385 ) (99 ) 4   239   (79 )
Corporate & other 4 (85 ) (62 ) (2 ) 203   54   (12 )
Total 1,522   (1,011 ) (214 ) 126   423   (172 )

1 Operating profit (loss) less net finance costs and taxes equals net earnings (loss) for the period on the consolidated statement of earnings (loss).
2 Cobre Panamá is 17.958% (March 31, 2025: 20%) owned by KPMC, a joint venture
3 Trident includes Sentinel copper mine and the Enterprise Nickel mine.
4 Corporate & other revenue includes hedge gains and losses recognized on zero cost collar options.
5 Finance costs of $192 million, including interest expense on debt, are not included within operating profit.

For the three months ended September 30, 2025, segmented information for the statement of earnings (loss) is presented as follows:

  Revenue Cost of sales (excluding depreciation) Depreciation Other Operating profit (loss) 1,5 Income tax expense
Cobre Panamá 2 245 (79 ) (38 ) (61 ) 67   (31 )
Kansanshi 476 (293 ) (66 ) (10 ) 107   (36 )
Trident 3 492 (328 ) (85 ) (2 ) 77   (23 )
Corporate & other 4 133 (90 ) (7 ) (64 ) (28 ) (18 )
Total 1,346 (790 ) (196 ) (137 ) 223   (108 )

1 Operating profit (loss) less net finance costs and taxes equals net earnings (loss) for the period on the consolidated statement of earnings (loss).
2 Cobre Panamá is 17.958% owned by KPMC, a joint venture – See note 7.
3 Trident includes Sentinel copper mine and the Enterprise Nickel mine.
4 Corporate & other revenue includes hedge gains and losses recognized on zero cost collar options.
5 Finance costs of $201 million, including interest expense on debt, are not included within operating profit. See note 16.

CAUTIONARY STATEMENT ON FORWARD-LOOKING INFORMATION

Certain statements and information herein, including all statements that are not historical facts, contain forward-looking statements and forward-looking information within the meaning of applicable securities laws. The forward-looking information includes estimates, forecasts and statements as to the Company’s production estimates for copper, gold and nickel; C1 cash costs, all-in sustaining costs and capital expenditure estimates; the delivery of gold to Royal Gold pursuant to the gold streaming agreement and the Company’s options to accelerate deliveries and reducing ongoing gold delivered to Royal Gold thereunder; the future production payments from Royal Gold under the gold streaming agreement and the resulting boost in liquidity; the impact on total tax costs resulting from the new mining convention in Mauritania; the Company’s production outlook at its mining projects; the Company’s ability to maintain supplementary power sourcing and import arrangements in Zambia and the availability, sourcing, transportation and pricing of diesel fuel and other critical consumables, including the Company’s ability to maintain alternative supply routes and contingency inventories, related fuel-efficiency initiatives, and the estimated timing of, and annualized impact on costs of, such strategies; the development, timing and expected benefits of medium and long-term power sourcing and grid-stability initiatives in Zambia, including the wind and solar power project and the Kansanshi STATCOM project; the status and future of Cobre Panamá and the P&SM program, including preservation strategies, the Processing Program, the processing and export of stockpiled ore, expected production, costs, cash outflows and operational requirements associated with the Processing Program, remaining refurbishment, maintenance, commissioning and workforce activities, the stabilization of two-train operation, the use of proceeds from sales of copper concentrate and the anticipated timing and effects of governmental reviews, audit reports and ministerial processes; the Company’s expectations regarding replacement and maintenance work, sustained mill performance and reliability at Sentinel, and the effects thereof; the Company’s focus on increasing total throughput at Sentinel and the effect of ongoing initiatives, including the continued operation of the RRC; the expansion of the Quantum Electra-Haul™ trolley-assist network, and the resulting operational and efficiency benefits; the continued optimization, mining sequence, grades, recoveries and operational performance of Enterprise; the Company’s expectations regarding the power supply and water supply system, along with operational adaptations and maintenance efforts at Guelb Moghrein; the expected cessation of copper production at Guelb Moghrein; the C&M activity at Ravensthorpe; the timing of environmental studies and approvals for Shoemaker Levy; the expected use and mine life of Taca Taca and the Company’s community engagement and development initiatives in Tolar Grande; the implementation of data collection programs relating to the water supply at Taca Taca; the timing of receipt of concessions, approvals and permits required for Taca Taca, including the ESIA and water use permits; the Company’s plans to submit an application for the RIGI regime; the expected use and timing of the Company’s expenditures at La Granja, project development activities, updated mineral resource estimates, the potential scale and economics of the project, future engineering studies, mineral reserve estimates, arsenic management strategies, the Company’s plans for community engagement and the completion of engineering studies and an ESIA; the Company’s goals regarding its drilling program at Haquira; the status, commissioning and performance of the Company’s pilot plant at Kansanshi; the expected sources of ore for the S3 feed at Kansanshi and the continued performance, throughput and optimization of the Kansanshi S3 Expansion and associated processing, smelting and acid production facilities; the Company’s efforts to evaluate the new near-surface gold zone occurrences at Kansanshi; the results of the Company’s extensive drill program at Sentinel; the timing, completion and benefits of ongoing infrastructure, processing and mine development initiatives at Sentinel, including flotation optimization projects, tailings infrastructure upgrades, trolley-assist infrastructure and future ore sourcing strategies; the recognition of deferred revenue resulting from the Company’s precious metal streaming arrangement with Franco-Nevada; the development and operation of the Company’s projects; the estimates regarding the interest expense on the Company’s debt, cash outflow on interest paid, capitalized interest and depreciation expense; the expected effective tax rate for the Company for full year 2026; the recoveries of the Company’s VAT receivable balances for the Company’s Zambian operations; the effect of foreign exchange and inflation rates on the Company’s cost of sales; the Company’s hedging programs; the effect of seasonality on the Company’s results; capital expenditures and the Company’s three-year capital expenditure guidance and the expected results thereof; estimates of the future price of certain precious and base metals; the Company’s project pipeline, development and growth plans and exploration and development program, future expenses and exploration and development capital requirements; the Company’s assessment and exploration of targets in the Central African Copper belt, the Andean porphyry belt, Kazakhstan and New Mexico, USA; the timing of publication of the updated NI 43-101 Technical Report in respect of La Granja; the Company’s ESG-related initiatives, including climate-related initiatives, tailings management programs and the planned alignment of the Company’s tailings facilities with the Global Industry Standard on Tailings Management by the end of 2030; and community engagement efforts. Often, but not always, forward-looking statements or information can be identified by the use of words such as “aims”, “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate” or “believes” or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.

With respect to forward-looking statements and information contained herein, the Company has made numerous assumptions including, among other things, about the geopolitical, economic, permitting and legal climate in which the Company operates; continuing production at all operating facilities (other than Cobre Panamá and Ravensthorpe); the continuation of governmental approvals and authorizations relating to the Processing Program at Cobre Panamá; the successful sale and commercialization of products generated from stockpiled ore processing; the price of certain precious and base metals; exchange rates; inflation rates; anticipated costs and expenditures; the Company’s ongoing commitment to invest in innovative technology and the effects thereof; the impact of acquisitions, dispositions, suspensions or delays in the Company’s business; the Company’s ability to secure sufficient power at its Zambian operations to avoid interruption resulting from the country’s decreased power availability; mineral reserve and mineral resource estimates; the timing and sufficiency of deliveries required for the Company’s development and expansion plans; future exploration results; and the ability to achieve the Company’s goals, including with respect to the Company’s climate and sustainability initiatives. Forward-looking statements and information by their nature are based on assumptions and involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. These factors include, but are not limited to, future production volumes and costs, the temporary or permanent closure of uneconomic operations, costs for inputs such as oil, power and sulphur, political stability in Panama, Zambia, Peru, Mauritania, Finland, Argentina and Australia, adverse weather conditions in Panama, Zambia, Finland, Mauritania, and Australia, potential social and environmental challenges (including the impact of climate change), power supply, mechanical failures, water supply, procurement and delivery of parts and supplies to the operations and events generally impacting global economic, political and social stability and legislative and regulatory reform. For mineral resource and mineral reserve figures appearing or referred to herein, varying cut-off grades have been used depending on the mine, method of extraction and type of ore contained in the orebody.

See the Company’s Annual Information Form for additional information on risks, uncertainties and other factors relating to the forward-looking statements and information. Although the Company has attempted to identify factors that would cause actual actions, events or results to differ materially from those disclosed in the forward-looking statements or information, there may be other factors that cause actual results, performances, achievements or events not as anticipated, estimated or intended. Also, many of these factors are beyond the Company’s control. Accordingly, readers should not place undue reliance on forward-looking statements or information. The Company undertakes no obligation to reissue or update forward-looking statements or information as a result of new information or events after the date hereof except as may be required by law. All forward-looking statements made and information contained herein are qualified by this cautionary statement.

MERRILLVILLE, Ind.–(BUSINESS WIRE)–NiSource Inc. (NYSE: NI) today announced that it will deliver $57.5 million in savings to its existing electric customers generated through data center development. Subject to regulatory approval, the average residential electric customer is expected to receive a monthly bill credit of approximately $5 for 18 months, beginning approximately 30 days after approval. The credit is an expansion of the value being driven through our NiSource GenCo model and is an

All amounts are in United States dollars, unless otherwise stated.

TORONTO, Oct. 28, 2026 (GLOBE NEWSWIRE) — Alamos Gold Inc. (TSX:AGI; NYSE:AGI) (“Alamos” or the “Company”) today reported its financial results for the quarter ended September 30, 2026.

“Our third quarter production was in line with quarterly guidance with a record performance from the Island Gold District offsetting lower planned production from Young-Davidson. The Island Gold District achieved a number of records in the quarter including record production, underground mining rates and milling rates. We expect a further increase in underground mining rates, as well as higher grades from the Island Gold District to drive a significant increase in consolidated production in the fourth quarter, at lower costs, and remain on track to achieve our revised annual production and cost guidance,” said John A. McCluskey, President and Chief Executive Officer.

“We expect significant growth from the Island Gold District over the next several years driven by the completion of the shaft expansion in 2027 and mill expansion in 2028. Commissioning of the shaft has been delayed approximately one quarter to mid-2027 given additional time required to complete the ore and waste handling system, but has no impact on our longer-term outlook. Through the expansions of the Island Gold District and development of Lynn Lake, we remain on track to nearly double our rate of production to approximately one million ounces annually by 2030, at substantially lower costs,” Mr. McCluskey added.

Third Quarter 2026 Operational and Financial Highlights

  • Produced 119,000 ounces of gold in the third quarter of 2026, meeting quarterly guidance. This included record production from the Island Gold District, reflecting record underground mining rates and milling rates. This was offset by lower production from Young-Davidson driven by lower mining rates and grades, as previously guided. With production expected to increase in the fourth quarter, the Company is on track to achieve its full year production guidance which was revised in July
  • Island Gold District continues to perform well, with underground mining rates increasing to average a record 1,790 tonnes per day (“tpd”). Magino milling rates also increased to a new quarterly record, averaging 10,313 tpd. The higher mining and milling rates drove record quarterly production of 68,700 ounces. The operation remains on track to achieve its full year production guidance, with a further increase in underground mining rates and higher grades expected to drive significant production growth in the fourth quarter
  • Third quarter gold sales totaled 118,361 ounces at an average realized price of $4,258 per ounce, generating quarterly revenues of $510.4 million, including silver sales. This represented a 10% increase from the third quarter of 2025
  • Cash flow from operating activities in the third quarter was $216.3 million ($234.9 million before changes in working capital and taxes paid1, or $0.56 per share)
  • Generated strong ongoing free cash flow1 of $75.6 million in the third quarter, while continuing to invest in high-return growth and a significant exploration program
  • Cost of sales was $214.2 million, or $1,810 per ounce in the third quarter. As previously guided, all-in sustaining costs (“AISC”1) of $1,956 per ounce increased from the second quarter, driven by lower production at Young-Davidson and higher sustaining capital at the Island Gold District. Total cash costs1 of $1,375 per ounce were also up from the second quarter. The Company remains on track to achieve revised full year cost guidance with total cash costs and AISC expected to decrease in the fourth quarter
  • Reported net earnings were $165.6 million for the third quarter, or $0.40 per share. Adjusted net earnings1 were $184.0 million, or $0.44 per share1. Adjusted net earnings include an after-tax adjustment for net loss on commodity hedge derivatives of $9.9 million, adjustments for net unrealized foreign exchange losses recorded within deferred taxes and foreign exchange gains totaling $7.1 million, and other adjustments of $1.4 million
  • Cash and cash equivalents totaled $597.4 million at September 30, 2026, down slightly from the second quarter primarily reflecting the use of $86.2 million to eliminate the majority of remaining legacy gold hedges inherited from Argonaut Gold (“Argonaut”). The Company remains well-positioned to internally fund all of its growth initiatives and increased shareholder returns with strong ongoing free cash flow
  • Subsequent to quarter end, $160 million was received on October 9, which represented the one-year anniversary payment for the sale of the Turkish projects completed in 2025. The final $150 million cash payment is scheduled to be received in October 2027
  • Returned $22.3 million to shareholders during the third quarter. This included the repurchase of 191,944 shares at a cost of $5.7 million ($29.70 per share), and dividend of $16.6 million (quarterly $0.04 per share). Subsequent to quarter end, the Company increased its share repurchases with a further 549,757 shares repurchased at a cost of $16.6 million ($30.25 per share). Given its strong financial position and outlook, the Company expects to continue to be active on its share buyback
  • Repurchased and eliminated a further 33,000 of the remaining 50,000 ounces of legacy gold hedges from Argonaut in the third quarter. These contracts were scheduled to mature in the first half of 2027 with an average forward sale price of $1,819 per ounce, providing further upside to higher gold prices in 2027. The Company utilized existing cash to eliminate the hedges at a cost of $86.2 million for an effective price of approximately $4,429 per ounce. Subsequent to quarter end, a further 3,000 ounces of forward sale contracts were repurchased and eliminated such that a total of 315,000 ounces, or 96%, of the 329,000 ounces of forward contracts inherited from Argonaut, have been retired prior to maturity. The remaining 14,000 ounces of forward contracts are expected to be eliminated prior to maturity after which there will be no obligation remaining under the legacy Argonaut hedges
  • Continued to advance construction of the Company’s key growth projects. Work on the Phase 3+ Shaft Expansion is progressing, although the completion of commissioning of the shaft is delayed by approximately one quarter to mid-2027 given additional time required to complete the ore and waste handling system
  • Construction of the PDA mill remains on track for completion mid-2027; however, the ramp up of underground development rates has been slower than planned which is expected to result in lower mining rates in the second half of 2027
  • Lynn Lake construction is ramping up as expected with initial production on track for the first half of 2029. The Company remains well positioned to achieve its longer term consolidated production rate of approximately one million ounces annually by 2030

(1) Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures.

Highlight Summary

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025                      2026                      2025
Financial Results (in millions)        
Operating revenues $510.4 $462.3 $1,701.2 $1,233.5
Cost of sales (1) $214.2 $194.1 $651.6 $590.0
Earnings from operations $268.7 $455.7 $970.8 $766.6
Earnings before income taxes $259.1 $371.5 $984.3 $578.8
Net earnings $165.6 $276.3 $627.4 $450.9
Adjusted net earnings (2) $184.0 $155.5 $663.6 $359.5
Adjusted earnings before interest, taxes, depreciation and amortization (2) $312.0 $283.5 $1,119.0 $689.1
Cash provided by operating activities $216.3 $265.3 $690.6 $544.4
Cash provided by operating activities before changes in working capital and taxes paid (2) $234.9 $275.3 $859.8 $639.6
Capital expenditures (sustaining) (2) $49.9 $34.8 $130.7 $95.1
Finance leases (sustaining) (2)(3) $3.0 $4.3 $10.2 $12.6
Capital expenditures (growth) (2) $164.4 $83.3 $421.6 $221.2
Capital expenditures (capitalized exploration) $12.6 $16.9 $38.7 $33.3
Free cash flow (2)(3) $75.6 $130.3 $320.8 $194.8
Operating Results        
Gold production (ounces) 119,000 141,700 373,500 403,900
Gold sales (ounces) 118,361 136,473 371,118 389,083
Per Ounce Data        
Average realized gold price (5) $4,258 $3,359 $4,532 $3,144
Average spot gold price (London PM Fix) $4,262 $3,457 $4,545 $3,201
Cost of sales per ounce of gold sold (includes amortization) (1) $1,810 $1,422 $1,756 $1,516
Total cash costs per ounce of gold sold (2) $1,375 $973 $1,302 $1,065
All-in sustaining costs per ounce of gold sold (2) $1,956 $1,375 $1,845 $1,499
Share Data        
Earnings per share, basic $0.40 $0.66 $1.50 $1.07
Earnings per share, diluted $0.39 $0.65 $1.49 $1.07
Adjusted earnings per share, basic (2) $0.44 $0.37 $1.58 $0.86
Weighted average common shares outstanding (basic) (000’s) 418,572 420,500 419,383 420,463
Financial Position (in millions)        
Cash and cash equivalents (4)     $597.4 $623.1

(1)  Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense.
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures.
(3)  Sustaining finance leases at the Island Gold District are not included as additions to mineral property, plant and equipment in cash flows used in investing activities.
(4) Cash and cash equivalents in the comparatives reflect the balance as at December 31, 2025.
(5) Average realized gold price for the nine months ended September 30, 2026 reflected the settlements of ounces under the gold prepayment facility based on the prepay price of $4,166 per ounce ($2,524 per ounce for the three and nine months ended September 30, 2025). Settlements under the facility were completed in the second quarter of 2026, and there were no related settlements in the third quarter of 2026.
   

  Three Months Ended September 30, Nine Months Ended September 30,
                       2026                      2025                      2026                      2025
Gold production (ounces)        
Island Gold District (7) 68,700 66,800 197,400 190,400
Young-Davidson 22,700 37,900 85,700 112,000
Mulatos District (8) 27,600 37,000 90,400 101,500
Gold sales (ounces)        
Island Gold District (7) 66,837 62,011 189,672 179,357
Young-Davidson 23,809 37,406 87,710 111,095
Mulatos District (8) 27,715 37,056 93,736 98,631
Cost of sales (in millions) (1)        
Island Gold District (7) $106.5 $83.4 $301.0 $251.2
Young-Davidson $62.3 $65.2 $195.3 $195.5
Mulatos District (8) $44.9 $45.5 $154.5 $143.3
Cost of sales per ounce of gold sold (includes amortization) (1)      
Island Gold District (7) $1,593 $1,345 $1,587 $1,401
Young-Davidson $2,617 $1,743 $2,227 $1,760
Mulatos District (8) $1,620 $1,228 $1,648 $1,453
Total cash costs per ounce of gold sold (2)      
Island Gold District (7) $1,242 $964 $1,247 $1,002
Young-Davidson $2,041 $1,200 $1,712 $1,248
Mulatos District (8) $1,122 $761 $1,028 $971
Mine-site all-in sustaining costs per ounce of gold sold (2)(3)      
Island Gold District (7) $1,782 $1,432 $1,752 $1,420
Young-Davidson $2,764 $1,476 $2,240 $1,555
Mulatos District (8) $1,209 $831 $1,105 $1,045
Capital expenditures (sustaining, growth, capitalized exploration and leases) (in millions) (2)  
Island Gold District (4)(7) $134.5 $92.8 $356.2 $239.5
Young-Davidson (5) $24.9 $20.2 $71.0 $60.4
Mulatos District (6)(8) $27.7 $11.2 $69.7 $18.9
Other $42.8 $15.1 $104.3 $43.4

(1)  Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense.
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures.
(3)  For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Includes capitalized exploration at Island Gold District of $7.1 million and $17.3 million for the three and nine months ended September 30, 2026, respectively ($5.1 million and $14.1 million for the three and nine months ended September 30, 2025, respectively).
(5) Includes capitalized exploration at Young-Davidson of $2.8 million and $8.9 million for the three and nine months ended September 30, 2026, respectively ($4.2 million and $9.1 million for the three and nine months ended September 30, 2025, respectively).
(6) Includes capitalized exploration at Mulatos District of $2.4 million and $7.7 million for the three and nine months ended September 30, 2026, respectively ($7.6 million and $10.1 million for the three and nine months ended September 30, 2025, respectively).
(7) The Island Gold District includes the Island Gold and Magino mines.
(8) The Mulatos District includes the Mulatos and La Yaqui Grande mines.
   

Environment, Social and Governance Summary Performance 

Health and Safety

  • Total Recordable Injury Frequency Rate1 (“TRIFR”) of 1.90 in the third quarter, an increase from the second quarter and prior year period
  • Lost Time Injury Frequency Rate1 (“LTIFR”) of 0.12 in the third quarter
  • Alamos had 32 recordable injuries across its sites, including two lost time injuries in the third quarter
  • Year-to-date TRIFR of 1.60 and LTIFR of 0.07 are higher than the prior year period

The Company acknowledges the increase in injury frequency rate is not to its standards. During the quarter, the Company initiated work stand-downs across its operations led by site management and corporate senior management, refocusing on safe and sustainable production.

Alamos strives to maintain a safe, healthy working environment for all, with a strong safety culture where everyone is continually reminded of the importance of keeping themselves and their colleagues healthy and injury-free. The Company’s overarching commitment is to have all employees and contractors return Home Safe Every Day.

Environment

  • Zero significant environmental incidents in the third quarter and year to date
  • Reclamation activities at the Cerro Pelon, El Victor and San Carlos pits in the Mulatos District were completed

There was one reportable incident in the third quarter. At the Young-Davidson mine paste plant, there was a 400 cubic metres process water slurry overflow outside of the building containment area. This material was cleaned up immediately with no environmental impact.

The Company remains committed to preserving the long-term health and viability of the natural environment surrounding its operations and projects. This includes investing in new initiatives to reduce the Company’s environmental footprint, with the goal of minimizing the impact of its activities.

Community

Alamos continued to provide charitable donations, sponsorships, medical support and infrastructure investments within its local communities, including:

  • Installation of additional infrastructure at the Matarachi Community Center, and new playground equipment purchased for the Matarachi Park
  • Completing the first phase of the Mulatos community beekeeping initiative, having trained 32 families from across seven communities and three municipalities, creating new opportunities for income diversification, community capacity building, and biodiversity conservation
  • Sponsorship of various events and teams, including golf tournament fundraisers, and music and community festivals around the Company’s operations
  • Cash donations to various health, education, and food programs in the communities in which Alamos operates

In addition, in September, Alamos joined community discussions in Pukatawagan, Manitoba, to celebrate the Impact Living Agreement signed in the prior year with Mathias Colomb Cree Nation and reaffirm the Company’s commitment to a strong partnership.

The Company believes that excellence in sustainability provides a net benefit to all stakeholders and continues to engage with local communities to better understand local challenges and priorities. Ongoing investments in local infrastructure, health care, education, cultural and community programs remain a focus of the Company.

Governance and Disclosure

  • Completed annual submissions to the Carbon Disclosure Project, reporting Alamos’ 2025 climate performance
  • Advanced Alamos’ annual ESG Report and Conflict-Free Gold Report, expected to be published during the fourth quarter

The Company maintains the highest standards of corporate governance to ensure that corporate decision-making reflects its values, including the Company’s commitment to sustainable development.

(1) Frequency rate is calculated as incidents per 200,000 hours worked.

Outlook and Strategy

2026 Guidance (5)
  Island Gold
District
Young-
Davidson
Mulatos
District
Lynn Lake Total
Gold production (000’s ounces) 290 – 310 100 – 115 120 – 135 — 510 – 560
Cost of sales, including amortization (in millions) (2)         $890
Total cash costs ($ per ounce) (1) $1,025 – $1,125 $1,750 – $1,850 $1,050 – $1,150 — $1,175 – $1,275
All-in sustaining costs ($ per ounce) (1)(3) $1,550 – $1,650 $2,500 – $2,600 $1,125 – $1,225 — $1,775 – $1,875
Capital expenditures ($ millions)          
Sustaining capital (1)(4) $135 – $150 $90 – $100 $3 – $5 — $228 – $255
Growth capital (1)(4) $355 – $385 $25 – $30 $137 – $145 $140 – $160 $657 – $720
Total sustaining and growth capital (1)(4) $490 – $535 $115 – $130 $140 – $150 $140 – $160 $885 – $975
Capitalized exploration (1) $33 $12 $9 $6 $60
Total capital expenditures and capitalized exploration (1) $523 – $568 $127 – $142 $149 – $159 $146 – $166 $945 – $1,035

(1) Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description of these measures.
(2) Cost of sales includes mining and processing costs, royalties, and amortization expense but excludes silver credit and inventory net realizable value adjustment, and is calculated based on the mid-point of total cash cost guidance.
(3) Total consolidated all-in sustaining costs include corporate and administrative, and share based compensation expenses. For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Sustaining and growth capital guidance excludes capitalized exploration.
(5)  Initial annual guidance was issued on February 4, 2026 and was revised on July 29, 2026. 
   

The Company’s objective is to operate a sustainable business model that supports growing returns to all stakeholders over the long-term, through growing production, expanding margins, and increasing profitability. This includes a balanced approach to capital allocation focused on generating strong ongoing free cash flow while re-investing in high-return internal growth opportunities, and supporting higher returns to shareholders.

Third quarter production of 119,000 ounces was in line with quarterly guidance, with a record performance from the Island Gold District offsetting lower planned production from Young-Davidson. As previously guided, AISC increased from the second quarter but is expected to improve in the fourth quarter. With higher production and lower costs expected in the fourth quarter, the Company remains on track to meet full year production and cost guidance which had been revised in July.

Production in the fourth quarter is expected to increase to between 140,000 and 160,000 ounces with total cash costs and AISC both decreasing to within the range of revised annual guidance. The improvement in both production and costs is expected to be driven by further growth from the Island Gold District which continues to perform well, achieving a number of records in the third quarter.

Underground mining rates within the Island Gold District increased 15% from the second quarter, to a record 1,790 tpd. Magino milling rates also increased 16% from the second quarter, to a record 10,313 tpd. Both contributed to record quarterly production at the operation of 68,700 ounces. Increasing underground mining rates and higher grades are expected to drive a more significant increase in production from the Island Gold District in the fourth quarter.

The Company continues to generate strong ongoing free cash flow while advancing its portfolio of high-return growth projects which are expected to support further production growth and lower costs over the next several years. Free cash flow totaled $75.6 million in the third quarter, net of a significant reinvestment in growth and exploration, supporting the Company’s other capital allocation priorities. This included a further $22.3 million of shares repurchased since the second quarter, and eliminating the majority of the remaining legacy Argonaut hedges that were set to mature in the first half of 2027 at a cost of $92.9 million.

The Company’s key growth projects all continued to advance during the third quarter, including the Island Gold District shaft and mill expansion, PDA and Lynn Lake. These projects are expected to nearly double production to approximately one million ounces annually by 2030, at substantially lower costs, underpinning one of the strongest outlooks in the sector.

The Island Gold District will be a key driver of this growth and cost improvement over the next several years. With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.

Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027. The commissioning of the shaft is expected to drive consolidated gold production higher and costs lower as underground mining rates ramp up.

The Magino mill expansion to 20,000 tpd is progressing well and is expected to drive a further increase in production and decrease in costs in 2028.

Construction of the PDA mill remains on track for completion mid-2027; however, lower underground development rates are expected to result in lower than planned production from PDA during the second half of 2027. The slower pace of development reflects the requirement for additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027.

The ramp up of construction activities at Lynn Lake is advancing according to schedule, with installation of the permanent camp completed and foundation work for the process plant underway. The project remains on track to deliver initial production in the first half of 2029, contributing to further growth in consolidated production.

The short-term delays within the Island Gold District and PDA, as well as the previously disclosed impact on mining rates at Young-Davidson, are expected to impact near-term production and costs into 2027; however, they are not expected to impact the medium to longer term outlook. The Company expects significant production growth over the next several years and remains on track to nearly double production to approximately one million ounces annually by 2030, at substantially lower costs.

The Company remains well positioned to fund its high-return growth projects internally with strong ongoing free cash flow, $597.4 million of cash and cash equivalents at the end of the third quarter of 2026, and approximately $1.15 billion of total liquidity. At current gold prices, the Company expects significant free cash flow growth over the next several years with the completion of the Phase 3+ Shaft and IGD Expansions. The Company remains focused on delivering increasing shareholder returns with $122.5 million distributed thus far in 2026 through dividends and share buybacks. This included a 60% increase in the quarterly dividend rate in the first quarter, and the repurchase of $72.3 million of shares. Thus far in 2026, the Company has also utilized $227.9 million to eliminate legacy Argonaut gold hedges.

Given its strong outlook with significant free cash flow growth expected over the next several years, the Company expects to continue to be active on its share buyback while balancing its other capital allocation priorities.

Third Quarter 2026 Results

Island Gold District Financial and Operational Review

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Gold production (ounces) 68,700 66,800 197,400 190,400
Gold sales (ounces) 66,837 62,011 189,672 179,357
Financial Review (in millions)        
Operating revenues $285.1 $213.0 $861.2 $575.8
Cost of sales (1) $106.5 $83.4 $301.0 $251.2
Earnings from operations $176.6 $128.6 $554.8 $320.8
Cash provided by operating activities $203.7 $160.9 $576.1 $370.5
Capital expenditures (sustaining) (2) $32.3 $23.9 $83.0 $59.5
Finance leases (sustaining) (2),(5) $3.0 $4.3 $10.2 $12.6
Capital expenditures (growth) (2) $92.1 $59.5 $245.7 $153.3
Capital expenditures (capitalized exploration) (2) $7.1 $5.1 $17.3 $14.1
Mine-site free cash flow (2),(5) $72.2 $72.4 $230.1 $143.6
Cost of sales, including amortization per ounce of gold sold (1) $1,593 $1,345 $1,587 $1,401
Total cash costs per ounce of gold sold (2) $1,242 $964 $1,247 $1,002
Mine-site all-in sustaining costs per ounce of gold sold (2),(3) $1,782 $1,432 $1,752 $1,420
Island Gold Mine        
Underground Operations        
Tonnes of ore mined (9) 164,634 121,864 433,826 345,272
Tonnes of ore mined per day (9) 1,790 1,325 1,589 1,265
Average grade of gold (4),(9) 8.69 12.05 9.04 11.69
Metres developed 2,128 1,779 6,072 6,058
Island Gold Mill Operations (8)        
Tonnes of ore processed 117,460 23,906 342,710 234,174
Tonnes of ore processed per day (10) 1,277 1,087 1,255 1,154
Average grade of gold (4) 9.37 13.20 9.81 12.03
Contained ounces milled 35,395 10,148 108,143 90,578
Average recovery rate 97% 99% 97% 98%
Magino Mine        
Open Pit Operations        
Tonnes of ore mined – open pit (6) 1,807,233 1,622,689 4,062,943 3,938,588
Tonnes of ore mined per day 19,644 17,638 14,883 14,427
Total waste mined – open pit (7) 3,995,799 3,764,681 11,224,595 11,104,219
Total tonnes mined – open pit 5,803,032 5,387,370 15,287,538 15,042,807
Waste-to-ore ratio (7) 2.21 2.32 2.76 2.82
Average grade of gold (4) 0.65 0.84 0.73 0.81
Magino Mill Operations (8)        
Tonnes of ore processed 948,782 776,796 2,431,243 2,210,908
Tonnes of ore processed per day 10,313 8,443 8,906 8,099
Average grade of gold processed (4) 1.17 2.28 1.20 1.42
Contained ounces milled 35,702 56,923 94,141 101,000
Average recovery rate 95% 96% 95% 95%
Island Gold District Mill Operations        
Tonnes of ore processed per day 11,590 8,703 10,161 8,956
Average grade of gold processed (4) 2.07 2.61 2.27 2.44
Average recovery rate 96% 97% 96% 97%

(1) Cost of sales includes mining and processing costs, royalties, and amortization.
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. 
(3)  For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Grams per tonne of gold (“g/t Au”).
(5) Mine-site free cash flow does not include lease payments which are classified as cash flows used in financing activities on the consolidated financial statements. 
(6) Includes ore stockpiled during the periods. 
(7) Total waste mined includes operating waste and capitalized stripping.
(8) Magino mill results include the processing of open pit ore from Magino and excess underground ore not processed within the Island Gold mill. Grades of gold processed from the Magino mine averaged 0.88 g/t Au and 1.00 g/t Au, respectively, for the three and nine months ended September 30, 2026. 
(9) Excludes 13,541 tonnes of ore grading 2.98 g/t Au that was recovered from the ore pad and processed during the second quarter of 2026.
(10) Island Gold average milling rates exclude the period where mill was on care and maintenance between July 16 and September 23, 2025.
   

The Island Gold District produced a record 68,700 ounces in the third quarter of 2026, 3% higher than the prior year period and a 2% increase compared to the second quarter. With higher underground mining rates and grades expected to drive increasing production in the fourth quarter, the Island Gold District remains on track to achieve its full year production guidance of between 290,000 and 310,000 ounces.

Island Gold Operational Review

Underground mining rates increased to average a record 1,790 tpd in the third quarter, 35% higher than the prior year period and a 15% increase from the previous quarter. Mining rates are expected to increase further during the fourth quarter and remain on track to reach 2,000 tpd by the end of 2026.

With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.

Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027.

Underground grades mined averaged 8.69 g/t Au during the third quarter, slightly below the second quarter and guidance due to higher than expected dilution within certain higher grade stopes mined in August. Dilution performance was in line with expectations in September. Grades are expected to improve to near the top end of the annual guidance range of 11.5 g/t Au in the fourth quarter.

Processing rates within the Island Gold mill averaged 1,277 tpd for the third quarter, with excess underground ore mined during the quarter processed within the Magino mill. Mill recoveries averaged 97% for the third quarter, in line with expectations.

The Island Gold mill will continue operating into the first quarter of 2028 and process approximately 1,265 tpd of higher grade underground ore. The remaining underground ore mined beyond the Island Gold mill capacity will be blended at increasing rates with open pit ore and processed within the Magino mill. Following the expected completion of the Magino mill expansion to 20,000 tpd in the first quarter of 2028, the Island Gold mill will be shut down and all underground and open pit ore will be processed within the larger and more cost-effective Magino mill.

Magino Operational Review

Total mining rates averaged 63,076 tpd during the third quarter, including 19,644 tpd of ore, which was 11% higher than the prior year period. Grades mined of 0.65 g/t Au for the third quarter were 23% lower than the prior year period and slightly below the guidance range for 2026, primarily due to changes in mining sequence in the pit. Year-to-date grades mined were in line with guidance.

Magino milling rates averaged a new quarterly record of 10,313 tpd in the third quarter, a 16% increase from the second quarter, and above targeted rates of 10,000 tpd in the second half of 2026. The increase reflects the improving performance and reliability of the overall circuit driven by an enhanced maintenance program which is supporting increased availability, as well as supplemental ore feed from the temporary crusher. Milling rates are expected to remain at steady state levels of 10,000 tpd in the fourth quarter and through 2027.

As outlined in the IGD Expansion Study announced on February 3, 2026, further improvements are planned for the existing crushing and conveying circuit as part of the mill expansion to 20,000 tpd. These include the addition of a gyratory crusher, ore bins, and a new truck dump configuration allowing for the direct tipping of ore. In addition to the connection to grid power, these changes will significantly improve the performance of the existing crushing circuit by reducing ore rehandling and ensuring more consistent and higher ore flow to the mill.

Grades processed averaged 1.17 g/t Au during the third quarter, and included approximately 48,000 tonnes of higher grade underground ore. Recoveries for the third quarter were 95%, consistent with guidance.

Island Gold District Financial Review

Revenues of $285.1 million in the third quarter were 34% higher than the prior year period, driven by higher realized gold prices and an increase in ounces sold. Similarly, revenues of $861.2 million for the first nine months of the year were 50% higher than the prior year period, driven by the same factors.

Cost of sales of $106.5 million in the third quarter and $301.0 million for the first nine months of the year were 28% and 20% higher than the comparative periods, respectively, driven by higher underground and open pit tonnes mined and ongoing inflation.

Total cash costs of $1,242 per ounce and mine-site AISC of $1,782 per ounce in the third quarter were higher than the prior year period, driven by lower grades mined from underground and open pit operations, increased labour and contractor costs, and increased diesel costs. In addition, mine-site AISC was impacted by higher sustaining capital in support of the IGD Expansion to 20,000 tpd. For the first nine months of the year, total cash costs of $1,247 per ounce and mine-site AISC of $1,752 per ounce were higher than the prior year period, driven by the same factors. Total cash costs and mine-site AISC are both expected to decrease in the fourth quarter bringing full year costs in line with revised annual guidance.

Capital expenditures totaled $134.5 million in the third quarter, including $32.3 million of sustaining capital, $3.0 million of sustaining lease payments, and $7.1 million of capitalized exploration. Growth capital spending of $92.1 million was primarily focused on the Phase 3+ Shaft and IGD Expansions, including shaft site infrastructure and underground development, as well as the Magino mill expansion to 20,000 tpd. Both sustaining and growth capital spending are expected to increase in the fourth quarter to be consistent with full year guidance.

The Island Gold District generated strong mine-site free cash flow of $72.2 million in the third quarter and $230.1 million for the first nine months, net of significant capital investment related to the Phase 3+ Shaft and IGD Expansions. At current gold prices, the Island Gold District is expected to continue generating strong free cash flow while funding the expansion of the operation and a robust exploration program, with significant growth over the next several years as production increases and costs decrease.

Young-Davidson Financial and Operational Review

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Gold production (ounces) 22,700 37,900 85,700 112,000
Gold sales (ounces) 23,809 37,406 87,710 111,095
Financial Review (in millions)        
Operating revenues $104.3 $130.0 $408.0 $357.3
Cost of sales (1) $62.3 $65.2 $195.3 $195.5
Earnings from operations $41.2 $64.6 $209.2 $159.7
Cash provided by operating activities $55.3 $82.5 $240.3 $220.6
Capital expenditures (sustaining) (2) $17.1 $10.2 $45.9 $33.8
Capital expenditures (growth) (2) $5.0 $5.8 $16.2 $17.5
Capital expenditures (capitalized exploration) (2) $2.8 $4.2 $8.9 $9.1
Mine-site free cash flow (2) $30.4 $62.3 $169.3 $160.2
Cost of sales, including amortization per ounce of gold sold (1) $2,617 $1,743 $2,227 $1,760
Total cash costs per ounce of gold sold (2) $2,041 $1,200 $1,712 $1,248
Mine-site all-in sustaining costs per ounce of gold sold (2),(3) $2,764 $1,476 $2,240 $1,555
Underground Operations        
Tonnes of ore mined 472,400 667,801 1,769,857 1,930,719
Tonnes of ore mined per day 5,135 7,259 6,483 7,072
Average grade of gold (4) 1.60 1.92 1.71 1.98
Metres developed 1,423 1,800 5,507 6,135
Mill Operations        
Tonnes of ore processed 650,136 720,933 1,935,497 1,959,516
Tonnes of ore processed per day 7,067 7,836 7,090 7,178
Average grade of gold (4) 1.20 1.79 1.55 1.94
Contained ounces milled 25,117 41,387 96,593 122,354
Average recovery rate 90% 91% 89% 91%

(1)  Cost of sales includes mining and processing costs, royalties and amortization.
(2) Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. 
(3)  For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites. 
(4) Grams per tonne of gold.
   

Operational Review

Young-Davidson produced 22,700 ounces of gold in the third quarter, 40% below the prior year period due to lower mining rates and grades. As previously guided in July, mining rates and grades are expected to be lower than originally planned as a result of the localized seismic event that impacted a portion of the operation during the second quarter. Mining rates were consistent with revised guidance in the third quarter and with similar production expected in the fourth quarter, the operation is on track to meet its revised 2026 production guidance of between 100,000 and 115,000 ounces.

Mining rates averaged 5,135 tpd in the third quarter, in line with revised guidance of 5,000 tpd for the second half of 2026. The Company is advancing rehabilitation work on the 9410 level, and continuing the implementation of enhanced ground support throughout the lower portion of the mine. In addition, an updated mine plan is being evaluated, designed to minimize stress through an optimized ore extraction sequence. These initiatives are expected to support a gradual increase in mining rates through 2027 and 2028. An update on future mining rates and costs will be provided following the completion of the updated mine plan, with an expected release early in 2027 in conjunction with the Company’s three-year guidance.

Grades mined of 1.60 g/t Au for the third quarter were slightly lower than planned.

Milling rates averaged 7,067 tpd in the third quarter, higher than mining rates as lower-grade surface stockpiles were processed. As a result, milled grades of 1.20 g/t Au were below mined grades in the third quarter. Milling rates are expected to continue to exceed mining rates, and grades processed to be below mined grades, in the fourth quarter as additional stockpiles are processed. Mill recoveries averaged 90% for the third quarter and were consistent with guidance.

Financial Review

Revenues were $104.3 million in the third quarter, 20% lower than the prior year period, reflecting lower ounces sold, partially offset by higher realized gold prices. For the first nine months of the year, revenues of $408.0 million were 14% higher than the prior year period as higher realized gold prices more than offset lower ounces sold.

Cost of sales of $62.3 million in the third quarter was 4% lower than the prior year period, driven by lower mining rates, partially offset by ongoing inflation and enhanced ground support measures. Cost of sales of $195.3 million for the first nine months of the year was in line with the prior year period.

Third quarter total cash costs of $2,041 per ounce and mine-site AISC of $2,764 per ounce were higher than the prior year period, reflecting higher cost per tonne mined given the lower mining rates, lower grades mined, as well as rehabilitation work and enhanced ground support measures. Ongoing labour inflation also contributed to the increase. For the first nine months of the year, total cash costs of $1,712 per ounce and mine-site AISC of $2,240 per ounce were higher than the prior year period, driven by the same factors. Mine-site AISC are expected to increase in the fourth quarter given the timing of sustaining capital spend, bringing full year costs in line with revised guidance.

Capital expenditures in the third quarter totaled $24.9 million, including $17.1 million of sustaining capital, $5.0 million of growth capital, and $2.8 million of capitalized exploration. Capital expenditures, inclusive of capitalized exploration, totaled $71.0 million for the first nine months of the year. Capital spending is expected to increase in the fourth quarter bringing full year spending to the lower end of revised annual guidance.

Mine-site free cash flow was $30.4 million in the third quarter, 51% lower than the prior year period, primarily driven by lower ounces sold. Mine-site free cash flow was $169.3 million for the first nine months of the year, 6% higher than the prior year period. The operation is well-positioned to continue generating strong ongoing free cash flow over the long-term at current gold prices.

Mulatos District Financial and Operational Review

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025                   2026 2025
Gold production (ounces) 27,600 37,000 90,400 101,500
Gold sales (ounces) 27,715 37,056 93,736 98,631
Financial Review (in millions)        
Operating revenues $121.0 $130.8 $438.5 $325.4
Cost of sales (1) $44.9 $45.5 $154.5 $143.3
Earnings from operations $72.9 $85.3 $274.5 $175.6
Cash provided by operating activities $66.4 $84.6 $230.4 $148.1
Capital expenditures (sustaining) (2) $0.5 $0.7 $1.8 $1.8
Capital expenditures (growth) (2) $24.8 $2.9 $60.2 $7.0
Capital expenditures (capitalized exploration) (2) $2.4 $7.6 $7.7 $10.1
Mine-site free cash flow (2) $38.7 $73.4 $160.7 $129.2
Cost of sales, including amortization per ounce of gold sold (1) $1,620 $1,228 $1,648 $1,453
Total cash costs per ounce of gold sold (2) $1,122 $761 $1,028 $971
Mine-site all-in sustaining costs per ounce of gold sold (2),(3) $1,209 $831 $1,105 $1,045
La Yaqui Grande Mine        
Open Pit Operations        
Tonnes of ore mined – open pit 548,157 997,286 2,248,782 3,007,335
Total waste mined – open pit 3,553,670 3,895,690 12,017,548 12,115,215
Total tonnes mined – open pit 4,101,827 4,892,976 14,266,330 15,122,550
Waste-to-ore ratio 6.48 3.91 5.34 4.03
Crushing and Heap Leach Operations        
Tonnes of ore stacked 539,283 1,011,191 2,346,838 3,050,211
Average grade of gold processed (4) 0.94 1.48 1.17 1.25
Contained ounces stacked 16,307 48,037 88,312 122,927
Average recovery rate 143% 61% 85% 62%
Ore crushed per day (tonnes) 5,900 11,000 8,600 11,200

(1) Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense. 
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. 
(3) For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Grams per tonne of gold.
   

Mulatos District Operational Review 

The Mulatos District produced 27,600 ounces in the third quarter, a 25% decrease from the prior year period, reflecting lower production at La Yaqui Grande as well as a lower contribution from residual leaching of the Mulatos leach pad. Production was also down slightly from the second quarter reflecting lower grades and stacking rates. The Mulatos District remains on track to meet its revised production guidance of between 120,000 and 135,000 ounces with higher grades and stacking rates expected to contribute to stronger production in the fourth quarter.

La Yaqui Grande produced 23,400 ounces in the third quarter, 20% lower than the prior year period. Stacking rates averaged 5,900 tpd in the third quarter, below guidance, reflecting the impact of the rainy season and limited mining areas at the bottom of the open pit as La Yaqui Grande nears the end of its mine life. With the end of the rainy season, mining and stacking rates are expected to improve in the fourth quarter. Grades stacked averaged 0.94 g/t Au in the third quarter, and are expected to increase in the fourth quarter, consistent with guidance. Recovery rates averaged 143%, driven by recovery of ounces stacked in prior periods.

La Yaqui Grande is expected to start residual leaching after cessation of open pit mining operations, in the first half of 2027, contributing to ongoing production through 2027. Mulatos has been in the residual leaching phase since December 2023 and produced 4,200 ounces in the third quarter.

Mulatos District Financial Review

Revenues of $121.0 million in the third quarter were 7% lower than the prior year period, reflecting lower ounces sold, partially offset by higher realized gold prices. For the first nine months of the year, revenues of $438.5 million were 35% higher than the prior year period due to higher realized gold prices, slightly offset by lower ounces sold.

Cost of sales of $44.9 million in the third quarter was consistent with the prior year period as lower tonnes mined and stacked were offset by inflation. For the first nine months of the year, cost of sales of $154.5 million was 8% higher than the prior year period driven by the Mulatos leach pad inventory adjustment recorded in the second quarter. As at September 30, 2026, the remaining inventory balance on the Mulatos leach pad was $8.5 million, which the Company expects to recover through residual leaching over the remainder of the year.

Total cash costs of $1,122 per ounce and mine-site AISC of $1,209 per ounce in the third quarter were higher than the prior year period, reflecting increased unit costs from residual leaching at Mulatos, as well as lower stacking rates and grades processed at La Yaqui Grande. For the first nine months of the year, total cash costs of $1,028 per ounce and mine-site AISC of $1,105 per ounce were higher than the prior year period driven by the same factors.

Capital expenditures totaled $27.7 million in the third quarter, including $0.5 million of sustaining capital and $2.4 million of capitalized exploration. Growth capital spending related to PDA of $24.8 million included underground development, as well as structural steel and concrete foundation work for the mill. Spending on PDA is expected to increase in the fourth quarter of the year as construction activities continue to ramp up. Capital expenditures, inclusive of capitalized exploration, totaled $69.7 million for the first nine months of the year.

Construction of the PDA mill remains on track for completion mid-2027, while lower than planned underground development rates are expected to result in lower production from PDA during the second half of 2027. The slower pace of development reflects unexpected ground conditions in some areas, which are requiring additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027. The Company will provide more details on the impact to production and costs with the release of the updated three-year guidance early in 2027.

The Mulatos District generated strong mine-site free cash flow of $38.7 million in the third quarter and $160.7 million for the first nine months, net of significant capital investment related to PDA and a substantial exploration program. This was net of $16.9 million of cash tax payments in the third quarter, and $94.7 million in cash taxes paid in the first nine months of the year. The Company expects cash tax installments in Mexico of between $15 and $20 million in the fourth quarter, related to the 2026 tax year, based on a budgeted gold price of $4,000 per ounce.

Third Quarter 2026 Development Activities

Island Gold District (Ontario, Canada)

Phase 3+ Shaft and IGD Expansion

In 2022, the Company announced the Phase 3+ Shaft Expansion at Island Gold from 1,200 tpd to 2,400 tpd. The expansion includes the construction of a shaft and paste plant, as well as accelerated development to support the higher mining rates.

With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.

Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027.

Following the completion of the Phase 3+ Shaft Expansion project, the operation will transition from trucking ore and waste up the ramp to skipping ore and waste to surface, driving production higher and costs significantly lower.

On February 3, 2026, the Company announced the IGD Expansion Study outlining a larger, long-life, low-cost mine with an average annual gold production of 534,000 ounces over the initial 10 years (starting in 2028) at average mine-site AISC of $1,025 per ounce. The IGD Expansion growth capital of $542 million will be spent on the expansion of the Magino mill to 20,000 tpd, accelerated underground development, and mobile equipment to support higher underground and open pit mining rates of 3,000 tpd and 17,000 tpd, respectively.

The Island Gold mill will continue operating and will be dedicated to processing approximately 1,265 tpd of higher grade underground ore until the expected completion of the Magino mill expansion in the first quarter of 2028. The remaining underground ore mined, beyond the Island Gold mill capacity of 1,265 tpd, will be blended at increasing rates with open pit ore and processed within the Magino mill.

During the third quarter of 2026, the Company spent $92.1 million in growth capital at the Island Gold District. Progress during the third quarter is summarized as follows:

  • Commissioning of the water handling facility substantially completed
  • Continued shaft equipping and work on the ore and waste handling system in advance of shaft commissioning in mid-2027
  • Magino mill expansion to 20,000 tpd is progressing with excavation and concrete works advancing for the crushers and fine ore bins, and refinery structural steel and foundation concrete works ongoing
  • Advanced construction of the truck shop and truck wash with commissioning expected in the first quarter of 2027
  • Paste plant construction substantially complete with commissioning expected to coincide with shaft commissioning
  • Continued construction of the new administrative complex with completion expected in the fourth quarter of 2026
  • Advanced lateral development in support of the ramp up of underground mining rates through 2026 and into 2027

As of September 30, 2026, approximately $815 million was spent on the Phase 3+ Shaft Expansion. Given inflation over the past year, as well as additional work in the ore and waste handling system, the Company expects total project capital to be approximately 5% higher than the $835 million budgeted.

Phase 3+ Shaft Expansion Estimate
Growth capital ($ millions)
February 20261 Spent to date1,2 Committed to date1 % Spent & Committed
Shaft & Shaft Surface Complex $324 $301 $11 96%
Accelerated Underground Development, Infrastructure, and Equipment 255 234 7 95%
Site Infrastructure, Mill and Other3 165 184 6 115%
General Indirect Costs 91 96 3 109%
Total Phase 3+ Shaft Expansion Growth Capital $835 $815 $27 101%
         

As of September 30, 2026, 45% of growth capital related to the IGD Expansion has been spent and committed, with the majority of spending focused on the Magino mill expansion.

IGD Expansion Estimate
Growth capital ($ millions)
February 20261 Spent to date1,2 Committed to date1 % Spent & Committed
Mill Expansion $199 $71 $56 64%
Accelerated Underground Development 166 24 — 14%
Mining Equipment 81 16 25 51%
Site Infrastructure and Other 96 27 23 52%
Total IGD Expansion Growth Capital $542 $138 $104 45%

1. Reflects updated capital estimates released in February 2026 as part of the IGD Expansion, based on CAD/USD exchange $0.74:1. Spent to date based on average CAD/USD of $0.73:1 since the start of 2022. Committed to date based on the spot CAD/USD rate as at September 30, 2026 of $0.70:1.
2. Amount spent to date accounted for on an accrual basis, including working capital movements.
3.  Includes power upgrade spent to-date on a 100% basis and does not reflect partner’s contributions.
   

Island Gold shaft site area – October 2026

Island Gold shaft site area- October 2026

1350L shaft station equipping in progress – October 2026

1350L Shaft Station - October 2026

Magino mill expansion – October 2026

Magino mill expansion - October 2026

Lynn Lake (Manitoba, Canada)

On January 13, 2025, the Company announced a positive construction decision on the Lynn Lake project. With the approval of the Closure Plan in January 2025, the required permitting and pre-construction conditions have been met allowing for the start of construction on the project.

In February 2025, an internal economic study and development plan was released on the BT and Linkwood satellite deposits located in proximity to the Lynn Lake project. In February 2026, an updated development plan for the Lynn Lake project was announced incorporating the BT and Linkwood deposits. Given the significantly longer mine life, the Company re-engineered and optimized a number of elements within the broader development plan. This included several scope changes, most notably increasing the mill capacity by 13% to 9,000 tpd, driving higher production and stronger economics. The initial capital for the project is $937 million, of which $871 million remained to be spent as of January 1, 2026.

The updated parameters for the Lynn Lake project, incorporating the revised initial capital, larger Mineral Reserve base including BT and Linkwood, and increased mill throughput, are as follows:

  • Average annual production of 186,000 ounces over the initial 10 years
  • Low mine-site AISC of $829 per ounce over the initial 10 years ($1,039 per ounce over the life of mine)
  • Long mine life of 25 years with total production of three million ounces (based on Mineral Reserves at the end of 2024)
  • Attractive economics with significant near-mine and regional exploration upside

Capital spending on the Lynn Lake project in 2026 is expected to be between $140 and $160 million. Construction activities in 2026 include permanent camp construction, bulk earthworks, power infrastructure upgrades, and orders for long lead-time items.

The majority of initial capital will be spent in 2027 and 2028, with first production expected in the first half of 2029. With attractive economics and significant exploration upside, the Lynn Lake project is a key component of the Company’s leading high-return organic growth profile.

During the third quarter of 2026, the Company spent $40.2 million in development capital at the Lynn Lake project, with key activities summarized as follows:

  • Commissioned the permanent camp with occupancy permit obtained and 120 dorm rooms opened
  • Progressed process plant site preparation and foundations work
  • Commenced commissioning of the water and sewage treatment facilities
  • Continued site-wide infrastructure construction, including roads, laydown areas, and settlement pond
  • Advanced drill and blasting activities for the starter pit at MacLellan
Lynn Lake Project Initial Capital ($ millions) February 20261 Spent to date1,2 Committed to date1 % Spent & Committed
Mine Development and Site Preparation $146 $56 $69 86%
Process Plant, Utilities and Equipment 334 45 65 33%
Site Infrastructure and Other 121 25 22 39%
General Indirect Costs 262 58 — 22%
Capitalized Operating Costs 74 1 — 1%
Total Initial Capital $937 $185 $156 36%

1.  Reflects updated capital estimates released in February 2026, based on CAD/USD exchange $0.74:1. Spent to date based on average CAD/USD of $0.72:1 since the start of 2025. Committed to date based on the spot CAD/USD rate as at September 30, 2026 of $0.70:1.
2. Amount spent to date accounted for on an accrual basis, including working capital movements.
   

Lynn Lake permanent camp – October 2026

Lynn Lake permanent camp - October 2026

Lynn Lake process plant area  – October 2026

Lynn Lake process plant area - October 2026

PDA (Sonora, Mexico)

On September 4, 2024, the Company reported the results of the development plan for the PDA project located within the Mulatos District. PDA is a higher-grade underground deposit adjacent to the Mulatos open pit and will benefit from the use of existing crushing infrastructure from Cerro Pelon, supporting lower initial capital and project execution risk.

In January 2025, the Company announced it was granted approval of an amendment to its existing environmental impact assessment (Manifestación de Impacto Ambiental) by Mexico’s Secretariat of Environment and Natural Resources, allowing for the start of construction on the PDA project. Total initial capital estimate of $165 million remains unchanged with approximately $72.9 million spent to date. Remaining initial capital will be spent in the fourth quarter of 2026 and 2027.

Construction of the PDA mill remains on track for completion mid-2027, while lower than planned underground development rates are expected to result in lower production from PDA during the second half of 2027. The slower pace of development reflects unexpected ground conditions in some areas, which are requiring additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027. The Company will provide more details on the impact to production and costs with the release of the updated three-year guidance early in 2027.

During the third quarter of 2026, the Company spent $24.8 million in growth capital at the PDA project, with key activities summarized as follows:

  • Finalized all major equipment purchase orders with most deliveries expected during the fourth quarter
  • Advanced underground mine development with 573 metres (“m”) completed during the third quarter
  • Primary crusher and fine crushing construction continued to advance, with electrical conduit installation, power and control cable pulling, conveyor belt vulcanization, and control cabin installation completed
  • Completed approximately 75% of mill structural works
  • Completed installation of the primary and scavenger flotation cells
  • Commenced structural works for the dewatering and water tanks, with receiver and air line installation ongoing
  • Advanced distribution power line construction, with excavation completed for 18 of 24 pole pits

PDA portals – October 2026

PDA portals - october 2026

PDA crusher and mill area – October 2026

PDA crusher and mill area - october 2026 V3 (2)

Third Quarter 2026 Exploration Activities

Island Gold District (Ontario, Canada)

A total of $43 million has been budgeted for exploration at the Island Gold District in 2026, up from $24 million spent in 2025. The exploration program will continue to build on the success from 2025 with high-grade gold mineralization extended across the Island Gold deposit, as well as within multiple structures within the hanging wall and footwall.

In 2025, drilling programs at Island Gold and Magino focused on delineation drilling to convert the large Inferred Mineral Resource base to Mineral Reserves. This program was executed successfully and resulted in a significant increase in Mineral Reserves at both Island Gold and Magino, which was incorporated into the IGD Expansion that was announced on February 3, 2026. With the deposit open laterally and at depth, there is significant potential for further growth in Mineral Reserves and Resources.

A total of 50,000 m of underground exploration drilling is planned in 2026 with a focus on defining new Mineral Reserves and Resources in proximity to existing production horizons and infrastructure. This includes drilling across the strike extent of the main Island Gold deposit (E1E and C-Zones), as well as within a growing number of newly defined hanging-wall and footwall zones.

These potential high-grade Mineral Reserve and Resource additions would be low cost to develop, given their proximity to existing infrastructure, and provide increased operational flexibility as mining rates increase. To support the underground exploration program, 1,090 m of underground exploration drift development is planned to extend drill platforms on multiple levels.

Additionally, 48,000 m of surface exploration drilling has been budgeted targeting the area between the Island Gold and Magino deposits, as well as the down-plunge extension of the Island Gold deposit, below a depth of 1,500 m.

The regional exploration program at the Island Gold District includes 16,000 m of surface drilling. The focus of the regional program will be following up on high-grade mineralization intersected in the 2025 drill program at Cline-Pick located approximately seven km northeast of the Island Gold mine.

During the third quarter of 2026, 12,660 m of underground exploration drilling was completed in 60 holes, and 10,099 m of underground delineation drilling across 44 holes. Additionally, 13,063 m of surface exploration drilling was completed in 20 holes. Year to date, 33,615 m of underground exploration drilling was completed in 133 holes, or 67% of the budgeted metres, and 22,609 m of underground delineation drilling across 95 holes. Additionally, 30,207 m of surface exploration drilling was completed in 30 holes, representing 63% of the budget for the year.

As part of the regional exploration program, 8,463 m of drilling was completed in 16 holes at Cline-Pick in the third quarter. Year to date, 17,110 m of drilling has been completed in 31 holes at Cline-Pick, exceeding the budgeted regional drill program for the year. 

As detailed in the June exploration update (see press release dated June 22, 2026), high-grade mineralization was extended across multiple areas which are being targeted as sources of additional higher-grade mill feed within the expanded Magino mill. This includes defining a new zone of high-grade mineralization 250 m west of underground Mineral Reserves and Mineral Resources (Island Gold West Extension), and continuing to extend high-grade mineralization within the Island West up-plunge area, and the past producing Cline-Pick and Edwards mines. These targets represent opportunities for further production growth by increasing the proportion of higher-grade ore to be fed within the expanded Magino mill.

Total exploration expenditures during the third quarter were $9.1 million, of which $7.1 million was capitalized. In the first nine months of the year, the Company incurred exploration expenditures of $22.7 million, of which $17.3 million was capitalized.

Young-Davidson (Ontario, Canada)

A total of $17 million has been budgeted for exploration at Young-Davidson in 2026, up from $13 million spent in 2025. This includes 48,000 m of underground exploration drilling focused on extending mineralization within the Young-Davidson syenite, which hosts the majority of Mineral Reserves and Mineral Resources, and to test and expand on gold mineralization that has been intersected within two areas of focus in the hanging wall. This new style of mineralization is located in close proximity to the existing mid-mine infrastructure.

The regional program includes 10,000 m of drilling focused on evaluating several targets including the Otisse NE target and the Biralger target located approximately 3 km and 17 km northeast of Young-Davidson, respectively. A comprehensive data compilation project commenced in 2025, and will be completed in 2026 for the Wydee and Matachewan projects, both acquired in 2024, and located in proximity to Young-Davidson.

During the third quarter, 17,039 m of underground exploration drilling was completed in 52 holes across multiple levels. Drilling is targeting syenite-hosted mineralization, as well as continuing to test mineralization in the hanging wall sediments and mafic-ultramafic stratigraphy. Year to date, 46,008 m of drilling has been completed in 132 holes. The seismic event that occurred at Young-Davidson in June has not impacted the budgeted exploration program in 2026.

A total of 4,865 m of regional surface exploration drilling was completed in 16 holes in the first quarter focused on evaluating the Otisse NE and Biralger targets. No regional exploration drilling was undertaken in the third quarter; however, drilling is planned in the fourth quarter.

Total exploration expenditures during the third quarter of 2026 were $3.6 million, of which $2.8 million was capitalized. For the first nine months of the year, exploration expenditures totaled $12.4 million, of which $8.9 million was capitalized.

Mulatos District (Sonora, Mexico)

A total of $21 million has been budgeted at Mulatos for exploration in 2026, consistent with $20 million spent in 2025. The regional drilling program is expected to total 44,500 m and includes 20,000 m of surface exploration drilling at the Cerro Pelon sulphide target, 9,000 m at the recently discovered Halcon target, and an additional 15,500 m planned across several early to advanced stage targets within the Mulatos District. The planned addition of a mill to process higher-grade sulphides has created new opportunities for growth within the Mulatos District, including Cerro Pelon and the Halcon target.

During the third quarter, 4,483 m of surface exploration drilling was completed in 15 holes at Cerro Pelon, and 7,623 m were completed in 15 holes at Halcon. Additionally, 2,310 m were drilled in five regional holes across the district. For the first nine months of the year, 40,334 m have been drilled at Mulatos in 123 drill holes, representing close to 90% of budgeted metres for the year.

Total exploration expenditures during the third quarter were $5.6 million, of which $2.4 million was capitalized. For the first nine months of the year, exploration expenditures totaled $17.2 million, of which $7.7 million was capitalized.

Lynn Lake (Manitoba, Canada)

A total of $6 million has been budgeted for exploration at the Lynn Lake project in 2026. This is up from $3 million spent in 2025. The exploration budget includes 13,500 m to test the potential for underground mining opportunities below the Gordon and MacLellan open pits.

In total, 13,740 m of drilling was completed in 25 holes at the Gordon and MacLellan deposits in the first half of the year.  Results have been received, and geological models are being updated to be used for 2027 drill planning purposes.

Exploration spending totaled $0.3 million in the third quarter and $4.8 million for the first nine months of the year, all of which was capitalized.

Qiqavik (Quebec, Canada)

A total of $7 million has been budgeted for exploration at the Qiqavik project in 2026, similar to 2025. Qiqavik is a camp-scale property covering 60,400 ha in the Cape Smith Greenstone Belt in Nunavik, Quebec. The Qiqavik project covers 50 km of strike covering prospective gold hosting environments and several major crustal-scale structures such as the Qiqavik Break and the Bergeron fault. Early-stage exploration completed to date indicates that high-grade gold occurrences are controlled by structural splays off the Qiqavik Break.

The 2026 exploration program will follow up on discoveries made across several target areas during the 2025 drill program, and test the next series of highest priority targets as outlined in a press release dated January 28, 2026. The success of this early-stage greenfield drilling program across multiple target areas continues to support the significant gold endowment potential of the Qiqavik project.

During the third quarter, the Company completed a comprehensive exploration program at the Qiqavik project consisting of diamond drilling, geological mapping, prospecting, till sampling, and drone-based magnetic surveys (5,395 line-km). A total of 7,461 m of drilling was completed in 23 holes across seven target zones, including both follow-up drilling on established mineralized trends and initial testing of newly generated targets, for which assays are pending. Exploration activities successfully refined the geological and structural framework of the property, identified additional gold-bearing occurrences, and advanced the understanding of relationships between gold-bearing boulder trains and their potential bedrock source areas. Information generated through the 2026 program is expected to support the prioritization of follow-up targets and future discovery-focused drilling campaigns.

Exploration spending was $5.6 million in the third quarter and $7.4 million for the first nine months of the year, all of which was expensed.

Review of Third Quarter Financial Results

During the third quarter of 2026, the Company sold 118,361 ounces of gold for operating revenues of $510.4 million, a 10% increase from the prior year period. The increase was due to higher realized gold prices partially offset by lower ounces sold at Young-Davidson and the Mulatos District.

The average realized gold price in the third quarter was $4,258 per ounce, 27% higher than the prior year period, and in line with the average London PM fix for the quarter.

Cost of sales (which includes mining and processing costs, royalties, and amortization expense) was $214.2 million in the third quarter, 10% higher than the prior year period. Key drivers of changes to cost of sales as compared to the prior year period were as follows:

Mining and processing costs were $163.8 million, 21% higher than the prior year period. The increase primarily reflects ongoing inflation, and higher underground and open pit tonnes mined at the Island Gold District, partially offset by lower mining rates at Young-Davidson and La Yaqui Grande.

Total cash costs of $1,375 per ounce and AISC of $1,956 per ounce were higher than the prior year period, driven by ongoing inflation, lower grades mined at the Island Gold District, and higher cost per tonne mined at Young-Davidson given the lower mining rates. Lower stacking rates and grades processed at La Yaqui Grande also contributed to the increase, as stacking rates were temporarily impacted by the rainy season. In addition, AISC was impacted by higher sustaining capital reflecting expenditures at the Island Gold District in support of the IGD Expansion to 20,000 tpd, as well as rehabilitation work and enhanced ground support measures at Young-Davidson.

Royalty expense was $6.2 million in the third quarter, consistent with the prior year period.

Amortization of $44.2 million was 15% lower than the prior year period driven by lower ounces sold. Amortization was $373 per ounce sold, 2% lower than the prior year period, primarily due to an increase in the depletion base resulting from the 2025 year-end Mineral Reserves and Resources update.

The Company recognized earnings from operations of $268.7 million in the third quarter, 41% lower than the prior year period. The prior year period included a one-time impairment reversal of $218.8 million related to the sale of the Turkish Projects.

In the third quarter, net loss on commodity derivatives was $14.6 million, compared to $80.0 million in the prior year period. The decrease was driven by fewer remaining legacy gold hedges from Argonaut following the retirement of hedges prior to settlement, and a lower mark-to-market adjustment reflecting a smaller change in gold prices during the quarter. During the third quarter, the Company repurchased and eliminated 33,000 of the remaining 50,000 ounces of legacy gold hedges at a cost of $86.2 million for an effective price of approximately $4,429 per ounce. These contracts were scheduled to mature in the first half of 2027 with an average forward sale price of $1,819 per ounce, providing further upside to higher gold prices in 2027.

The Company reported net earnings of $165.6 million in the third quarter, compared to $276.3 million in the prior year period. On an adjusted basis, earnings were $184.0 million, or $0.44 per share. Adjusted net earnings include an after-tax adjustment for net loss on commodity hedge derivatives of $9.9 million, adjustments for net unrealized foreign exchange losses recorded within deferred taxes and foreign exchange gains totaling $7.1 million, and other adjustments of $1.4 million.

Associated Documents

This press release should be read in conjunction with the Company’s consolidated financial statements for the three-month period ended September 30, 2026 and associated Management’s Discussion and Analysis (“MD&A”), which are available from the Company’s website, www.alamosgold.com, in the “Investors” section under “Reports and Financials”, and on SEDAR+ (www.sedarplus.ca) and EDGAR (www.sec.gov).

Reminder of Third Quarter 2026 Results Conference Call

Senior management will host a conference call on Thursday, October 29, 2026 at 10:00 am ET to discuss the results. Participants may join the conference call via webcast or through the following dial-in numbers:

Via Webcast:

To view the live webcast, please register at www.alamosgold.com, or through the following link view webcast.

Via Phone:

Toronto and International: (647) 495-7514
Toll free (Canada and the United States): (888) 596-4144
Participant passcode: 1813237#
   

Alternatively, you may register your phone number here within 30 minutes of the scheduled start of the call to receive an instant automated call back. 

A playback will be available until November 28, 2026 by dialling (647) 362-9199 or (800) 770-2030 within Canada and the United States. The passcode is 1813237#. The webcast will be archived at www.alamosgold.com.

Qualified Persons

Chris Bostwick, FAusIMM, Alamos’ Senior Vice President, Technical Services, who is a qualified person within the meaning of National Instrument 43-101 (“Qualified Person”), has reviewed and approved the scientific and technical information contained in this press release.

About Alamos

Alamos is a Canadian-based intermediate gold producer with diversified production from three operations in North America. This includes the Island Gold District and Young-Davidson mine in northern Ontario, Canada, and the Mulatos District in Sonora State, Mexico. Additionally, the Company has a strong portfolio of growth projects including the IGD Expansion, and the Lynn Lake project in Manitoba, Canada. Alamos employs more than 2,400 people and is committed to the highest standards of sustainable development. The Company’s shares are traded on the TSX and NYSE under the symbol “AGI”.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Scott K. Parsons
Senior Vice-President, Corporate Development & Investor Relations
(416) 368-9932 x 5439
 
Khalid Elhaj
Vice President, Business Development & Investor Relations
(416) 368-9932 x 5427
 

The TSX and NYSE have not reviewed and do not accept responsibility for the adequacy or accuracy of this release. 

Cautionary Note Regarding Forward-Looking Statements
This press release contains or incorporates by reference “forward-looking statements” and “forward-looking information” as defined under applicable Canadian and U.S. securities legislation.  All statements, other than statements of historical fact, which address events, results, outcomes or developments that the Company expects to occur are, or may be deemed to be, forward-looking statements. Forward-looking statements are generally, but not always, identified by the use of forward-looking terminology such as “expect”, “assume”, “schedule”, “believe”, “anticipate”, “intend”, “objective”, “strive”, “estimate”, “potential”, “forecast”, “budget”, “target”, “on track”, “outlook”, “continue”, “plan” or variations of such words and phrases and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved or the negative connotation of such terms.

Such statements in this press release may include (without limitation) information, assumptions, expectations and guidance as to strategy, plans, and future financial and operating performance, such as those regarding: free cash flow; mine-site free cash flow; costs (including total cash costs, AISC, mine-site AISC, capital expenditures, growth and sustaining capital, capitalized exploration, exploration spending); budgets; tax rates and the payment of taxes; total liquidity; returns to stakeholders; opportunities for share repurchases under the Company’s Normal Course Issuer Bid; repurchase of legacy Argonaut hedges; impacts of inflation and increasing labour and contractor costs; mine plans; mine life; Mineral Reserve life; Mineral Reserves and Resources; gold and other metal price assumptions; foreign exchange rates; sector outlook; size, value and profitability of operations and the Company’s balanced approach to capital allocation; expanding margins; project economics; project risks; mining methodologies; underground development rates; mining, stacking, milling and processing rates; total mill feed and throughput rates; recovery rates; anticipated gold production, production rates, timing of production, further production potential and growth; gold grades; exploration potential, budgets, focuses, programs, targets, and projected results; investment in and funding of growth initiatives and projects; operational impacts on the natural environment; the Company’s approach to reduction of its environmental footprint, greenhouse gas emissions, and related investments in new initiatives; community relations, engagement activities, and initiatives; corporate governance; plans with respect to health and safety; project milestones and timing and effects of completion of the IGD Expansion and the Phase 3+ Shaft Expansion; Magino mill expansion and intended effects on costs and processing; infrastructure upgrades; power projects; in the Mulatos District, the Puerto Del Aire project, including construction of the PDA mill, Cerro Pelon and the Halcon target, and anticipated timing of commencement of residual leaching at La Yaqui Grande; construction developments at the Lynn Lake project, project milestones and production projections and timing; exploration potential at the Qiqavik Gold project; scheduled final installment of $150m in respect of the sale of the Company’s Turkish development projects; and any other statements that express management’s expectations or estimates of future performance, operational, geological or financial results.

Alamos cautions that forward-looking statements are necessarily based upon several factors and assumptions that, while considered reasonable by the Company at the time of making such statements, are inherently subject to significant business, economic, technical, legal, political and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information.

Risk factors that may affect Alamos’ ability to achieve the expectations set forth in the forward-looking statements in this document include, but are not limited to: the actual results of current exploration activities; changes to current estimates of Mineral Reserves and Resources; changes to production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing and recovery rate estimates which may be impacted by unscheduled maintenance, weather issues, labour and contractor availability and other operating or technical difficulties in connection with mining or development activities, including geotechnical challenges); conclusions of economic and geological evaluations; the costs and timing of exploration, construction and development of new deposits; changes in project parameters as plans continue to be refined; operations may be exposed to illnesses, diseases, epidemics and pandemics which may impact, among other things, the broader market and the trading price of the Company’s shares; the duration of any regulatory responses to any illness, disease, epidemic or pandemic; government and the Company’s attempts to reduce the spread of any illness, disease, epidemic or pandemic which may affect many aspects of the Company’s operations including the ability to transport personnel to and from site, contractor and supply availability and the ability to sell or deliver gold doré bars; provincial, state and federal orders or mandates (including with respect to mining operations generally or auxiliary businesses or services required for the Company’s operations) in Canada, Mexico and other jurisdictions in which the Company does or may conduct business; political and economic conditions and developments in the jurisdictions in which the Company operates and in the world generally; fluctuations in the price of gold or certain other commodities such as, diesel fuel, natural gas, and electricity; changes in foreign exchange rates (particularly CAD, MXN and USD); the impact of inflation and any tariffs, trade barriers and/or regulatory costs; changes in the Company’s credit rating; any decision to declare a quarterly dividend; employee and community relations; litigation, administrative or regulatory proceedings and any resulting court, administrative, regulatory or arbitral decision(s) or order(s); disruptions affecting operations; power outages; availability of and increased costs associated with mining inputs and labour; delays in implementing growth and improvement initiatives; delays with the Phase 3+ Shaft Expansion or the IGD Expansion; delays in or obstructions to construction of the 115kV powerline for the Island Gold District; delays with the expansion of the Magino mill, paste plant construction project, construction of the Lynn Lake Project, construction of the PDA project, and/or the development or updating of mine plans; changes with respect to the intended method of accessing, mining the deposit, and processing any ore at PDA; delays in receiving or failure to receive the third installment payment in respect of the sale of the Company’s Turkish development projects; risks associated with the start-up of new mines; the risk that the Company’s mines may not perform as planned; uncertainty with the Company’s ability to secure additional capital to execute its business plans; the speculative nature of mineral exploration and development, including the risks of obtaining and maintaining necessary licenses and permits, including the necessary licenses, permits, authorizations and/or approvals from the appropriate regulatory authorities for the Company’s development stage and operating assets; labour and contractor availability (and being able to secure the same on favourable terms); contests over title to properties; expropriation or nationalization of property; inherent risks and hazards associated with mining and mineral processing including industrial hazards and industrial accidents; environmental hazards including, without limitation, fires, floods, storm-related damage, seismic activity and unusual or unexpected formations, pressures and cave-ins; changes in national and local government legislation, controls or regulations in Canada, Mexico, the United States and other jurisdictions in which the Company does or may carry on business in the future; increased costs and risks related to the potential impact of climate change; failure to comply with environmental and health and safety laws and regulations; disruptions in the maintenance or provision of required infrastructure and information technology systems; risk of loss due to sabotage, protests and other civil disturbances; the impact of global liquidity and credit availability and the values of assets and liabilities based on projected future cash flows; risks arising from holding derivative instruments; and business opportunities that may be pursued by the Company.

Additional risk factors and details with respect to risk factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this press release are set out in the Company’s latest 40-F/Annual Information Form and its Management’s Discussion and Analysis for the year ended December 31, 2025, each under the heading “Risk Factors”, which is available on the SEDAR+ website at www.sedarplus.ca or on EDGAR at www.sec.gov. The foregoing should be reviewed in conjunction with the information, risk factors and assumptions found in this MD&A.

The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.

Cautionary Note to U.S. Investors

Measured, Indicated and Inferred Resources: All resource and reserve estimates included in this press release or documents referenced in this press release have been prepared in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Standards”). NI 43-101 is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Mining disclosure in the United States was previously required to comply with SEC Industry Guide 7 (“SEC Industry Guide 7”) under the United States Securities Exchange Act of 1934, as amended. The U.S. Securities and Exchange Commission (the “SEC”) has adopted final rules, to replace SEC Industry Guide 7 with new mining disclosure rules under sub-part 1300 of Regulation S-K of the U.S. Securities Act (“Regulation S-K 1300”) which became mandatory for U.S. reporting companies beginning with the first fiscal year commencing on or after January 1, 2021. Under Regulation S-K 1300, the SEC now recognizes estimates of “Measured Mineral Resources”, “Indicated Mineral Resources” and “Inferred Mineral Resources”. In addition, the SEC has amended its definitions of “Proven Mineral Reserves” and “Probable Mineral Reserves” to be substantially similar to international standards.

Investors are cautioned that while the above terms are “substantially similar” to CIM Definitions, there are differences in the definitions under Regulation S-K 1300 and the CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the mineral reserve or mineral resource estimates under the standards adopted under Regulation S-K 1300. U.S. investors are also cautioned that while the SEC recognizes “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under Regulation S-K 1300, investors should not assume that any part or all of the mineralization in these categories will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described using these terms has a greater degree of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves. Accordingly, investors are cautioned not to assume that any measured mineral resources, indicated mineral resources, or inferred mineral resources that the Company reports are or will be economically or legally mineable.

International Financial Reporting Standards: The condensed interim consolidated financial statements of the Company have been prepared by management in accordance with International Financial Reporting Standard 34, Interim Financial Reporting, as issued by the International Accounting Standards Board. These accounting principles differ in certain material respects from accounting principles generally accepted in the United States of America. The Company’s reporting currency is the United States dollar unless otherwise noted.

Non-GAAP Measures and Additional GAAP Measures

 

The Company has included certain non-GAAP financial measures to supplement its condensed interim consolidated financial statements for the three and nine months ended September 30, 2026 and 2025, which are presented in accordance with IFRS, including the following:

  • adjusted net earnings and adjusted earnings per share;
  • cash flow from operating activities before changes in working capital and taxes paid;
  • Company-wide free cash flow;
  • total mine-site free cash flow;
  • mine-site free cash flow;
  • total cash costs per ounce of gold sold;
  • AISC per ounce of gold sold;
  • mine-site AISC per ounce of gold sold;
  • sustaining and non-sustaining capital expenditures; and
  • adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”).

The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. Non-GAAP financial measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Management’s determination of the components of non-GAAP and additional measures is evaluated on a periodic basis influenced by new items and transactions, a review of investor uses and new regulations as applicable. Any changes to the measures are duly noted and retrospectively applied as applicable.

Adjusted Net Earnings and Adjusted Earnings per Share

“Adjusted net earnings” and “adjusted earnings per share” are non-GAAP financial measures with no standard meaning under IFRS which exclude the following from net earnings:

  • Foreign exchange gains or losses
  • Items included in other loss
  • Impairment expense/reversal of impairment
  • Net gain or loss on commodity derivatives
  • Certain non-recurring items
  • Foreign exchange gain or loss recorded in deferred tax expense
  • The income and mining tax impact of items included in other loss

The Company uses adjusted net earnings for its own internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect the items which have been excluded from the determination of adjusted net earnings. Consequently, the presentation of adjusted net earnings enables shareholders to better understand the underlying operating performance of the core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings based on an internal assessment of performance measures that are useful for evaluating the operating performance of the Company’s business and a review of the non-GAAP measures used by mining industry analysts and other mining companies.

Adjusted net earnings is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of operating profit or cash flows from operations as determined under IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Net earnings $165.6 $276.3 $627.4 $450.9
Adjustments:        
Foreign exchange (gain) loss (0.9) 1.5 (4.3) 7.7
Impairment reversal, net of tax — (192.9) — (192.9)
Inventory net realizable value adjustment, net of tax — — 7.0 —
Net loss on commodity derivatives, net of tax 9.9 53.8 2.7 117.2
Other loss 1.8 3.9 4.8 7.1
Unrealized foreign exchange loss (gain) recorded in deferred tax expense 8.0 13.9 27.1 (29.1)
Other income and mining tax adjustments (0.4) (1.0) (1.1) (1.4)
Adjusted net earnings $184.0 $155.5 $663.6 $359.5
Adjusted earnings per share – basic $0.44 $0.37 $1.58 $0.86
         

Cash Flow from Operating Activities before Changes in Working Capital and Taxes Paid

“Cash flow from operating activities before changes in working capital and taxes paid” is a non-GAAP performance measure that could provide an indication of the Company’s ability to generate cash flows from operations, and is calculated by adding back the change in working capital and taxes paid to cash flow from operating activities. “Cash flow from operating activities before changes in working capital and taxes paid” is a non-GAAP financial measure with no standard meaning under IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Cash flow from operating activities $216.3 $265.3 $690.6 $544.4
Add: Changes in working capital and taxes paid 18.6 10.0 169.2 95.2
Cash flow from operating activities before changes in working capital and taxes paid                   $234.9                   $275.3                   $859.8                   $639.6
         

Company-wide Free Cash Flow

“Company-wide free cash flow” is a non-GAAP performance measure calculated from cash flow from operating activities, less mineral property, plant and equipment expenditures and non-recurring costs. The Company believes this to be a useful indicator of its ability to operate without reliance on additional borrowing or usage of existing cash company-wide. Company-wide free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other mining companies. Company-wide free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Cash flow from operating activities $216.3 $265.3 $690.6 $544.4
Less: mineral property, plant and equipment expenditures (226.9) (135.0) (591.0) (349.6)
Add: early settlement of legacy Argonaut hedges (1) 86.2 — 221.2 —
Company-wide free cash flow                     $75.6                   $130.3                   $320.8                   $194.8
         

(1)   Represents the early settlement of 33,000 ounces and 83,000 ounces, respectively, during the three and nine months ended September 30, 2026, of the remaining legacy Argonaut hedges.

Mine-site Free Cash Flow

“Mine-site free cash flow” is a non-GAAP financial performance measure calculated as cash flow from operating mine-sites, less mine-site mineral property, plant and equipment expenditures. The Company believes this to be a useful indicator of its ability to operate without reliance on additional borrowing or usage of existing cash. Mine-site free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other mining companies. Mine-site free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Consolidated Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities                   $216.3                   $265.3                   $690.6                   $544.4
Add: operating cash flow used by non-mine site activity (1)                     109.1                       62.7                     356.2                     194.8
Cash flow from operating mine-sites                   $325.4                   $328.0                $1,046.8                   $739.2
         
Mineral property, plant and equipment expenditures                   $226.9                   $135.0                   $591.0                   $349.6
Less: capital expenditures from development projects and corporate                      (42.8)                      (15.1)                    (104.3)                      (43.4)
         
Capital expenditure and capital advances from mine-sites                   $184.1                   $119.9                   $486.7                   $306.2
Total mine-site free cash flow                   $141.3                   $208.1                   $560.1                   $433.0
         

Island Gold District Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities (1) $203.7 $160.9 $576.1 $370.5
Mineral property, plant and equipment expenditures (131.5) (88.5) (346.0) (226.9)
Mine-site free cash flow                     $72.2                     $72.4                   $230.1                   $143.6
         

Young-Davidson Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities (1) $55.3 $82.5 $240.3 $220.6
Mineral property, plant and equipment expenditures (24.9) (20.2) (71.0) (60.4)
Mine-site free cash flow                     $30.4                     $62.3                   $169.3                   $160.2
         

Mulatos District Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities                     $66.4                     $84.6                   $230.4                   $148.1
Mineral property, plant and equipment expenditures                      (27.7)                      (11.2)                      (69.7)                      (18.9)
Mine-site free cash flow                     $38.7                     $73.4                   $160.7                   $129.2
         

(1) Cash from operating activities for the Canadian operations excludes the impact of the nil ounces and 12,255 ounces settled under the gold prepayment arrangement for the three and nine months ended September 30, 2026, respectively (three and nine months ended September 30, 2025 – 12,346 ounces and 37,038 ounces, respectively). The non-cash adjustment to reflect the settlement of the gold prepayment arrangement is included in Company-wide free cash flow.
   

Total Cash Costs per ounce

Total cash costs per ounce is a non-GAAP term typically used by gold mining companies to evaluate the costs of producing gold and to assess the ability of a mining company to generate cash flow from operating activities. Total cash costs per ounce includes mining and processing costs plus applicable royalties, and net of costs allocated to by-product and net realizable value adjustments. Total cash costs per ounce is exclusive of exploration costs. As well, the Company excludes mark-to-market adjustments for the revaluation of previously issued share-based compensation, therefore, total cash costs will incorporate the cost of long term incentives associated with the grant date fair value for instruments issued.

Total cash costs per ounce is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of cash flow from operating activities under IFRS or operating costs presented under IFRS.

All-in Sustaining Costs per ounce and Mine-site All-in Sustaining Costs

The Company adopted an “all-in sustaining costs per ounce” non-GAAP performance measure in accordance with the World Gold Council. The Company believes the measure more fully defines the total costs associated with producing gold; however, this performance measure has no standardized meaning. Accordingly, there may be some variation in the method of computation of “all-in sustaining costs per ounce” as determined by the Company compared with other mining companies. In this context, “all-in sustaining costs per ounce” for the consolidated Company reflects total mining and processing costs, corporate and administrative costs, share-based compensation, sustaining exploration costs, sustaining capital, sustaining finance leases and other operating costs. The Company excludes mark-to-market adjustments for the revaluation of previously issued share-based compensation, therefore all-in sustaining costs will incorporate the cost of long term incentives associated with the grant date fair value for instruments issued.

For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites, as detailed in the reconciliations below. 

Sustaining capital expenditures are expenditures that do not increase annual gold ounce production at a mine site and exclude all expenditures at the Company’s development projects as well as certain expenditures at the Company’s operating sites that are deemed expansionary in nature. Non-sustaining capital expenditures or growth capital are expenditures primarily incurred at development projects and costs related to major projects at existing operations, where these projects will materially benefit the mine site. Capitalized exploration expenditures are expenditures that meet the IFRS definition for capitalization and are incurred to further expand the known Mineral Reserves and Resources at existing operations or development projects. For each mine-site reconciliation, corporate and administrative costs, and non-site specific costs are not included in the all-in sustaining cost per ounce calculation.

All-in sustaining costs per gold ounce is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of cash flow from operating activities under IFRS or operating costs presented under IFRS. 

Total Cash Costs and All-in Sustaining Costs per Ounce Reconciliation Tables

The following tables reconcile these non-GAAP measures to the most directly comparable IFRS measures on a Company-wide and individual mine-site basis.

Total Cash Costs and AISC Reconciliation – Company-wide  
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $163.8 $135.9 $483.1 $415.3
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (2) (1.0) (5.3) (0.3) (9.3)
Costs allocated to silver by-product (6.3) (4.0) (19.4) (10.4)
Royalties 6.2 6.2 19.8 18.6
Total cash costs $162.7 $132.8 $483.2 $414.2
Gold ounces sold 118,361 136,473 371,118 389,083
Total cash costs per ounce                   $1,375                      $973                   $1,302                   $1,065
         
Total cash costs $162.7 $132.8 $483.2 $414.2
Corporate and administrative (1) 10.2 9.6 32.3 29.6
Sustaining capital expenditures (3) 49.9 34.8 130.7 95.1
Sustaining finance leases 3.0 4.3 10.2 12.6
Interest on sustaining finance leases 0.3 0.4 1.1 1.7
Share-based compensation 5.0 16.7 18.7 47.1
Share-based compensation mark-to-market allocated to corporate (2) (2.7) (13.8) (0.6) (25.4)
Sustaining exploration 0.6 0.4 1.9 1.5
Accretion of decommissioning liabilities 2.5 2.4 7.2 7.0
Total all-in sustaining costs $231.5 $187.6 $684.7 $583.4
Gold ounces sold 118,361 136,473 371,118 389,083
Total all-in sustaining costs per ounce                   $1,956                   $1,375                   $1,845                   $1,499

(1) Corporate and administrative expenses exclude expenses incurred at development properties.
(2) Share-based compensation included in total cash costs and AISC excludes the impact of mark-to-market adjustments for changes in the Company’s share price in the periods allocated to sites (included in mining and processing costs) and corporate head office (included in share-based compensation expense). See Note 10 (d) of the condensed interim consolidated financial statements for the three and nine months ended September 30, 2026 and 2025 for further details.
(3) Sustaining capital expenditures are defined as those expenditures which do not increase annual gold ounce production at a mine site and exclude all expenditures at growth projects and certain expenditures at operating sites which are deemed expansionary in nature. Total sustaining capital expenditures for the periods are as follows:
   

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Mineral property, plant and equipment expenditures                   $226.9                   $135.0                   $591.0                   $349.6
Less: non-sustaining capital expenditures at:        
Island Gold District                      (99.2)                      (64.6)                    (263.0)                    (167.4)
Young-Davidson                        (7.8)                      (10.0)                      (25.1)                      (26.6)
Mulatos District                      (27.2)                      (10.5)                      (67.9)                      (17.1)
Corporate and other                      (42.8)                      (15.1)                    (104.3)                      (43.4)
Sustaining capital expenditures                     $49.9                     $34.8                   $130.7                     $95.1
         

Island Gold District Total Cash Costs and Mine-site AISC Reconciliation    
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $80.9 $59.2 $230.1 $174.7
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) (0.3) (2.0) (0.1) (3.5)
Costs allocated to silver by-product (1.0) (0.2) (2.4) (1.1)
Royalties 3.4 2.8 9.0 9.7
Total cash costs $83.0 $59.8 $236.6 $179.8
Gold ounces sold 66,837 62,011 189,672 179,357
Mine-site total cash costs per ounce                   $1,242                      $964                   $1,247                   $1,002
         
Total cash costs $83.0 $59.8 $236.6 $179.8
Sustaining capital expenditures 32.3 23.9 83.0 59.5
Sustaining finance leases 3.0 4.3 10.2 12.6
Interest on sustaining finance leases 0.3 0.4 1.1 1.7
Accretion of decommissioning liabilities 0.5 0.4 1.4 1.1
Total all-in sustaining costs $119.1 $88.8 $332.3 $254.7
Gold ounces sold 66,837 62,011 189,672 179,357
Mine-site all-in sustaining costs per ounce                   $1,782                   $1,432                   $1,752                   $1,420
         

Young-Davidson Total Cash Costs and Mine-site AISC Reconciliation    
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $49.6 $45.5 $149.5 $138.3
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) (0.4) (1.8) (0.1) (3.1)
Costs allocated to silver by-product (2.2) (0.9) (5.6) (2.2)
Royalties 1.6 2.1 6.4 5.6
Total cash costs $48.6 $44.9 $150.2 $138.6
Gold ounces sold 23,809 37,406 87,710 111,095
Mine-site total cash costs per ounce                   $2,041                   $1,200                   $1,712                   $1,248
         
Total cash costs $48.6 $44.9 $150.2 $138.6
Sustaining capital expenditures 17.1 10.2 45.9 33.8
Accretion of decommissioning liabilities 0.1 0.1 0.4 0.4
Total all-in sustaining costs $65.8 $55.2 $196.5 $172.8
Gold ounces sold 23,809 37,406 87,710 111,095
Mine-site all-in sustaining costs per ounce                   $2,764                   $1,476                   $2,240                   $1,555

Mulatos District Total Cash Costs and Mine-site AISC Reconciliation    
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $33.3 $31.2 $103.5 $102.3
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) (0.3) (1.5) (0.1) (2.7)
Costs allocated to silver by-product (3.1) (2.8) (11.4) (7.1)
Royalties 1.2 1.3 4.4 3.3
Total cash costs $31.1 $28.2 $96.4 $95.8
Gold ounces sold 27,715 37,056 93,736 98,631
Mine-site total cash costs per ounce                   $1,122                      $761                   $1,028                      $971
         
Total cash costs $31.1 $28.2 $96.4 $95.8
Sustaining capital expenditures 0.5 0.7 1.8 1.8
Accretion of decommissioning liabilities 1.9 1.9 5.4 5.5
Total all-in sustaining costs $33.5 $30.8 $103.6 $103.1
Gold ounces sold 27,715 37,056 93,736 98,631
Mine-site all-in sustaining costs per ounce                   $1,209                      $831                   $1,105                   $1,045

(1) Share-based compensation included in mine-site total cash costs and mine-site AISC excludes the impact of mark-to-market adjustments for changes in the Company’s share price in the periods allocated to sites included in mining and processing costs.
   

Adjusted EBITDA

Adjusted EBITDA represents net earnings before interest, taxes, depreciation, and amortization and removes the effects of certain items that the Company believes are not reflective of the Company’s underlying performance for the reporting period. The measure also removes the impact of non-cash items such as impairment loss charges or reversals, and net gain or loss on derivative financial instruments. Adjusted EBITDA is an indicator of the Company’s ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures.

Adjusted EBITDA does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.  

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Net earnings $165.6 $276.3 $627.4 $450.9
Adjustments:        
Reversal of impairment — (218.8) — (218.8)
Inventory net realizable value adjustment — — 10.8 —
Finance income (5.9) (1.2) (18.0) (1.2)
Amortization 44.2 52.0 137.9 156.1
Net loss on commodity derivatives 14.6 80.0 4.0 174.2
Deferred income tax expense 48.6 48.7 156.6 35.3
Current income tax expense 44.9 46.5 200.3 92.6
Adjusted EBITDA                   $312.0                   $283.5              $1,119.0                  $689.1
         

Additional GAAP Measures

Additional GAAP measures are presented on the Company’s condensed interim consolidated financial statements and are not meant to be a substitute for other subtotals or totals presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. The following additional GAAP measures are used and are intended to provide an indication of the Company’s mine and operating performance:

  • Earnings from operations – represents the amount of earnings before net finance expense/income, foreign exchange loss/gain, other loss, net loss/gain on commodity derivatives and income tax expense

Unaudited Condensed Interim Consolidated Statements of Financial Position, Comprehensive
Income, and Cash Flow

ALAMOS GOLD INC.
Condensed Interim Consolidated Statements of Financial Position
(Unaudited – stated in millions of United States dollars)

  September 30, 2026   December 31, 2025
ASSETS      
Current Assets      
Cash and cash equivalents $597.4   $623.1
Equity securities 44.2   58.9
Amounts receivable 59.1   45.0
Inventories 215.6   225.4
Deferred payment consideration 162.6   157.1
Other current assets 36.1   26.0
Total Current Assets 1,115.0   1,135.5
       
Non-Current Assets      
Mineral property, plant and equipment 5,462.8   4,957.5
Deferred income taxes 41.1   34.0
Inventories 130.9   84.9
Deferred payment consideration 147.1   142.0
Other non-current assets 11.4   30.7
Total Assets                         $6,908.3                           $6,384.6
       
LIABILITIES      
Current Liabilities      
Accounts payable and accrued liabilities $386.8   $316.1
Derivative liabilities 48.7   128.0
Deferred revenue —   50.0
Income taxes payable 95.1   53.6
Current portion of lease liabilities 9.3   11.8
Current portion of decommissioning liabilities 14.0   8.1
Total Current Liabilities 553.9   567.6
       
Non-Current Liabilities      
Deferred income taxes 1,032.0   873.3
Derivative liabilities —   129.1
Debt 200.0   200.0
Lease liabilities 17.2   11.2
Decommissioning liabilities 149.5   153.4
Other non-current liabilities 4.0   4.2
Total Liabilities 1,956.6   1,938.8
       
EQUITY      
Share capital $4,131.3   $4,140.6
Contributed surplus 84.5   87.7
Accumulated other comprehensive (loss) income (18.8)   0.3
Retained earnings 754.7   217.2
Total Equity 4,951.7   4,445.8
Total Liabilities and Equity                         $6,908.3                           $6,384.6
       

ALAMOS GOLD INC.
Condensed Interim Consolidated Statements of Comprehensive Income
(Unaudited – stated in millions of United States dollars, except share and per share amounts)

       
  Three Months Ended
September 30,
Nine Months Ended
September 30,
  2026   2025   2026   2025
OPERATING REVENUES $510.4   $462.3   $1,701.2   $1,233.5
               
COST OF SALES              
Mining and processing 163.8   135.9   483.1   415.3
Inventory net realizable value adjustment —   —   10.8   —
Royalties 6.2   6.2   19.8   18.6
Amortization 44.2   52.0   137.9   156.1
  214.2   194.1   651.6   590.0
EXPENSES              
Exploration 12.3   5.0   27.8   19.0
Corporate and administrative 10.2   9.6   32.3   29.6
Share-based compensation 5.0   16.7   18.7   47.1
Reversal of impairment —   (218.8)   —   (218.8)
  241.7   6.6   730.4   466.9
EARNINGS FROM OPERATIONS                   268.7                     455.7                        970.8                        766.6
               
OTHER (EXPENSES) INCOME              
Net loss on commodity derivatives (14.6)   (80.0)   (4.0)   (174.2)
Finance income 5.9   1.2   18.0   1.2
Foreign exchange gain 0.9   (1.5)   4.3   (7.7)
Other loss (1.8)   (3.9)   (4.8)   (7.1)
EARNINGS BEFORE INCOME TAXES                 $259.1                   $371.5                      $984.3                      $578.8
               
INCOME TAXES              
Current income tax expense (44.9)   (46.5)   (200.3)   (92.6)
Deferred income tax expense (48.6)   (48.7)   (156.6)   (35.3)
NET EARNINGS                 $165.6                   $276.3                      $627.4                      $450.9
               
Items that may be subsequently reclassified to net earnings:              
Net change in fair value of currency hedging instruments, net of taxes (3.8)   (3.3)   (7.6)   7.1
Net change in fair value of fuel hedging instruments, net of taxes 0.3   —   0.9   —
Items that will not be reclassified to net earnings:              
Unrealized gain (loss) on equity securities, net of taxes 4.5   19.5   (12.0)   28.4
Total other comprehensive income (loss)                     $1.0                     $16.2                       ($18.7)                        $35.5
COMPREHENSIVE INCOME                 $166.6                   $292.5                      $608.7                      $486.4
               
EARNINGS PER SHARE              
– basic                   $0.40                     $0.66                        $1.50                        $1.07
– diluted                   $0.39                     $0.65                        $1.49                        $1.07
               

ALAMOS GOLD INC.
Condensed Interim Consolidated Statements of Cash Flows
(Unaudited – stated in millions of United States dollars)

  Three Months Ended September 30,   Nine Months Ended September 30,
  2026   2025   2026   2025
CASH PROVIDED BY (USED IN):              
OPERATING ACTIVITIES              
Net earnings $165.6   $276.3   $627.4   $450.9
Adjustments for items not involving cash:              
Amortization 44.2   52.0   137.9   156.1
Reversal of impairment     (218.8)       (218.8)
Inventory net realizable value adjustment —   —   10.8    
Foreign exchange (gain) loss (0.9)   1.5   (4.3)   7.7
Current income tax expense 44.9   46.5   200.3   92.6
Deferred income tax expense 48.6   48.7   156.6   35.3
Share-based compensation 7.0   22.5   20.9   58.0
Finance income (5.9)   (1.2)   (18.0)   (1.2)
Net loss on commodity derivatives 14.6   80.0   4.0   174.2
Deferred revenue recognized —   (31.2)   (51.0)   (93.5)
Settlement of legacy Argonaut  gold hedges (86.2)   —   (221.2)   —
Other items 3.0   (1.0)   (3.6)   (21.7)
Changes in working capital and taxes paid (18.6)   (10.0)   (169.2)   (95.2)
                    216.3                          265.3                     690.6                      544.4
INVESTING ACTIVITIES              
Mineral property, plant and equipment (226.9)   (135.0)   (591.0)   (349.6)
Interest capitalized to mineral property, plant and equipment (3.0)   (4.3)   (9.2)   (13.2)
Repurchase of royalty on Young-Davidson —   —   —   (2.0)
Proceeds from disposition of equity securities —   5.6   0.6   7.4
Investment in equity securities —   —   (0.6)   (0.2)
Transaction costs arising on asset dispositions and  acquisitions —   (0.2)   —   (0.2)
                   (229.9)                         (133.9)                    (600.2)                    (357.8)
FINANCING ACTIVITIES              
Dividends paid (16.2)   (10.1)   (48.6)   (29.4)
Repurchase and cancellation of common shares (5.7)   —   (55.7)   (10.0)
Credit facility transaction costs, standby fees and interest (1.1)   (0.3)   (1.9)   (2.2)
Proceeds from the exercise of options and warrants 0.2   1.3   0.8   3.1
Lease payments (3.0)   (4.3)   (10.2)   (12.6)
                    (25.8)                           (13.4)                    (115.6)                      (51.1)
Effect of exchange rates on cash and cash equivalents                     (0.1)                              0.2                       (0.5)                          0.4
Net (decrease) increase in cash and cash equivalents                   (39.5)                          118.2                     (25.7)                      135.9
Cash and cash equivalents – beginning of period 636.9   344.9   623.1   327.2
CASH AND CASH EQUIVALENTS – END OF PERIOD                 $597.4                        $463.1                   $597.4                    $463.1

Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/6d1a29e1-0154-42a7-a129-20a638aad6b9
https://www.globenewswire.com/NewsRoom/AttachmentNg/03bfa292-d224-4cfd-8c22-ddc40ea130aa
https://www.globenewswire.com/NewsRoom/AttachmentNg/d802db77-a4b5-4311-9d67-6c09e8e3d786
https://www.globenewswire.com/NewsRoom/AttachmentNg/b162f26f-f2ee-489e-af99-a2335d1fc159
https://www.globenewswire.com/NewsRoom/AttachmentNg/a8a7e949-6b99-49d5-9be3-7d39bf50c706
https://www.globenewswire.com/NewsRoom/AttachmentNg/84e28a01-5b0f-440c-b1d0-a3c4e04c7a70
https://www.globenewswire.com/NewsRoom/AttachmentNg/7177f97d-1ab4-4276-95de-dfd0c0fbfd07

All amounts are in United States dollars, unless otherwise stated.

TORONTO, Oct. 28, 2026 (GLOBE NEWSWIRE) — Alamos Gold Inc. (TSX:AGI; NYSE:AGI) (“Alamos” or the “Company”) today reported its financial results for the quarter ended September 30, 2026.

“Our third quarter production was in line with quarterly guidance with a record performance from the Island Gold District offsetting lower planned production from Young-Davidson. The Island Gold District achieved a number of records in the quarter including record production, underground mining rates and milling rates. We expect a further increase in underground mining rates, as well as higher grades from the Island Gold District to drive a significant increase in consolidated production in the fourth quarter, at lower costs, and remain on track to achieve our revised annual production and cost guidance,” said John A. McCluskey, President and Chief Executive Officer.

“We expect significant growth from the Island Gold District over the next several years driven by the completion of the shaft expansion in 2027 and mill expansion in 2028. Commissioning of the shaft has been delayed approximately one quarter to mid-2027 given additional time required to complete the ore and waste handling system, but has no impact on our longer-term outlook. Through the expansions of the Island Gold District and development of Lynn Lake, we remain on track to nearly double our rate of production to approximately one million ounces annually by 2030, at substantially lower costs,” Mr. McCluskey added.

Third Quarter 2026 Operational and Financial Highlights

  • Produced 119,000 ounces of gold in the third quarter of 2026, meeting quarterly guidance. This included record production from the Island Gold District, reflecting record underground mining rates and milling rates. This was offset by lower production from Young-Davidson driven by lower mining rates and grades, as previously guided. With production expected to increase in the fourth quarter, the Company is on track to achieve its full year production guidance which was revised in July
  • Island Gold District continues to perform well, with underground mining rates increasing to average a record 1,790 tonnes per day (“tpd”). Magino milling rates also increased to a new quarterly record, averaging 10,313 tpd. The higher mining and milling rates drove record quarterly production of 68,700 ounces. The operation remains on track to achieve its full year production guidance, with a further increase in underground mining rates and higher grades expected to drive significant production growth in the fourth quarter
  • Third quarter gold sales totaled 118,361 ounces at an average realized price of $4,258 per ounce, generating quarterly revenues of $510.4 million, including silver sales. This represented a 10% increase from the third quarter of 2025
  • Cash flow from operating activities in the third quarter was $216.3 million ($234.9 million before changes in working capital and taxes paid1, or $0.56 per share)
  • Generated strong ongoing free cash flow1 of $75.6 million in the third quarter, while continuing to invest in high-return growth and a significant exploration program
  • Cost of sales was $214.2 million, or $1,810 per ounce in the third quarter. As previously guided, all-in sustaining costs (“AISC”1) of $1,956 per ounce increased from the second quarter, driven by lower production at Young-Davidson and higher sustaining capital at the Island Gold District. Total cash costs1 of $1,375 per ounce were also up from the second quarter. The Company remains on track to achieve revised full year cost guidance with total cash costs and AISC expected to decrease in the fourth quarter
  • Reported net earnings were $165.6 million for the third quarter, or $0.40 per share. Adjusted net earnings1 were $184.0 million, or $0.44 per share1. Adjusted net earnings include an after-tax adjustment for net loss on commodity hedge derivatives of $9.9 million, adjustments for net unrealized foreign exchange losses recorded within deferred taxes and foreign exchange gains totaling $7.1 million, and other adjustments of $1.4 million
  • Cash and cash equivalents totaled $597.4 million at September 30, 2026, down slightly from the second quarter primarily reflecting the use of $86.2 million to eliminate the majority of remaining legacy gold hedges inherited from Argonaut Gold (“Argonaut”). The Company remains well-positioned to internally fund all of its growth initiatives and increased shareholder returns with strong ongoing free cash flow
  • Subsequent to quarter end, $160 million was received on October 9, which represented the one-year anniversary payment for the sale of the Turkish projects completed in 2025. The final $150 million cash payment is scheduled to be received in October 2027
  • Returned $22.3 million to shareholders during the third quarter. This included the repurchase of 191,944 shares at a cost of $5.7 million ($29.70 per share), and dividend of $16.6 million (quarterly $0.04 per share). Subsequent to quarter end, the Company increased its share repurchases with a further 549,757 shares repurchased at a cost of $16.6 million ($30.25 per share). Given its strong financial position and outlook, the Company expects to continue to be active on its share buyback
  • Repurchased and eliminated a further 33,000 of the remaining 50,000 ounces of legacy gold hedges from Argonaut in the third quarter. These contracts were scheduled to mature in the first half of 2027 with an average forward sale price of $1,819 per ounce, providing further upside to higher gold prices in 2027. The Company utilized existing cash to eliminate the hedges at a cost of $86.2 million for an effective price of approximately $4,429 per ounce. Subsequent to quarter end, a further 3,000 ounces of forward sale contracts were repurchased and eliminated such that a total of 315,000 ounces, or 96%, of the 329,000 ounces of forward contracts inherited from Argonaut, have been retired prior to maturity. The remaining 14,000 ounces of forward contracts are expected to be eliminated prior to maturity after which there will be no obligation remaining under the legacy Argonaut hedges
  • Continued to advance construction of the Company’s key growth projects. Work on the Phase 3+ Shaft Expansion is progressing, although the completion of commissioning of the shaft is delayed by approximately one quarter to mid-2027 given additional time required to complete the ore and waste handling system
  • Construction of the PDA mill remains on track for completion mid-2027; however, the ramp up of underground development rates has been slower than planned which is expected to result in lower mining rates in the second half of 2027
  • Lynn Lake construction is ramping up as expected with initial production on track for the first half of 2029. The Company remains well positioned to achieve its longer term consolidated production rate of approximately one million ounces annually by 2030

(1) Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures.

Highlight Summary

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025                      2026                      2025
Financial Results (in millions)        
Operating revenues $510.4 $462.3 $1,701.2 $1,233.5
Cost of sales (1) $214.2 $194.1 $651.6 $590.0
Earnings from operations $268.7 $455.7 $970.8 $766.6
Earnings before income taxes $259.1 $371.5 $984.3 $578.8
Net earnings $165.6 $276.3 $627.4 $450.9
Adjusted net earnings (2) $184.0 $155.5 $663.6 $359.5
Adjusted earnings before interest, taxes, depreciation and amortization (2) $312.0 $283.5 $1,119.0 $689.1
Cash provided by operating activities $216.3 $265.3 $690.6 $544.4
Cash provided by operating activities before changes in working capital and taxes paid (2) $234.9 $275.3 $859.8 $639.6
Capital expenditures (sustaining) (2) $49.9 $34.8 $130.7 $95.1
Finance leases (sustaining) (2)(3) $3.0 $4.3 $10.2 $12.6
Capital expenditures (growth) (2) $164.4 $83.3 $421.6 $221.2
Capital expenditures (capitalized exploration) $12.6 $16.9 $38.7 $33.3
Free cash flow (2)(3) $75.6 $130.3 $320.8 $194.8
Operating Results        
Gold production (ounces) 119,000 141,700 373,500 403,900
Gold sales (ounces) 118,361 136,473 371,118 389,083
Per Ounce Data        
Average realized gold price (5) $4,258 $3,359 $4,532 $3,144
Average spot gold price (London PM Fix) $4,262 $3,457 $4,545 $3,201
Cost of sales per ounce of gold sold (includes amortization) (1) $1,810 $1,422 $1,756 $1,516
Total cash costs per ounce of gold sold (2) $1,375 $973 $1,302 $1,065
All-in sustaining costs per ounce of gold sold (2) $1,956 $1,375 $1,845 $1,499
Share Data        
Earnings per share, basic $0.40 $0.66 $1.50 $1.07
Earnings per share, diluted $0.39 $0.65 $1.49 $1.07
Adjusted earnings per share, basic (2) $0.44 $0.37 $1.58 $0.86
Weighted average common shares outstanding (basic) (000’s) 418,572 420,500 419,383 420,463
Financial Position (in millions)        
Cash and cash equivalents (4)     $597.4 $623.1

(1)  Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense.
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures.
(3)  Sustaining finance leases at the Island Gold District are not included as additions to mineral property, plant and equipment in cash flows used in investing activities.
(4) Cash and cash equivalents in the comparatives reflect the balance as at December 31, 2025.
(5) Average realized gold price for the nine months ended September 30, 2026 reflected the settlements of ounces under the gold prepayment facility based on the prepay price of $4,166 per ounce ($2,524 per ounce for the three and nine months ended September 30, 2025). Settlements under the facility were completed in the second quarter of 2026, and there were no related settlements in the third quarter of 2026.
   

  Three Months Ended September 30, Nine Months Ended September 30,
                       2026                      2025                      2026                      2025
Gold production (ounces)        
Island Gold District (7) 68,700 66,800 197,400 190,400
Young-Davidson 22,700 37,900 85,700 112,000
Mulatos District (8) 27,600 37,000 90,400 101,500
Gold sales (ounces)        
Island Gold District (7) 66,837 62,011 189,672 179,357
Young-Davidson 23,809 37,406 87,710 111,095
Mulatos District (8) 27,715 37,056 93,736 98,631
Cost of sales (in millions) (1)        
Island Gold District (7) $106.5 $83.4 $301.0 $251.2
Young-Davidson $62.3 $65.2 $195.3 $195.5
Mulatos District (8) $44.9 $45.5 $154.5 $143.3
Cost of sales per ounce of gold sold (includes amortization) (1)      
Island Gold District (7) $1,593 $1,345 $1,587 $1,401
Young-Davidson $2,617 $1,743 $2,227 $1,760
Mulatos District (8) $1,620 $1,228 $1,648 $1,453
Total cash costs per ounce of gold sold (2)      
Island Gold District (7) $1,242 $964 $1,247 $1,002
Young-Davidson $2,041 $1,200 $1,712 $1,248
Mulatos District (8) $1,122 $761 $1,028 $971
Mine-site all-in sustaining costs per ounce of gold sold (2)(3)      
Island Gold District (7) $1,782 $1,432 $1,752 $1,420
Young-Davidson $2,764 $1,476 $2,240 $1,555
Mulatos District (8) $1,209 $831 $1,105 $1,045
Capital expenditures (sustaining, growth, capitalized exploration and leases) (in millions) (2)  
Island Gold District (4)(7) $134.5 $92.8 $356.2 $239.5
Young-Davidson (5) $24.9 $20.2 $71.0 $60.4
Mulatos District (6)(8) $27.7 $11.2 $69.7 $18.9
Other $42.8 $15.1 $104.3 $43.4

(1)  Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense.
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures.
(3)  For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Includes capitalized exploration at Island Gold District of $7.1 million and $17.3 million for the three and nine months ended September 30, 2026, respectively ($5.1 million and $14.1 million for the three and nine months ended September 30, 2025, respectively).
(5) Includes capitalized exploration at Young-Davidson of $2.8 million and $8.9 million for the three and nine months ended September 30, 2026, respectively ($4.2 million and $9.1 million for the three and nine months ended September 30, 2025, respectively).
(6) Includes capitalized exploration at Mulatos District of $2.4 million and $7.7 million for the three and nine months ended September 30, 2026, respectively ($7.6 million and $10.1 million for the three and nine months ended September 30, 2025, respectively).
(7) The Island Gold District includes the Island Gold and Magino mines.
(8) The Mulatos District includes the Mulatos and La Yaqui Grande mines.
   

Environment, Social and Governance Summary Performance 

Health and Safety

  • Total Recordable Injury Frequency Rate1 (“TRIFR”) of 1.90 in the third quarter, an increase from the second quarter and prior year period
  • Lost Time Injury Frequency Rate1 (“LTIFR”) of 0.12 in the third quarter
  • Alamos had 32 recordable injuries across its sites, including two lost time injuries in the third quarter
  • Year-to-date TRIFR of 1.60 and LTIFR of 0.07 are higher than the prior year period

The Company acknowledges the increase in injury frequency rate is not to its standards. During the quarter, the Company initiated work stand-downs across its operations led by site management and corporate senior management, refocusing on safe and sustainable production.

Alamos strives to maintain a safe, healthy working environment for all, with a strong safety culture where everyone is continually reminded of the importance of keeping themselves and their colleagues healthy and injury-free. The Company’s overarching commitment is to have all employees and contractors return Home Safe Every Day.

Environment

  • Zero significant environmental incidents in the third quarter and year to date
  • Reclamation activities at the Cerro Pelon, El Victor and San Carlos pits in the Mulatos District were completed

There was one reportable incident in the third quarter. At the Young-Davidson mine paste plant, there was a 400 cubic metres process water slurry overflow outside of the building containment area. This material was cleaned up immediately with no environmental impact.

The Company remains committed to preserving the long-term health and viability of the natural environment surrounding its operations and projects. This includes investing in new initiatives to reduce the Company’s environmental footprint, with the goal of minimizing the impact of its activities.

Community

Alamos continued to provide charitable donations, sponsorships, medical support and infrastructure investments within its local communities, including:

  • Installation of additional infrastructure at the Matarachi Community Center, and new playground equipment purchased for the Matarachi Park
  • Completing the first phase of the Mulatos community beekeeping initiative, having trained 32 families from across seven communities and three municipalities, creating new opportunities for income diversification, community capacity building, and biodiversity conservation
  • Sponsorship of various events and teams, including golf tournament fundraisers, and music and community festivals around the Company’s operations
  • Cash donations to various health, education, and food programs in the communities in which Alamos operates

In addition, in September, Alamos joined community discussions in Pukatawagan, Manitoba, to celebrate the Impact Living Agreement signed in the prior year with Mathias Colomb Cree Nation and reaffirm the Company’s commitment to a strong partnership.

The Company believes that excellence in sustainability provides a net benefit to all stakeholders and continues to engage with local communities to better understand local challenges and priorities. Ongoing investments in local infrastructure, health care, education, cultural and community programs remain a focus of the Company.

Governance and Disclosure

  • Completed annual submissions to the Carbon Disclosure Project, reporting Alamos’ 2025 climate performance
  • Advanced Alamos’ annual ESG Report and Conflict-Free Gold Report, expected to be published during the fourth quarter

The Company maintains the highest standards of corporate governance to ensure that corporate decision-making reflects its values, including the Company’s commitment to sustainable development.

(1) Frequency rate is calculated as incidents per 200,000 hours worked.

Outlook and Strategy

2026 Guidance (5)
  Island Gold
District
Young-
Davidson
Mulatos
District
Lynn Lake Total
Gold production (000’s ounces) 290 – 310 100 – 115 120 – 135 — 510 – 560
Cost of sales, including amortization (in millions) (2)         $890
Total cash costs ($ per ounce) (1) $1,025 – $1,125 $1,750 – $1,850 $1,050 – $1,150 — $1,175 – $1,275
All-in sustaining costs ($ per ounce) (1)(3) $1,550 – $1,650 $2,500 – $2,600 $1,125 – $1,225 — $1,775 – $1,875
Capital expenditures ($ millions)          
Sustaining capital (1)(4) $135 – $150 $90 – $100 $3 – $5 — $228 – $255
Growth capital (1)(4) $355 – $385 $25 – $30 $137 – $145 $140 – $160 $657 – $720
Total sustaining and growth capital (1)(4) $490 – $535 $115 – $130 $140 – $150 $140 – $160 $885 – $975
Capitalized exploration (1) $33 $12 $9 $6 $60
Total capital expenditures and capitalized exploration (1) $523 – $568 $127 – $142 $149 – $159 $146 – $166 $945 – $1,035

(1) Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description of these measures.
(2) Cost of sales includes mining and processing costs, royalties, and amortization expense but excludes silver credit and inventory net realizable value adjustment, and is calculated based on the mid-point of total cash cost guidance.
(3) Total consolidated all-in sustaining costs include corporate and administrative, and share based compensation expenses. For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Sustaining and growth capital guidance excludes capitalized exploration.
(5)  Initial annual guidance was issued on February 4, 2026 and was revised on July 29, 2026. 
   

The Company’s objective is to operate a sustainable business model that supports growing returns to all stakeholders over the long-term, through growing production, expanding margins, and increasing profitability. This includes a balanced approach to capital allocation focused on generating strong ongoing free cash flow while re-investing in high-return internal growth opportunities, and supporting higher returns to shareholders.

Third quarter production of 119,000 ounces was in line with quarterly guidance, with a record performance from the Island Gold District offsetting lower planned production from Young-Davidson. As previously guided, AISC increased from the second quarter but is expected to improve in the fourth quarter. With higher production and lower costs expected in the fourth quarter, the Company remains on track to meet full year production and cost guidance which had been revised in July.

Production in the fourth quarter is expected to increase to between 140,000 and 160,000 ounces with total cash costs and AISC both decreasing to within the range of revised annual guidance. The improvement in both production and costs is expected to be driven by further growth from the Island Gold District which continues to perform well, achieving a number of records in the third quarter.

Underground mining rates within the Island Gold District increased 15% from the second quarter, to a record 1,790 tpd. Magino milling rates also increased 16% from the second quarter, to a record 10,313 tpd. Both contributed to record quarterly production at the operation of 68,700 ounces. Increasing underground mining rates and higher grades are expected to drive a more significant increase in production from the Island Gold District in the fourth quarter.

The Company continues to generate strong ongoing free cash flow while advancing its portfolio of high-return growth projects which are expected to support further production growth and lower costs over the next several years. Free cash flow totaled $75.6 million in the third quarter, net of a significant reinvestment in growth and exploration, supporting the Company’s other capital allocation priorities. This included a further $22.3 million of shares repurchased since the second quarter, and eliminating the majority of the remaining legacy Argonaut hedges that were set to mature in the first half of 2027 at a cost of $92.9 million.

The Company’s key growth projects all continued to advance during the third quarter, including the Island Gold District shaft and mill expansion, PDA and Lynn Lake. These projects are expected to nearly double production to approximately one million ounces annually by 2030, at substantially lower costs, underpinning one of the strongest outlooks in the sector.

The Island Gold District will be a key driver of this growth and cost improvement over the next several years. With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.

Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027. The commissioning of the shaft is expected to drive consolidated gold production higher and costs lower as underground mining rates ramp up.

The Magino mill expansion to 20,000 tpd is progressing well and is expected to drive a further increase in production and decrease in costs in 2028.

Construction of the PDA mill remains on track for completion mid-2027; however, lower underground development rates are expected to result in lower than planned production from PDA during the second half of 2027. The slower pace of development reflects the requirement for additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027.

The ramp up of construction activities at Lynn Lake is advancing according to schedule, with installation of the permanent camp completed and foundation work for the process plant underway. The project remains on track to deliver initial production in the first half of 2029, contributing to further growth in consolidated production.

The short-term delays within the Island Gold District and PDA, as well as the previously disclosed impact on mining rates at Young-Davidson, are expected to impact near-term production and costs into 2027; however, they are not expected to impact the medium to longer term outlook. The Company expects significant production growth over the next several years and remains on track to nearly double production to approximately one million ounces annually by 2030, at substantially lower costs.

The Company remains well positioned to fund its high-return growth projects internally with strong ongoing free cash flow, $597.4 million of cash and cash equivalents at the end of the third quarter of 2026, and approximately $1.15 billion of total liquidity. At current gold prices, the Company expects significant free cash flow growth over the next several years with the completion of the Phase 3+ Shaft and IGD Expansions. The Company remains focused on delivering increasing shareholder returns with $122.5 million distributed thus far in 2026 through dividends and share buybacks. This included a 60% increase in the quarterly dividend rate in the first quarter, and the repurchase of $72.3 million of shares. Thus far in 2026, the Company has also utilized $227.9 million to eliminate legacy Argonaut gold hedges.

Given its strong outlook with significant free cash flow growth expected over the next several years, the Company expects to continue to be active on its share buyback while balancing its other capital allocation priorities.

Third Quarter 2026 Results

Island Gold District Financial and Operational Review

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Gold production (ounces) 68,700 66,800 197,400 190,400
Gold sales (ounces) 66,837 62,011 189,672 179,357
Financial Review (in millions)        
Operating revenues $285.1 $213.0 $861.2 $575.8
Cost of sales (1) $106.5 $83.4 $301.0 $251.2
Earnings from operations $176.6 $128.6 $554.8 $320.8
Cash provided by operating activities $203.7 $160.9 $576.1 $370.5
Capital expenditures (sustaining) (2) $32.3 $23.9 $83.0 $59.5
Finance leases (sustaining) (2),(5) $3.0 $4.3 $10.2 $12.6
Capital expenditures (growth) (2) $92.1 $59.5 $245.7 $153.3
Capital expenditures (capitalized exploration) (2) $7.1 $5.1 $17.3 $14.1
Mine-site free cash flow (2),(5) $72.2 $72.4 $230.1 $143.6
Cost of sales, including amortization per ounce of gold sold (1) $1,593 $1,345 $1,587 $1,401
Total cash costs per ounce of gold sold (2) $1,242 $964 $1,247 $1,002
Mine-site all-in sustaining costs per ounce of gold sold (2),(3) $1,782 $1,432 $1,752 $1,420
Island Gold Mine        
Underground Operations        
Tonnes of ore mined (9) 164,634 121,864 433,826 345,272
Tonnes of ore mined per day (9) 1,790 1,325 1,589 1,265
Average grade of gold (4),(9) 8.69 12.05 9.04 11.69
Metres developed 2,128 1,779 6,072 6,058
Island Gold Mill Operations (8)        
Tonnes of ore processed 117,460 23,906 342,710 234,174
Tonnes of ore processed per day (10) 1,277 1,087 1,255 1,154
Average grade of gold (4) 9.37 13.20 9.81 12.03
Contained ounces milled 35,395 10,148 108,143 90,578
Average recovery rate 97% 99% 97% 98%
Magino Mine        
Open Pit Operations        
Tonnes of ore mined – open pit (6) 1,807,233 1,622,689 4,062,943 3,938,588
Tonnes of ore mined per day 19,644 17,638 14,883 14,427
Total waste mined – open pit (7) 3,995,799 3,764,681 11,224,595 11,104,219
Total tonnes mined – open pit 5,803,032 5,387,370 15,287,538 15,042,807
Waste-to-ore ratio (7) 2.21 2.32 2.76 2.82
Average grade of gold (4) 0.65 0.84 0.73 0.81
Magino Mill Operations (8)        
Tonnes of ore processed 948,782 776,796 2,431,243 2,210,908
Tonnes of ore processed per day 10,313 8,443 8,906 8,099
Average grade of gold processed (4) 1.17 2.28 1.20 1.42
Contained ounces milled 35,702 56,923 94,141 101,000
Average recovery rate 95% 96% 95% 95%
Island Gold District Mill Operations        
Tonnes of ore processed per day 11,590 8,703 10,161 8,956
Average grade of gold processed (4) 2.07 2.61 2.27 2.44
Average recovery rate 96% 97% 96% 97%

(1) Cost of sales includes mining and processing costs, royalties, and amortization.
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. 
(3)  For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Grams per tonne of gold (“g/t Au”).
(5) Mine-site free cash flow does not include lease payments which are classified as cash flows used in financing activities on the consolidated financial statements. 
(6) Includes ore stockpiled during the periods. 
(7) Total waste mined includes operating waste and capitalized stripping.
(8) Magino mill results include the processing of open pit ore from Magino and excess underground ore not processed within the Island Gold mill. Grades of gold processed from the Magino mine averaged 0.88 g/t Au and 1.00 g/t Au, respectively, for the three and nine months ended September 30, 2026. 
(9) Excludes 13,541 tonnes of ore grading 2.98 g/t Au that was recovered from the ore pad and processed during the second quarter of 2026.
(10) Island Gold average milling rates exclude the period where mill was on care and maintenance between July 16 and September 23, 2025.
   

The Island Gold District produced a record 68,700 ounces in the third quarter of 2026, 3% higher than the prior year period and a 2% increase compared to the second quarter. With higher underground mining rates and grades expected to drive increasing production in the fourth quarter, the Island Gold District remains on track to achieve its full year production guidance of between 290,000 and 310,000 ounces.

Island Gold Operational Review

Underground mining rates increased to average a record 1,790 tpd in the third quarter, 35% higher than the prior year period and a 15% increase from the previous quarter. Mining rates are expected to increase further during the fourth quarter and remain on track to reach 2,000 tpd by the end of 2026.

With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.

Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027.

Underground grades mined averaged 8.69 g/t Au during the third quarter, slightly below the second quarter and guidance due to higher than expected dilution within certain higher grade stopes mined in August. Dilution performance was in line with expectations in September. Grades are expected to improve to near the top end of the annual guidance range of 11.5 g/t Au in the fourth quarter.

Processing rates within the Island Gold mill averaged 1,277 tpd for the third quarter, with excess underground ore mined during the quarter processed within the Magino mill. Mill recoveries averaged 97% for the third quarter, in line with expectations.

The Island Gold mill will continue operating into the first quarter of 2028 and process approximately 1,265 tpd of higher grade underground ore. The remaining underground ore mined beyond the Island Gold mill capacity will be blended at increasing rates with open pit ore and processed within the Magino mill. Following the expected completion of the Magino mill expansion to 20,000 tpd in the first quarter of 2028, the Island Gold mill will be shut down and all underground and open pit ore will be processed within the larger and more cost-effective Magino mill.

Magino Operational Review

Total mining rates averaged 63,076 tpd during the third quarter, including 19,644 tpd of ore, which was 11% higher than the prior year period. Grades mined of 0.65 g/t Au for the third quarter were 23% lower than the prior year period and slightly below the guidance range for 2026, primarily due to changes in mining sequence in the pit. Year-to-date grades mined were in line with guidance.

Magino milling rates averaged a new quarterly record of 10,313 tpd in the third quarter, a 16% increase from the second quarter, and above targeted rates of 10,000 tpd in the second half of 2026. The increase reflects the improving performance and reliability of the overall circuit driven by an enhanced maintenance program which is supporting increased availability, as well as supplemental ore feed from the temporary crusher. Milling rates are expected to remain at steady state levels of 10,000 tpd in the fourth quarter and through 2027.

As outlined in the IGD Expansion Study announced on February 3, 2026, further improvements are planned for the existing crushing and conveying circuit as part of the mill expansion to 20,000 tpd. These include the addition of a gyratory crusher, ore bins, and a new truck dump configuration allowing for the direct tipping of ore. In addition to the connection to grid power, these changes will significantly improve the performance of the existing crushing circuit by reducing ore rehandling and ensuring more consistent and higher ore flow to the mill.

Grades processed averaged 1.17 g/t Au during the third quarter, and included approximately 48,000 tonnes of higher grade underground ore. Recoveries for the third quarter were 95%, consistent with guidance.

Island Gold District Financial Review

Revenues of $285.1 million in the third quarter were 34% higher than the prior year period, driven by higher realized gold prices and an increase in ounces sold. Similarly, revenues of $861.2 million for the first nine months of the year were 50% higher than the prior year period, driven by the same factors.

Cost of sales of $106.5 million in the third quarter and $301.0 million for the first nine months of the year were 28% and 20% higher than the comparative periods, respectively, driven by higher underground and open pit tonnes mined and ongoing inflation.

Total cash costs of $1,242 per ounce and mine-site AISC of $1,782 per ounce in the third quarter were higher than the prior year period, driven by lower grades mined from underground and open pit operations, increased labour and contractor costs, and increased diesel costs. In addition, mine-site AISC was impacted by higher sustaining capital in support of the IGD Expansion to 20,000 tpd. For the first nine months of the year, total cash costs of $1,247 per ounce and mine-site AISC of $1,752 per ounce were higher than the prior year period, driven by the same factors. Total cash costs and mine-site AISC are both expected to decrease in the fourth quarter bringing full year costs in line with revised annual guidance.

Capital expenditures totaled $134.5 million in the third quarter, including $32.3 million of sustaining capital, $3.0 million of sustaining lease payments, and $7.1 million of capitalized exploration. Growth capital spending of $92.1 million was primarily focused on the Phase 3+ Shaft and IGD Expansions, including shaft site infrastructure and underground development, as well as the Magino mill expansion to 20,000 tpd. Both sustaining and growth capital spending are expected to increase in the fourth quarter to be consistent with full year guidance.

The Island Gold District generated strong mine-site free cash flow of $72.2 million in the third quarter and $230.1 million for the first nine months, net of significant capital investment related to the Phase 3+ Shaft and IGD Expansions. At current gold prices, the Island Gold District is expected to continue generating strong free cash flow while funding the expansion of the operation and a robust exploration program, with significant growth over the next several years as production increases and costs decrease.

Young-Davidson Financial and Operational Review

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Gold production (ounces) 22,700 37,900 85,700 112,000
Gold sales (ounces) 23,809 37,406 87,710 111,095
Financial Review (in millions)        
Operating revenues $104.3 $130.0 $408.0 $357.3
Cost of sales (1) $62.3 $65.2 $195.3 $195.5
Earnings from operations $41.2 $64.6 $209.2 $159.7
Cash provided by operating activities $55.3 $82.5 $240.3 $220.6
Capital expenditures (sustaining) (2) $17.1 $10.2 $45.9 $33.8
Capital expenditures (growth) (2) $5.0 $5.8 $16.2 $17.5
Capital expenditures (capitalized exploration) (2) $2.8 $4.2 $8.9 $9.1
Mine-site free cash flow (2) $30.4 $62.3 $169.3 $160.2
Cost of sales, including amortization per ounce of gold sold (1) $2,617 $1,743 $2,227 $1,760
Total cash costs per ounce of gold sold (2) $2,041 $1,200 $1,712 $1,248
Mine-site all-in sustaining costs per ounce of gold sold (2),(3) $2,764 $1,476 $2,240 $1,555
Underground Operations        
Tonnes of ore mined 472,400 667,801 1,769,857 1,930,719
Tonnes of ore mined per day 5,135 7,259 6,483 7,072
Average grade of gold (4) 1.60 1.92 1.71 1.98
Metres developed 1,423 1,800 5,507 6,135
Mill Operations        
Tonnes of ore processed 650,136 720,933 1,935,497 1,959,516
Tonnes of ore processed per day 7,067 7,836 7,090 7,178
Average grade of gold (4) 1.20 1.79 1.55 1.94
Contained ounces milled 25,117 41,387 96,593 122,354
Average recovery rate 90% 91% 89% 91%

(1)  Cost of sales includes mining and processing costs, royalties and amortization.
(2) Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. 
(3)  For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites. 
(4) Grams per tonne of gold.
   

Operational Review

Young-Davidson produced 22,700 ounces of gold in the third quarter, 40% below the prior year period due to lower mining rates and grades. As previously guided in July, mining rates and grades are expected to be lower than originally planned as a result of the localized seismic event that impacted a portion of the operation during the second quarter. Mining rates were consistent with revised guidance in the third quarter and with similar production expected in the fourth quarter, the operation is on track to meet its revised 2026 production guidance of between 100,000 and 115,000 ounces.

Mining rates averaged 5,135 tpd in the third quarter, in line with revised guidance of 5,000 tpd for the second half of 2026. The Company is advancing rehabilitation work on the 9410 level, and continuing the implementation of enhanced ground support throughout the lower portion of the mine. In addition, an updated mine plan is being evaluated, designed to minimize stress through an optimized ore extraction sequence. These initiatives are expected to support a gradual increase in mining rates through 2027 and 2028. An update on future mining rates and costs will be provided following the completion of the updated mine plan, with an expected release early in 2027 in conjunction with the Company’s three-year guidance.

Grades mined of 1.60 g/t Au for the third quarter were slightly lower than planned.

Milling rates averaged 7,067 tpd in the third quarter, higher than mining rates as lower-grade surface stockpiles were processed. As a result, milled grades of 1.20 g/t Au were below mined grades in the third quarter. Milling rates are expected to continue to exceed mining rates, and grades processed to be below mined grades, in the fourth quarter as additional stockpiles are processed. Mill recoveries averaged 90% for the third quarter and were consistent with guidance.

Financial Review

Revenues were $104.3 million in the third quarter, 20% lower than the prior year period, reflecting lower ounces sold, partially offset by higher realized gold prices. For the first nine months of the year, revenues of $408.0 million were 14% higher than the prior year period as higher realized gold prices more than offset lower ounces sold.

Cost of sales of $62.3 million in the third quarter was 4% lower than the prior year period, driven by lower mining rates, partially offset by ongoing inflation and enhanced ground support measures. Cost of sales of $195.3 million for the first nine months of the year was in line with the prior year period.

Third quarter total cash costs of $2,041 per ounce and mine-site AISC of $2,764 per ounce were higher than the prior year period, reflecting higher cost per tonne mined given the lower mining rates, lower grades mined, as well as rehabilitation work and enhanced ground support measures. Ongoing labour inflation also contributed to the increase. For the first nine months of the year, total cash costs of $1,712 per ounce and mine-site AISC of $2,240 per ounce were higher than the prior year period, driven by the same factors. Mine-site AISC are expected to increase in the fourth quarter given the timing of sustaining capital spend, bringing full year costs in line with revised guidance.

Capital expenditures in the third quarter totaled $24.9 million, including $17.1 million of sustaining capital, $5.0 million of growth capital, and $2.8 million of capitalized exploration. Capital expenditures, inclusive of capitalized exploration, totaled $71.0 million for the first nine months of the year. Capital spending is expected to increase in the fourth quarter bringing full year spending to the lower end of revised annual guidance.

Mine-site free cash flow was $30.4 million in the third quarter, 51% lower than the prior year period, primarily driven by lower ounces sold. Mine-site free cash flow was $169.3 million for the first nine months of the year, 6% higher than the prior year period. The operation is well-positioned to continue generating strong ongoing free cash flow over the long-term at current gold prices.

Mulatos District Financial and Operational Review

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025                   2026 2025
Gold production (ounces) 27,600 37,000 90,400 101,500
Gold sales (ounces) 27,715 37,056 93,736 98,631
Financial Review (in millions)        
Operating revenues $121.0 $130.8 $438.5 $325.4
Cost of sales (1) $44.9 $45.5 $154.5 $143.3
Earnings from operations $72.9 $85.3 $274.5 $175.6
Cash provided by operating activities $66.4 $84.6 $230.4 $148.1
Capital expenditures (sustaining) (2) $0.5 $0.7 $1.8 $1.8
Capital expenditures (growth) (2) $24.8 $2.9 $60.2 $7.0
Capital expenditures (capitalized exploration) (2) $2.4 $7.6 $7.7 $10.1
Mine-site free cash flow (2) $38.7 $73.4 $160.7 $129.2
Cost of sales, including amortization per ounce of gold sold (1) $1,620 $1,228 $1,648 $1,453
Total cash costs per ounce of gold sold (2) $1,122 $761 $1,028 $971
Mine-site all-in sustaining costs per ounce of gold sold (2),(3) $1,209 $831 $1,105 $1,045
La Yaqui Grande Mine        
Open Pit Operations        
Tonnes of ore mined – open pit 548,157 997,286 2,248,782 3,007,335
Total waste mined – open pit 3,553,670 3,895,690 12,017,548 12,115,215
Total tonnes mined – open pit 4,101,827 4,892,976 14,266,330 15,122,550
Waste-to-ore ratio 6.48 3.91 5.34 4.03
Crushing and Heap Leach Operations        
Tonnes of ore stacked 539,283 1,011,191 2,346,838 3,050,211
Average grade of gold processed (4) 0.94 1.48 1.17 1.25
Contained ounces stacked 16,307 48,037 88,312 122,927
Average recovery rate 143% 61% 85% 62%
Ore crushed per day (tonnes) 5,900 11,000 8,600 11,200

(1) Cost of sales includes mining and processing costs, inventory net realizable value adjustment, royalties, and amortization expense. 
(2)  Refer to the “Non-GAAP Measures and Additional GAAP Measures” section of this press release and associated MD&A for a description and calculation of these measures. 
(3) For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites.
(4)  Grams per tonne of gold.
   

Mulatos District Operational Review 

The Mulatos District produced 27,600 ounces in the third quarter, a 25% decrease from the prior year period, reflecting lower production at La Yaqui Grande as well as a lower contribution from residual leaching of the Mulatos leach pad. Production was also down slightly from the second quarter reflecting lower grades and stacking rates. The Mulatos District remains on track to meet its revised production guidance of between 120,000 and 135,000 ounces with higher grades and stacking rates expected to contribute to stronger production in the fourth quarter.

La Yaqui Grande produced 23,400 ounces in the third quarter, 20% lower than the prior year period. Stacking rates averaged 5,900 tpd in the third quarter, below guidance, reflecting the impact of the rainy season and limited mining areas at the bottom of the open pit as La Yaqui Grande nears the end of its mine life. With the end of the rainy season, mining and stacking rates are expected to improve in the fourth quarter. Grades stacked averaged 0.94 g/t Au in the third quarter, and are expected to increase in the fourth quarter, consistent with guidance. Recovery rates averaged 143%, driven by recovery of ounces stacked in prior periods.

La Yaqui Grande is expected to start residual leaching after cessation of open pit mining operations, in the first half of 2027, contributing to ongoing production through 2027. Mulatos has been in the residual leaching phase since December 2023 and produced 4,200 ounces in the third quarter.

Mulatos District Financial Review

Revenues of $121.0 million in the third quarter were 7% lower than the prior year period, reflecting lower ounces sold, partially offset by higher realized gold prices. For the first nine months of the year, revenues of $438.5 million were 35% higher than the prior year period due to higher realized gold prices, slightly offset by lower ounces sold.

Cost of sales of $44.9 million in the third quarter was consistent with the prior year period as lower tonnes mined and stacked were offset by inflation. For the first nine months of the year, cost of sales of $154.5 million was 8% higher than the prior year period driven by the Mulatos leach pad inventory adjustment recorded in the second quarter. As at September 30, 2026, the remaining inventory balance on the Mulatos leach pad was $8.5 million, which the Company expects to recover through residual leaching over the remainder of the year.

Total cash costs of $1,122 per ounce and mine-site AISC of $1,209 per ounce in the third quarter were higher than the prior year period, reflecting increased unit costs from residual leaching at Mulatos, as well as lower stacking rates and grades processed at La Yaqui Grande. For the first nine months of the year, total cash costs of $1,028 per ounce and mine-site AISC of $1,105 per ounce were higher than the prior year period driven by the same factors.

Capital expenditures totaled $27.7 million in the third quarter, including $0.5 million of sustaining capital and $2.4 million of capitalized exploration. Growth capital spending related to PDA of $24.8 million included underground development, as well as structural steel and concrete foundation work for the mill. Spending on PDA is expected to increase in the fourth quarter of the year as construction activities continue to ramp up. Capital expenditures, inclusive of capitalized exploration, totaled $69.7 million for the first nine months of the year.

Construction of the PDA mill remains on track for completion mid-2027, while lower than planned underground development rates are expected to result in lower production from PDA during the second half of 2027. The slower pace of development reflects unexpected ground conditions in some areas, which are requiring additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027. The Company will provide more details on the impact to production and costs with the release of the updated three-year guidance early in 2027.

The Mulatos District generated strong mine-site free cash flow of $38.7 million in the third quarter and $160.7 million for the first nine months, net of significant capital investment related to PDA and a substantial exploration program. This was net of $16.9 million of cash tax payments in the third quarter, and $94.7 million in cash taxes paid in the first nine months of the year. The Company expects cash tax installments in Mexico of between $15 and $20 million in the fourth quarter, related to the 2026 tax year, based on a budgeted gold price of $4,000 per ounce.

Third Quarter 2026 Development Activities

Island Gold District (Ontario, Canada)

Phase 3+ Shaft and IGD Expansion

In 2022, the Company announced the Phase 3+ Shaft Expansion at Island Gold from 1,200 tpd to 2,400 tpd. The expansion includes the construction of a shaft and paste plant, as well as accelerated development to support the higher mining rates.

With the shaft sink completed earlier in the year, the current focus is on completing shaft equipping, and work on the shaft bottom infrastructure. During the excavation of the bins in the ore and waste handling system, a dyke was encountered that will require additional ground support. In addition, the Company is proactively enhancing ground support across the loading pocket and the broader ore and waste handling system. As a result, the commissioning of the shaft has been delayed by approximately one quarter and is now expected to be completed mid-2027.

Underground mining rates are expected to continue increasing above 2,000 tpd in the first half of 2027; however, the ramp up to 2,400 tpd is not expected until the second half of the year. As a result, underground mining rates are expected to be lower than previously guided during the first half of 2027.

Following the completion of the Phase 3+ Shaft Expansion project, the operation will transition from trucking ore and waste up the ramp to skipping ore and waste to surface, driving production higher and costs significantly lower.

On February 3, 2026, the Company announced the IGD Expansion Study outlining a larger, long-life, low-cost mine with an average annual gold production of 534,000 ounces over the initial 10 years (starting in 2028) at average mine-site AISC of $1,025 per ounce. The IGD Expansion growth capital of $542 million will be spent on the expansion of the Magino mill to 20,000 tpd, accelerated underground development, and mobile equipment to support higher underground and open pit mining rates of 3,000 tpd and 17,000 tpd, respectively.

The Island Gold mill will continue operating and will be dedicated to processing approximately 1,265 tpd of higher grade underground ore until the expected completion of the Magino mill expansion in the first quarter of 2028. The remaining underground ore mined, beyond the Island Gold mill capacity of 1,265 tpd, will be blended at increasing rates with open pit ore and processed within the Magino mill.

During the third quarter of 2026, the Company spent $92.1 million in growth capital at the Island Gold District. Progress during the third quarter is summarized as follows:

  • Commissioning of the water handling facility substantially completed
  • Continued shaft equipping and work on the ore and waste handling system in advance of shaft commissioning in mid-2027
  • Magino mill expansion to 20,000 tpd is progressing with excavation and concrete works advancing for the crushers and fine ore bins, and refinery structural steel and foundation concrete works ongoing
  • Advanced construction of the truck shop and truck wash with commissioning expected in the first quarter of 2027
  • Paste plant construction substantially complete with commissioning expected to coincide with shaft commissioning
  • Continued construction of the new administrative complex with completion expected in the fourth quarter of 2026
  • Advanced lateral development in support of the ramp up of underground mining rates through 2026 and into 2027

As of September 30, 2026, approximately $815 million was spent on the Phase 3+ Shaft Expansion. Given inflation over the past year, as well as additional work in the ore and waste handling system, the Company expects total project capital to be approximately 5% higher than the $835 million budgeted.

Phase 3+ Shaft Expansion Estimate
Growth capital ($ millions)
February 20261 Spent to date1,2 Committed to date1 % Spent & Committed
Shaft & Shaft Surface Complex $324 $301 $11 96%
Accelerated Underground Development, Infrastructure, and Equipment 255 234 7 95%
Site Infrastructure, Mill and Other3 165 184 6 115%
General Indirect Costs 91 96 3 109%
Total Phase 3+ Shaft Expansion Growth Capital $835 $815 $27 101%
         

As of September 30, 2026, 45% of growth capital related to the IGD Expansion has been spent and committed, with the majority of spending focused on the Magino mill expansion.

IGD Expansion Estimate
Growth capital ($ millions)
February 20261 Spent to date1,2 Committed to date1 % Spent & Committed
Mill Expansion $199 $71 $56 64%
Accelerated Underground Development 166 24 — 14%
Mining Equipment 81 16 25 51%
Site Infrastructure and Other 96 27 23 52%
Total IGD Expansion Growth Capital $542 $138 $104 45%

1. Reflects updated capital estimates released in February 2026 as part of the IGD Expansion, based on CAD/USD exchange $0.74:1. Spent to date based on average CAD/USD of $0.73:1 since the start of 2022. Committed to date based on the spot CAD/USD rate as at September 30, 2026 of $0.70:1.
2. Amount spent to date accounted for on an accrual basis, including working capital movements.
3.  Includes power upgrade spent to-date on a 100% basis and does not reflect partner’s contributions.
   

Island Gold shaft site area – October 2026

Island Gold shaft site area- October 2026

1350L shaft station equipping in progress – October 2026

1350L Shaft Station - October 2026

Magino mill expansion – October 2026

Magino mill expansion - October 2026

Lynn Lake (Manitoba, Canada)

On January 13, 2025, the Company announced a positive construction decision on the Lynn Lake project. With the approval of the Closure Plan in January 2025, the required permitting and pre-construction conditions have been met allowing for the start of construction on the project.

In February 2025, an internal economic study and development plan was released on the BT and Linkwood satellite deposits located in proximity to the Lynn Lake project. In February 2026, an updated development plan for the Lynn Lake project was announced incorporating the BT and Linkwood deposits. Given the significantly longer mine life, the Company re-engineered and optimized a number of elements within the broader development plan. This included several scope changes, most notably increasing the mill capacity by 13% to 9,000 tpd, driving higher production and stronger economics. The initial capital for the project is $937 million, of which $871 million remained to be spent as of January 1, 2026.

The updated parameters for the Lynn Lake project, incorporating the revised initial capital, larger Mineral Reserve base including BT and Linkwood, and increased mill throughput, are as follows:

  • Average annual production of 186,000 ounces over the initial 10 years
  • Low mine-site AISC of $829 per ounce over the initial 10 years ($1,039 per ounce over the life of mine)
  • Long mine life of 25 years with total production of three million ounces (based on Mineral Reserves at the end of 2024)
  • Attractive economics with significant near-mine and regional exploration upside

Capital spending on the Lynn Lake project in 2026 is expected to be between $140 and $160 million. Construction activities in 2026 include permanent camp construction, bulk earthworks, power infrastructure upgrades, and orders for long lead-time items.

The majority of initial capital will be spent in 2027 and 2028, with first production expected in the first half of 2029. With attractive economics and significant exploration upside, the Lynn Lake project is a key component of the Company’s leading high-return organic growth profile.

During the third quarter of 2026, the Company spent $40.2 million in development capital at the Lynn Lake project, with key activities summarized as follows:

  • Commissioned the permanent camp with occupancy permit obtained and 120 dorm rooms opened
  • Progressed process plant site preparation and foundations work
  • Commenced commissioning of the water and sewage treatment facilities
  • Continued site-wide infrastructure construction, including roads, laydown areas, and settlement pond
  • Advanced drill and blasting activities for the starter pit at MacLellan
Lynn Lake Project Initial Capital ($ millions) February 20261 Spent to date1,2 Committed to date1 % Spent & Committed
Mine Development and Site Preparation $146 $56 $69 86%
Process Plant, Utilities and Equipment 334 45 65 33%
Site Infrastructure and Other 121 25 22 39%
General Indirect Costs 262 58 — 22%
Capitalized Operating Costs 74 1 — 1%
Total Initial Capital $937 $185 $156 36%

1.  Reflects updated capital estimates released in February 2026, based on CAD/USD exchange $0.74:1. Spent to date based on average CAD/USD of $0.72:1 since the start of 2025. Committed to date based on the spot CAD/USD rate as at September 30, 2026 of $0.70:1.
2. Amount spent to date accounted for on an accrual basis, including working capital movements.
   

Lynn Lake permanent camp – October 2026

Lynn Lake permanent camp - October 2026

Lynn Lake process plant area  – October 2026

Lynn Lake process plant area - October 2026

PDA (Sonora, Mexico)

On September 4, 2024, the Company reported the results of the development plan for the PDA project located within the Mulatos District. PDA is a higher-grade underground deposit adjacent to the Mulatos open pit and will benefit from the use of existing crushing infrastructure from Cerro Pelon, supporting lower initial capital and project execution risk.

In January 2025, the Company announced it was granted approval of an amendment to its existing environmental impact assessment (Manifestación de Impacto Ambiental) by Mexico’s Secretariat of Environment and Natural Resources, allowing for the start of construction on the PDA project. Total initial capital estimate of $165 million remains unchanged with approximately $72.9 million spent to date. Remaining initial capital will be spent in the fourth quarter of 2026 and 2027.

Construction of the PDA mill remains on track for completion mid-2027, while lower than planned underground development rates are expected to result in lower production from PDA during the second half of 2027. The slower pace of development reflects unexpected ground conditions in some areas, which are requiring additional ground support, as well as contractor performance. The Company expects improved development rates moving forward, but the performance to date is expected to impact the ramp up in mining rates through the second half of 2027. The Company will provide more details on the impact to production and costs with the release of the updated three-year guidance early in 2027.

During the third quarter of 2026, the Company spent $24.8 million in growth capital at the PDA project, with key activities summarized as follows:

  • Finalized all major equipment purchase orders with most deliveries expected during the fourth quarter
  • Advanced underground mine development with 573 metres (“m”) completed during the third quarter
  • Primary crusher and fine crushing construction continued to advance, with electrical conduit installation, power and control cable pulling, conveyor belt vulcanization, and control cabin installation completed
  • Completed approximately 75% of mill structural works
  • Completed installation of the primary and scavenger flotation cells
  • Commenced structural works for the dewatering and water tanks, with receiver and air line installation ongoing
  • Advanced distribution power line construction, with excavation completed for 18 of 24 pole pits

PDA portals – October 2026

PDA portals - october 2026

PDA crusher and mill area – October 2026

PDA crusher and mill area - october 2026 V3 (2)

Third Quarter 2026 Exploration Activities

Island Gold District (Ontario, Canada)

A total of $43 million has been budgeted for exploration at the Island Gold District in 2026, up from $24 million spent in 2025. The exploration program will continue to build on the success from 2025 with high-grade gold mineralization extended across the Island Gold deposit, as well as within multiple structures within the hanging wall and footwall.

In 2025, drilling programs at Island Gold and Magino focused on delineation drilling to convert the large Inferred Mineral Resource base to Mineral Reserves. This program was executed successfully and resulted in a significant increase in Mineral Reserves at both Island Gold and Magino, which was incorporated into the IGD Expansion that was announced on February 3, 2026. With the deposit open laterally and at depth, there is significant potential for further growth in Mineral Reserves and Resources.

A total of 50,000 m of underground exploration drilling is planned in 2026 with a focus on defining new Mineral Reserves and Resources in proximity to existing production horizons and infrastructure. This includes drilling across the strike extent of the main Island Gold deposit (E1E and C-Zones), as well as within a growing number of newly defined hanging-wall and footwall zones.

These potential high-grade Mineral Reserve and Resource additions would be low cost to develop, given their proximity to existing infrastructure, and provide increased operational flexibility as mining rates increase. To support the underground exploration program, 1,090 m of underground exploration drift development is planned to extend drill platforms on multiple levels.

Additionally, 48,000 m of surface exploration drilling has been budgeted targeting the area between the Island Gold and Magino deposits, as well as the down-plunge extension of the Island Gold deposit, below a depth of 1,500 m.

The regional exploration program at the Island Gold District includes 16,000 m of surface drilling. The focus of the regional program will be following up on high-grade mineralization intersected in the 2025 drill program at Cline-Pick located approximately seven km northeast of the Island Gold mine.

During the third quarter of 2026, 12,660 m of underground exploration drilling was completed in 60 holes, and 10,099 m of underground delineation drilling across 44 holes. Additionally, 13,063 m of surface exploration drilling was completed in 20 holes. Year to date, 33,615 m of underground exploration drilling was completed in 133 holes, or 67% of the budgeted metres, and 22,609 m of underground delineation drilling across 95 holes. Additionally, 30,207 m of surface exploration drilling was completed in 30 holes, representing 63% of the budget for the year.

As part of the regional exploration program, 8,463 m of drilling was completed in 16 holes at Cline-Pick in the third quarter. Year to date, 17,110 m of drilling has been completed in 31 holes at Cline-Pick, exceeding the budgeted regional drill program for the year. 

As detailed in the June exploration update (see press release dated June 22, 2026), high-grade mineralization was extended across multiple areas which are being targeted as sources of additional higher-grade mill feed within the expanded Magino mill. This includes defining a new zone of high-grade mineralization 250 m west of underground Mineral Reserves and Mineral Resources (Island Gold West Extension), and continuing to extend high-grade mineralization within the Island West up-plunge area, and the past producing Cline-Pick and Edwards mines. These targets represent opportunities for further production growth by increasing the proportion of higher-grade ore to be fed within the expanded Magino mill.

Total exploration expenditures during the third quarter were $9.1 million, of which $7.1 million was capitalized. In the first nine months of the year, the Company incurred exploration expenditures of $22.7 million, of which $17.3 million was capitalized.

Young-Davidson (Ontario, Canada)

A total of $17 million has been budgeted for exploration at Young-Davidson in 2026, up from $13 million spent in 2025. This includes 48,000 m of underground exploration drilling focused on extending mineralization within the Young-Davidson syenite, which hosts the majority of Mineral Reserves and Mineral Resources, and to test and expand on gold mineralization that has been intersected within two areas of focus in the hanging wall. This new style of mineralization is located in close proximity to the existing mid-mine infrastructure.

The regional program includes 10,000 m of drilling focused on evaluating several targets including the Otisse NE target and the Biralger target located approximately 3 km and 17 km northeast of Young-Davidson, respectively. A comprehensive data compilation project commenced in 2025, and will be completed in 2026 for the Wydee and Matachewan projects, both acquired in 2024, and located in proximity to Young-Davidson.

During the third quarter, 17,039 m of underground exploration drilling was completed in 52 holes across multiple levels. Drilling is targeting syenite-hosted mineralization, as well as continuing to test mineralization in the hanging wall sediments and mafic-ultramafic stratigraphy. Year to date, 46,008 m of drilling has been completed in 132 holes. The seismic event that occurred at Young-Davidson in June has not impacted the budgeted exploration program in 2026.

A total of 4,865 m of regional surface exploration drilling was completed in 16 holes in the first quarter focused on evaluating the Otisse NE and Biralger targets. No regional exploration drilling was undertaken in the third quarter; however, drilling is planned in the fourth quarter.

Total exploration expenditures during the third quarter of 2026 were $3.6 million, of which $2.8 million was capitalized. For the first nine months of the year, exploration expenditures totaled $12.4 million, of which $8.9 million was capitalized.

Mulatos District (Sonora, Mexico)

A total of $21 million has been budgeted at Mulatos for exploration in 2026, consistent with $20 million spent in 2025. The regional drilling program is expected to total 44,500 m and includes 20,000 m of surface exploration drilling at the Cerro Pelon sulphide target, 9,000 m at the recently discovered Halcon target, and an additional 15,500 m planned across several early to advanced stage targets within the Mulatos District. The planned addition of a mill to process higher-grade sulphides has created new opportunities for growth within the Mulatos District, including Cerro Pelon and the Halcon target.

During the third quarter, 4,483 m of surface exploration drilling was completed in 15 holes at Cerro Pelon, and 7,623 m were completed in 15 holes at Halcon. Additionally, 2,310 m were drilled in five regional holes across the district. For the first nine months of the year, 40,334 m have been drilled at Mulatos in 123 drill holes, representing close to 90% of budgeted metres for the year.

Total exploration expenditures during the third quarter were $5.6 million, of which $2.4 million was capitalized. For the first nine months of the year, exploration expenditures totaled $17.2 million, of which $7.7 million was capitalized.

Lynn Lake (Manitoba, Canada)

A total of $6 million has been budgeted for exploration at the Lynn Lake project in 2026. This is up from $3 million spent in 2025. The exploration budget includes 13,500 m to test the potential for underground mining opportunities below the Gordon and MacLellan open pits.

In total, 13,740 m of drilling was completed in 25 holes at the Gordon and MacLellan deposits in the first half of the year.  Results have been received, and geological models are being updated to be used for 2027 drill planning purposes.

Exploration spending totaled $0.3 million in the third quarter and $4.8 million for the first nine months of the year, all of which was capitalized.

Qiqavik (Quebec, Canada)

A total of $7 million has been budgeted for exploration at the Qiqavik project in 2026, similar to 2025. Qiqavik is a camp-scale property covering 60,400 ha in the Cape Smith Greenstone Belt in Nunavik, Quebec. The Qiqavik project covers 50 km of strike covering prospective gold hosting environments and several major crustal-scale structures such as the Qiqavik Break and the Bergeron fault. Early-stage exploration completed to date indicates that high-grade gold occurrences are controlled by structural splays off the Qiqavik Break.

The 2026 exploration program will follow up on discoveries made across several target areas during the 2025 drill program, and test the next series of highest priority targets as outlined in a press release dated January 28, 2026. The success of this early-stage greenfield drilling program across multiple target areas continues to support the significant gold endowment potential of the Qiqavik project.

During the third quarter, the Company completed a comprehensive exploration program at the Qiqavik project consisting of diamond drilling, geological mapping, prospecting, till sampling, and drone-based magnetic surveys (5,395 line-km). A total of 7,461 m of drilling was completed in 23 holes across seven target zones, including both follow-up drilling on established mineralized trends and initial testing of newly generated targets, for which assays are pending. Exploration activities successfully refined the geological and structural framework of the property, identified additional gold-bearing occurrences, and advanced the understanding of relationships between gold-bearing boulder trains and their potential bedrock source areas. Information generated through the 2026 program is expected to support the prioritization of follow-up targets and future discovery-focused drilling campaigns.

Exploration spending was $5.6 million in the third quarter and $7.4 million for the first nine months of the year, all of which was expensed.

Review of Third Quarter Financial Results

During the third quarter of 2026, the Company sold 118,361 ounces of gold for operating revenues of $510.4 million, a 10% increase from the prior year period. The increase was due to higher realized gold prices partially offset by lower ounces sold at Young-Davidson and the Mulatos District.

The average realized gold price in the third quarter was $4,258 per ounce, 27% higher than the prior year period, and in line with the average London PM fix for the quarter.

Cost of sales (which includes mining and processing costs, royalties, and amortization expense) was $214.2 million in the third quarter, 10% higher than the prior year period. Key drivers of changes to cost of sales as compared to the prior year period were as follows:

Mining and processing costs were $163.8 million, 21% higher than the prior year period. The increase primarily reflects ongoing inflation, and higher underground and open pit tonnes mined at the Island Gold District, partially offset by lower mining rates at Young-Davidson and La Yaqui Grande.

Total cash costs of $1,375 per ounce and AISC of $1,956 per ounce were higher than the prior year period, driven by ongoing inflation, lower grades mined at the Island Gold District, and higher cost per tonne mined at Young-Davidson given the lower mining rates. Lower stacking rates and grades processed at La Yaqui Grande also contributed to the increase, as stacking rates were temporarily impacted by the rainy season. In addition, AISC was impacted by higher sustaining capital reflecting expenditures at the Island Gold District in support of the IGD Expansion to 20,000 tpd, as well as rehabilitation work and enhanced ground support measures at Young-Davidson.

Royalty expense was $6.2 million in the third quarter, consistent with the prior year period.

Amortization of $44.2 million was 15% lower than the prior year period driven by lower ounces sold. Amortization was $373 per ounce sold, 2% lower than the prior year period, primarily due to an increase in the depletion base resulting from the 2025 year-end Mineral Reserves and Resources update.

The Company recognized earnings from operations of $268.7 million in the third quarter, 41% lower than the prior year period. The prior year period included a one-time impairment reversal of $218.8 million related to the sale of the Turkish Projects.

In the third quarter, net loss on commodity derivatives was $14.6 million, compared to $80.0 million in the prior year period. The decrease was driven by fewer remaining legacy gold hedges from Argonaut following the retirement of hedges prior to settlement, and a lower mark-to-market adjustment reflecting a smaller change in gold prices during the quarter. During the third quarter, the Company repurchased and eliminated 33,000 of the remaining 50,000 ounces of legacy gold hedges at a cost of $86.2 million for an effective price of approximately $4,429 per ounce. These contracts were scheduled to mature in the first half of 2027 with an average forward sale price of $1,819 per ounce, providing further upside to higher gold prices in 2027.

The Company reported net earnings of $165.6 million in the third quarter, compared to $276.3 million in the prior year period. On an adjusted basis, earnings were $184.0 million, or $0.44 per share. Adjusted net earnings include an after-tax adjustment for net loss on commodity hedge derivatives of $9.9 million, adjustments for net unrealized foreign exchange losses recorded within deferred taxes and foreign exchange gains totaling $7.1 million, and other adjustments of $1.4 million.

Associated Documents

This press release should be read in conjunction with the Company’s consolidated financial statements for the three-month period ended September 30, 2026 and associated Management’s Discussion and Analysis (“MD&A”), which are available from the Company’s website, www.alamosgold.com, in the “Investors” section under “Reports and Financials”, and on SEDAR+ (www.sedarplus.ca) and EDGAR (www.sec.gov).

Reminder of Third Quarter 2026 Results Conference Call

Senior management will host a conference call on Thursday, October 29, 2026 at 10:00 am ET to discuss the results. Participants may join the conference call via webcast or through the following dial-in numbers:

Via Webcast:

To view the live webcast, please register at www.alamosgold.com, or through the following link view webcast.

Via Phone:

Toronto and International: (647) 495-7514
Toll free (Canada and the United States): (888) 596-4144
Participant passcode: 1813237#
   

Alternatively, you may register your phone number here within 30 minutes of the scheduled start of the call to receive an instant automated call back. 

A playback will be available until November 28, 2026 by dialling (647) 362-9199 or (800) 770-2030 within Canada and the United States. The passcode is 1813237#. The webcast will be archived at www.alamosgold.com.

Qualified Persons

Chris Bostwick, FAusIMM, Alamos’ Senior Vice President, Technical Services, who is a qualified person within the meaning of National Instrument 43-101 (“Qualified Person”), has reviewed and approved the scientific and technical information contained in this press release.

About Alamos

Alamos is a Canadian-based intermediate gold producer with diversified production from three operations in North America. This includes the Island Gold District and Young-Davidson mine in northern Ontario, Canada, and the Mulatos District in Sonora State, Mexico. Additionally, the Company has a strong portfolio of growth projects including the IGD Expansion, and the Lynn Lake project in Manitoba, Canada. Alamos employs more than 2,400 people and is committed to the highest standards of sustainable development. The Company’s shares are traded on the TSX and NYSE under the symbol “AGI”.

FOR FURTHER INFORMATION, PLEASE CONTACT:

Scott K. Parsons
Senior Vice-President, Corporate Development & Investor Relations
(416) 368-9932 x 5439
 
Khalid Elhaj
Vice President, Business Development & Investor Relations
(416) 368-9932 x 5427
 

The TSX and NYSE have not reviewed and do not accept responsibility for the adequacy or accuracy of this release. 

Cautionary Note Regarding Forward-Looking Statements
This press release contains or incorporates by reference “forward-looking statements” and “forward-looking information” as defined under applicable Canadian and U.S. securities legislation.  All statements, other than statements of historical fact, which address events, results, outcomes or developments that the Company expects to occur are, or may be deemed to be, forward-looking statements. Forward-looking statements are generally, but not always, identified by the use of forward-looking terminology such as “expect”, “assume”, “schedule”, “believe”, “anticipate”, “intend”, “objective”, “strive”, “estimate”, “potential”, “forecast”, “budget”, “target”, “on track”, “outlook”, “continue”, “plan” or variations of such words and phrases and similar expressions or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved or the negative connotation of such terms.

Such statements in this press release may include (without limitation) information, assumptions, expectations and guidance as to strategy, plans, and future financial and operating performance, such as those regarding: free cash flow; mine-site free cash flow; costs (including total cash costs, AISC, mine-site AISC, capital expenditures, growth and sustaining capital, capitalized exploration, exploration spending); budgets; tax rates and the payment of taxes; total liquidity; returns to stakeholders; opportunities for share repurchases under the Company’s Normal Course Issuer Bid; repurchase of legacy Argonaut hedges; impacts of inflation and increasing labour and contractor costs; mine plans; mine life; Mineral Reserve life; Mineral Reserves and Resources; gold and other metal price assumptions; foreign exchange rates; sector outlook; size, value and profitability of operations and the Company’s balanced approach to capital allocation; expanding margins; project economics; project risks; mining methodologies; underground development rates; mining, stacking, milling and processing rates; total mill feed and throughput rates; recovery rates; anticipated gold production, production rates, timing of production, further production potential and growth; gold grades; exploration potential, budgets, focuses, programs, targets, and projected results; investment in and funding of growth initiatives and projects; operational impacts on the natural environment; the Company’s approach to reduction of its environmental footprint, greenhouse gas emissions, and related investments in new initiatives; community relations, engagement activities, and initiatives; corporate governance; plans with respect to health and safety; project milestones and timing and effects of completion of the IGD Expansion and the Phase 3+ Shaft Expansion; Magino mill expansion and intended effects on costs and processing; infrastructure upgrades; power projects; in the Mulatos District, the Puerto Del Aire project, including construction of the PDA mill, Cerro Pelon and the Halcon target, and anticipated timing of commencement of residual leaching at La Yaqui Grande; construction developments at the Lynn Lake project, project milestones and production projections and timing; exploration potential at the Qiqavik Gold project; scheduled final installment of $150m in respect of the sale of the Company’s Turkish development projects; and any other statements that express management’s expectations or estimates of future performance, operational, geological or financial results.

Alamos cautions that forward-looking statements are necessarily based upon several factors and assumptions that, while considered reasonable by the Company at the time of making such statements, are inherently subject to significant business, economic, technical, legal, political and competitive uncertainties and contingencies. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements and undue reliance should not be placed on such statements and information.

Risk factors that may affect Alamos’ ability to achieve the expectations set forth in the forward-looking statements in this document include, but are not limited to: the actual results of current exploration activities; changes to current estimates of Mineral Reserves and Resources; changes to production estimates (which assume accuracy of projected ore grade, mining rates, recovery timing and recovery rate estimates which may be impacted by unscheduled maintenance, weather issues, labour and contractor availability and other operating or technical difficulties in connection with mining or development activities, including geotechnical challenges); conclusions of economic and geological evaluations; the costs and timing of exploration, construction and development of new deposits; changes in project parameters as plans continue to be refined; operations may be exposed to illnesses, diseases, epidemics and pandemics which may impact, among other things, the broader market and the trading price of the Company’s shares; the duration of any regulatory responses to any illness, disease, epidemic or pandemic; government and the Company’s attempts to reduce the spread of any illness, disease, epidemic or pandemic which may affect many aspects of the Company’s operations including the ability to transport personnel to and from site, contractor and supply availability and the ability to sell or deliver gold doré bars; provincial, state and federal orders or mandates (including with respect to mining operations generally or auxiliary businesses or services required for the Company’s operations) in Canada, Mexico and other jurisdictions in which the Company does or may conduct business; political and economic conditions and developments in the jurisdictions in which the Company operates and in the world generally; fluctuations in the price of gold or certain other commodities such as, diesel fuel, natural gas, and electricity; changes in foreign exchange rates (particularly CAD, MXN and USD); the impact of inflation and any tariffs, trade barriers and/or regulatory costs; changes in the Company’s credit rating; any decision to declare a quarterly dividend; employee and community relations; litigation, administrative or regulatory proceedings and any resulting court, administrative, regulatory or arbitral decision(s) or order(s); disruptions affecting operations; power outages; availability of and increased costs associated with mining inputs and labour; delays in implementing growth and improvement initiatives; delays with the Phase 3+ Shaft Expansion or the IGD Expansion; delays in or obstructions to construction of the 115kV powerline for the Island Gold District; delays with the expansion of the Magino mill, paste plant construction project, construction of the Lynn Lake Project, construction of the PDA project, and/or the development or updating of mine plans; changes with respect to the intended method of accessing, mining the deposit, and processing any ore at PDA; delays in receiving or failure to receive the third installment payment in respect of the sale of the Company’s Turkish development projects; risks associated with the start-up of new mines; the risk that the Company’s mines may not perform as planned; uncertainty with the Company’s ability to secure additional capital to execute its business plans; the speculative nature of mineral exploration and development, including the risks of obtaining and maintaining necessary licenses and permits, including the necessary licenses, permits, authorizations and/or approvals from the appropriate regulatory authorities for the Company’s development stage and operating assets; labour and contractor availability (and being able to secure the same on favourable terms); contests over title to properties; expropriation or nationalization of property; inherent risks and hazards associated with mining and mineral processing including industrial hazards and industrial accidents; environmental hazards including, without limitation, fires, floods, storm-related damage, seismic activity and unusual or unexpected formations, pressures and cave-ins; changes in national and local government legislation, controls or regulations in Canada, Mexico, the United States and other jurisdictions in which the Company does or may carry on business in the future; increased costs and risks related to the potential impact of climate change; failure to comply with environmental and health and safety laws and regulations; disruptions in the maintenance or provision of required infrastructure and information technology systems; risk of loss due to sabotage, protests and other civil disturbances; the impact of global liquidity and credit availability and the values of assets and liabilities based on projected future cash flows; risks arising from holding derivative instruments; and business opportunities that may be pursued by the Company.

Additional risk factors and details with respect to risk factors that may affect the Company’s ability to achieve the expectations set forth in the forward-looking statements contained in this press release are set out in the Company’s latest 40-F/Annual Information Form and its Management’s Discussion and Analysis for the year ended December 31, 2025, each under the heading “Risk Factors”, which is available on the SEDAR+ website at www.sedarplus.ca or on EDGAR at www.sec.gov. The foregoing should be reviewed in conjunction with the information, risk factors and assumptions found in this MD&A.

The Company disclaims any intention or obligation to update or revise any forward-looking statements whether as a result of new information, future events or otherwise, except as required by applicable law.

Cautionary Note to U.S. Investors

Measured, Indicated and Inferred Resources: All resource and reserve estimates included in this press release or documents referenced in this press release have been prepared in accordance with Canadian National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) and the Canadian Institute of Mining, Metallurgy and Petroleum (the “CIM”) – CIM Definition Standards on Mineral Resources and Mineral Reserves, adopted by the CIM Council, as amended (the “CIM Standards”). NI 43-101 is a rule developed by the Canadian Securities Administrators, which established standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Mining disclosure in the United States was previously required to comply with SEC Industry Guide 7 (“SEC Industry Guide 7”) under the United States Securities Exchange Act of 1934, as amended. The U.S. Securities and Exchange Commission (the “SEC”) has adopted final rules, to replace SEC Industry Guide 7 with new mining disclosure rules under sub-part 1300 of Regulation S-K of the U.S. Securities Act (“Regulation S-K 1300”) which became mandatory for U.S. reporting companies beginning with the first fiscal year commencing on or after January 1, 2021. Under Regulation S-K 1300, the SEC now recognizes estimates of “Measured Mineral Resources”, “Indicated Mineral Resources” and “Inferred Mineral Resources”. In addition, the SEC has amended its definitions of “Proven Mineral Reserves” and “Probable Mineral Reserves” to be substantially similar to international standards.

Investors are cautioned that while the above terms are “substantially similar” to CIM Definitions, there are differences in the definitions under Regulation S-K 1300 and the CIM Standards. Accordingly, there is no assurance any mineral reserves or mineral resources that the Company may report as “proven mineral reserves”, “probable mineral reserves”, “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under NI 43-101 would be the same had the Company prepared the mineral reserve or mineral resource estimates under the standards adopted under Regulation S-K 1300. U.S. investors are also cautioned that while the SEC recognizes “measured mineral resources”, “indicated mineral resources” and “inferred mineral resources” under Regulation S-K 1300, investors should not assume that any part or all of the mineralization in these categories will ever be converted into a higher category of mineral resources or into mineral reserves. Mineralization described using these terms has a greater degree of uncertainty as to its existence and feasibility than mineralization that has been characterized as reserves. Accordingly, investors are cautioned not to assume that any measured mineral resources, indicated mineral resources, or inferred mineral resources that the Company reports are or will be economically or legally mineable.

International Financial Reporting Standards: The condensed interim consolidated financial statements of the Company have been prepared by management in accordance with International Financial Reporting Standard 34, Interim Financial Reporting, as issued by the International Accounting Standards Board. These accounting principles differ in certain material respects from accounting principles generally accepted in the United States of America. The Company’s reporting currency is the United States dollar unless otherwise noted.

Non-GAAP Measures and Additional GAAP Measures

 

The Company has included certain non-GAAP financial measures to supplement its condensed interim consolidated financial statements for the three and nine months ended September 30, 2026 and 2025, which are presented in accordance with IFRS, including the following:

  • adjusted net earnings and adjusted earnings per share;
  • cash flow from operating activities before changes in working capital and taxes paid;
  • Company-wide free cash flow;
  • total mine-site free cash flow;
  • mine-site free cash flow;
  • total cash costs per ounce of gold sold;
  • AISC per ounce of gold sold;
  • mine-site AISC per ounce of gold sold;
  • sustaining and non-sustaining capital expenditures; and
  • adjusted earnings before interest, taxes, depreciation, and amortization (“Adjusted EBITDA”).

The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. Non-GAAP financial measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. Management’s determination of the components of non-GAAP and additional measures is evaluated on a periodic basis influenced by new items and transactions, a review of investor uses and new regulations as applicable. Any changes to the measures are duly noted and retrospectively applied as applicable.

Adjusted Net Earnings and Adjusted Earnings per Share

“Adjusted net earnings” and “adjusted earnings per share” are non-GAAP financial measures with no standard meaning under IFRS which exclude the following from net earnings:

  • Foreign exchange gains or losses
  • Items included in other loss
  • Impairment expense/reversal of impairment
  • Net gain or loss on commodity derivatives
  • Certain non-recurring items
  • Foreign exchange gain or loss recorded in deferred tax expense
  • The income and mining tax impact of items included in other loss

The Company uses adjusted net earnings for its own internal purposes. Management’s internal budgets and forecasts and public guidance do not reflect the items which have been excluded from the determination of adjusted net earnings. Consequently, the presentation of adjusted net earnings enables shareholders to better understand the underlying operating performance of the core mining business through the eyes of management. Management periodically evaluates the components of adjusted net earnings based on an internal assessment of performance measures that are useful for evaluating the operating performance of the Company’s business and a review of the non-GAAP measures used by mining industry analysts and other mining companies.

Adjusted net earnings is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of operating profit or cash flows from operations as determined under IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Net earnings $165.6 $276.3 $627.4 $450.9
Adjustments:        
Foreign exchange (gain) loss (0.9) 1.5 (4.3) 7.7
Impairment reversal, net of tax — (192.9) — (192.9)
Inventory net realizable value adjustment, net of tax — — 7.0 —
Net loss on commodity derivatives, net of tax 9.9 53.8 2.7 117.2
Other loss 1.8 3.9 4.8 7.1
Unrealized foreign exchange loss (gain) recorded in deferred tax expense 8.0 13.9 27.1 (29.1)
Other income and mining tax adjustments (0.4) (1.0) (1.1) (1.4)
Adjusted net earnings $184.0 $155.5 $663.6 $359.5
Adjusted earnings per share – basic $0.44 $0.37 $1.58 $0.86
         

Cash Flow from Operating Activities before Changes in Working Capital and Taxes Paid

“Cash flow from operating activities before changes in working capital and taxes paid” is a non-GAAP performance measure that could provide an indication of the Company’s ability to generate cash flows from operations, and is calculated by adding back the change in working capital and taxes paid to cash flow from operating activities. “Cash flow from operating activities before changes in working capital and taxes paid” is a non-GAAP financial measure with no standard meaning under IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Cash flow from operating activities $216.3 $265.3 $690.6 $544.4
Add: Changes in working capital and taxes paid 18.6 10.0 169.2 95.2
Cash flow from operating activities before changes in working capital and taxes paid                   $234.9                   $275.3                   $859.8                   $639.6
         

Company-wide Free Cash Flow

“Company-wide free cash flow” is a non-GAAP performance measure calculated from cash flow from operating activities, less mineral property, plant and equipment expenditures and non-recurring costs. The Company believes this to be a useful indicator of its ability to operate without reliance on additional borrowing or usage of existing cash company-wide. Company-wide free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other mining companies. Company-wide free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Cash flow from operating activities $216.3 $265.3 $690.6 $544.4
Less: mineral property, plant and equipment expenditures (226.9) (135.0) (591.0) (349.6)
Add: early settlement of legacy Argonaut hedges (1) 86.2 — 221.2 —
Company-wide free cash flow                     $75.6                   $130.3                   $320.8                   $194.8
         

(1)   Represents the early settlement of 33,000 ounces and 83,000 ounces, respectively, during the three and nine months ended September 30, 2026, of the remaining legacy Argonaut hedges.

Mine-site Free Cash Flow

“Mine-site free cash flow” is a non-GAAP financial performance measure calculated as cash flow from operating mine-sites, less mine-site mineral property, plant and equipment expenditures. The Company believes this to be a useful indicator of its ability to operate without reliance on additional borrowing or usage of existing cash. Mine-site free cash flow is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures of performance presented by other mining companies. Mine-site free cash flow should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS.

Consolidated Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities                   $216.3                   $265.3                   $690.6                   $544.4
Add: operating cash flow used by non-mine site activity (1)                     109.1                       62.7                     356.2                     194.8
Cash flow from operating mine-sites                   $325.4                   $328.0                $1,046.8                   $739.2
         
Mineral property, plant and equipment expenditures                   $226.9                   $135.0                   $591.0                   $349.6
Less: capital expenditures from development projects and corporate                      (42.8)                      (15.1)                    (104.3)                      (43.4)
         
Capital expenditure and capital advances from mine-sites                   $184.1                   $119.9                   $486.7                   $306.2
Total mine-site free cash flow                   $141.3                   $208.1                   $560.1                   $433.0
         

Island Gold District Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities (1) $203.7 $160.9 $576.1 $370.5
Mineral property, plant and equipment expenditures (131.5) (88.5) (346.0) (226.9)
Mine-site free cash flow                     $72.2                     $72.4                   $230.1                   $143.6
         

Young-Davidson Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities (1) $55.3 $82.5 $240.3 $220.6
Mineral property, plant and equipment expenditures (24.9) (20.2) (71.0) (60.4)
Mine-site free cash flow                     $30.4                     $62.3                   $169.3                   $160.2
         

Mulatos District Mine-Site Free Cash Flow Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Cash flow from operating activities                     $66.4                     $84.6                   $230.4                   $148.1
Mineral property, plant and equipment expenditures                      (27.7)                      (11.2)                      (69.7)                      (18.9)
Mine-site free cash flow                     $38.7                     $73.4                   $160.7                   $129.2
         

(1) Cash from operating activities for the Canadian operations excludes the impact of the nil ounces and 12,255 ounces settled under the gold prepayment arrangement for the three and nine months ended September 30, 2026, respectively (three and nine months ended September 30, 2025 – 12,346 ounces and 37,038 ounces, respectively). The non-cash adjustment to reflect the settlement of the gold prepayment arrangement is included in Company-wide free cash flow.
   

Total Cash Costs per ounce

Total cash costs per ounce is a non-GAAP term typically used by gold mining companies to evaluate the costs of producing gold and to assess the ability of a mining company to generate cash flow from operating activities. Total cash costs per ounce includes mining and processing costs plus applicable royalties, and net of costs allocated to by-product and net realizable value adjustments. Total cash costs per ounce is exclusive of exploration costs. As well, the Company excludes mark-to-market adjustments for the revaluation of previously issued share-based compensation, therefore, total cash costs will incorporate the cost of long term incentives associated with the grant date fair value for instruments issued.

Total cash costs per ounce is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of cash flow from operating activities under IFRS or operating costs presented under IFRS.

All-in Sustaining Costs per ounce and Mine-site All-in Sustaining Costs

The Company adopted an “all-in sustaining costs per ounce” non-GAAP performance measure in accordance with the World Gold Council. The Company believes the measure more fully defines the total costs associated with producing gold; however, this performance measure has no standardized meaning. Accordingly, there may be some variation in the method of computation of “all-in sustaining costs per ounce” as determined by the Company compared with other mining companies. In this context, “all-in sustaining costs per ounce” for the consolidated Company reflects total mining and processing costs, corporate and administrative costs, share-based compensation, sustaining exploration costs, sustaining capital, sustaining finance leases and other operating costs. The Company excludes mark-to-market adjustments for the revaluation of previously issued share-based compensation, therefore all-in sustaining costs will incorporate the cost of long term incentives associated with the grant date fair value for instruments issued.

For the purposes of calculating mine-site all-in sustaining costs at individual mine sites the Company allocates a portion of share based compensation to the mine sites, but does not include an allocation of corporate and administrative expenses to the mine sites, as detailed in the reconciliations below. 

Sustaining capital expenditures are expenditures that do not increase annual gold ounce production at a mine site and exclude all expenditures at the Company’s development projects as well as certain expenditures at the Company’s operating sites that are deemed expansionary in nature. Non-sustaining capital expenditures or growth capital are expenditures primarily incurred at development projects and costs related to major projects at existing operations, where these projects will materially benefit the mine site. Capitalized exploration expenditures are expenditures that meet the IFRS definition for capitalization and are incurred to further expand the known Mineral Reserves and Resources at existing operations or development projects. For each mine-site reconciliation, corporate and administrative costs, and non-site specific costs are not included in the all-in sustaining cost per ounce calculation.

All-in sustaining costs per gold ounce is intended to provide additional information only and does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The measure is not necessarily indicative of cash flow from operating activities under IFRS or operating costs presented under IFRS. 

Total Cash Costs and All-in Sustaining Costs per Ounce Reconciliation Tables

The following tables reconcile these non-GAAP measures to the most directly comparable IFRS measures on a Company-wide and individual mine-site basis.

Total Cash Costs and AISC Reconciliation – Company-wide  
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $163.8 $135.9 $483.1 $415.3
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (2) (1.0) (5.3) (0.3) (9.3)
Costs allocated to silver by-product (6.3) (4.0) (19.4) (10.4)
Royalties 6.2 6.2 19.8 18.6
Total cash costs $162.7 $132.8 $483.2 $414.2
Gold ounces sold 118,361 136,473 371,118 389,083
Total cash costs per ounce                   $1,375                      $973                   $1,302                   $1,065
         
Total cash costs $162.7 $132.8 $483.2 $414.2
Corporate and administrative (1) 10.2 9.6 32.3 29.6
Sustaining capital expenditures (3) 49.9 34.8 130.7 95.1
Sustaining finance leases 3.0 4.3 10.2 12.6
Interest on sustaining finance leases 0.3 0.4 1.1 1.7
Share-based compensation 5.0 16.7 18.7 47.1
Share-based compensation mark-to-market allocated to corporate (2) (2.7) (13.8) (0.6) (25.4)
Sustaining exploration 0.6 0.4 1.9 1.5
Accretion of decommissioning liabilities 2.5 2.4 7.2 7.0
Total all-in sustaining costs $231.5 $187.6 $684.7 $583.4
Gold ounces sold 118,361 136,473 371,118 389,083
Total all-in sustaining costs per ounce                   $1,956                   $1,375                   $1,845                   $1,499

(1) Corporate and administrative expenses exclude expenses incurred at development properties.
(2) Share-based compensation included in total cash costs and AISC excludes the impact of mark-to-market adjustments for changes in the Company’s share price in the periods allocated to sites (included in mining and processing costs) and corporate head office (included in share-based compensation expense). See Note 10 (d) of the condensed interim consolidated financial statements for the three and nine months ended September 30, 2026 and 2025 for further details.
(3) Sustaining capital expenditures are defined as those expenditures which do not increase annual gold ounce production at a mine site and exclude all expenditures at growth projects and certain expenditures at operating sites which are deemed expansionary in nature. Total sustaining capital expenditures for the periods are as follows:
   

  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions)        
Mineral property, plant and equipment expenditures                   $226.9                   $135.0                   $591.0                   $349.6
Less: non-sustaining capital expenditures at:        
Island Gold District                      (99.2)                      (64.6)                    (263.0)                    (167.4)
Young-Davidson                        (7.8)                      (10.0)                      (25.1)                      (26.6)
Mulatos District                      (27.2)                      (10.5)                      (67.9)                      (17.1)
Corporate and other                      (42.8)                      (15.1)                    (104.3)                      (43.4)
Sustaining capital expenditures                     $49.9                     $34.8                   $130.7                     $95.1
         

Island Gold District Total Cash Costs and Mine-site AISC Reconciliation    
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $80.9 $59.2 $230.1 $174.7
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) (0.3) (2.0) (0.1) (3.5)
Costs allocated to silver by-product (1.0) (0.2) (2.4) (1.1)
Royalties 3.4 2.8 9.0 9.7
Total cash costs $83.0 $59.8 $236.6 $179.8
Gold ounces sold 66,837 62,011 189,672 179,357
Mine-site total cash costs per ounce                   $1,242                      $964                   $1,247                   $1,002
         
Total cash costs $83.0 $59.8 $236.6 $179.8
Sustaining capital expenditures 32.3 23.9 83.0 59.5
Sustaining finance leases 3.0 4.3 10.2 12.6
Interest on sustaining finance leases 0.3 0.4 1.1 1.7
Accretion of decommissioning liabilities 0.5 0.4 1.4 1.1
Total all-in sustaining costs $119.1 $88.8 $332.3 $254.7
Gold ounces sold 66,837 62,011 189,672 179,357
Mine-site all-in sustaining costs per ounce                   $1,782                   $1,432                   $1,752                   $1,420
         

Young-Davidson Total Cash Costs and Mine-site AISC Reconciliation    
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $49.6 $45.5 $149.5 $138.3
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) (0.4) (1.8) (0.1) (3.1)
Costs allocated to silver by-product (2.2) (0.9) (5.6) (2.2)
Royalties 1.6 2.1 6.4 5.6
Total cash costs $48.6 $44.9 $150.2 $138.6
Gold ounces sold 23,809 37,406 87,710 111,095
Mine-site total cash costs per ounce                   $2,041                   $1,200                   $1,712                   $1,248
         
Total cash costs $48.6 $44.9 $150.2 $138.6
Sustaining capital expenditures 17.1 10.2 45.9 33.8
Accretion of decommissioning liabilities 0.1 0.1 0.4 0.4
Total all-in sustaining costs $65.8 $55.2 $196.5 $172.8
Gold ounces sold 23,809 37,406 87,710 111,095
Mine-site all-in sustaining costs per ounce                   $2,764                   $1,476                   $2,240                   $1,555

Mulatos District Total Cash Costs and Mine-site AISC Reconciliation    
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
(in millions, except ounces and per ounce figures)        
Mining and processing $33.3 $31.2 $103.5 $102.3
Share-based compensation mark-to-market allocated to sites (included in mining and processing) (1) (0.3) (1.5) (0.1) (2.7)
Costs allocated to silver by-product (3.1) (2.8) (11.4) (7.1)
Royalties 1.2 1.3 4.4 3.3
Total cash costs $31.1 $28.2 $96.4 $95.8
Gold ounces sold 27,715 37,056 93,736 98,631
Mine-site total cash costs per ounce                   $1,122                      $761                   $1,028                      $971
         
Total cash costs $31.1 $28.2 $96.4 $95.8
Sustaining capital expenditures 0.5 0.7 1.8 1.8
Accretion of decommissioning liabilities 1.9 1.9 5.4 5.5
Total all-in sustaining costs $33.5 $30.8 $103.6 $103.1
Gold ounces sold 27,715 37,056 93,736 98,631
Mine-site all-in sustaining costs per ounce                   $1,209                      $831                   $1,105                   $1,045

(1) Share-based compensation included in mine-site total cash costs and mine-site AISC excludes the impact of mark-to-market adjustments for changes in the Company’s share price in the periods allocated to sites included in mining and processing costs.
   

Adjusted EBITDA

Adjusted EBITDA represents net earnings before interest, taxes, depreciation, and amortization and removes the effects of certain items that the Company believes are not reflective of the Company’s underlying performance for the reporting period. The measure also removes the impact of non-cash items such as impairment loss charges or reversals, and net gain or loss on derivative financial instruments. Adjusted EBITDA is an indicator of the Company’s ability to generate liquidity by producing operating cash flow to fund working capital needs, service debt obligations, and fund capital expenditures.

Adjusted EBITDA does not have any standardized meaning under IFRS and may not be comparable to similar measures presented by other mining companies. It should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS. The following table reconciles this non-GAAP measure to the most directly comparable IFRS measure.  

(in millions)        
  Three Months Ended September 30, Nine Months Ended September 30,
  2026 2025 2026 2025
Net earnings $165.6 $276.3 $627.4 $450.9
Adjustments:        
Reversal of impairment — (218.8) — (218.8)
Inventory net realizable value adjustment — — 10.8 —
Finance income (5.9) (1.2) (18.0) (1.2)
Amortization 44.2 52.0 137.9 156.1
Net loss on commodity derivatives 14.6 80.0 4.0 174.2
Deferred income tax expense 48.6 48.7 156.6 35.3
Current income tax expense 44.9 46.5 200.3 92.6
Adjusted EBITDA                   $312.0                   $283.5              $1,119.0                  $689.1
         

Additional GAAP Measures

Additional GAAP measures are presented on the Company’s condensed interim consolidated financial statements and are not meant to be a substitute for other subtotals or totals presented in accordance with IFRS, but rather should be evaluated in conjunction with such IFRS measures. The following additional GAAP measures are used and are intended to provide an indication of the Company’s mine and operating performance:

  • Earnings from operations – represents the amount of earnings before net finance expense/income, foreign exchange loss/gain, other loss, net loss/gain on commodity derivatives and income tax expense

Unaudited Condensed Interim Consolidated Statements of Financial Position, Comprehensive
Income, and Cash Flow

ALAMOS GOLD INC.
Condensed Interim Consolidated Statements of Financial Position
(Unaudited – stated in millions of United States dollars)

  September 30, 2026   December 31, 2025
ASSETS      
Current Assets      
Cash and cash equivalents $597.4   $623.1
Equity securities 44.2   58.9
Amounts receivable 59.1   45.0
Inventories 215.6   225.4
Deferred payment consideration 162.6   157.1
Other current assets 36.1   26.0
Total Current Assets 1,115.0   1,135.5
       
Non-Current Assets      
Mineral property, plant and equipment 5,462.8   4,957.5
Deferred income taxes 41.1   34.0
Inventories 130.9   84.9
Deferred payment consideration 147.1   142.0
Other non-current assets 11.4   30.7
Total Assets                         $6,908.3                           $6,384.6
       
LIABILITIES      
Current Liabilities      
Accounts payable and accrued liabilities $386.8   $316.1
Derivative liabilities 48.7   128.0
Deferred revenue —   50.0
Income taxes payable 95.1   53.6
Current portion of lease liabilities 9.3   11.8
Current portion of decommissioning liabilities 14.0   8.1
Total Current Liabilities 553.9   567.6
       
Non-Current Liabilities      
Deferred income taxes 1,032.0   873.3
Derivative liabilities —   129.1
Debt 200.0   200.0
Lease liabilities 17.2   11.2
Decommissioning liabilities 149.5   153.4
Other non-current liabilities 4.0   4.2
Total Liabilities 1,956.6   1,938.8
       
EQUITY      
Share capital $4,131.3   $4,140.6
Contributed surplus 84.5   87.7
Accumulated other comprehensive (loss) income (18.8)   0.3
Retained earnings 754.7   217.2
Total Equity 4,951.7   4,445.8
Total Liabilities and Equity                         $6,908.3                           $6,384.6
       

ALAMOS GOLD INC.
Condensed Interim Consolidated Statements of Comprehensive Income
(Unaudited – stated in millions of United States dollars, except share and per share amounts)

       
  Three Months Ended
September 30,
Nine Months Ended
September 30,
  2026   2025   2026   2025
OPERATING REVENUES $510.4   $462.3   $1,701.2   $1,233.5
               
COST OF SALES              
Mining and processing 163.8   135.9   483.1   415.3
Inventory net realizable value adjustment —   —   10.8   —
Royalties 6.2   6.2   19.8   18.6
Amortization 44.2   52.0   137.9   156.1
  214.2   194.1   651.6   590.0
EXPENSES              
Exploration 12.3   5.0   27.8   19.0
Corporate and administrative 10.2   9.6   32.3   29.6
Share-based compensation 5.0   16.7   18.7   47.1
Reversal of impairment —   (218.8)   —   (218.8)
  241.7   6.6   730.4   466.9
EARNINGS FROM OPERATIONS                   268.7                     455.7                        970.8                        766.6
               
OTHER (EXPENSES) INCOME              
Net loss on commodity derivatives (14.6)   (80.0)   (4.0)   (174.2)
Finance income 5.9   1.2   18.0   1.2
Foreign exchange gain 0.9   (1.5)   4.3   (7.7)
Other loss (1.8)   (3.9)   (4.8)   (7.1)
EARNINGS BEFORE INCOME TAXES                 $259.1                   $371.5                      $984.3                      $578.8
               
INCOME TAXES              
Current income tax expense (44.9)   (46.5)   (200.3)   (92.6)
Deferred income tax expense (48.6)   (48.7)   (156.6)   (35.3)
NET EARNINGS                 $165.6                   $276.3                      $627.4                      $450.9
               
Items that may be subsequently reclassified to net earnings:              
Net change in fair value of currency hedging instruments, net of taxes (3.8)   (3.3)   (7.6)   7.1
Net change in fair value of fuel hedging instruments, net of taxes 0.3   —   0.9   —
Items that will not be reclassified to net earnings:              
Unrealized gain (loss) on equity securities, net of taxes 4.5   19.5   (12.0)   28.4
Total other comprehensive income (loss)                     $1.0                     $16.2                       ($18.7)                        $35.5
COMPREHENSIVE INCOME                 $166.6                   $292.5                      $608.7                      $486.4
               
EARNINGS PER SHARE              
– basic                   $0.40                     $0.66                        $1.50                        $1.07
– diluted                   $0.39                     $0.65                        $1.49                        $1.07
               

ALAMOS GOLD INC.
Condensed Interim Consolidated Statements of Cash Flows
(Unaudited – stated in millions of United States dollars)

  Three Months Ended September 30,   Nine Months Ended September 30,
  2026   2025   2026   2025
CASH PROVIDED BY (USED IN):              
OPERATING ACTIVITIES              
Net earnings $165.6   $276.3   $627.4   $450.9
Adjustments for items not involving cash:              
Amortization 44.2   52.0   137.9   156.1
Reversal of impairment     (218.8)       (218.8)
Inventory net realizable value adjustment —   —   10.8    
Foreign exchange (gain) loss (0.9)   1.5   (4.3)   7.7
Current income tax expense 44.9   46.5   200.3   92.6
Deferred income tax expense 48.6   48.7   156.6   35.3
Share-based compensation 7.0   22.5   20.9   58.0
Finance income (5.9)   (1.2)   (18.0)   (1.2)
Net loss on commodity derivatives 14.6   80.0   4.0   174.2
Deferred revenue recognized —   (31.2)   (51.0)   (93.5)
Settlement of legacy Argonaut  gold hedges (86.2)   —   (221.2)   —
Other items 3.0   (1.0)   (3.6)   (21.7)
Changes in working capital and taxes paid (18.6)   (10.0)   (169.2)   (95.2)
                    216.3                          265.3                     690.6                      544.4
INVESTING ACTIVITIES              
Mineral property, plant and equipment (226.9)   (135.0)   (591.0)   (349.6)
Interest capitalized to mineral property, plant and equipment (3.0)   (4.3)   (9.2)   (13.2)
Repurchase of royalty on Young-Davidson —   —   —   (2.0)
Proceeds from disposition of equity securities —   5.6   0.6   7.4
Investment in equity securities —   —   (0.6)   (0.2)
Transaction costs arising on asset dispositions and  acquisitions —   (0.2)   —   (0.2)
                   (229.9)                         (133.9)                    (600.2)                    (357.8)
FINANCING ACTIVITIES              
Dividends paid (16.2)   (10.1)   (48.6)   (29.4)
Repurchase and cancellation of common shares (5.7)   —   (55.7)   (10.0)
Credit facility transaction costs, standby fees and interest (1.1)   (0.3)   (1.9)   (2.2)
Proceeds from the exercise of options and warrants 0.2   1.3   0.8   3.1
Lease payments (3.0)   (4.3)   (10.2)   (12.6)
                    (25.8)                           (13.4)                    (115.6)                      (51.1)
Effect of exchange rates on cash and cash equivalents                     (0.1)                              0.2                       (0.5)                          0.4
Net (decrease) increase in cash and cash equivalents                   (39.5)                          118.2                     (25.7)                      135.9
Cash and cash equivalents – beginning of period 636.9   344.9   623.1   327.2
CASH AND CASH EQUIVALENTS – END OF PERIOD                 $597.4                        $463.1                   $597.4                    $463.1

Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/6d1a29e1-0154-42a7-a129-20a638aad6b9
https://www.globenewswire.com/NewsRoom/AttachmentNg/03bfa292-d224-4cfd-8c22-ddc40ea130aa
https://www.globenewswire.com/NewsRoom/AttachmentNg/d802db77-a4b5-4311-9d67-6c09e8e3d786
https://www.globenewswire.com/NewsRoom/AttachmentNg/b162f26f-f2ee-489e-af99-a2335d1fc159
https://www.globenewswire.com/NewsRoom/AttachmentNg/a8a7e949-6b99-49d5-9be3-7d39bf50c706
https://www.globenewswire.com/NewsRoom/AttachmentNg/84e28a01-5b0f-440c-b1d0-a3c4e04c7a70
https://www.globenewswire.com/NewsRoom/AttachmentNg/7177f97d-1ab4-4276-95de-dfd0c0fbfd07

On track for updated guidance
Grade enhancement projects advancing well, first gold poured at Redbird
Return of capital increased to 50%, repurchased 5% of shares since April 2025

TORONTO, Oct. 28, 2026 (GLOBE NEWSWIRE) — Kinross Gold Corporation (TSX: K, NYSE: KGC) (“Kinross” or the “Company”) today announced its results for the third quarter ended September 30, 2026.
This news release contains forward-looking information about expected future events and financial and operating performance of the Company. We refer to the risks and assumptions set out in our Cautionary Statement on Forward-Looking Information located on pages 22 and 24 of this release. All dollar amounts are expressed in U.S. dollars, unless otherwise noted.

2026 third-quarter highlights:

  • Production1 of 424,693 gold equivalent ounces (“Au eq. oz.”).
  • Production cost of sales2 of $1,502 per Au eq. oz. sold and attributable production cost of sales1 of $1,485 per Au eq. oz. sold.
  • Attributable all-in sustaining cost1 of $1,947 per Au eq. oz. sold.
  • Operating cash flow3 of $714.4 million and attributable adjusted operating cash flow1 of $830.9 million.
  • Attributable free cash flow1 of $281.3 million and attributable adjusted free cash flow1 of $391.4 million.
  • Margins4 increased by 19% to $2,747 per Au eq. oz. sold compared with Q3 2025. 
  • Reported earnings5 of $583.2 million, or $0.49 per share, with adjusted net earnings6 of $591.3 million, or $0.50 per share.
  • Cash and cash equivalents of $2.6 billion and net cash7 of $1.9 billion at September 30, 2026.

Return of capital to shareholders:

  • Reflecting its strong cash flow and balance sheet strength, Kinross increased its 2026 return of capital commitment from 40% to 50% of free cash flow. During the first three quarters of 2026, the Company repurchased $710 million in shares, and an additional $100 million to date in October. Including its quarterly dividend, Kinross has returned over $950 million in capital to shareholders year-to-date as of October 28, 2026.
  • Since April 2025, Kinross returned over $1.4 billion of capital through share repurchases, representing approximately 5% of its shares outstanding. 
  • Kinross’ Board of Directors declared a quarterly dividend of $0.04 per common share payable on December 3, 2026, to shareholders of record at the close of business on November 19, 2026.

Operational highlights:

  • At La Coipa, mining and milling activities have stabilized as weather has improved and operational improvement initiatives have progressed.
  • At Round Mountain, operations have made progress towards stability, with higher mill grades from Phase S and improved recoveries contributing to higher production quarter-over-quarter.
  • Kinross’ broader portfolio performed well, led by Paracatu and Tasiast that together accounted for more than half of the Q3 production while remaining the two lowest-cost operations.

Development project highlights:

  • At Great Bear, underground development for Advanced Exploration (“AEX”) continued to advance, with the North and South declines reaching over 500 metres combined as of late-October. AEX surface construction is substantially complete, with supporting infrastructure now in place. Detailed engineering for the Main Project progressed to over 55% complete.
  • At Round Mountain Phase X, underground development is advancing well and is approximately 8% ahead of plan, with more than 9,600 metres completed to date. Positive infill drilling results were received in the early stoping horizons, while infrastructure development and operational-readiness activities are progressing well to support planned first production in 2028.
  • At Kettle River-Curlew (“Curlew”), underground development continued ahead of schedule, and construction of the tailings dewatering plant and mill refurbishment progressed substantially. Exploration drilling also extended the prospective mineralized zones in the North Stealth, Roadrunner and K5 areas.
  • First gold was poured from Bald Mountain Redbird 1 in early October, while Redbird 2 continues to progress well with initial leach pad construction activities nearing completion, and detailed engineering and procurement for the Sulphidization, Acidification, Recycling and Thickening (“SART”) plant well underway.
  • At Lobo-Marte, permitting continues to progress, detailed engineering has commenced and first production remains targeted for the early 2030s.

CEO commentary:
J. Paul Rollinson, CEO, made the following comments in relation to 2026 third-quarter results:

“Kinross’ portfolio demonstrated its resilience in Q3. Our largest operations, Paracatu and Tasiast, continued to make significant contributions and we maintained disciplined cost management. We remain on track for our updated guidance, supported by operational improvements at Round Mountain and La Coipa. We are focused on maintaining this momentum and driving continuous improvement across our operations.

“We continue to make strong progress across our development pipeline. At Great Bear, AEX underground development is well underway and AEX surface construction is substantially complete. Round Mountain Phase X and Curlew are advancing well, and first gold was poured at Redbird in early October. At Lobo-Marte, permitting continues to progress and detailed engineering has commenced. These projects underpin our grade enhancement strategy and, together with the opportunities across our significant resource inventory, contribute to our long-term production profile.

“Our strong financial position and ability to generate significant free cash flow provide us with flexibility to advance these opportunities while continuing to return robust capital to shareholders. During the quarter, we increased our 2026 return of capital target to 50% of full-year free cash flow and have returned over $950 million to shareholders year-to-date. Since April 2025, we have repurchased approximately 5% of our shares outstanding.

“Looking ahead, we remain focused on optimizing our cash flow across the business and allocating capital in a disciplined manner to advance our project pipeline, deliver operational excellence and maximize shareholder value.”

Summary of financial and operating results

(in millions of U.S. dollars, except ounces, per share amounts, and per ounce amounts) Three months ended
September 30,
Nine months ended
September 30,
  2026   2025   2026   2025
Operating Highlights(a)        
Total gold equivalent ounces(b)        
Produced   432,368   520,301   1,434,650   1,580,239
Sold   417,657   520,733   1,410,820   1,571,045
Attributable gold equivalent ounces(b)        
Produced   424,693   503,862   1,409,582   1,528,524
Sold   410,245   504,111   1,386,340   1,518,975
Gold ounces – sold   412,363   511,564   1,381,342   1,547,223
Silver ounces – sold (000’s)   361   804   1,806   2,171
         
Earnings(a)        
Metal sales $ 1,774.7 $ 1,802.1 $ 6,420.5 $ 5,028.1
Production cost of sales $ 627.2 $ 598.6 $ 1,992.4 $ 1,713.7
Depreciation, depletion and amortization $ 217.1 $ 285.4 $ 768.3 $ 836.7
Operating earnings $ 821.0 $ 810.1 $ 3,345.5 $ 2,155.3
Net earnings attributable to common shareholders $ 583.2 $ 584.9 $ 2,270.4 $ 1,483.6
Net earnings per share attributable to common shareholders (basic) $ 0.49 $ 0.48 $ 1.91 $ 1.21
Net earnings per share attributable to common shareholders (diluted) $ 0.49 $ 0.48 $ 1.90 $ 1.21
Adjusted net earnings(c) $ 591.3 $ 529.6 $ 2,293.2 $ 1,434.6
Adjusted net earnings per share(c) $ 0.50 $ 0.44 $ 1.92 $ 1.17
         
Cash Flow(a)        
Net cash flow provided from operating activities $ 714.4 $ 1,024.1 $ 2,999.8 $ 2,623.6
Attributable adjusted operating cash flow(c) $ 830.9 $ 965.5 $ 3,072.1 $ 2,469.2
Capital expenditures(d) $ 439.6 $ 312.2 $ 1,133.8 $ 826.0
Attributable capital expenditures(c) $ 439.5 $ 307.6 $ 1,124.6 $ 813.5
Attributable free cash flow(c) $ 281.3 $ 686.7 $ 1,845.6 $ 1,714.1
Attributable adjusted free cash flow(c) $ 391.4 $ 657.9 $ 1,947.5 $ 1,655.7
         
Per Ounce Metrics(a)        
Average realized gold price per ounce(e) $ 4,249 $ 3,460 $ 4,549 $ 3,200
Attributable average realized gold price per ounce(c) $ 4,248 $ 3,458 $ 4,551 $ 3,199
Production cost of sales per equivalent ounce sold(b)(f) $ 1,502 $ 1,150 $ 1,412 $ 1,091
Attributable production cost of sales per equivalent ounce sold(b)(c) $ 1,485 $ 1,145 $ 1,396 $ 1,086
Attributable production cost of sales per ounce sold on a by-product basis(c) $ 1,449 $ 1,102 $ 1,327 $ 1,052
Attributable all-in sustaining cost per equivalent ounce sold(b)(c) $ 1,947 $ 1,622 $ 1,827 $ 1,490
Attributable all-in sustaining cost per ounce sold on a by-product basis(c) $ 1,917 $ 1,588 $ 1,767 $ 1,462
Attributable all-in cost per equivalent ounce sold(b)(c) $ 2,862 $ 2,016 $ 2,468 $ 1,877
Attributable all-in cost per ounce sold on a by-product basis(c) $ 2,844 $ 1,989 $ 2,421 $ 1,855

(a)   All measures and ratios include 100% of the results from Manh Choh, except measures and ratios denoted as “attributable.” “Attributable” measures and ratios include Kinross’ 70% share of Manh Choh production, sales, cash flow, capital expenditures and costs, as applicable.
(b)   “Gold equivalent ounces” include silver ounces produced and sold converted to a gold equivalent based on a ratio of the average spot market prices for the commodities for each period. The ratio for the third quarter and first nine months of 2026 was 68.10:1 and 62.05:1, respectively (third quarter and first nine months of 2025 – 87.73:1 and 91.33:1, respectively).
(c)   The definition and reconciliation of these non-GAAP financial measures and ratios is included on pages 15 to 21 of this news release. Non-GAAP financial measures and ratios have no standardized meaning under IFRS and therefore, may not be comparable to similar measures presented by other issuers.
(d)   “Capital expenditures” is “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows.
(e)   “Average realized gold price per ounce” is defined as gold revenue divided by total gold ounces sold.
(f)    “Production cost of sales per equivalent ounce sold” is defined as production cost of sales divided by total gold equivalent ounces sold.

The following operating and financial results are based on third-quarter gold equivalent production:

Production: Kinross produced 424,693 Au eq. oz. in Q3 2026, compared with 503,862 Au eq. oz. in Q3 2025. The decrease is a result of planned lower production from Fort Knox and Bald Mountain as well as a reduction in production at La Coipa and Round Mountain, while Tasiast and Paracatu remained stable.

Average realized gold price8: The average realized gold price in the third quarter was $4,249 per ounce, compared with $3,460 per ounce in Q3 2025, a 23% increase year-over-year.

Revenue: Revenue was $1,774.7 million in Q3 2026, compared with $1,802.1 million during Q3 2025. The 2% decrease year-over-year was due to the decrease in production and ounces sold.

Production cost of sales: Production cost of sales per Au eq. oz. sold2 increased to $1,502 in Q3 2026, compared with $1,150 in Q3 2025. Attributable production cost of sales per Au eq. oz. sold1 increased to $1,485 for Q3 2026, compared with $1,145 in Q3 2025, primarily due to higher energy, contractor and reagent costs, lower production and an increase in royalty costs as a result of the higher gold prices.

Attributable production cost of sales per Au oz. sold on a by-product basis1 was $1,449 in the third quarter of 2026, compared with $1,102 in the third quarter of 2025, based on attributable gold sales of 405,030 ounces and silver sales of 355,178 ounces.

Margins4: Kinross’ margin per Au eq. oz. sold increased by 19% to $2,747 in Q3 2026, compared with the Q3 2025 margin of $2,310.

Attributable all-in sustaining cost1: Attributable all-in sustaining cost per Au eq. oz. sold was $1,947 in Q3 2026, compared with $1,622 in Q3 2025.

Attributable all-in sustaining cost per Au oz. sold on a by-product basis was $1,917 in the third quarter, compared with $1,588 in Q3 2025.

Operating cash flow3: Operating cash flow was $714.4 million in the third quarter, compared with $1,024.1 million for Q3 2025.

Attributable adjusted operating cash flow1 in Q3 2026 was $830.9 million, compared with $965.5 million for Q3 2025.

Attributable free cash flow1: Attributable free cash flow was $281.3 million in the quarter, compared with $686.7 million in Q3 2025. Excluding working capital, attributable adjusted free cash flow was $391.4 million in the quarter, compared with $657.9 million in Q3 2025. Both metrics were impacted by timing of sales and higher capital expenditure spending in Q3 2026.

Reported net earnings5: Reported net earnings were $583.2 million during the quarter, or $0.49 per share, in line with reported net earnings of $584.9 million, or $0.48 per share, for Q3 2025.

Adjusted net earnings6 increased to $591.3 million, or $0.50 per share, for Q3 2026, compared with $529.6 million, or $0.44 per share, for Q3 2025.

Capital expenditures9: Capital expenditures increased to $439.6 million in the third quarter, compared with $312.2 million in Q3 2025, driven by a ramp-up of development activities at Curlew, Bald Mountain Redbird, Great Bear and Round Mountain Phase X, partially offset by a decrease in spending at Manh Choh.

Attributable capital expenditures1 were $439.5 million for Q3 2026, compared with $307.6 million for Q3 2025.

Balance sheet

As of September 30, 2026, Kinross had cash and cash equivalents of $2.6 billion and net cash7 of $1.9 billion, comparable with the second quarter of 2026.

The Company had additional available credit10 of $1.7 billion and total liquidity11 of approximately $4.4 billion as of September 30, 2026, with no debt maturities until 2033. In August, S&P Global Ratings upgraded Kinross’ long-term issuer credit rating and issue-level rating on the Company’s unsecured debt to ‘BBB’ from ‘BBB-‘, with a stable outlook.

Return of capital to shareholders

Kinross continues to advance its 2026 buyback strategy, having repurchased approximately $230 million in shares during the quarter, representing 8.6 million shares. Including its quarterly dividend, Kinross returned over $275 million to shareholders in Q3.

Year-to-date, approximately $810 million in shares have been repurchased, representing 28.5 million shares. Including its quarterly dividend, Kinross returned over $950 million in capital to shareholders to date in 2026 and 46% of free cash flow over the first nine months of 2026.

Since April 2025, Kinross has repurchased approximately $1.4 billion in shares, representing approximately 5% of its shares outstanding, and returned a total of approximately $1.7 billion in capital to shareholders.

As part of its quarterly dividend program, the Company also declared a dividend of $0.04 per common share payable on December 3, 2026, to shareholders of record on November 19, 2026.

Operating results

Mine-by-mine summaries for 2026 third-quarter operating results may be found on pages 9 and 13 of this news release. Unless otherwise noted, commentary in this section is relative to the previous quarter.

Tasiast delivered another solid quarter, with strong mining and processing performance supporting production in line with the mine plan. Higher throughput helped offset the impact of anticipated lower grades and recoveries. Cost of sales per ounce sold reflected the planned production profile for the quarter and was impacted by higher fuel and maintenance supply costs.

Paracatu performed in line with expectations during the quarter, supported by strong mining and processing performance. Higher ore tonnes mined helped offset the impact of planned lower grades and recoveries associated with mine sequencing. Cost of sales per ounce sold reflected the planned production profile and was affected by higher energy costs.

La Coipa‘s performance was impacted by unprecedented winter weather that disrupted mining and milling activities during the quarter. Improved weather conditions resulted in higher mining rates, improved throughput and the ability to resume ore blending towards the end of Q3. Actions to enhance plant performance and recovery also delivered positive results, positioning the operation for improved performance going forward. Cost of sales per ounce sold was affected by lower production during the quarter.

Fort Knox’s production reflected mill maintenance activities and planned lower grades during the quarter, partially offset by improved mill recoveries. Cost of sales per ounce sold was impacted by lower production and higher reagent and blasting supply costs.

Round Mountain delivered improved production during the quarter, supported by higher mill grades and recoveries, and increased tonnes placed on the heap leach pads. The operation continues to advance initiatives to improve recovery and mining rates, including targeted mill circuit enhancements and increased selective mining. Cost of sales per ounce sold benefited from higher production during the quarter and stockpiling of ore for future use, offset by higher fuel and maintenance costs.

Bald Mountain production benefited from increased tonnes placed on the heap leach pads and the timing of ounces recovered. The operation continued to ramp-up ore delivery from Redbird and achieved an important milestone with the first gold pour from this deposit in early October. Cost of sales per ounce sold continued to improve as a result of higher production.

Development projects

Great Bear

At Great Bear, Kinross continues to progress its AEX program alongside permitting, detailed engineering, and procurement activities for the Main Project. 

AEX surface construction is now substantially complete and all infrastructure required to support the underground development is in place. The North and South underground declines continue to progress, with a combined total of over 500 metres of development completed to date.

For the Main Project, detailed engineering has progressed to over 55% complete to date. Manufacturing activities are underway on several long-lead equipment packages, including the mill motors, transformers, and power plant generators. Contracts for the camp complex and the administration building have been awarded. Construction readiness planning is underway.

The Main Project permitting process is well advanced. The Impact Assessment Agency of Canada (“IAAC”) issued its first round of formal information requests at the end of July, and Kinross’ responses were formally provided to IAAC.

Provincially, the integrated One Project, One Process is progressing well and Kinross’ permit applications continue to advance in accordance with the permitting plan to maintain Kinross’ overall project permitting timeline. Responses have been provided to the technical comments received from the Ministry of the Environment, Conservation and Parks to date, and the provincial technical review is expected to be complete by the end of the year.

Kinross continued to advance negotiations of the Impact Benefits Agreement (“Agreement”) with Wabauskang and Lac Seul First Nations. Following the previously signed Memorandum of Understanding that captures the key economic compensatory and procurement elements, the parties are currently progressing the non-financial aspects of the Agreement.

At Great Bear, drilling in Q3 has focused primarily on near-mine targets, where multiple infill holes have confirmed the down-dip extensions of mineralization at Viggo for an additional 150 metres. This drilling reaffirms the exploration belief that these high-grade chutes remain open at depth below the known resource.

Round Mountain Phase X

At Round Mountain Phase X, underground development continues to advance ahead of schedule, with over 9,600 metres developed to date, approximately 8% ahead of plan. Infill drilling also progressed for the early stoping horizons, indicating higher ounces than expected driven by improved continuity of mineralization on the back of tighter drill spacing. In addition, extensional drilling approximately 300 metres down dip of the current resource intersected 11.7 g/t over 27.5 metres, highlighting the potential for mineralization to continue at depth.

Engineering, procurement and early works for surface and underground infrastructure are progressing well. Operational-readiness activities are also ramping up to support a smooth transition to operations and the planned start of production in 2028.

Curlew

At Curlew, construction of the Tailings Dewatering Plant (“TDP”) and the mill refurbishment progressed substantially. At the TDP, exterior works on tanks and the thickener are largely complete while interior structural steel and mechanical equipment installation is progressing. At the mill, removal of equipment that will not be reutilized continues and the installation of new carbon-in-leach tanks has commenced. At the mine, construction of a new administrative and dry facility is nearing completion and underground development continues to advance ahead of schedule, with over 3,600 metres of horizontal development completed as of September 30, raise collars completed, and raise-boring activities advancing.

Bald Mountain Redbird

First gold was poured from Redbird 1 in early October, while Redbird 2 construction continued to advance on plan, with pre-stripping well underway and earthworks and lining activities for the first phase of the Bald Heap Leach Pad expansion nearing completion. Procurement and engineering activities for the SART plant also progressed substantially, with detailed engineering approximately 30% complete. The Redbird 2 satellite pits are now fully permitted.

Lobo-Marte

At Lobo-Marte, permitting continues to progress well following the acceptance of the project’s Environmental Impact Assessment for review by Chile’s Environmental Assessment Service in the second quarter. Detailed engineering has commenced and execution planning continues to advance, with first production targeted in the early 2030s.

Sustainability

Health and Safety: In September 2026, two unrelated safety incidents occurred at Bald Mountain. As a result, one business partner employee suffered fatal injuries on site, and another was seriously injured. The second business partner employee later passed away in hospital. Kinross extends its deepest condolences to their families, friends and colleagues. Following these incidents, Kinross held company-wide Safety Stand Downs to reinforce safety practices and controls.

Alaska: At Fort Knox, Trout Unlimited and Kinross, together with other partners and supporters, launched the Cripple Creek Restoration Project, the second project under the Alaska Abandoned Mine Restoration Initiative, building on the first restoration project at Resurrection Creek near Anchorage in 2022. The initiative focuses on restoring waterways and fish habitat impacted by historic mining.

The Manh Choh Community Foundation completed its second grant cycle for initiatives across five local communities. Kinross has also supported recovery efforts following the Tok wildfire, including emergency assistance for families whose homes were rendered uninhabitable. 

Mauritania: At Tasiast, new community infrastructure in Benichab, including a modern communal market and meat processing facility, was handed over in August. The infrastructure was delivered through the Tasiast Fund to support sustainable development in the mine’s impact area. Tasiast also made further contributions to community health capacity through its long-term partnership with the Ministry of Health and Project C.U.R.E.

Chile: Kinross Chile received the Award for Commitment to Territories and Education from the Mining Foundation of Chile, recognizing the Company’s contributions over three decades in support of education, training and opportunities for communities in the Atacama region. 

Sustainability ratings: Kinross received a leading score of 70 from the S&P CSA assessment, currently ranking in the 97th percentile, up one point from its 2025 assessment. This assessment represents a comprehensive view of the company’s governance, management, and performance in sustainability.

Conference call details

In connection with this news release, Kinross will hold a conference call and audio webcast on October 29, 2026, at 8:00 a.m. EDT to discuss the results, followed by a question-and-answer session. To access the call, please dial:

Canada & US toll-free – (888) 596-4144; Conference ID: 9425112
Outside of Canada & US – +1 (646) 968-2525; Conference ID: 9425112

Replay (available up to 14 days after the call):

Canada & US toll-free – +1 (800) 770-2030; Conference ID: 9425112 #
Outside of Canada & US – +1 (609) 800-9909; Conference ID: 9425112 #

You may also access the conference call on a listen-only basis via webcast at our website www.kinross.com. The audio webcast will be archived on www.kinross.com.

About Kinross Gold Corporation

Kinross is a Canadian-based global senior gold mining company with operations and projects in the United States, Brazil, Mauritania, Chile and Canada. Our focus is on delivering value based on the core principles of responsible mining, operational excellence, disciplined growth, and balance sheet strength. Kinross maintains listings on the Toronto Stock Exchange (symbol: K) and the New York Stock Exchange (symbol: KGC).

Media Contact
Samantha Sheffield
Senior Director, Corporate Communications
phone: 416-365-3034
Samantha.Sheffield@Kinross.com

Investor Relations Contact
David Shaver 
Executive Vice-President, Investor Relations & Communications
phone: 416-365-2854 
InvestorRelations@Kinross.com

Review of operations

Three months ended September 30, Gold equivalent ounces            
  Produced   Sold   Production cost of sales
($millions)
  Production cost of sales/equivalent ounce sold
  2026   2025     2026   2025     2026   2025     2026 2025
                       
Tasiast 120,232   120,934     110,735   116,251     118.7   103.4     1,072 889
Paracatu 146,428   150,367     142,714   149,903     171.6   139.9     1,202 933
La Coipa 29,203   57,997     31,046   57,544     68.1   69.0     2,194 1,199
                       
Fort Knox 80,118   112,181     80,025   117,500     158.5   159.7     1,981 1,359
Round Mountain 27,068   37,297     25,969   37,274     66.4   78.1     2,557 2,095
Bald Mountain 29,319   41,525     27,168   42,261     43.9   48.5     1,616 1,148
United States Total 136,505   191,003     133,162   197,035     268.8   286.3     2,019 1,453
Less: Manh Choh non-controlling interest (30%) (7,675 ) (16,439 )   (7,412 ) (16,622 )   (17.8 ) (21.3 )      
United States Attributable Total 128,830   174,564     125,750   180,413     251.0   265.0     1,996 1,469
                       
Operations Total 432,368   520,301     417,657   520,733     627.2   598.6     1,502 1,150
                       
Attributable Total 424,693   503,862     410,245   504,111     609.4   577.3     1,485 1,145

Nine months ended September 30, Gold equivalent ounces            
  Produced   Sold   Production cost of sales
($millions)
  Production cost of sales/equivalent ounce sold
  2026   2025     2026   2025     2026   2025     2026 2025
                       
Tasiast 383,557   377,804     374,579   367,489     379.8   311.0     1,014 846
Paracatu 464,537   446,270     458,574   445,545     523.2   422.1     1,141 947
La Coipa 142,453   164,451     139,532   163,814     226.5   203.5     1,623 1,242
                       
Fort Knox 286,990   339,299     283,834   342,810     510.8   432.8     1,800 1,263
Round Mountain 73,057   111,648     72,171   111,098     206.4   187.2     2,860 1,685
Bald Mountain 84,056   140,767     82,130   140,289     145.7   157.1     1,774 1,120
United States Total 444,103   591,714     438,135   594,197     862.9   777.1     1,969 1,308
Less: Manh Choh non-controlling interest (30%) (25,068 ) (51,715 )   (24,480 ) (52,070 )   (57.5 ) (64.5 )      
United States Attributable Total 419,035   539,999     413,655   542,127     805.4   712.6     1,947 1,314
                       
Operations Total 1,434,650   1,580,239     1,410,820   1,571,045     1,992.4   1,713.7     1,412 1,091
                       
Attributable Total 1,409,582   1,528,524     1,386,340   1,518,975     1,934.9   1,649.2     1,396 1,086

Consolidated balance sheets

(unaudited, expressed in millions of U.S. dollars, except share amounts) As at
  September 30, December 31,
    2026     2025  
Assets    
Current assets    
Cash and cash equivalents $ 2,638.4   $ 1,742.3  
Restricted cash   16.9     13.5  
Accounts receivable and prepaid assets   148.2     145.8  
Inventories   1,486.4     1,370.3  
Other current assets   74.4     16.6  
    4,364.3     3,288.5  
Non-current assets    
Property, plant and equipment   8,630.5     8,289.4  
Long-term investments   91.4     99.3  
Other long-term assets   852.2     708.9  
Deferred tax assets   5.1     25.0  
Total assets $ 13,943.5   $ 12,411.1  
     
Liabilities    
Current liabilities    
Accounts payable and accrued liabilities $ 733.5   $ 716.4  
Current income tax payable   691.9     595.7  
Current portion of provisions   77.5     74.2  
Other current liabilities   16.5     13.3  
    1,519.4     1,399.6  
Non-current liabilities    
Long-term debt   739.2     738.2  
Provisions   959.5     976.6  
Other long-term liabilities   57.6     64.8  
Deferred tax liabilities   569.2     537.8  
Total liabilities $ 3,844.9   $ 3,717.0  
     
Equity    
Common shareholders’ equity    
Common share capital $ 4,306.7   $ 4,382.0  
Contributed surplus   9,456.8     10,137.6  
Accumulated deficit   (3,815.7 )   (5,943.3 )
Accumulated other comprehensive income (loss)   23.4     (0.3 )
Total common shareholders’ equity   9,971.2     8,576.0  
Non-controlling interests   127.4     118.1  
Total equity $ 10,098.6   $ 8,694.1  
Total liabilities and equity $ 13,943.5   $ 12,411.1  
     
Common shares    
Authorized Unlimited
  Unlimited  
Issued   1,178,450,917     1,199,843,037  
Outstanding   1,178,038,135     1,199,843,037  

Consolidated statements of operations

(unaudited, expressed in millions of U.S. dollars, except per share amounts) Three months ended Nine months ended
  September 30, September 30, September 30, September 30,
    2026     2025     2026     2025  
         
Revenue        
Metal sales $ 1,774.7   $ 1,802.1   $ 6,420.5   $ 5,028.1  
         
Cost of sales        
Production cost of sales   627.2     598.6     1,992.4     1,713.7  
Depreciation, depletion and amortization   217.1     285.4     768.3     836.7  
Total cost of sales   844.3     884.0     2,760.7     2,550.4  
Gross profit   930.4     918.1     3,659.8     2,477.7  
Other operating expense   32.7     26.1     83.0     71.2  
Exploration and business development   43.0     50.7     120.3     154.7  
General and administrative   33.7     31.2     111.0     96.5  
Operating earnings   821.0     810.1     3,345.5     2,155.3  
Other (expense) income – net   (9.0 )   16.8     (26.2 )   (16.2 )
Finance income   25.5     45.2     60.7     56.8  
Finance expense   (19.2 )   (30.7 )   (58.5 )   (98.8 )
Earnings before tax   818.3     841.4     3,321.5     2,097.1  
Income tax expense – net   (228.9 )   (232.3 )   (1,024.3 )   (540.0 )
Net earnings $ 589.4   $ 609.1   $ 2,297.2   $ 1,557.1  
Net earnings attributable to:        
Non-controlling interests   6.2     24.2     26.8     73.5  
Common shareholders $ 583.2   $ 584.9   $ 2,270.4   $ 1,483.6  
Earnings per share attributable to common shareholders        
Basic $ 0.49   $ 0.48   $ 1.91   $ 1.21  
Diluted $ 0.49   $ 0.48   $ 1.90   $ 1.21  

Consolidated statements of cash flows

(unaudited, expressed in millions of U.S. dollars) Three months ended Nine months ended
  September 30, September 30, September 30, September 30,
    2026     2025     2026     2025  
Net inflow (outflow) of cash related to the following activities:        
Operating:        
Net earnings $ 589.4   $ 609.1   $ 2,297.2   $ 1,557.1  
Adjustments to reconcile net earnings to net cash provided from operating activities:        
Depreciation, depletion and amortization   217.1     285.4     768.3     836.7  
Share-based compensation expense   3.9     3.4     13.9     11.2  
Finance expense – net   (6.3 )   17.3     (2.2 )   73.8  
Income tax expense – net   228.9     232.3     1,024.3     540.0  
Gain on sale of Asante Gold Corporation holdings   –     (63.0 )   –     (63.0 )
Foreign exchange (gains) losses   (2.5 )   5.5     6.2     16.8  
Reclamation payments   (20.4 )   (8.8 )   (49.4 )   (21.9 )
Other   (16.3 )   (21.9 )   (13.4 )   (33.7 )
Changes in working capital:        
Accounts receivable and other assets   (34.1 )   (34.5 )   (25.4 )   (8.7 )
Inventories   (55.0 )   (19.9 )   (52.9 )   (49.4 )
Accounts payable and accrued liabilities   (39.2 )   76.5     (40.2 )   110.3  
Cash flow provided from operating activities   865.5     1,081.4     3,926.4     2,969.2  
Income taxes paid   (151.1 )   (57.3 )   (926.6 )   (345.6 )
Net cash flow provided from operating activities   714.4     1,024.1     2,999.8     2,623.6  
Investing:        
Additions to property, plant and equipment   (439.6 )   (312.2 )   (1,133.8 )   (826.0 )
Interest paid capitalized to property, plant and equipment   (14.7 )   (4.5 )   (21.8 )   (18.0 )
Proceeds from long-term investments and other assets   47.7     94.3     75.3     94.3  
Additions to long-term investments and other assets   (84.8 )   (12.5 )   (129.3 )   (36.4 )
Increase in restricted cash   (1.0 )   (1.5 )   (3.4 )   (4.0 )
Interest received and other   25.7     11.1     60.2     24.3  
Net cash flow used in investing activities   (466.7 )   (225.3 )   (1,152.8 )   (765.8 )
Net cash flow of discontinued operations provided from investing activities   –     53.4     –     53.4  
Financing:        
Repayment of debt   –     –     –     (200.0 )
Interest paid   (9.5 )   (31.0 )   (26.7 )   (55.0 )
Payment of lease liabilities   (2.1 )   (2.0 )   (6.3 )   (5.0 )
Distributions paid to non-controlling interest   –     (33.0 )   (18.0 )   (87.0 )
Dividends paid to common shareholders   (47.3 )   (36.4 )   (142.8 )   (110.0 )
Payments for employee taxes withheld from restricted share unit releases   (0.1 )   –     (55.7 )   (10.0 )
Repurchase and cancellation of shares   (210.1 )   (165.1 )   (690.2 )   (335.2 )
Taxes paid on repurchase of shares   –     –     (12.1 )   –  
Net cash flow used in financing activities   (269.1 )   (267.5 )   (951.8 )   (802.2 )
Effect of exchange rate changes on cash and cash equivalents   3.4     0.5     0.9     1.2  
(Decrease) increase in cash and cash equivalents   (18.0 )   585.2     896.1     1,110.2  
Cash and cash equivalents, beginning of period   2,656.4     1,136.5     1,742.3     611.5  
Cash and cash equivalents, end of period $ 2,638.4   $ 1,721.7   $ 2,638.4   $ 1,721.7  

  Operating Summary
  Mine Period Tonnes Ore Mined Ore Processed (Milled) Ore Processed (Heap Leach) Grade (Mill) Grade (Heap Leach) Recovery
(a)(b)
Gold Eq Production
(c)
Gold Eq Sales(c) Production cost of sales Production cost of
sales/oz(d)
Cap Ex – sustaining
(e)
Total Cap Ex
(e)
      (‘000 tonnes) (‘000 tonnes) (‘000 tonnes) (g/t) (g/t) (%) (ounces) (ounces) ($ millions) ($/ounce) ($ millions) ($ millions)
West Africa Tasiast Q3 2026 3,694 2,316 – 1.72 – 92 % 120,232 110,735 $ 118.7 $ 1,072 $ 16.9 $ 89.1
Q2 2026 3,172 2,208 – 1.82 – 94 % 133,311 132,165 $ 130.8 $ 990 $ 46.6 $ 96.3
Q1 2026 3,495 2,092 – 2.30 – 94 % 130,014 131,679 $ 130.3 $ 990 $ 10.8 $ 60.0
Q4 2025 3,120 2,252 – 1.87 – 94 % 125,625 118,912 $ 119.2 $ 1,002 $ 28.6 $ 80.5
Q3 2025 1,685 2,181 – 1.78 – 94 % 120,934 116,251 $ 103.4 $ 889 $ 47.6 $ 102.0
Americas Paracatu Q3 2026 14,502 13,363 – 0.40 – 83 % 146,428 142,714 $ 171.6 $ 1,202 $ 57.6 $ 74.1
Q2 2026 11,332 13,216 – 0.43 – 84 % 157,526 157,011 $ 173.9 $ 1,108 $ 51.4 $ 64.2
Q1 2026 10,272 12,507 – 0.41 – 85 % 160,583 158,849 $ 177.7 $ 1,119 $ 22.2 $ 25.8
Q4 2025 10,929 12,395 – 0.45 – 83 % 155,048 154,565 $ 165.0 $ 1,068 $ 67.6 $ 67.6
Q3 2025 12,958 13,214 – 0.44 – 82 % 150,367 149,903 $ 139.9 $ 933 $ 58.2 $ 58.2
La Coipa(f) Q3 2026 1,114 691 – 1.95 – 62 % 29,203 31,046 $ 68.1 $ 2,194 $ 7.0 $ 15.3
Q2 2026 988 1,151 – 2.07 – 60 % 59,039 54,749 $ 76.4 $ 1,395 $ 17.9 $ 22.8
Q1 2026 580 972 – 1.64 – 74 % 54,211 53,737 $ 82.0 $ 1,526 $ 19.9 $ 21.7
Q4 2025 1,219 1,203 – 2.42 – 74 % 67,319 71,419 $ 80.7 $ 1,130 $ 31.7 $ 31.7
Q3 2025 1,006 932 – 2.36 – 76 % 57,997 57,544 $ 69.0 $ 1,199 $ 18.5 $ 18.5
Fort Knox
(100%)(g)
Q3 2026 6,285 1,414 5,465 1.22 0.22 84 % 80,118 80,025 $ 158.5 $ 1,981 $ 21.0 $ 26.0
Q2 2026 5,681 1,866 3,965 1.51 0.27 82 % 104,500 107,591 $ 177.5 $ 1,650 $ 37.3 $ 40.0
Q1 2026 9,523 1,154 7,314 1.45 0.28 86 % 102,372 96,218 $ 174.8 $ 1,817 $ 24.1 $ 24.1
Q4 2025 11,056 1,645 8,805 1.02 0.23 88 % 71,523 74,294 $ 125.8 $ 1,693 $ 38.0 $ 38.0
Q3 2025 8,140 1,511 6,538 1.86 0.23 90 % 112,181 117,500 $ 159.7 $ 1,359 $ 45.0 $ 45.0
Fort Knox
(attributable)(g)
Q3 2026 6,202 1,358 5,465 1.07 0.22 84 % 72,443 72,613 $ 140.7 $ 1,938 $ 20.9 $ 25.9
Q2 2026 5,610 1,796 3,965 1.37 0.27 82 % 95,485 98,796 $ 157.7 $ 1,596 $ 32.5 $ 35.2
Q1 2026 9,463 1,103 7,314 1.31 0.28 85 % 93,994 87,945 $ 154.9 $ 1,761 $ 19.8 $ 19.8
Q4 2025 11,001 1,597 8,805 0.93 0.23 87 % 65,434 67,882 $ 113.6 $ 1,673 $ 31.5 $ 31.5
Q3 2025 8,056 1,425 6,538 1.55 0.23 89 % 95,742 100,878 $ 138.4 $ 1,372 $ 40.4 $ 40.4
Round Mountain Q3 2026 2,541 884 3,772 0.73 0.19 60 % 27,068 25,969 $ 66.4 $ 2,557 $ 10.7 $ 44.0
Q2 2026 2,389 951 878 0.39 0.29 44 % 19,789 20,118 $ 67.6 $ 3,360 $ 6.9 $ 49.1
Q1 2026 790 953 513 0.37 0.21 52 % 26,200 26,084 $ 72.4 $ 2,776 $ 4.9 $ 53.9
Q4 2025 737 966 1,110 0.49 0.29 67 % 31,754 31,641 $ 86.6 $ 2,737 $ 8.6 $ 41.5
Q3 2025 1,659 914 1,113 0.66 0.32 72 % 37,297 37,274 $ 78.1 $ 2,095 $ 4.5 $ 33.0
Bald Mountain Q3 2026 6,347 – 6,347 – 0.29 nm 29,319 27,168 $ 43.9 $ 1,616 $ 5.6 $ 77.5
Q2 2026 6,046 – 6,046 – 0.30 nm 27,176 27,401 $ 48.5 $ 1,770 $ 4.0 $ 54.0
Q1 2026 3,985 – 3,985 – 0.30 nm 27,561 27,561 $ 53.3 $ 1,934 $ 6.9 $ 39.7
Q4 2025 3,165 – 3,165 – 0.30 nm 38,402 37,141 $ 55.4 $ 1,492 $ 13.1 $ 51.6
Q3 2025 2,182 – 2,182 – 0.31 nm 41,525 42,261 $ 48.5 $ 1,148 $ 5.3 $ 27.9

(a)   Due to the nature of heap leach operations, recovery rates at Bald Mountain cannot be accurately measured on a quarterly basis. Recovery rates at Fort Knox and Round Mountain represent mill recovery only.
(b)  “nm” means not meaningful.
(c)  Gold equivalent ounces include silver ounces produced and sold converted to a gold equivalent based on the ratio of the average spot market prices for the commodities for each period. The ratios for the quarters presented are as follows: Q3 2026: 68.10:1; Q2 2026: 61.61:1; Q1 2026: 57.79:1; Q4 2025: 76.34:1; Q3 2025: 87.73:1.
(d)  “Production cost of sales per equivalent ounce sold” is defined as production cost of sales divided by total gold equivalent ounces sold.
(e)  “Total Cap Ex” is “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows. “Cap Ex – sustaining” is a non-GAAP financial measure. The definition and reconciliation of this non-GAAP financial measure is included on pages 21 to 21 of this news release.
(f)   La Coipa silver grade and recovery were as follows: Q3 2026: 29.34 g/t, 39%; Q2 2026: 44.14 g/t, 33%; Q1 2026: 35.03 g/t, 39%; Q4 2025: 33.21 g/t, 41%; Q3 2025: 41.34 g/t, 49%.
(g)  The Fort Knox segment is composed of Fort Knox and Manh Choh. Manh Choh tonnes of ore processed and grade were as follows: Q3 2026: 184,810 tonnes, 4.99 g/t; Q2 2026: 229,965 tonnes, 4.98 g/t; Q1 2026: 170,077 tonnes, 4.51 g/t; Q4 2025: 158,016 tonnes, 4.08 g/t; Q3 2025: 286,496 tonnes, 7.05 g/t. The attributable results for Fort Knox include 100% of Fort Knox and 70% of Manh Choh.

Reconciliation of non-GAAP financial measures and ratios

The Company has included certain non-GAAP financial measures and ratios in this document. These financial measures and ratios are not defined under IFRS and should not be considered in isolation. The Company believes that these financial measures and ratios, together with financial measures and ratios determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. The inclusion of these financial measures and ratios is meant to provide additional information and should not be used as a substitute for performance measures prepared in accordance with IFRS. These financial measures and ratios are not necessarily standard and therefore may not be comparable to other issuers.

Adjusted Net Earnings and Adjusted Net Earnings per Share

Adjusted net earnings and adjusted net earnings per share are non-GAAP financial measures and ratios which determine the performance of the Company, excluding certain impacts which the Company believes are not reflective of the Company’s underlying performance for the reporting period, such as the impact of foreign exchange gains and losses, reassessment of prior year taxes and/or taxes otherwise not related to the current period, impairment charges (reversals), gains and losses and other one-time costs related to acquisitions, dispositions and other transactions, and non-hedge derivative gains and losses. Although some of the items are recurring, the Company believes that they are not reflective of the underlying operating performance of its current business and are not necessarily indicative of future operating results. Management believes that these measures and ratios, which are used internally to assess performance and in planning and forecasting future operating results, provide investors with the ability to better evaluate underlying performance, particularly since the excluded items are typically not included in public guidance. However, adjusted net earnings and adjusted net earnings per share measures and ratios are not necessarily indicative of net earnings and earnings per share measures and ratios as determined under IFRS.

The following table provides a reconciliation of net earnings to adjusted net earnings for the periods presented:

(expressed in millions of U.S. dollars, except per share amounts) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Net earnings attributable to common shareholders – as reported $ 583.2   $ 584.9   $ 2,270.4   $ 1,483.6  
Adjusting items:        
Foreign exchange losses   1.5     9.8     5.7     28.6  
Foreign exchange gains on translation of tax basis and foreign exchange on deferred income taxes within income tax expense   (3.4 )   (15.6 )   (13.5 )   (36.6 )
Taxes in respect of prior periods   3.9     3.3     9.0     (1.3 )
Costs in connection with conveyor belt repairs   4.9     –     25.0     –  
Gain on sale of Asante holdings(a)   –     (53.0 )   –     (53.0 )
Tasiast mill fire related costs   –     –     –     13.0  
Other   3.1     0.9     2.9     4.3  
Tax effects of the above adjustments   (1.9 )   (0.7 )   (6.3 )   (4.0 )
    8.1     (55.3 )   22.8     (49.0 )
Adjusted net earnings $ 591.3   $ 529.6   $ 2,293.2   $ 1,434.6  
Weighted average number of common shares outstanding – Basic   1,183.9     1,215.3     1,191.6     1,223.8  
Adjusted net earnings per share $ 0.50   $ 0.44   $ 1.92   $ 1.17  
Basic earnings per share attributable to common shareholders – as reported $ 0.49   $ 0.48   $ 1.91   $ 1.21  

(a)   The gain on sale of Asante holdings includes interest income of $21.8 million related to periods prior to 2025.

Attributable Free Cash Flow and Attributable Adjusted Free Cash Flow

Attributable free cash flow and attributable adjusted free cash flow are non-GAAP financial measures. Attributable free cash flow is defined as net cash flow provided from operating activities less attributable capital expenditures and non-controlling interest included in net cash flows provided from operating activities. Attributable adjusted free cash flow is defined as attributable free cash flow, excluding attributable changes in working capital given that numerous factors can result in it being volatile. The Company believes that these measures, which are used internally to evaluate the Company’s underlying cash generation performance and the ability to repay creditors and return cash to shareholders, provide investors with the ability to better evaluate the Company’s underlying performance. However, these measures are not necessarily indicative of operating earnings or net cash flow provided from operating activities as determined under IFRS.

The following table provides a reconciliation of attributable free cash flow and attributable adjusted free cash flow for the periods presented:

(expressed in millions of U.S. dollars) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Net cash flow provided from operating activities – as reported $ 714.4   $ 1,024.1   $ 2,999.8   $ 2,623.6  
Adjusting items:        
Attributable(a) capital expenditures   (439.5 )   (307.6 )   (1,124.6 )   (813.5 )
Non-controlling interest(b) cash flow used in (from) operating activities   6.4     (29.8 )   (29.6 )   (96.0 )
Attributable(a) free cash flow   281.3     686.7     1,845.6     1,714.1  
Adjusting items:        
Attributable(a) working capital changes:        
Accounts receivable and other assets   25.5     27.1     11.0     (0.5 )
Inventories   45.6     19.1     44.1     49.8  
Accounts payable and accrued liabilities   39.0     (75.0 )   46.8     (107.7 )
Attributable(a) adjusted free cash flow   391.4     657.9     1,947.5     1,655.7  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Adjusted Operating Cash Flow

Attributable adjusted operating cash flow is a non-GAAP financial measure and is defined as net cash flow provided from operating activities excluding changes in working capital, certain impacts which the Company believes are not reflective of the Company’s regular operating cash flow, and net cash flows provided from operating activities, net of working capital changes, relating to non-controlling interests. Working capital is excluded given that numerous factors can result in it being volatile. The Company uses attributable adjusted operating cash flow internally as a measure of the underlying operating cash flow performance and future operating cash flow-generating capability of the Company. However, the attributable adjusted operating cash flow measure is not necessarily indicative of net cash flow provided from operating activities as determined under IFRS.

The following table provides a reconciliation of attributable adjusted operating cash flow for the periods presented:

(expressed in millions of U.S. dollars) Three months ended
September 30,
Nine months ended
September 30,
    2026   2025(m)   2026   2025(m)
         
Net cash flow provided from operating activities – as reported $ 714.4   $ 1,024.1   $ 2,999.8   $ 2,623.6  
Adjusting items:        
Working capital changes:        
Accounts receivable and other assets   34.1     34.5     25.4     8.7  
Inventories   55.0     19.9     52.9     49.4  
Accounts payable and accrued liabilities   39.2     (76.5 )   40.2     (110.3 )
    842.7     1,002.0     3,118.3     2,571.4  
Non-controlling interest(b) cash flow from operating activities, net of working capital changes   (11.8 )   (36.5 )   (46.2 )   (102.2 )
Attributable(a) adjusted operating cash flow $ 830.9   $ 965.5   $ 3,072.1   $ 2,469.2  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Average Realized Gold Price per Ounce

Attributable average realized gold price per ounce is a non-GAAP ratio which calculates the average price realized from gold sales attributable to the Company. The Company believes that this measure provides a more accurate measure with which to compare the Company’s gold sales performance to market gold prices. The following table provides a reconciliation of attributable average realized gold price per ounce for the periods presented:

(in millions of U.S. dollars, except ounces and average realized gold price per ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Metal sales – as reported $ 1,774.7   $ 1,802.1   $ 6,420.5   $ 5,028.1  
Less: silver revenue(c)   (22.7 )   (32.3 )   (136.4 )   (77.4 )
Less: non-controlling interest(b) gold revenue   (31.3 )   (57.8 )   (107.0 )   (165.9 )
Attributable(a)gold revenue $ 1,720.7   $ 1,712.0   $ 6,177.1   $ 4,784.8  
         
Gold ounces sold   412,363     511,564     1,381,342     1,547,223  
Less: non-controlling interest(b) gold ounces sold   (7,333 )   (16,428 )   (23,974 )   (51,575 )
Attributable(a) gold ounces sold   405,030     495,136     1,357,368     1,495,648  
Attributable(a) average realized gold price per ounce $ 4,248   $ 3,458   $ 4,551   $ 3,199  
Average realized gold price per ounce(d) $ 4,249   $ 3,460   $ 4,549   $ 3,200  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Production Cost of Sales per Equivalent Ounce Sold

Production cost of sales per equivalent ounce sold is defined as production cost of sales, as reported on the consolidated statement of operations, divided by the total number of gold equivalent ounces sold. This measure converts the Company’s non-gold production into gold equivalent ounces and credits it to total production.

Attributable production cost of sales per equivalent ounce sold is a non-GAAP ratio and is defined as attributable production cost of sales divided by the attributable number of gold equivalent ounces sold. This measure converts the Company’s attributable non-gold production into gold equivalent ounces and credits it to total attributable production. Management uses this measure to monitor and evaluate the performance of its operating properties that are attributable to its shareholders.

The following table provides a reconciliation of production cost of sales and attributable production cost of sales per equivalent ounce sold for the periods presented:

(expressed in millions of U.S. dollars, except ounces and production cost of sales per equivalent ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Attributable(a) production cost of sales $ 609.4   $ 577.3   $ 1,934.9   $ 1,649.2  
         
Gold equivalent ounces sold   417,657     520,733     1,410,820     1,571,045  
Less: non-controlling interest(b) gold equivalent ounces sold   (7,412 )   (16,622 )   (24,480 )   (52,070 )
Attributable(a) gold equivalent ounces sold   410,245     504,111     1,386,340     1,518,975  
Attributable(a) production cost of sales per equivalent ounce sold $ 1,485   $ 1,145   $ 1,396   $ 1,086  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Production Cost of Sales per Ounce Sold on a By-Product Basis

Attributable production cost of sales per ounce sold on a by-product basis is a non-GAAP ratio which calculates the Company’s non-gold production as a credit against its per ounce production costs, rather than converting its non-gold production into gold equivalent ounces and crediting it to total production, as is the case in co-product accounting. Management believes that this ratio provides investors with the ability to better evaluate Kinross’ production cost of sales per ounce on a comparable basis with other major gold producers who routinely calculate their cost of sales per ounce using by-product accounting rather than co-product accounting.

The following table provides a reconciliation of attributable production cost of sales per ounce sold on a by-product basis for the periods presented:

(expressed in millions of U.S. dollars, except ounces and production cost of sales per ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Less: attributable(a) impact of silver by-product(n)   (22.4 )   (31.7 )   (134.1 )   (75.8 )
Attributable(a) production cost of sales on a by-product basis $ 587.0   $ 545.6   $ 1,800.8   $ 1,573.4  
         
Gold ounces sold   412,363     511,564     1,381,342     1,547,223  
Less: non-controlling interest(b) gold ounces sold   (7,333 )   (16,428 )   (23,974 )   (51,575 )
Attributable(a) gold ounces sold   405,030     495,136     1,357,368     1,495,648  
Attributable(a) production cost of sales per ounce sold on a by-product basis $ 1,449   $ 1,102   $ 1,327   $ 1,052  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable All-In Sustaining Cost and All-In Cost per Ounce Sold on a By-Product Basis

Attributable all-in sustaining cost and all-in cost per ounce sold on a by-product basis are non-GAAP financial measures and ratios, as applicable, calculated based on guidance published by the World Gold Council (“WGC”). The WGC is a market development organization for the gold industry and is an association whose membership comprises leading gold mining companies including Kinross. Although the WGC is not a mining industry regulatory organization, it worked closely with its member companies to develop these metrics. Adoption of the all-in sustaining cost and all-in cost metrics is voluntary and not necessarily standard, and therefore, these measures and ratios presented by the Company may not be comparable to similar measures and ratios presented by other issuers. The Company believes that the all-in sustaining cost and all-in cost measures complement existing measures and ratios reported by Kinross.

All-in sustaining cost includes both operating and capital costs required to sustain gold production on an ongoing basis. The value of silver sold is deducted from the total production cost of sales as it is considered residual production, i.e. a by-product. Sustaining operating costs represent expenditures incurred at current operations that are considered necessary to maintain current production. Sustaining capital represents capital expenditures at existing operations comprising mine development costs, including capitalized development, and ongoing replacement of mine equipment and other capital facilities, and does not include capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements at existing operations.

All-in cost is comprised of all-in sustaining cost as well as operating expenditures incurred at locations with no current operation, or costs related to other non-sustaining activities, and capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements at existing operations.

Attributable all-in sustaining cost and all-in cost per ounce sold on a by-product basis are calculated by adjusting production cost of sales, as reported on the interim condensed consolidated statements of operations, as follows:

(in millions of U.S. dollars, except ounces and costs per ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Less: attributable(a) impact of silver by-product(n)   (22.4 )   (31.7 )   (134.1 )   (75.8 )
Attributable(a) production cost of sales on a by-product basis $ 587.0   $ 545.6   $ 1,800.8   $ 1,573.4  
Adjusting items on an attributable(a) basis:        
General and administrative(f)   33.7     31.2     111.0     96.5  
Other operating expense – sustaining(g)   1.2     0.4     6.2     1.5  
Reclamation and remediation – sustaining(h)   21.7     21.7     68.3     66.4  
Exploration and business development – sustaining(i)   12.1     10.7     43.9     38.5  
Additions to property, plant and equipment – sustaining(j)   118.8     174.7     363.1     406.6  
Lease payments – sustaining(k)   1.8     1.8     5.6     4.4  
All-in Sustaining Cost on a by-product basis – attributable(a) $ 776.3   $ 786.1   $ 2,398.9   $ 2,187.3  
Adjusting items on an attributable(a) basis:        
Other operating expense – non-sustaining(g)   22.4     24.2     44.8     59.5  
Reclamation and remediation – non-sustaining(h)   2.0     2.3     5.9     6.9  
Exploration and business development – non-sustaining(i)   30.1     38.9     75.0     113.8  
Additions to property, plant and equipment – non-sustaining(j)   320.7     132.9     761.5     406.9  
Lease payments – non-sustaining(k)   0.3     0.2     0.7     0.6  
All-in Cost on a by-product basis – attributable(a) $ 1,151.8   $ 984.6   $ 3,286.8   $ 2,775.0  
         
Gold ounces sold   412,363     511,564     1,381,342     1,547,223  
Less: non-controlling interest(b) gold ounces sold   (7,333 )   (16,428 )   (23,974 )   (51,575 )
Attributable(a) gold ounces sold   405,030     495,136     1,357,368     1,495,648  
Attributable(a) all-in sustaining cost per ounce sold on a by-product basis $ 1,917   $ 1,588   $ 1,767   $ 1,462  
Attributable(a) all-in cost per ounce sold on a by-product basis $ 2,844   $ 1,989   $ 2,421   $ 1,855  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable All-In Sustaining Cost and All-In Cost per Equivalent Ounce Sold

The Company also assesses its attributable all-in sustaining cost and all-in cost on a gold equivalent ounce basis. Under these non-GAAP financial measures and ratios, the Company’s production of silver is converted into gold equivalent ounces and credited to total production.

Attributable all-in sustaining cost and all-in cost per equivalent ounce sold are calculated by adjusting production cost of sales, as reported on the interim condensed consolidated statements of operations, as follows:

(in millions of U.S. dollars, except ounces and cost per equivalent ounce) Three months ended
September 30,
Nine months ended
September 30,
  2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Attributable(a) production cost of sales $ 609.4   $ 577.3   $ 1,934.9   $ 1,649.2  
Adjusting items on an attributable(a) basis:        
General and administrative(f)   33.7     31.2     111.0     96.5  
Other operating expense – sustaining(g)   1.2     0.4     6.2     1.5  
Reclamation and remediation – sustaining(h)   21.7     21.7     68.3     66.4  
Exploration and business development – sustaining(i)   12.1     10.7     43.9     38.5  
Additions to property, plant and equipment – sustaining(j)   118.8     174.7     363.1     406.6  
Lease payments – sustaining(k)   1.8     1.8     5.6     4.4  
All-in Sustaining Cost – attributable(a) $ 798.7   $ 817.8   $ 2,533.0   $ 2,263.1  
Adjusting items on an attributable(a) basis:        
Other operating expense – non-sustaining(g)   22.4     24.2     44.8     59.5  
Reclamation and remediation – non-sustaining(h)   2.0     2.3     5.9     6.9  
Exploration and business development – non-sustaining(i)   30.1     38.9     75.0     113.8  
Additions to property, plant and equipment – non-sustaining(j)   320.7     132.9     761.5     406.9  
Lease payments – non-sustaining(k)   0.3     0.2     0.7     0.6  
All-in Cost – attributable(a) $ 1,174.2   $ 1,016.3   $ 3,420.9   $ 2,850.8  
         
Gold equivalent ounces sold   417,657     520,733     1,410,820     1,571,045  
Less: non-controlling interest(b) gold equivalent ounces sold   (7,412 )   (16,622 )   (24,480 )   (52,070 )
Attributable(a) gold equivalent ounces sold   410,245     504,111     1,386,340     1,518,975  
Attributable(a) all-in sustaining cost per equivalent ounce sold $ 1,947   $ 1,622   $ 1,827   $ 1,490  
Attributable(a) all-in cost per equivalent ounce sold $ 2,862   $ 2,016   $ 2,468   $ 1,877  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Capital Expenditures and Attributable Capital Expenditures

Capital expenditures are classified as either sustaining capital expenditures or non-sustaining capital expenditures, depending on the nature of the expenditure. Sustaining capital expenditures typically represent capital expenditures at existing operations including capitalized exploration costs and capitalized development unless related to major projects, ongoing replacement of mine equipment and other capital facilities and other capital expenditures and is calculated as total additions to property, plant and equipment (as reported on the interim condensed consolidated statements of cash flows), less non-sustaining capital expenditures. Non-sustaining capital expenditures represent capital expenditures for major projects, including major capital development projects at existing operations that are expected to materially benefit the operation, as well as enhancement capital for significant infrastructure improvements at existing operations. Management believes the distinction between sustaining capital expenditures and non-sustaining expenditures is a useful indicator of the purpose of capital expenditures and this distinction is an input into the calculation of attributable all-in sustaining costs per ounce and attributable all-in costs per ounce. The categorization of sustaining capital expenditures and non-sustaining capital expenditures is consistent with the definitions under the WGC all-in cost standard. Sustaining capital expenditures and non-sustaining capital expenditures are not defined under IFRS, however, the sum of these two measures total to additions to property, plant and equipment as disclosed under IFRS on the interim condensed consolidated statements of cash flows.

Additions to property, plant and equipment per the interim condensed consolidated statements of cash flows includes 100% of capital expenditures for Manh Choh. Attributable capital expenditures is a non-GAAP financial measure and includes Kinross’ 70% share of capital expenditures for Manh Choh. Management believes this to be a useful indicator of Kinross’ cash resources utilized for capital expenditures.

The following table provides a reconciliation of the classification of capital expenditures for the periods presented:

(expressed in millions of U.S. dollars) Tasiast
(Mauritania)
Paracatu
(Brazil)
La Coipa
(Chile)
Fort Knox(l)
(USA)
Round Mountain
(USA)
Bald Mountain
(USA)
Total
USA
Other(o) Total
Three months ended September 30, 2026
Sustaining capital expenditures $ 16.9 $ 57.6 $ 7.0 $ 21.0   $ 10.7 $ 5.6 $ 37.3   $ 0.1 $ 118.9  
Non-sustaining capital expenditures   72.2   16.5   8.3   5.0     33.3   71.9   110.2     113.5   320.7  
Additions to property, plant and equipment – per cash flow $ 89.1 $ 74.1 $ 15.3 $ 26.0   $ 44.0 $ 77.5 $ 147.5   $ 113.6 $ 439.6  
Less: Non-controlling interest(b)   –   –   –   (0.1 )   –   –   (0.1 )   –   (0.1 )
Attributable(a) capital expenditures $ 89.1 $ 74.1 $ 15.3 $ 25.9   $ 44.0 $ 77.5 $ 147.4   $ 113.6 $ 439.5  
Three months ended September 30, 2025                  
Sustaining capital expenditures $ 47.6 $ 58.2 $ 18.5 $ 45.0   $ 4.5 $ 5.3 $ 54.8   $ 0.2 $ 179.3  
Non-sustaining capital expenditures   54.4   –   –   –     28.5   22.6   51.1     27.4   132.9  
Additions to property, plant and equipment – per cash flow $ 102.0 $ 58.2 $ 18.5 $ 45.0   $ 33.0 $ 27.9 $ 105.9   $ 27.6 $ 312.2  
Less: Non-controlling interest(b)   –   –   –   (4.6 )   –   –   (4.6 )   –   (4.6 )
Attributable(a)capital expenditures $ 102.0 $ 58.2 $ 18.5 $ 40.4   $ 33.0 $ 27.9 $ 101.3   $ 27.6 $ 307.6  

(expressed in millions of U.S. dollars) Tasiast
(Mauritania)
Paracatu
(Brazil)
La Coipa
(Chile)
Fort Knox(l)
(USA)
Round Mountain
(USA)
Bald Mountain
(USA)
Total
USA
Other(o) Total
Nine months ended September 30, 2026
Sustaining capital expenditures $           74.3 $     131.2 $      44.8 $      82.4   $       22.5 $        16.5 $   121.4   $       0.6 $   372.3  
Non-sustaining capital expenditures             171.1          32.9          15.0           7.7           124.5          154.7       286.9         255.6       761.5  
Additions to property, plant and equipment – per cash flow $         245.4 $     164.1 $      59.8 $      90.1   $     147.0 $      171.2 $   408.3   $   256.2 $ 1,133.8  
Less: Non-controlling interest(b)                   –               –              –          (9.2 )               –                –         (9.2 )             –         (9.2 )
Attributable(a) capital expenditures $         245.4 $     164.1 $      59.8 $      80.9   $     147.0 $      171.2 $   399.1   $   256.2 $ 1,124.6  
Nine months ended September 30, 2025                  
Sustaining capital expenditures $           84.4 $     121.0 $      59.1 $    116.2   $       13.0 $        24.9 $   154.1   $       0.5 $   419.1  
Non-sustaining capital expenditures             187.4               –              –              –             82.4           61.2       143.6           75.9       406.9  
Additions to property, plant and equipment – per cash flow $         271.8 $     121.0 $      59.1 $    116.2   $       95.4 $        86.1 $   297.7   $     76.4 $   826.0  
Less: Non-controlling interest(b)                   –               –              –        (12.5 )               –                –       (12.5 )             –       (12.5 )
Attributable(a) capital expenditures $         271.8 $     121.0 $      59.1 $    103.7   $       95.4 $        86.1 $   285.2   $     76.4 $   813.5  

See pages 22 and 22 for details of the footnotes referenced within the tables above.

Endnotes

(a)    “Attributable” measures and ratios include Kinross’ share of Manh Choh (70%) sales, costs, cash flows and capital expenditures.
(b)    “Non-controlling interest” represents the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100% for cash flow from operating activities, costs, sales and capital expenditures, as appropriate.
(c)    “Silver revenue” represents the portion of metal sales realized from the production of secondary or by-product metal (i.e. silver), which is produced as a by-product of the process used to produce gold.
(d)    “Average realized gold price per ounce” is defined as gold revenue divided by total gold ounces sold.
(e)    “Production cost of sales per equivalent ounce sold” is defined as production cost of sales divided by total gold equivalent ounces sold.
(f)     “General and administrative” expenses are as reported on the interim condensed consolidated statements of operations, excluding certain impacts which the Company believes are not reflective of the Company’s underlying performance for the reporting period. General and administrative expenses are considered sustaining costs as they are required to be absorbed on a continuing basis for the effective operation and governance of the Company.
(g)    “Other operating expense – sustaining” is calculated as “Other operating expense” as reported on the interim condensed consolidated statements of operations, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100% and other operating and reclamation and remediation expenses related to non-sustaining activities as well as other items not reflective of the underlying operating performance of the Company. Other operating expenses are classified as either sustaining or non-sustaining based on the type and location of the expenditure incurred. The majority of other operating expenses that are incurred at existing operations are considered costs necessary to sustain operations, and are therefore, classified as sustaining. Other operating expenses incurred at locations where there is no current operation or related to other non-sustaining activities are classified as non-sustaining.
(h)    “Reclamation and remediation – sustaining” is calculated as current period accretion related to reclamation and remediation obligations plus current period amortization of the corresponding reclamation and remediation assets, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100%, and is intended to reflect the periodic cost of reclamation and remediation for currently operating mines. Reclamation and remediation costs for development projects or closed mines are excluded from this amount and classified as non-sustaining.
(i)     “Exploration and business development – sustaining” is calculated as “Exploration and business development” expenses as reported on the interim condensed consolidated statements of operations, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100% and non-sustaining exploration and business development expenses. Exploration expenses are classified as either sustaining or non-sustaining based on a determination of the type and location of the exploration expenditure. Exploration expenditures within the footprint of operating mines are considered costs required to sustain current operations and are therefore included in sustaining costs. Exploration expenditures focused on new ore bodies near existing mines (i.e. brownfield), new exploration projects (i.e. greenfield) or for other generative exploration activity not linked to existing mining operations are classified as non-sustaining. Business development expenses are classified as either sustaining or non-sustaining based on a determination of the type of expense and requirement for general or growth-related operations.
(j)     “Additions to property, plant and equipment – sustaining” and “non-sustaining” are as presented on pages 21 and 21 of this news release and include Kinross’ share of Manh Choh’s (70%) sustaining and non-sustaining capital expenditures.
(k)    “Lease payments – sustaining” represents the majority of lease payments as reported on the interim condensed consolidated statements of cash flows and is made up of the principal and financing components of such cash payments, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100%, and non-sustaining lease payments. Lease payments for development projects or closed mines are classified as non-sustaining.
(l)     The Fort Knox segment is composed of Fort Knox and Manh Choh for all periods presented.
(m)   Attributable adjusted operating cash flow for the three and nine months ended September 30, 2025 has been presented in accordance with the current period’s presentation.
(n)    “Impact of silver by-product” represents the costs allocated to the production of secondary or by-product metal (i.e. silver), which is produced as a by-product of the process used to produce gold.
(o)    Other includes corporate and other non-operating assets (including Great Bear, Curlew and Lobo-Marte).

Cautionary statement on forward-looking information 

All statements, other than statements of historical fact, contained or incorporated by reference in this news release including, but not limited to, any information as to the future financial or operating performance of Kinross, constitute “forward-looking information” or “forward-looking statements” within the meaning of certain securities laws, including the provisions of the Securities Act (Ontario) and the provisions for “safe harbor” under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements contained in this news release, include, but are not limited to, those under the headings (or headings that include) “2026 third-quarter highlights”, “Return of capital to shareholders”, “CEO commentary”, “Development project highlights” “Operating results”, and Development projects”, as well as statements with respect to our guidance for production, cost guidance, including production costs of sales, all-in sustaining cost of sales, and capital expenditures; anticipated returns of capital to shareholders, including the declaration, payment, increase and sustainability of the Company’s dividends; the size, scope and execution of the proposed share buybacks and the anticipated timing thereof, including the Company’s statement committing to share buybacks and dividends for 2026 of 50% of free cash flow; statement about future recovery rates at La Coipa and Round Mountain; identification of additional resources and reserves or the conversion of resources to reserves; the Company’s liquidity; the Company’s debt levels; the schedules budgets, and forecast economics for the Company’s development projects; budgets for and future plans for exploration, development and operation at the Company’s operations and projects, including the Great Bear and Lobo-Marte projects; planned timing for the submission of permits; potential mine life extensions at the Company’s operations; the Company’s balance sheet and liquidity outlook, as well as references to other possible events including, the future price of gold and silver, costs of production, operating costs; price inflation; capital expenditures, costs and timing of the development of projects and new deposits, estimates and the realization of such estimates (such as mineral or gold reserves and resources or mine life), success of exploration, development and mining, currency fluctuations, capital requirements, project studies, government regulation, permit applications, environmental risks and proceedings, and resolution of pending litigation. The words “advance”, “believe”, “continue”, “deliver”, “expects”, “focus”, “forecast”, “guidance”, “long-term”, “looking ahead”, “on plan”, “on track”, “opportunities”, “outlook”, “plan”, “progress”, “target”, or variations of or similar such words and phrases or statements that certain actions, events or results may, could, should or will be achieved, received or taken, or will occur or result and similar such expressions identify forward-looking statements.

Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates, models and assumptions of Kinross referenced, contained or incorporated by reference in this news release, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein and in our Management’s Discussion and Analysis (“MD&A”) for the year ended December 31, 2025, and the Annual Information Form dated March 26, 2026 as well as: (1) there being no significant disruptions affecting the operations of the Company, whether due to extreme weather events and other or related natural disasters, labour disruptions (including but not limited to strikes or workforce reductions), supply disruptions, power disruptions, damage to equipment, pit wall slides or otherwise; (2) permitting, development, operations and production from the Company’s operations and development projects being consistent with Kinross’ current expectations including, without limitation: mill grades, recovery rates, and reconciliation aligning with internal expectations, the maintenance of existing permits and approvals and the timely receipt of all permits and authorizations necessary for construction and operations; water and power supply and continued operation of the tailings reprocessing facility at Paracatu; permitting of the Great Bear project (including the consultation process with Indigenous groups), permitting and development of the Lobo-Marte project; in each case in a manner consistent with the Company’s expectations; and the successful completion of exploration consistent with the Company’s expectations at the Company’s projects; (3) political regulatory and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, restrictions or penalties imposed, or actions taken, by any government, including but not limited to amendments to the mining laws and tailings facility regulations in Brazil, potential amendments to water laws and/or other water use restrictions and regulatory actions in Chile, dam safety regulations, potential amendments to minerals and mining laws and energy levies laws, new regulations relating to work permits, potential amendments to customs and mining laws (including but not limited to amendments to the VAT) and the potential application of the tax code in Mauritania, potential amendments to and enforcement of tax laws in Mauritania (including, but not limited to, the interpretation, implementation, application and enforcement of any such laws and amendments thereto), substantial changes to the federal and/or provincial regulatory and permitting regimes in Canada, third party legal challenges to existing permits, and the impact of any trade tariffs being consistent with Kinross’ current expectations; (4) the completion of studies and the results of those studies being consistent with Kinross’ current expectations; (5) the exchange rate between the Canadian dollar, Brazilian real, Chilean peso, Mauritanian ouguiya and the U.S. dollar being approximately consistent with current levels; (6) certain price assumptions for gold and silver which includes, as it relates to share repurchases, assumptions that prices for gold and silver remain approximately consistent with current levels; (7) prices for diesel, natural gas, fuel oil, electricity and other key supplies being approximately consistent with the Company’s expectations; (8) attributable production and cost of sales forecasts for the Company meeting expectations; (9) the accuracy of the current mineral reserve and mineral resource estimates of the Company and Kinross’ analysis thereof being consistent with expectations (including but not limited to ore tonnage and ore grade estimates), future mineral resource and mineral reserve estimates being consistent with preliminary work undertaken by the Company, mine plans for the Company’s current and future mining operations, and the Company’s internal models; (10) labour and materials costs increasing on a basis consistent with Kinross’ current expectations; (11) the terms and conditions of the legal and fiscal stability agreements for Tasiast being interpreted and applied in a manner consistent with their intent and Kinross’ expectations and without material amendment or formal dispute (including without limitation the application of tax, customs and duties exemptions and royalties); (12) asset impairment potential; (13) the regulatory and legislative regime regarding mining, electricity production and transmission (including rules related to power tariffs) in Brazil being consistent with Kinross’ current expectations; (14) access to capital markets, including but not limited to maintaining our current credit ratings consistent with the Company’s current expectations; (15) potential direct or indirect operational impacts resulting from infectious diseases or pandemics; (16) changes in national and local government legislation or other government actions, including Ontario environmental regulations and the Canadian federal impact assessment regime; (17) litigation, regulatory proceedings and audits, and the potential ramifications thereof, being concluded in a manner consistent with the Company’s expectations (including without limitation litigation in Chile relating to the wetlands remediation plan or other environmental obligations arising therefrom); (18) the Company’s financial results, cash flows and future prospects being consistent with Company expectations in amounts sufficient to permit sustained dividend payments; (19) the impacts of potential geotechnical instability being consistent with the Company’s expectations; and (20) the impacts of groundwater inflows at the La Coipa pit being consistent with the Company’s expectations. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to: the inaccuracy of any of the foregoing assumptions; fluctuations in the currency markets; fluctuations in the spot and forward price of gold or certain other commodities (such as fuel and electricity); price inflation of goods and services; changes in the discount rates applied to calculate the present value of net future cash flows based on country-specific real weighted average cost of capital; changes in the market valuations of peer group gold producers and the Company, and the resulting impact on market price to net asset value multiples; changes in various market variables, such as interest rates, foreign exchange rates, gold or silver prices and lease rates, or global fuel prices, that could impact the mark-to-market value of outstanding derivative instruments and ongoing payments/receipts under any financial obligations; risks arising from holding derivative instruments (such as credit risk, market liquidity risk and mark-to-market risk); changes in national and local government legislation, taxation (including but not limited to income tax, advance income tax, stamp tax, withholding tax, capital tax, tariffs, value-added or sales tax, capital outflow tax, capital gains tax, windfall or windfall profits tax, production royalties, excise tax, customs/import or export taxes/duties, asset taxes, asset transfer tax, property use or other real estate tax, together with any related fine, penalty, surcharge, or interest imposed in connection with such taxes), controls, tariffs, policies and regulations; the security of personnel and assets; political or economic developments in Canada, the United States, Chile, Brazil, Mauritania or other countries in which Kinross does business or may carry on business; business opportunities that may be presented to, or pursued by, us; our ability to successfully integrate acquisitions and complete divestitures; operating or technical difficulties in connection with mining, development or refining activities; employee relations; litigation or other claims against, or regulatory investigations and/or any enforcement actions, administrative orders or sanctions in respect of the Company (and/or its directors, officers, or employees) including, but not limited to, securities class action litigation in Canada and/or the United States, environmental litigation or regulatory proceedings or any investigations, enforcement actions and/or sanctions under any applicable anti-corruption, international sanctions and/or anti-money laundering laws and regulations in Canada, the United States or any other applicable jurisdiction; the speculative nature of gold exploration and development including, but not limited to, the risks of obtaining and maintaining necessary licenses and permits; diminishing quantities or grades of reserves; adverse changes in our credit ratings; and contests over title to properties, particularly title to undeveloped properties. In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, Kinross’ actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, Kinross, including but not limited to resulting in an impairment charge on goodwill and/or assets. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management’s expectations and plans relating to the future. All of the forward-looking statements made in this news release are qualified by this cautionary statement and those made in our other filings with the securities regulators of Canada and the United States including, but not limited to, the cautionary statements made in the “Risk Analysis” section of our MD&A for the year ended December 31, 2025, and the “Risk Factors” set forth in the Company’s Annual Information Form dated March 26, 2026. These factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

Key Sensitivities

Approximately 70%-80% of the Company’s costs are denominated in U.S. dollars.

A 10% change in foreign currency exchange rates would be expected to result in an approximate $30 impact on attributable production cost of sales per equivalent ounce sold1, 12.

Specific to the Brazilian real, a 10% change in the exchange rate would be expected to result in an approximate $50 impact on Brazilian attributable production cost of sales per equivalent ounce sold1.

Specific to the Chilean peso, a 10% change in the exchange rate would be expected to result in an approximate $60 impact on Chilean attributable production cost of sales per equivalent ounce sold1.

A $10 per barrel change in the price of oil would be expected to result in an approximate $10 impact on attributable production cost of sales per equivalent ounce sold1.

A $100 change in the price of gold would be expected to result in an approximate $5 impact on attributable production cost of sales per equivalent ounce sold1 as a result of a change in royalties.

Other information

Where we say “we”, “us”, “our”, the “Company”, or “Kinross” in this news release, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as may be applicable.

The technical information about the Company’s mineral properties contained in this news release has been prepared under the supervision of Mr. Nicos Pfeiffer, an officer of the Company who is a “qualified person” within the meaning of National Instrument 43-101.

Source: Kinross Gold Corporation

________________________________
1   Unless otherwise stated, production figures in this news release are on an attributable basis. “Attributable” includes Kinross’ 70% share of Manh Choh production, costs, cash flows and capital expenditures. Financial figures include 100% of Manh Choh results except when denoted as attributable. Attributable figures are non-GAAP financial measures and ratios. Refer to footnote 6.
2   “Production cost of sales per equivalent ounce sold” is defined as production cost of sales, as reported on the interim condensed consolidated statements of operations, divided by total gold equivalent ounces sold.
3   Operating cash flow figures in this news release represent “Net cash flow provided from operating activities,” as reported on the interim condensed consolidated statements of cash flows.
4   “Margins” per equivalent ounce sold is defined as average realized gold price per ounce less production cost of sales per equivalent ounce sold.
5   Earnings, net earnings, and reported net earnings figures in this news release represent “Net earnings attributable to common shareholders,” as reported on the interim condensed consolidated statements of operations.
6   These figures are non-GAAP financial measures and ratios, as applicable, and are defined and reconciled on pages 15 to 22 of this news release. Non-GAAP financial measures and ratios have no standardized meaning under International Financial Reporting Standards (“IFRS”) and therefore, may not be comparable to similar measures presented by other issuers.
7   Net cash is calculated as cash and cash equivalents of $2,638.4 million less long-term debt of $739.2 million as reported on the Company’s interim condensed consolidated balance sheet as at September 30, 2026.
8   “Average realized gold price per ounce” is defined as gold revenue divided by total gold ounces sold.
9   “Capital expenditures” is “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows.
10  “Available credit” is defined as available credit under the Company’s credit facilities and is calculated in Section 6 Liquidity and Capital Resources of Kinross’ MD&A for the three and nine months ended September 30, 2026.
11 “Total liquidity” is defined as the sum of cash and cash equivalents, as reported on the interim condensed consolidated balance sheets, and available credit under the Company’s credit facilities (as calculated in Section 6 Liquidity and Capital Resources of Kinross’ MD&A for the three and nine months ended September 30, 2026).
12 Refers to all of the currencies in the countries where the Company has mining operations, fluctuating simultaneously by 10% in the same direction, either appreciating or depreciating, taking into consideration the impact of hedging and the weighting of each currency within our consolidated cost structure.

On track for updated guidance
Grade enhancement projects advancing well, first gold poured at Redbird
Return of capital increased to 50%, repurchased 5% of shares since April 2025

TORONTO, Oct. 28, 2026 (GLOBE NEWSWIRE) — Kinross Gold Corporation (TSX: K, NYSE: KGC) (“Kinross” or the “Company”) today announced its results for the third quarter ended September 30, 2026.
This news release contains forward-looking information about expected future events and financial and operating performance of the Company. We refer to the risks and assumptions set out in our Cautionary Statement on Forward-Looking Information located on pages 22 and 24 of this release. All dollar amounts are expressed in U.S. dollars, unless otherwise noted.

2026 third-quarter highlights:

  • Production1 of 424,693 gold equivalent ounces (“Au eq. oz.”).
  • Production cost of sales2 of $1,502 per Au eq. oz. sold and attributable production cost of sales1 of $1,485 per Au eq. oz. sold.
  • Attributable all-in sustaining cost1 of $1,947 per Au eq. oz. sold.
  • Operating cash flow3 of $714.4 million and attributable adjusted operating cash flow1 of $830.9 million.
  • Attributable free cash flow1 of $281.3 million and attributable adjusted free cash flow1 of $391.4 million.
  • Margins4 increased by 19% to $2,747 per Au eq. oz. sold compared with Q3 2025. 
  • Reported earnings5 of $583.2 million, or $0.49 per share, with adjusted net earnings6 of $591.3 million, or $0.50 per share.
  • Cash and cash equivalents of $2.6 billion and net cash7 of $1.9 billion at September 30, 2026.

Return of capital to shareholders:

  • Reflecting its strong cash flow and balance sheet strength, Kinross increased its 2026 return of capital commitment from 40% to 50% of free cash flow. During the first three quarters of 2026, the Company repurchased $710 million in shares, and an additional $100 million to date in October. Including its quarterly dividend, Kinross has returned over $950 million in capital to shareholders year-to-date as of October 28, 2026.
  • Since April 2025, Kinross returned over $1.4 billion of capital through share repurchases, representing approximately 5% of its shares outstanding. 
  • Kinross’ Board of Directors declared a quarterly dividend of $0.04 per common share payable on December 3, 2026, to shareholders of record at the close of business on November 19, 2026.

Operational highlights:

  • At La Coipa, mining and milling activities have stabilized as weather has improved and operational improvement initiatives have progressed.
  • At Round Mountain, operations have made progress towards stability, with higher mill grades from Phase S and improved recoveries contributing to higher production quarter-over-quarter.
  • Kinross’ broader portfolio performed well, led by Paracatu and Tasiast that together accounted for more than half of the Q3 production while remaining the two lowest-cost operations.

Development project highlights:

  • At Great Bear, underground development for Advanced Exploration (“AEX”) continued to advance, with the North and South declines reaching over 500 metres combined as of late-October. AEX surface construction is substantially complete, with supporting infrastructure now in place. Detailed engineering for the Main Project progressed to over 55% complete.
  • At Round Mountain Phase X, underground development is advancing well and is approximately 8% ahead of plan, with more than 9,600 metres completed to date. Positive infill drilling results were received in the early stoping horizons, while infrastructure development and operational-readiness activities are progressing well to support planned first production in 2028.
  • At Kettle River-Curlew (“Curlew”), underground development continued ahead of schedule, and construction of the tailings dewatering plant and mill refurbishment progressed substantially. Exploration drilling also extended the prospective mineralized zones in the North Stealth, Roadrunner and K5 areas.
  • First gold was poured from Bald Mountain Redbird 1 in early October, while Redbird 2 continues to progress well with initial leach pad construction activities nearing completion, and detailed engineering and procurement for the Sulphidization, Acidification, Recycling and Thickening (“SART”) plant well underway.
  • At Lobo-Marte, permitting continues to progress, detailed engineering has commenced and first production remains targeted for the early 2030s.

CEO commentary:
J. Paul Rollinson, CEO, made the following comments in relation to 2026 third-quarter results:

“Kinross’ portfolio demonstrated its resilience in Q3. Our largest operations, Paracatu and Tasiast, continued to make significant contributions and we maintained disciplined cost management. We remain on track for our updated guidance, supported by operational improvements at Round Mountain and La Coipa. We are focused on maintaining this momentum and driving continuous improvement across our operations.

“We continue to make strong progress across our development pipeline. At Great Bear, AEX underground development is well underway and AEX surface construction is substantially complete. Round Mountain Phase X and Curlew are advancing well, and first gold was poured at Redbird in early October. At Lobo-Marte, permitting continues to progress and detailed engineering has commenced. These projects underpin our grade enhancement strategy and, together with the opportunities across our significant resource inventory, contribute to our long-term production profile.

“Our strong financial position and ability to generate significant free cash flow provide us with flexibility to advance these opportunities while continuing to return robust capital to shareholders. During the quarter, we increased our 2026 return of capital target to 50% of full-year free cash flow and have returned over $950 million to shareholders year-to-date. Since April 2025, we have repurchased approximately 5% of our shares outstanding.

“Looking ahead, we remain focused on optimizing our cash flow across the business and allocating capital in a disciplined manner to advance our project pipeline, deliver operational excellence and maximize shareholder value.”

Summary of financial and operating results

(in millions of U.S. dollars, except ounces, per share amounts, and per ounce amounts) Three months ended
September 30,
Nine months ended
September 30,
  2026   2025   2026   2025
Operating Highlights(a)        
Total gold equivalent ounces(b)        
Produced   432,368   520,301   1,434,650   1,580,239
Sold   417,657   520,733   1,410,820   1,571,045
Attributable gold equivalent ounces(b)        
Produced   424,693   503,862   1,409,582   1,528,524
Sold   410,245   504,111   1,386,340   1,518,975
Gold ounces – sold   412,363   511,564   1,381,342   1,547,223
Silver ounces – sold (000’s)   361   804   1,806   2,171
         
Earnings(a)        
Metal sales $ 1,774.7 $ 1,802.1 $ 6,420.5 $ 5,028.1
Production cost of sales $ 627.2 $ 598.6 $ 1,992.4 $ 1,713.7
Depreciation, depletion and amortization $ 217.1 $ 285.4 $ 768.3 $ 836.7
Operating earnings $ 821.0 $ 810.1 $ 3,345.5 $ 2,155.3
Net earnings attributable to common shareholders $ 583.2 $ 584.9 $ 2,270.4 $ 1,483.6
Net earnings per share attributable to common shareholders (basic) $ 0.49 $ 0.48 $ 1.91 $ 1.21
Net earnings per share attributable to common shareholders (diluted) $ 0.49 $ 0.48 $ 1.90 $ 1.21
Adjusted net earnings(c) $ 591.3 $ 529.6 $ 2,293.2 $ 1,434.6
Adjusted net earnings per share(c) $ 0.50 $ 0.44 $ 1.92 $ 1.17
         
Cash Flow(a)        
Net cash flow provided from operating activities $ 714.4 $ 1,024.1 $ 2,999.8 $ 2,623.6
Attributable adjusted operating cash flow(c) $ 830.9 $ 965.5 $ 3,072.1 $ 2,469.2
Capital expenditures(d) $ 439.6 $ 312.2 $ 1,133.8 $ 826.0
Attributable capital expenditures(c) $ 439.5 $ 307.6 $ 1,124.6 $ 813.5
Attributable free cash flow(c) $ 281.3 $ 686.7 $ 1,845.6 $ 1,714.1
Attributable adjusted free cash flow(c) $ 391.4 $ 657.9 $ 1,947.5 $ 1,655.7
         
Per Ounce Metrics(a)        
Average realized gold price per ounce(e) $ 4,249 $ 3,460 $ 4,549 $ 3,200
Attributable average realized gold price per ounce(c) $ 4,248 $ 3,458 $ 4,551 $ 3,199
Production cost of sales per equivalent ounce sold(b)(f) $ 1,502 $ 1,150 $ 1,412 $ 1,091
Attributable production cost of sales per equivalent ounce sold(b)(c) $ 1,485 $ 1,145 $ 1,396 $ 1,086
Attributable production cost of sales per ounce sold on a by-product basis(c) $ 1,449 $ 1,102 $ 1,327 $ 1,052
Attributable all-in sustaining cost per equivalent ounce sold(b)(c) $ 1,947 $ 1,622 $ 1,827 $ 1,490
Attributable all-in sustaining cost per ounce sold on a by-product basis(c) $ 1,917 $ 1,588 $ 1,767 $ 1,462
Attributable all-in cost per equivalent ounce sold(b)(c) $ 2,862 $ 2,016 $ 2,468 $ 1,877
Attributable all-in cost per ounce sold on a by-product basis(c) $ 2,844 $ 1,989 $ 2,421 $ 1,855

(a)   All measures and ratios include 100% of the results from Manh Choh, except measures and ratios denoted as “attributable.” “Attributable” measures and ratios include Kinross’ 70% share of Manh Choh production, sales, cash flow, capital expenditures and costs, as applicable.
(b)   “Gold equivalent ounces” include silver ounces produced and sold converted to a gold equivalent based on a ratio of the average spot market prices for the commodities for each period. The ratio for the third quarter and first nine months of 2026 was 68.10:1 and 62.05:1, respectively (third quarter and first nine months of 2025 – 87.73:1 and 91.33:1, respectively).
(c)   The definition and reconciliation of these non-GAAP financial measures and ratios is included on pages 15 to 21 of this news release. Non-GAAP financial measures and ratios have no standardized meaning under IFRS and therefore, may not be comparable to similar measures presented by other issuers.
(d)   “Capital expenditures” is “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows.
(e)   “Average realized gold price per ounce” is defined as gold revenue divided by total gold ounces sold.
(f)    “Production cost of sales per equivalent ounce sold” is defined as production cost of sales divided by total gold equivalent ounces sold.

The following operating and financial results are based on third-quarter gold equivalent production:

Production: Kinross produced 424,693 Au eq. oz. in Q3 2026, compared with 503,862 Au eq. oz. in Q3 2025. The decrease is a result of planned lower production from Fort Knox and Bald Mountain as well as a reduction in production at La Coipa and Round Mountain, while Tasiast and Paracatu remained stable.

Average realized gold price8: The average realized gold price in the third quarter was $4,249 per ounce, compared with $3,460 per ounce in Q3 2025, a 23% increase year-over-year.

Revenue: Revenue was $1,774.7 million in Q3 2026, compared with $1,802.1 million during Q3 2025. The 2% decrease year-over-year was due to the decrease in production and ounces sold.

Production cost of sales: Production cost of sales per Au eq. oz. sold2 increased to $1,502 in Q3 2026, compared with $1,150 in Q3 2025. Attributable production cost of sales per Au eq. oz. sold1 increased to $1,485 for Q3 2026, compared with $1,145 in Q3 2025, primarily due to higher energy, contractor and reagent costs, lower production and an increase in royalty costs as a result of the higher gold prices.

Attributable production cost of sales per Au oz. sold on a by-product basis1 was $1,449 in the third quarter of 2026, compared with $1,102 in the third quarter of 2025, based on attributable gold sales of 405,030 ounces and silver sales of 355,178 ounces.

Margins4: Kinross’ margin per Au eq. oz. sold increased by 19% to $2,747 in Q3 2026, compared with the Q3 2025 margin of $2,310.

Attributable all-in sustaining cost1: Attributable all-in sustaining cost per Au eq. oz. sold was $1,947 in Q3 2026, compared with $1,622 in Q3 2025.

Attributable all-in sustaining cost per Au oz. sold on a by-product basis was $1,917 in the third quarter, compared with $1,588 in Q3 2025.

Operating cash flow3: Operating cash flow was $714.4 million in the third quarter, compared with $1,024.1 million for Q3 2025.

Attributable adjusted operating cash flow1 in Q3 2026 was $830.9 million, compared with $965.5 million for Q3 2025.

Attributable free cash flow1: Attributable free cash flow was $281.3 million in the quarter, compared with $686.7 million in Q3 2025. Excluding working capital, attributable adjusted free cash flow was $391.4 million in the quarter, compared with $657.9 million in Q3 2025. Both metrics were impacted by timing of sales and higher capital expenditure spending in Q3 2026.

Reported net earnings5: Reported net earnings were $583.2 million during the quarter, or $0.49 per share, in line with reported net earnings of $584.9 million, or $0.48 per share, for Q3 2025.

Adjusted net earnings6 increased to $591.3 million, or $0.50 per share, for Q3 2026, compared with $529.6 million, or $0.44 per share, for Q3 2025.

Capital expenditures9: Capital expenditures increased to $439.6 million in the third quarter, compared with $312.2 million in Q3 2025, driven by a ramp-up of development activities at Curlew, Bald Mountain Redbird, Great Bear and Round Mountain Phase X, partially offset by a decrease in spending at Manh Choh.

Attributable capital expenditures1 were $439.5 million for Q3 2026, compared with $307.6 million for Q3 2025.

Balance sheet

As of September 30, 2026, Kinross had cash and cash equivalents of $2.6 billion and net cash7 of $1.9 billion, comparable with the second quarter of 2026.

The Company had additional available credit10 of $1.7 billion and total liquidity11 of approximately $4.4 billion as of September 30, 2026, with no debt maturities until 2033. In August, S&P Global Ratings upgraded Kinross’ long-term issuer credit rating and issue-level rating on the Company’s unsecured debt to ‘BBB’ from ‘BBB-‘, with a stable outlook.

Return of capital to shareholders

Kinross continues to advance its 2026 buyback strategy, having repurchased approximately $230 million in shares during the quarter, representing 8.6 million shares. Including its quarterly dividend, Kinross returned over $275 million to shareholders in Q3.

Year-to-date, approximately $810 million in shares have been repurchased, representing 28.5 million shares. Including its quarterly dividend, Kinross returned over $950 million in capital to shareholders to date in 2026 and 46% of free cash flow over the first nine months of 2026.

Since April 2025, Kinross has repurchased approximately $1.4 billion in shares, representing approximately 5% of its shares outstanding, and returned a total of approximately $1.7 billion in capital to shareholders.

As part of its quarterly dividend program, the Company also declared a dividend of $0.04 per common share payable on December 3, 2026, to shareholders of record on November 19, 2026.

Operating results

Mine-by-mine summaries for 2026 third-quarter operating results may be found on pages 9 and 13 of this news release. Unless otherwise noted, commentary in this section is relative to the previous quarter.

Tasiast delivered another solid quarter, with strong mining and processing performance supporting production in line with the mine plan. Higher throughput helped offset the impact of anticipated lower grades and recoveries. Cost of sales per ounce sold reflected the planned production profile for the quarter and was impacted by higher fuel and maintenance supply costs.

Paracatu performed in line with expectations during the quarter, supported by strong mining and processing performance. Higher ore tonnes mined helped offset the impact of planned lower grades and recoveries associated with mine sequencing. Cost of sales per ounce sold reflected the planned production profile and was affected by higher energy costs.

La Coipa‘s performance was impacted by unprecedented winter weather that disrupted mining and milling activities during the quarter. Improved weather conditions resulted in higher mining rates, improved throughput and the ability to resume ore blending towards the end of Q3. Actions to enhance plant performance and recovery also delivered positive results, positioning the operation for improved performance going forward. Cost of sales per ounce sold was affected by lower production during the quarter.

Fort Knox’s production reflected mill maintenance activities and planned lower grades during the quarter, partially offset by improved mill recoveries. Cost of sales per ounce sold was impacted by lower production and higher reagent and blasting supply costs.

Round Mountain delivered improved production during the quarter, supported by higher mill grades and recoveries, and increased tonnes placed on the heap leach pads. The operation continues to advance initiatives to improve recovery and mining rates, including targeted mill circuit enhancements and increased selective mining. Cost of sales per ounce sold benefited from higher production during the quarter and stockpiling of ore for future use, offset by higher fuel and maintenance costs.

Bald Mountain production benefited from increased tonnes placed on the heap leach pads and the timing of ounces recovered. The operation continued to ramp-up ore delivery from Redbird and achieved an important milestone with the first gold pour from this deposit in early October. Cost of sales per ounce sold continued to improve as a result of higher production.

Development projects

Great Bear

At Great Bear, Kinross continues to progress its AEX program alongside permitting, detailed engineering, and procurement activities for the Main Project. 

AEX surface construction is now substantially complete and all infrastructure required to support the underground development is in place. The North and South underground declines continue to progress, with a combined total of over 500 metres of development completed to date.

For the Main Project, detailed engineering has progressed to over 55% complete to date. Manufacturing activities are underway on several long-lead equipment packages, including the mill motors, transformers, and power plant generators. Contracts for the camp complex and the administration building have been awarded. Construction readiness planning is underway.

The Main Project permitting process is well advanced. The Impact Assessment Agency of Canada (“IAAC”) issued its first round of formal information requests at the end of July, and Kinross’ responses were formally provided to IAAC.

Provincially, the integrated One Project, One Process is progressing well and Kinross’ permit applications continue to advance in accordance with the permitting plan to maintain Kinross’ overall project permitting timeline. Responses have been provided to the technical comments received from the Ministry of the Environment, Conservation and Parks to date, and the provincial technical review is expected to be complete by the end of the year.

Kinross continued to advance negotiations of the Impact Benefits Agreement (“Agreement”) with Wabauskang and Lac Seul First Nations. Following the previously signed Memorandum of Understanding that captures the key economic compensatory and procurement elements, the parties are currently progressing the non-financial aspects of the Agreement.

At Great Bear, drilling in Q3 has focused primarily on near-mine targets, where multiple infill holes have confirmed the down-dip extensions of mineralization at Viggo for an additional 150 metres. This drilling reaffirms the exploration belief that these high-grade chutes remain open at depth below the known resource.

Round Mountain Phase X

At Round Mountain Phase X, underground development continues to advance ahead of schedule, with over 9,600 metres developed to date, approximately 8% ahead of plan. Infill drilling also progressed for the early stoping horizons, indicating higher ounces than expected driven by improved continuity of mineralization on the back of tighter drill spacing. In addition, extensional drilling approximately 300 metres down dip of the current resource intersected 11.7 g/t over 27.5 metres, highlighting the potential for mineralization to continue at depth.

Engineering, procurement and early works for surface and underground infrastructure are progressing well. Operational-readiness activities are also ramping up to support a smooth transition to operations and the planned start of production in 2028.

Curlew

At Curlew, construction of the Tailings Dewatering Plant (“TDP”) and the mill refurbishment progressed substantially. At the TDP, exterior works on tanks and the thickener are largely complete while interior structural steel and mechanical equipment installation is progressing. At the mill, removal of equipment that will not be reutilized continues and the installation of new carbon-in-leach tanks has commenced. At the mine, construction of a new administrative and dry facility is nearing completion and underground development continues to advance ahead of schedule, with over 3,600 metres of horizontal development completed as of September 30, raise collars completed, and raise-boring activities advancing.

Bald Mountain Redbird

First gold was poured from Redbird 1 in early October, while Redbird 2 construction continued to advance on plan, with pre-stripping well underway and earthworks and lining activities for the first phase of the Bald Heap Leach Pad expansion nearing completion. Procurement and engineering activities for the SART plant also progressed substantially, with detailed engineering approximately 30% complete. The Redbird 2 satellite pits are now fully permitted.

Lobo-Marte

At Lobo-Marte, permitting continues to progress well following the acceptance of the project’s Environmental Impact Assessment for review by Chile’s Environmental Assessment Service in the second quarter. Detailed engineering has commenced and execution planning continues to advance, with first production targeted in the early 2030s.

Sustainability

Health and Safety: In September 2026, two unrelated safety incidents occurred at Bald Mountain. As a result, one business partner employee suffered fatal injuries on site, and another was seriously injured. The second business partner employee later passed away in hospital. Kinross extends its deepest condolences to their families, friends and colleagues. Following these incidents, Kinross held company-wide Safety Stand Downs to reinforce safety practices and controls.

Alaska: At Fort Knox, Trout Unlimited and Kinross, together with other partners and supporters, launched the Cripple Creek Restoration Project, the second project under the Alaska Abandoned Mine Restoration Initiative, building on the first restoration project at Resurrection Creek near Anchorage in 2022. The initiative focuses on restoring waterways and fish habitat impacted by historic mining.

The Manh Choh Community Foundation completed its second grant cycle for initiatives across five local communities. Kinross has also supported recovery efforts following the Tok wildfire, including emergency assistance for families whose homes were rendered uninhabitable. 

Mauritania: At Tasiast, new community infrastructure in Benichab, including a modern communal market and meat processing facility, was handed over in August. The infrastructure was delivered through the Tasiast Fund to support sustainable development in the mine’s impact area. Tasiast also made further contributions to community health capacity through its long-term partnership with the Ministry of Health and Project C.U.R.E.

Chile: Kinross Chile received the Award for Commitment to Territories and Education from the Mining Foundation of Chile, recognizing the Company’s contributions over three decades in support of education, training and opportunities for communities in the Atacama region. 

Sustainability ratings: Kinross received a leading score of 70 from the S&P CSA assessment, currently ranking in the 97th percentile, up one point from its 2025 assessment. This assessment represents a comprehensive view of the company’s governance, management, and performance in sustainability.

Conference call details

In connection with this news release, Kinross will hold a conference call and audio webcast on October 29, 2026, at 8:00 a.m. EDT to discuss the results, followed by a question-and-answer session. To access the call, please dial:

Canada & US toll-free – (888) 596-4144; Conference ID: 9425112
Outside of Canada & US – +1 (646) 968-2525; Conference ID: 9425112

Replay (available up to 14 days after the call):

Canada & US toll-free – +1 (800) 770-2030; Conference ID: 9425112 #
Outside of Canada & US – +1 (609) 800-9909; Conference ID: 9425112 #

You may also access the conference call on a listen-only basis via webcast at our website www.kinross.com. The audio webcast will be archived on www.kinross.com.

About Kinross Gold Corporation

Kinross is a Canadian-based global senior gold mining company with operations and projects in the United States, Brazil, Mauritania, Chile and Canada. Our focus is on delivering value based on the core principles of responsible mining, operational excellence, disciplined growth, and balance sheet strength. Kinross maintains listings on the Toronto Stock Exchange (symbol: K) and the New York Stock Exchange (symbol: KGC).

Media Contact
Samantha Sheffield
Senior Director, Corporate Communications
phone: 416-365-3034
Samantha.Sheffield@Kinross.com

Investor Relations Contact
David Shaver 
Executive Vice-President, Investor Relations & Communications
phone: 416-365-2854 
InvestorRelations@Kinross.com

Review of operations

Three months ended September 30, Gold equivalent ounces            
  Produced   Sold   Production cost of sales
($millions)
  Production cost of sales/equivalent ounce sold
  2026   2025     2026   2025     2026   2025     2026 2025
                       
Tasiast 120,232   120,934     110,735   116,251     118.7   103.4     1,072 889
Paracatu 146,428   150,367     142,714   149,903     171.6   139.9     1,202 933
La Coipa 29,203   57,997     31,046   57,544     68.1   69.0     2,194 1,199
                       
Fort Knox 80,118   112,181     80,025   117,500     158.5   159.7     1,981 1,359
Round Mountain 27,068   37,297     25,969   37,274     66.4   78.1     2,557 2,095
Bald Mountain 29,319   41,525     27,168   42,261     43.9   48.5     1,616 1,148
United States Total 136,505   191,003     133,162   197,035     268.8   286.3     2,019 1,453
Less: Manh Choh non-controlling interest (30%) (7,675 ) (16,439 )   (7,412 ) (16,622 )   (17.8 ) (21.3 )      
United States Attributable Total 128,830   174,564     125,750   180,413     251.0   265.0     1,996 1,469
                       
Operations Total 432,368   520,301     417,657   520,733     627.2   598.6     1,502 1,150
                       
Attributable Total 424,693   503,862     410,245   504,111     609.4   577.3     1,485 1,145

Nine months ended September 30, Gold equivalent ounces            
  Produced   Sold   Production cost of sales
($millions)
  Production cost of sales/equivalent ounce sold
  2026   2025     2026   2025     2026   2025     2026 2025
                       
Tasiast 383,557   377,804     374,579   367,489     379.8   311.0     1,014 846
Paracatu 464,537   446,270     458,574   445,545     523.2   422.1     1,141 947
La Coipa 142,453   164,451     139,532   163,814     226.5   203.5     1,623 1,242
                       
Fort Knox 286,990   339,299     283,834   342,810     510.8   432.8     1,800 1,263
Round Mountain 73,057   111,648     72,171   111,098     206.4   187.2     2,860 1,685
Bald Mountain 84,056   140,767     82,130   140,289     145.7   157.1     1,774 1,120
United States Total 444,103   591,714     438,135   594,197     862.9   777.1     1,969 1,308
Less: Manh Choh non-controlling interest (30%) (25,068 ) (51,715 )   (24,480 ) (52,070 )   (57.5 ) (64.5 )      
United States Attributable Total 419,035   539,999     413,655   542,127     805.4   712.6     1,947 1,314
                       
Operations Total 1,434,650   1,580,239     1,410,820   1,571,045     1,992.4   1,713.7     1,412 1,091
                       
Attributable Total 1,409,582   1,528,524     1,386,340   1,518,975     1,934.9   1,649.2     1,396 1,086

Consolidated balance sheets

(unaudited, expressed in millions of U.S. dollars, except share amounts) As at
  September 30, December 31,
    2026     2025  
Assets    
Current assets    
Cash and cash equivalents $ 2,638.4   $ 1,742.3  
Restricted cash   16.9     13.5  
Accounts receivable and prepaid assets   148.2     145.8  
Inventories   1,486.4     1,370.3  
Other current assets   74.4     16.6  
    4,364.3     3,288.5  
Non-current assets    
Property, plant and equipment   8,630.5     8,289.4  
Long-term investments   91.4     99.3  
Other long-term assets   852.2     708.9  
Deferred tax assets   5.1     25.0  
Total assets $ 13,943.5   $ 12,411.1  
     
Liabilities    
Current liabilities    
Accounts payable and accrued liabilities $ 733.5   $ 716.4  
Current income tax payable   691.9     595.7  
Current portion of provisions   77.5     74.2  
Other current liabilities   16.5     13.3  
    1,519.4     1,399.6  
Non-current liabilities    
Long-term debt   739.2     738.2  
Provisions   959.5     976.6  
Other long-term liabilities   57.6     64.8  
Deferred tax liabilities   569.2     537.8  
Total liabilities $ 3,844.9   $ 3,717.0  
     
Equity    
Common shareholders’ equity    
Common share capital $ 4,306.7   $ 4,382.0  
Contributed surplus   9,456.8     10,137.6  
Accumulated deficit   (3,815.7 )   (5,943.3 )
Accumulated other comprehensive income (loss)   23.4     (0.3 )
Total common shareholders’ equity   9,971.2     8,576.0  
Non-controlling interests   127.4     118.1  
Total equity $ 10,098.6   $ 8,694.1  
Total liabilities and equity $ 13,943.5   $ 12,411.1  
     
Common shares    
Authorized Unlimited
  Unlimited  
Issued   1,178,450,917     1,199,843,037  
Outstanding   1,178,038,135     1,199,843,037  

Consolidated statements of operations

(unaudited, expressed in millions of U.S. dollars, except per share amounts) Three months ended Nine months ended
  September 30, September 30, September 30, September 30,
    2026     2025     2026     2025  
         
Revenue        
Metal sales $ 1,774.7   $ 1,802.1   $ 6,420.5   $ 5,028.1  
         
Cost of sales        
Production cost of sales   627.2     598.6     1,992.4     1,713.7  
Depreciation, depletion and amortization   217.1     285.4     768.3     836.7  
Total cost of sales   844.3     884.0     2,760.7     2,550.4  
Gross profit   930.4     918.1     3,659.8     2,477.7  
Other operating expense   32.7     26.1     83.0     71.2  
Exploration and business development   43.0     50.7     120.3     154.7  
General and administrative   33.7     31.2     111.0     96.5  
Operating earnings   821.0     810.1     3,345.5     2,155.3  
Other (expense) income – net   (9.0 )   16.8     (26.2 )   (16.2 )
Finance income   25.5     45.2     60.7     56.8  
Finance expense   (19.2 )   (30.7 )   (58.5 )   (98.8 )
Earnings before tax   818.3     841.4     3,321.5     2,097.1  
Income tax expense – net   (228.9 )   (232.3 )   (1,024.3 )   (540.0 )
Net earnings $ 589.4   $ 609.1   $ 2,297.2   $ 1,557.1  
Net earnings attributable to:        
Non-controlling interests   6.2     24.2     26.8     73.5  
Common shareholders $ 583.2   $ 584.9   $ 2,270.4   $ 1,483.6  
Earnings per share attributable to common shareholders        
Basic $ 0.49   $ 0.48   $ 1.91   $ 1.21  
Diluted $ 0.49   $ 0.48   $ 1.90   $ 1.21  

Consolidated statements of cash flows

(unaudited, expressed in millions of U.S. dollars) Three months ended Nine months ended
  September 30, September 30, September 30, September 30,
    2026     2025     2026     2025  
Net inflow (outflow) of cash related to the following activities:        
Operating:        
Net earnings $ 589.4   $ 609.1   $ 2,297.2   $ 1,557.1  
Adjustments to reconcile net earnings to net cash provided from operating activities:        
Depreciation, depletion and amortization   217.1     285.4     768.3     836.7  
Share-based compensation expense   3.9     3.4     13.9     11.2  
Finance expense – net   (6.3 )   17.3     (2.2 )   73.8  
Income tax expense – net   228.9     232.3     1,024.3     540.0  
Gain on sale of Asante Gold Corporation holdings   –     (63.0 )   –     (63.0 )
Foreign exchange (gains) losses   (2.5 )   5.5     6.2     16.8  
Reclamation payments   (20.4 )   (8.8 )   (49.4 )   (21.9 )
Other   (16.3 )   (21.9 )   (13.4 )   (33.7 )
Changes in working capital:        
Accounts receivable and other assets   (34.1 )   (34.5 )   (25.4 )   (8.7 )
Inventories   (55.0 )   (19.9 )   (52.9 )   (49.4 )
Accounts payable and accrued liabilities   (39.2 )   76.5     (40.2 )   110.3  
Cash flow provided from operating activities   865.5     1,081.4     3,926.4     2,969.2  
Income taxes paid   (151.1 )   (57.3 )   (926.6 )   (345.6 )
Net cash flow provided from operating activities   714.4     1,024.1     2,999.8     2,623.6  
Investing:        
Additions to property, plant and equipment   (439.6 )   (312.2 )   (1,133.8 )   (826.0 )
Interest paid capitalized to property, plant and equipment   (14.7 )   (4.5 )   (21.8 )   (18.0 )
Proceeds from long-term investments and other assets   47.7     94.3     75.3     94.3  
Additions to long-term investments and other assets   (84.8 )   (12.5 )   (129.3 )   (36.4 )
Increase in restricted cash   (1.0 )   (1.5 )   (3.4 )   (4.0 )
Interest received and other   25.7     11.1     60.2     24.3  
Net cash flow used in investing activities   (466.7 )   (225.3 )   (1,152.8 )   (765.8 )
Net cash flow of discontinued operations provided from investing activities   –     53.4     –     53.4  
Financing:        
Repayment of debt   –     –     –     (200.0 )
Interest paid   (9.5 )   (31.0 )   (26.7 )   (55.0 )
Payment of lease liabilities   (2.1 )   (2.0 )   (6.3 )   (5.0 )
Distributions paid to non-controlling interest   –     (33.0 )   (18.0 )   (87.0 )
Dividends paid to common shareholders   (47.3 )   (36.4 )   (142.8 )   (110.0 )
Payments for employee taxes withheld from restricted share unit releases   (0.1 )   –     (55.7 )   (10.0 )
Repurchase and cancellation of shares   (210.1 )   (165.1 )   (690.2 )   (335.2 )
Taxes paid on repurchase of shares   –     –     (12.1 )   –  
Net cash flow used in financing activities   (269.1 )   (267.5 )   (951.8 )   (802.2 )
Effect of exchange rate changes on cash and cash equivalents   3.4     0.5     0.9     1.2  
(Decrease) increase in cash and cash equivalents   (18.0 )   585.2     896.1     1,110.2  
Cash and cash equivalents, beginning of period   2,656.4     1,136.5     1,742.3     611.5  
Cash and cash equivalents, end of period $ 2,638.4   $ 1,721.7   $ 2,638.4   $ 1,721.7  

  Operating Summary
  Mine Period Tonnes Ore Mined Ore Processed (Milled) Ore Processed (Heap Leach) Grade (Mill) Grade (Heap Leach) Recovery
(a)(b)
Gold Eq Production
(c)
Gold Eq Sales(c) Production cost of sales Production cost of
sales/oz(d)
Cap Ex – sustaining
(e)
Total Cap Ex
(e)
      (‘000 tonnes) (‘000 tonnes) (‘000 tonnes) (g/t) (g/t) (%) (ounces) (ounces) ($ millions) ($/ounce) ($ millions) ($ millions)
West Africa Tasiast Q3 2026 3,694 2,316 – 1.72 – 92 % 120,232 110,735 $ 118.7 $ 1,072 $ 16.9 $ 89.1
Q2 2026 3,172 2,208 – 1.82 – 94 % 133,311 132,165 $ 130.8 $ 990 $ 46.6 $ 96.3
Q1 2026 3,495 2,092 – 2.30 – 94 % 130,014 131,679 $ 130.3 $ 990 $ 10.8 $ 60.0
Q4 2025 3,120 2,252 – 1.87 – 94 % 125,625 118,912 $ 119.2 $ 1,002 $ 28.6 $ 80.5
Q3 2025 1,685 2,181 – 1.78 – 94 % 120,934 116,251 $ 103.4 $ 889 $ 47.6 $ 102.0
Americas Paracatu Q3 2026 14,502 13,363 – 0.40 – 83 % 146,428 142,714 $ 171.6 $ 1,202 $ 57.6 $ 74.1
Q2 2026 11,332 13,216 – 0.43 – 84 % 157,526 157,011 $ 173.9 $ 1,108 $ 51.4 $ 64.2
Q1 2026 10,272 12,507 – 0.41 – 85 % 160,583 158,849 $ 177.7 $ 1,119 $ 22.2 $ 25.8
Q4 2025 10,929 12,395 – 0.45 – 83 % 155,048 154,565 $ 165.0 $ 1,068 $ 67.6 $ 67.6
Q3 2025 12,958 13,214 – 0.44 – 82 % 150,367 149,903 $ 139.9 $ 933 $ 58.2 $ 58.2
La Coipa(f) Q3 2026 1,114 691 – 1.95 – 62 % 29,203 31,046 $ 68.1 $ 2,194 $ 7.0 $ 15.3
Q2 2026 988 1,151 – 2.07 – 60 % 59,039 54,749 $ 76.4 $ 1,395 $ 17.9 $ 22.8
Q1 2026 580 972 – 1.64 – 74 % 54,211 53,737 $ 82.0 $ 1,526 $ 19.9 $ 21.7
Q4 2025 1,219 1,203 – 2.42 – 74 % 67,319 71,419 $ 80.7 $ 1,130 $ 31.7 $ 31.7
Q3 2025 1,006 932 – 2.36 – 76 % 57,997 57,544 $ 69.0 $ 1,199 $ 18.5 $ 18.5
Fort Knox
(100%)(g)
Q3 2026 6,285 1,414 5,465 1.22 0.22 84 % 80,118 80,025 $ 158.5 $ 1,981 $ 21.0 $ 26.0
Q2 2026 5,681 1,866 3,965 1.51 0.27 82 % 104,500 107,591 $ 177.5 $ 1,650 $ 37.3 $ 40.0
Q1 2026 9,523 1,154 7,314 1.45 0.28 86 % 102,372 96,218 $ 174.8 $ 1,817 $ 24.1 $ 24.1
Q4 2025 11,056 1,645 8,805 1.02 0.23 88 % 71,523 74,294 $ 125.8 $ 1,693 $ 38.0 $ 38.0
Q3 2025 8,140 1,511 6,538 1.86 0.23 90 % 112,181 117,500 $ 159.7 $ 1,359 $ 45.0 $ 45.0
Fort Knox
(attributable)(g)
Q3 2026 6,202 1,358 5,465 1.07 0.22 84 % 72,443 72,613 $ 140.7 $ 1,938 $ 20.9 $ 25.9
Q2 2026 5,610 1,796 3,965 1.37 0.27 82 % 95,485 98,796 $ 157.7 $ 1,596 $ 32.5 $ 35.2
Q1 2026 9,463 1,103 7,314 1.31 0.28 85 % 93,994 87,945 $ 154.9 $ 1,761 $ 19.8 $ 19.8
Q4 2025 11,001 1,597 8,805 0.93 0.23 87 % 65,434 67,882 $ 113.6 $ 1,673 $ 31.5 $ 31.5
Q3 2025 8,056 1,425 6,538 1.55 0.23 89 % 95,742 100,878 $ 138.4 $ 1,372 $ 40.4 $ 40.4
Round Mountain Q3 2026 2,541 884 3,772 0.73 0.19 60 % 27,068 25,969 $ 66.4 $ 2,557 $ 10.7 $ 44.0
Q2 2026 2,389 951 878 0.39 0.29 44 % 19,789 20,118 $ 67.6 $ 3,360 $ 6.9 $ 49.1
Q1 2026 790 953 513 0.37 0.21 52 % 26,200 26,084 $ 72.4 $ 2,776 $ 4.9 $ 53.9
Q4 2025 737 966 1,110 0.49 0.29 67 % 31,754 31,641 $ 86.6 $ 2,737 $ 8.6 $ 41.5
Q3 2025 1,659 914 1,113 0.66 0.32 72 % 37,297 37,274 $ 78.1 $ 2,095 $ 4.5 $ 33.0
Bald Mountain Q3 2026 6,347 – 6,347 – 0.29 nm 29,319 27,168 $ 43.9 $ 1,616 $ 5.6 $ 77.5
Q2 2026 6,046 – 6,046 – 0.30 nm 27,176 27,401 $ 48.5 $ 1,770 $ 4.0 $ 54.0
Q1 2026 3,985 – 3,985 – 0.30 nm 27,561 27,561 $ 53.3 $ 1,934 $ 6.9 $ 39.7
Q4 2025 3,165 – 3,165 – 0.30 nm 38,402 37,141 $ 55.4 $ 1,492 $ 13.1 $ 51.6
Q3 2025 2,182 – 2,182 – 0.31 nm 41,525 42,261 $ 48.5 $ 1,148 $ 5.3 $ 27.9

(a)   Due to the nature of heap leach operations, recovery rates at Bald Mountain cannot be accurately measured on a quarterly basis. Recovery rates at Fort Knox and Round Mountain represent mill recovery only.
(b)  “nm” means not meaningful.
(c)  Gold equivalent ounces include silver ounces produced and sold converted to a gold equivalent based on the ratio of the average spot market prices for the commodities for each period. The ratios for the quarters presented are as follows: Q3 2026: 68.10:1; Q2 2026: 61.61:1; Q1 2026: 57.79:1; Q4 2025: 76.34:1; Q3 2025: 87.73:1.
(d)  “Production cost of sales per equivalent ounce sold” is defined as production cost of sales divided by total gold equivalent ounces sold.
(e)  “Total Cap Ex” is “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows. “Cap Ex – sustaining” is a non-GAAP financial measure. The definition and reconciliation of this non-GAAP financial measure is included on pages 21 to 21 of this news release.
(f)   La Coipa silver grade and recovery were as follows: Q3 2026: 29.34 g/t, 39%; Q2 2026: 44.14 g/t, 33%; Q1 2026: 35.03 g/t, 39%; Q4 2025: 33.21 g/t, 41%; Q3 2025: 41.34 g/t, 49%.
(g)  The Fort Knox segment is composed of Fort Knox and Manh Choh. Manh Choh tonnes of ore processed and grade were as follows: Q3 2026: 184,810 tonnes, 4.99 g/t; Q2 2026: 229,965 tonnes, 4.98 g/t; Q1 2026: 170,077 tonnes, 4.51 g/t; Q4 2025: 158,016 tonnes, 4.08 g/t; Q3 2025: 286,496 tonnes, 7.05 g/t. The attributable results for Fort Knox include 100% of Fort Knox and 70% of Manh Choh.

Reconciliation of non-GAAP financial measures and ratios

The Company has included certain non-GAAP financial measures and ratios in this document. These financial measures and ratios are not defined under IFRS and should not be considered in isolation. The Company believes that these financial measures and ratios, together with financial measures and ratios determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company. The inclusion of these financial measures and ratios is meant to provide additional information and should not be used as a substitute for performance measures prepared in accordance with IFRS. These financial measures and ratios are not necessarily standard and therefore may not be comparable to other issuers.

Adjusted Net Earnings and Adjusted Net Earnings per Share

Adjusted net earnings and adjusted net earnings per share are non-GAAP financial measures and ratios which determine the performance of the Company, excluding certain impacts which the Company believes are not reflective of the Company’s underlying performance for the reporting period, such as the impact of foreign exchange gains and losses, reassessment of prior year taxes and/or taxes otherwise not related to the current period, impairment charges (reversals), gains and losses and other one-time costs related to acquisitions, dispositions and other transactions, and non-hedge derivative gains and losses. Although some of the items are recurring, the Company believes that they are not reflective of the underlying operating performance of its current business and are not necessarily indicative of future operating results. Management believes that these measures and ratios, which are used internally to assess performance and in planning and forecasting future operating results, provide investors with the ability to better evaluate underlying performance, particularly since the excluded items are typically not included in public guidance. However, adjusted net earnings and adjusted net earnings per share measures and ratios are not necessarily indicative of net earnings and earnings per share measures and ratios as determined under IFRS.

The following table provides a reconciliation of net earnings to adjusted net earnings for the periods presented:

(expressed in millions of U.S. dollars, except per share amounts) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Net earnings attributable to common shareholders – as reported $ 583.2   $ 584.9   $ 2,270.4   $ 1,483.6  
Adjusting items:        
Foreign exchange losses   1.5     9.8     5.7     28.6  
Foreign exchange gains on translation of tax basis and foreign exchange on deferred income taxes within income tax expense   (3.4 )   (15.6 )   (13.5 )   (36.6 )
Taxes in respect of prior periods   3.9     3.3     9.0     (1.3 )
Costs in connection with conveyor belt repairs   4.9     –     25.0     –  
Gain on sale of Asante holdings(a)   –     (53.0 )   –     (53.0 )
Tasiast mill fire related costs   –     –     –     13.0  
Other   3.1     0.9     2.9     4.3  
Tax effects of the above adjustments   (1.9 )   (0.7 )   (6.3 )   (4.0 )
    8.1     (55.3 )   22.8     (49.0 )
Adjusted net earnings $ 591.3   $ 529.6   $ 2,293.2   $ 1,434.6  
Weighted average number of common shares outstanding – Basic   1,183.9     1,215.3     1,191.6     1,223.8  
Adjusted net earnings per share $ 0.50   $ 0.44   $ 1.92   $ 1.17  
Basic earnings per share attributable to common shareholders – as reported $ 0.49   $ 0.48   $ 1.91   $ 1.21  

(a)   The gain on sale of Asante holdings includes interest income of $21.8 million related to periods prior to 2025.

Attributable Free Cash Flow and Attributable Adjusted Free Cash Flow

Attributable free cash flow and attributable adjusted free cash flow are non-GAAP financial measures. Attributable free cash flow is defined as net cash flow provided from operating activities less attributable capital expenditures and non-controlling interest included in net cash flows provided from operating activities. Attributable adjusted free cash flow is defined as attributable free cash flow, excluding attributable changes in working capital given that numerous factors can result in it being volatile. The Company believes that these measures, which are used internally to evaluate the Company’s underlying cash generation performance and the ability to repay creditors and return cash to shareholders, provide investors with the ability to better evaluate the Company’s underlying performance. However, these measures are not necessarily indicative of operating earnings or net cash flow provided from operating activities as determined under IFRS.

The following table provides a reconciliation of attributable free cash flow and attributable adjusted free cash flow for the periods presented:

(expressed in millions of U.S. dollars) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Net cash flow provided from operating activities – as reported $ 714.4   $ 1,024.1   $ 2,999.8   $ 2,623.6  
Adjusting items:        
Attributable(a) capital expenditures   (439.5 )   (307.6 )   (1,124.6 )   (813.5 )
Non-controlling interest(b) cash flow used in (from) operating activities   6.4     (29.8 )   (29.6 )   (96.0 )
Attributable(a) free cash flow   281.3     686.7     1,845.6     1,714.1  
Adjusting items:        
Attributable(a) working capital changes:        
Accounts receivable and other assets   25.5     27.1     11.0     (0.5 )
Inventories   45.6     19.1     44.1     49.8  
Accounts payable and accrued liabilities   39.0     (75.0 )   46.8     (107.7 )
Attributable(a) adjusted free cash flow   391.4     657.9     1,947.5     1,655.7  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Adjusted Operating Cash Flow

Attributable adjusted operating cash flow is a non-GAAP financial measure and is defined as net cash flow provided from operating activities excluding changes in working capital, certain impacts which the Company believes are not reflective of the Company’s regular operating cash flow, and net cash flows provided from operating activities, net of working capital changes, relating to non-controlling interests. Working capital is excluded given that numerous factors can result in it being volatile. The Company uses attributable adjusted operating cash flow internally as a measure of the underlying operating cash flow performance and future operating cash flow-generating capability of the Company. However, the attributable adjusted operating cash flow measure is not necessarily indicative of net cash flow provided from operating activities as determined under IFRS.

The following table provides a reconciliation of attributable adjusted operating cash flow for the periods presented:

(expressed in millions of U.S. dollars) Three months ended
September 30,
Nine months ended
September 30,
    2026   2025(m)   2026   2025(m)
         
Net cash flow provided from operating activities – as reported $ 714.4   $ 1,024.1   $ 2,999.8   $ 2,623.6  
Adjusting items:        
Working capital changes:        
Accounts receivable and other assets   34.1     34.5     25.4     8.7  
Inventories   55.0     19.9     52.9     49.4  
Accounts payable and accrued liabilities   39.2     (76.5 )   40.2     (110.3 )
    842.7     1,002.0     3,118.3     2,571.4  
Non-controlling interest(b) cash flow from operating activities, net of working capital changes   (11.8 )   (36.5 )   (46.2 )   (102.2 )
Attributable(a) adjusted operating cash flow $ 830.9   $ 965.5   $ 3,072.1   $ 2,469.2  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Average Realized Gold Price per Ounce

Attributable average realized gold price per ounce is a non-GAAP ratio which calculates the average price realized from gold sales attributable to the Company. The Company believes that this measure provides a more accurate measure with which to compare the Company’s gold sales performance to market gold prices. The following table provides a reconciliation of attributable average realized gold price per ounce for the periods presented:

(in millions of U.S. dollars, except ounces and average realized gold price per ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Metal sales – as reported $ 1,774.7   $ 1,802.1   $ 6,420.5   $ 5,028.1  
Less: silver revenue(c)   (22.7 )   (32.3 )   (136.4 )   (77.4 )
Less: non-controlling interest(b) gold revenue   (31.3 )   (57.8 )   (107.0 )   (165.9 )
Attributable(a)gold revenue $ 1,720.7   $ 1,712.0   $ 6,177.1   $ 4,784.8  
         
Gold ounces sold   412,363     511,564     1,381,342     1,547,223  
Less: non-controlling interest(b) gold ounces sold   (7,333 )   (16,428 )   (23,974 )   (51,575 )
Attributable(a) gold ounces sold   405,030     495,136     1,357,368     1,495,648  
Attributable(a) average realized gold price per ounce $ 4,248   $ 3,458   $ 4,551   $ 3,199  
Average realized gold price per ounce(d) $ 4,249   $ 3,460   $ 4,549   $ 3,200  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Production Cost of Sales per Equivalent Ounce Sold

Production cost of sales per equivalent ounce sold is defined as production cost of sales, as reported on the consolidated statement of operations, divided by the total number of gold equivalent ounces sold. This measure converts the Company’s non-gold production into gold equivalent ounces and credits it to total production.

Attributable production cost of sales per equivalent ounce sold is a non-GAAP ratio and is defined as attributable production cost of sales divided by the attributable number of gold equivalent ounces sold. This measure converts the Company’s attributable non-gold production into gold equivalent ounces and credits it to total attributable production. Management uses this measure to monitor and evaluate the performance of its operating properties that are attributable to its shareholders.

The following table provides a reconciliation of production cost of sales and attributable production cost of sales per equivalent ounce sold for the periods presented:

(expressed in millions of U.S. dollars, except ounces and production cost of sales per equivalent ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Attributable(a) production cost of sales $ 609.4   $ 577.3   $ 1,934.9   $ 1,649.2  
         
Gold equivalent ounces sold   417,657     520,733     1,410,820     1,571,045  
Less: non-controlling interest(b) gold equivalent ounces sold   (7,412 )   (16,622 )   (24,480 )   (52,070 )
Attributable(a) gold equivalent ounces sold   410,245     504,111     1,386,340     1,518,975  
Attributable(a) production cost of sales per equivalent ounce sold $ 1,485   $ 1,145   $ 1,396   $ 1,086  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable Production Cost of Sales per Ounce Sold on a By-Product Basis

Attributable production cost of sales per ounce sold on a by-product basis is a non-GAAP ratio which calculates the Company’s non-gold production as a credit against its per ounce production costs, rather than converting its non-gold production into gold equivalent ounces and crediting it to total production, as is the case in co-product accounting. Management believes that this ratio provides investors with the ability to better evaluate Kinross’ production cost of sales per ounce on a comparable basis with other major gold producers who routinely calculate their cost of sales per ounce using by-product accounting rather than co-product accounting.

The following table provides a reconciliation of attributable production cost of sales per ounce sold on a by-product basis for the periods presented:

(expressed in millions of U.S. dollars, except ounces and production cost of sales per ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Less: attributable(a) impact of silver by-product(n)   (22.4 )   (31.7 )   (134.1 )   (75.8 )
Attributable(a) production cost of sales on a by-product basis $ 587.0   $ 545.6   $ 1,800.8   $ 1,573.4  
         
Gold ounces sold   412,363     511,564     1,381,342     1,547,223  
Less: non-controlling interest(b) gold ounces sold   (7,333 )   (16,428 )   (23,974 )   (51,575 )
Attributable(a) gold ounces sold   405,030     495,136     1,357,368     1,495,648  
Attributable(a) production cost of sales per ounce sold on a by-product basis $ 1,449   $ 1,102   $ 1,327   $ 1,052  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable All-In Sustaining Cost and All-In Cost per Ounce Sold on a By-Product Basis

Attributable all-in sustaining cost and all-in cost per ounce sold on a by-product basis are non-GAAP financial measures and ratios, as applicable, calculated based on guidance published by the World Gold Council (“WGC”). The WGC is a market development organization for the gold industry and is an association whose membership comprises leading gold mining companies including Kinross. Although the WGC is not a mining industry regulatory organization, it worked closely with its member companies to develop these metrics. Adoption of the all-in sustaining cost and all-in cost metrics is voluntary and not necessarily standard, and therefore, these measures and ratios presented by the Company may not be comparable to similar measures and ratios presented by other issuers. The Company believes that the all-in sustaining cost and all-in cost measures complement existing measures and ratios reported by Kinross.

All-in sustaining cost includes both operating and capital costs required to sustain gold production on an ongoing basis. The value of silver sold is deducted from the total production cost of sales as it is considered residual production, i.e. a by-product. Sustaining operating costs represent expenditures incurred at current operations that are considered necessary to maintain current production. Sustaining capital represents capital expenditures at existing operations comprising mine development costs, including capitalized development, and ongoing replacement of mine equipment and other capital facilities, and does not include capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements at existing operations.

All-in cost is comprised of all-in sustaining cost as well as operating expenditures incurred at locations with no current operation, or costs related to other non-sustaining activities, and capital expenditures for major growth projects or enhancement capital for significant infrastructure improvements at existing operations.

Attributable all-in sustaining cost and all-in cost per ounce sold on a by-product basis are calculated by adjusting production cost of sales, as reported on the interim condensed consolidated statements of operations, as follows:

(in millions of U.S. dollars, except ounces and costs per ounce) Three months ended
September 30,
Nine months ended
September 30,
    2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Less: attributable(a) impact of silver by-product(n)   (22.4 )   (31.7 )   (134.1 )   (75.8 )
Attributable(a) production cost of sales on a by-product basis $ 587.0   $ 545.6   $ 1,800.8   $ 1,573.4  
Adjusting items on an attributable(a) basis:        
General and administrative(f)   33.7     31.2     111.0     96.5  
Other operating expense – sustaining(g)   1.2     0.4     6.2     1.5  
Reclamation and remediation – sustaining(h)   21.7     21.7     68.3     66.4  
Exploration and business development – sustaining(i)   12.1     10.7     43.9     38.5  
Additions to property, plant and equipment – sustaining(j)   118.8     174.7     363.1     406.6  
Lease payments – sustaining(k)   1.8     1.8     5.6     4.4  
All-in Sustaining Cost on a by-product basis – attributable(a) $ 776.3   $ 786.1   $ 2,398.9   $ 2,187.3  
Adjusting items on an attributable(a) basis:        
Other operating expense – non-sustaining(g)   22.4     24.2     44.8     59.5  
Reclamation and remediation – non-sustaining(h)   2.0     2.3     5.9     6.9  
Exploration and business development – non-sustaining(i)   30.1     38.9     75.0     113.8  
Additions to property, plant and equipment – non-sustaining(j)   320.7     132.9     761.5     406.9  
Lease payments – non-sustaining(k)   0.3     0.2     0.7     0.6  
All-in Cost on a by-product basis – attributable(a) $ 1,151.8   $ 984.6   $ 3,286.8   $ 2,775.0  
         
Gold ounces sold   412,363     511,564     1,381,342     1,547,223  
Less: non-controlling interest(b) gold ounces sold   (7,333 )   (16,428 )   (23,974 )   (51,575 )
Attributable(a) gold ounces sold   405,030     495,136     1,357,368     1,495,648  
Attributable(a) all-in sustaining cost per ounce sold on a by-product basis $ 1,917   $ 1,588   $ 1,767   $ 1,462  
Attributable(a) all-in cost per ounce sold on a by-product basis $ 2,844   $ 1,989   $ 2,421   $ 1,855  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Attributable All-In Sustaining Cost and All-In Cost per Equivalent Ounce Sold

The Company also assesses its attributable all-in sustaining cost and all-in cost on a gold equivalent ounce basis. Under these non-GAAP financial measures and ratios, the Company’s production of silver is converted into gold equivalent ounces and credited to total production.

Attributable all-in sustaining cost and all-in cost per equivalent ounce sold are calculated by adjusting production cost of sales, as reported on the interim condensed consolidated statements of operations, as follows:

(in millions of U.S. dollars, except ounces and cost per equivalent ounce) Three months ended
September 30,
Nine months ended
September 30,
  2026     2025     2026     2025  
         
Production cost of sales – as reported $ 627.2   $ 598.6   $ 1,992.4   $ 1,713.7  
Less: non-controlling interest(b) production cost of sales   (17.8 )   (21.3 )   (57.5 )   (64.5 )
Attributable(a) production cost of sales $ 609.4   $ 577.3   $ 1,934.9   $ 1,649.2  
Adjusting items on an attributable(a) basis:        
General and administrative(f)   33.7     31.2     111.0     96.5  
Other operating expense – sustaining(g)   1.2     0.4     6.2     1.5  
Reclamation and remediation – sustaining(h)   21.7     21.7     68.3     66.4  
Exploration and business development – sustaining(i)   12.1     10.7     43.9     38.5  
Additions to property, plant and equipment – sustaining(j)   118.8     174.7     363.1     406.6  
Lease payments – sustaining(k)   1.8     1.8     5.6     4.4  
All-in Sustaining Cost – attributable(a) $ 798.7   $ 817.8   $ 2,533.0   $ 2,263.1  
Adjusting items on an attributable(a) basis:        
Other operating expense – non-sustaining(g)   22.4     24.2     44.8     59.5  
Reclamation and remediation – non-sustaining(h)   2.0     2.3     5.9     6.9  
Exploration and business development – non-sustaining(i)   30.1     38.9     75.0     113.8  
Additions to property, plant and equipment – non-sustaining(j)   320.7     132.9     761.5     406.9  
Lease payments – non-sustaining(k)   0.3     0.2     0.7     0.6  
All-in Cost – attributable(a) $ 1,174.2   $ 1,016.3   $ 3,420.9   $ 2,850.8  
         
Gold equivalent ounces sold   417,657     520,733     1,410,820     1,571,045  
Less: non-controlling interest(b) gold equivalent ounces sold   (7,412 )   (16,622 )   (24,480 )   (52,070 )
Attributable(a) gold equivalent ounces sold   410,245     504,111     1,386,340     1,518,975  
Attributable(a) all-in sustaining cost per equivalent ounce sold $ 1,947   $ 1,622   $ 1,827   $ 1,490  
Attributable(a) all-in cost per equivalent ounce sold $ 2,862   $ 2,016   $ 2,468   $ 1,877  
Production cost of sales per equivalent ounce sold(e) $ 1,502   $ 1,150   $ 1,412   $ 1,091  

See pages 22 and 22 for details of the footnotes referenced within the table above.

Capital Expenditures and Attributable Capital Expenditures

Capital expenditures are classified as either sustaining capital expenditures or non-sustaining capital expenditures, depending on the nature of the expenditure. Sustaining capital expenditures typically represent capital expenditures at existing operations including capitalized exploration costs and capitalized development unless related to major projects, ongoing replacement of mine equipment and other capital facilities and other capital expenditures and is calculated as total additions to property, plant and equipment (as reported on the interim condensed consolidated statements of cash flows), less non-sustaining capital expenditures. Non-sustaining capital expenditures represent capital expenditures for major projects, including major capital development projects at existing operations that are expected to materially benefit the operation, as well as enhancement capital for significant infrastructure improvements at existing operations. Management believes the distinction between sustaining capital expenditures and non-sustaining expenditures is a useful indicator of the purpose of capital expenditures and this distinction is an input into the calculation of attributable all-in sustaining costs per ounce and attributable all-in costs per ounce. The categorization of sustaining capital expenditures and non-sustaining capital expenditures is consistent with the definitions under the WGC all-in cost standard. Sustaining capital expenditures and non-sustaining capital expenditures are not defined under IFRS, however, the sum of these two measures total to additions to property, plant and equipment as disclosed under IFRS on the interim condensed consolidated statements of cash flows.

Additions to property, plant and equipment per the interim condensed consolidated statements of cash flows includes 100% of capital expenditures for Manh Choh. Attributable capital expenditures is a non-GAAP financial measure and includes Kinross’ 70% share of capital expenditures for Manh Choh. Management believes this to be a useful indicator of Kinross’ cash resources utilized for capital expenditures.

The following table provides a reconciliation of the classification of capital expenditures for the periods presented:

(expressed in millions of U.S. dollars) Tasiast
(Mauritania)
Paracatu
(Brazil)
La Coipa
(Chile)
Fort Knox(l)
(USA)
Round Mountain
(USA)
Bald Mountain
(USA)
Total
USA
Other(o) Total
Three months ended September 30, 2026
Sustaining capital expenditures $ 16.9 $ 57.6 $ 7.0 $ 21.0   $ 10.7 $ 5.6 $ 37.3   $ 0.1 $ 118.9  
Non-sustaining capital expenditures   72.2   16.5   8.3   5.0     33.3   71.9   110.2     113.5   320.7  
Additions to property, plant and equipment – per cash flow $ 89.1 $ 74.1 $ 15.3 $ 26.0   $ 44.0 $ 77.5 $ 147.5   $ 113.6 $ 439.6  
Less: Non-controlling interest(b)   –   –   –   (0.1 )   –   –   (0.1 )   –   (0.1 )
Attributable(a) capital expenditures $ 89.1 $ 74.1 $ 15.3 $ 25.9   $ 44.0 $ 77.5 $ 147.4   $ 113.6 $ 439.5  
Three months ended September 30, 2025                  
Sustaining capital expenditures $ 47.6 $ 58.2 $ 18.5 $ 45.0   $ 4.5 $ 5.3 $ 54.8   $ 0.2 $ 179.3  
Non-sustaining capital expenditures   54.4   –   –   –     28.5   22.6   51.1     27.4   132.9  
Additions to property, plant and equipment – per cash flow $ 102.0 $ 58.2 $ 18.5 $ 45.0   $ 33.0 $ 27.9 $ 105.9   $ 27.6 $ 312.2  
Less: Non-controlling interest(b)   –   –   –   (4.6 )   –   –   (4.6 )   –   (4.6 )
Attributable(a)capital expenditures $ 102.0 $ 58.2 $ 18.5 $ 40.4   $ 33.0 $ 27.9 $ 101.3   $ 27.6 $ 307.6  

(expressed in millions of U.S. dollars) Tasiast
(Mauritania)
Paracatu
(Brazil)
La Coipa
(Chile)
Fort Knox(l)
(USA)
Round Mountain
(USA)
Bald Mountain
(USA)
Total
USA
Other(o) Total
Nine months ended September 30, 2026
Sustaining capital expenditures $           74.3 $     131.2 $      44.8 $      82.4   $       22.5 $        16.5 $   121.4   $       0.6 $   372.3  
Non-sustaining capital expenditures             171.1          32.9          15.0           7.7           124.5          154.7       286.9         255.6       761.5  
Additions to property, plant and equipment – per cash flow $         245.4 $     164.1 $      59.8 $      90.1   $     147.0 $      171.2 $   408.3   $   256.2 $ 1,133.8  
Less: Non-controlling interest(b)                   –               –              –          (9.2 )               –                –         (9.2 )             –         (9.2 )
Attributable(a) capital expenditures $         245.4 $     164.1 $      59.8 $      80.9   $     147.0 $      171.2 $   399.1   $   256.2 $ 1,124.6  
Nine months ended September 30, 2025                  
Sustaining capital expenditures $           84.4 $     121.0 $      59.1 $    116.2   $       13.0 $        24.9 $   154.1   $       0.5 $   419.1  
Non-sustaining capital expenditures             187.4               –              –              –             82.4           61.2       143.6           75.9       406.9  
Additions to property, plant and equipment – per cash flow $         271.8 $     121.0 $      59.1 $    116.2   $       95.4 $        86.1 $   297.7   $     76.4 $   826.0  
Less: Non-controlling interest(b)                   –               –              –        (12.5 )               –                –       (12.5 )             –       (12.5 )
Attributable(a) capital expenditures $         271.8 $     121.0 $      59.1 $    103.7   $       95.4 $        86.1 $   285.2   $     76.4 $   813.5  

See pages 22 and 22 for details of the footnotes referenced within the tables above.

Endnotes

(a)    “Attributable” measures and ratios include Kinross’ share of Manh Choh (70%) sales, costs, cash flows and capital expenditures.
(b)    “Non-controlling interest” represents the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100% for cash flow from operating activities, costs, sales and capital expenditures, as appropriate.
(c)    “Silver revenue” represents the portion of metal sales realized from the production of secondary or by-product metal (i.e. silver), which is produced as a by-product of the process used to produce gold.
(d)    “Average realized gold price per ounce” is defined as gold revenue divided by total gold ounces sold.
(e)    “Production cost of sales per equivalent ounce sold” is defined as production cost of sales divided by total gold equivalent ounces sold.
(f)     “General and administrative” expenses are as reported on the interim condensed consolidated statements of operations, excluding certain impacts which the Company believes are not reflective of the Company’s underlying performance for the reporting period. General and administrative expenses are considered sustaining costs as they are required to be absorbed on a continuing basis for the effective operation and governance of the Company.
(g)    “Other operating expense – sustaining” is calculated as “Other operating expense” as reported on the interim condensed consolidated statements of operations, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100% and other operating and reclamation and remediation expenses related to non-sustaining activities as well as other items not reflective of the underlying operating performance of the Company. Other operating expenses are classified as either sustaining or non-sustaining based on the type and location of the expenditure incurred. The majority of other operating expenses that are incurred at existing operations are considered costs necessary to sustain operations, and are therefore, classified as sustaining. Other operating expenses incurred at locations where there is no current operation or related to other non-sustaining activities are classified as non-sustaining.
(h)    “Reclamation and remediation – sustaining” is calculated as current period accretion related to reclamation and remediation obligations plus current period amortization of the corresponding reclamation and remediation assets, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100%, and is intended to reflect the periodic cost of reclamation and remediation for currently operating mines. Reclamation and remediation costs for development projects or closed mines are excluded from this amount and classified as non-sustaining.
(i)     “Exploration and business development – sustaining” is calculated as “Exploration and business development” expenses as reported on the interim condensed consolidated statements of operations, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100% and non-sustaining exploration and business development expenses. Exploration expenses are classified as either sustaining or non-sustaining based on a determination of the type and location of the exploration expenditure. Exploration expenditures within the footprint of operating mines are considered costs required to sustain current operations and are therefore included in sustaining costs. Exploration expenditures focused on new ore bodies near existing mines (i.e. brownfield), new exploration projects (i.e. greenfield) or for other generative exploration activity not linked to existing mining operations are classified as non-sustaining. Business development expenses are classified as either sustaining or non-sustaining based on a determination of the type of expense and requirement for general or growth-related operations.
(j)     “Additions to property, plant and equipment – sustaining” and “non-sustaining” are as presented on pages 21 and 21 of this news release and include Kinross’ share of Manh Choh’s (70%) sustaining and non-sustaining capital expenditures.
(k)    “Lease payments – sustaining” represents the majority of lease payments as reported on the interim condensed consolidated statements of cash flows and is made up of the principal and financing components of such cash payments, less the non-controlling interest portion in Manh Choh (30%) and other subsidiaries for which the Company’s interest is less than 100%, and non-sustaining lease payments. Lease payments for development projects or closed mines are classified as non-sustaining.
(l)     The Fort Knox segment is composed of Fort Knox and Manh Choh for all periods presented.
(m)   Attributable adjusted operating cash flow for the three and nine months ended September 30, 2025 has been presented in accordance with the current period’s presentation.
(n)    “Impact of silver by-product” represents the costs allocated to the production of secondary or by-product metal (i.e. silver), which is produced as a by-product of the process used to produce gold.
(o)    Other includes corporate and other non-operating assets (including Great Bear, Curlew and Lobo-Marte).

Cautionary statement on forward-looking information 

All statements, other than statements of historical fact, contained or incorporated by reference in this news release including, but not limited to, any information as to the future financial or operating performance of Kinross, constitute “forward-looking information” or “forward-looking statements” within the meaning of certain securities laws, including the provisions of the Securities Act (Ontario) and the provisions for “safe harbor” under the United States Private Securities Litigation Reform Act of 1995 and are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements contained in this news release, include, but are not limited to, those under the headings (or headings that include) “2026 third-quarter highlights”, “Return of capital to shareholders”, “CEO commentary”, “Development project highlights” “Operating results”, and Development projects”, as well as statements with respect to our guidance for production, cost guidance, including production costs of sales, all-in sustaining cost of sales, and capital expenditures; anticipated returns of capital to shareholders, including the declaration, payment, increase and sustainability of the Company’s dividends; the size, scope and execution of the proposed share buybacks and the anticipated timing thereof, including the Company’s statement committing to share buybacks and dividends for 2026 of 50% of free cash flow; statement about future recovery rates at La Coipa and Round Mountain; identification of additional resources and reserves or the conversion of resources to reserves; the Company’s liquidity; the Company’s debt levels; the schedules budgets, and forecast economics for the Company’s development projects; budgets for and future plans for exploration, development and operation at the Company’s operations and projects, including the Great Bear and Lobo-Marte projects; planned timing for the submission of permits; potential mine life extensions at the Company’s operations; the Company’s balance sheet and liquidity outlook, as well as references to other possible events including, the future price of gold and silver, costs of production, operating costs; price inflation; capital expenditures, costs and timing of the development of projects and new deposits, estimates and the realization of such estimates (such as mineral or gold reserves and resources or mine life), success of exploration, development and mining, currency fluctuations, capital requirements, project studies, government regulation, permit applications, environmental risks and proceedings, and resolution of pending litigation. The words “advance”, “believe”, “continue”, “deliver”, “expects”, “focus”, “forecast”, “guidance”, “long-term”, “looking ahead”, “on plan”, “on track”, “opportunities”, “outlook”, “plan”, “progress”, “target”, or variations of or similar such words and phrases or statements that certain actions, events or results may, could, should or will be achieved, received or taken, or will occur or result and similar such expressions identify forward-looking statements.

Forward-looking statements are necessarily based upon a number of estimates and assumptions that, while considered reasonable by Kinross as of the date of such statements, are inherently subject to significant business, economic and competitive uncertainties and contingencies. The estimates, models and assumptions of Kinross referenced, contained or incorporated by reference in this news release, which may prove to be incorrect, include, but are not limited to, the various assumptions set forth herein and in our Management’s Discussion and Analysis (“MD&A”) for the year ended December 31, 2025, and the Annual Information Form dated March 26, 2026 as well as: (1) there being no significant disruptions affecting the operations of the Company, whether due to extreme weather events and other or related natural disasters, labour disruptions (including but not limited to strikes or workforce reductions), supply disruptions, power disruptions, damage to equipment, pit wall slides or otherwise; (2) permitting, development, operations and production from the Company’s operations and development projects being consistent with Kinross’ current expectations including, without limitation: mill grades, recovery rates, and reconciliation aligning with internal expectations, the maintenance of existing permits and approvals and the timely receipt of all permits and authorizations necessary for construction and operations; water and power supply and continued operation of the tailings reprocessing facility at Paracatu; permitting of the Great Bear project (including the consultation process with Indigenous groups), permitting and development of the Lobo-Marte project; in each case in a manner consistent with the Company’s expectations; and the successful completion of exploration consistent with the Company’s expectations at the Company’s projects; (3) political regulatory and legal developments in any jurisdiction in which the Company operates being consistent with its current expectations including, without limitation, restrictions or penalties imposed, or actions taken, by any government, including but not limited to amendments to the mining laws and tailings facility regulations in Brazil, potential amendments to water laws and/or other water use restrictions and regulatory actions in Chile, dam safety regulations, potential amendments to minerals and mining laws and energy levies laws, new regulations relating to work permits, potential amendments to customs and mining laws (including but not limited to amendments to the VAT) and the potential application of the tax code in Mauritania, potential amendments to and enforcement of tax laws in Mauritania (including, but not limited to, the interpretation, implementation, application and enforcement of any such laws and amendments thereto), substantial changes to the federal and/or provincial regulatory and permitting regimes in Canada, third party legal challenges to existing permits, and the impact of any trade tariffs being consistent with Kinross’ current expectations; (4) the completion of studies and the results of those studies being consistent with Kinross’ current expectations; (5) the exchange rate between the Canadian dollar, Brazilian real, Chilean peso, Mauritanian ouguiya and the U.S. dollar being approximately consistent with current levels; (6) certain price assumptions for gold and silver which includes, as it relates to share repurchases, assumptions that prices for gold and silver remain approximately consistent with current levels; (7) prices for diesel, natural gas, fuel oil, electricity and other key supplies being approximately consistent with the Company’s expectations; (8) attributable production and cost of sales forecasts for the Company meeting expectations; (9) the accuracy of the current mineral reserve and mineral resource estimates of the Company and Kinross’ analysis thereof being consistent with expectations (including but not limited to ore tonnage and ore grade estimates), future mineral resource and mineral reserve estimates being consistent with preliminary work undertaken by the Company, mine plans for the Company’s current and future mining operations, and the Company’s internal models; (10) labour and materials costs increasing on a basis consistent with Kinross’ current expectations; (11) the terms and conditions of the legal and fiscal stability agreements for Tasiast being interpreted and applied in a manner consistent with their intent and Kinross’ expectations and without material amendment or formal dispute (including without limitation the application of tax, customs and duties exemptions and royalties); (12) asset impairment potential; (13) the regulatory and legislative regime regarding mining, electricity production and transmission (including rules related to power tariffs) in Brazil being consistent with Kinross’ current expectations; (14) access to capital markets, including but not limited to maintaining our current credit ratings consistent with the Company’s current expectations; (15) potential direct or indirect operational impacts resulting from infectious diseases or pandemics; (16) changes in national and local government legislation or other government actions, including Ontario environmental regulations and the Canadian federal impact assessment regime; (17) litigation, regulatory proceedings and audits, and the potential ramifications thereof, being concluded in a manner consistent with the Company’s expectations (including without limitation litigation in Chile relating to the wetlands remediation plan or other environmental obligations arising therefrom); (18) the Company’s financial results, cash flows and future prospects being consistent with Company expectations in amounts sufficient to permit sustained dividend payments; (19) the impacts of potential geotechnical instability being consistent with the Company’s expectations; and (20) the impacts of groundwater inflows at the La Coipa pit being consistent with the Company’s expectations. Known and unknown factors could cause actual results to differ materially from those projected in the forward-looking statements. Such factors include, but are not limited to: the inaccuracy of any of the foregoing assumptions; fluctuations in the currency markets; fluctuations in the spot and forward price of gold or certain other commodities (such as fuel and electricity); price inflation of goods and services; changes in the discount rates applied to calculate the present value of net future cash flows based on country-specific real weighted average cost of capital; changes in the market valuations of peer group gold producers and the Company, and the resulting impact on market price to net asset value multiples; changes in various market variables, such as interest rates, foreign exchange rates, gold or silver prices and lease rates, or global fuel prices, that could impact the mark-to-market value of outstanding derivative instruments and ongoing payments/receipts under any financial obligations; risks arising from holding derivative instruments (such as credit risk, market liquidity risk and mark-to-market risk); changes in national and local government legislation, taxation (including but not limited to income tax, advance income tax, stamp tax, withholding tax, capital tax, tariffs, value-added or sales tax, capital outflow tax, capital gains tax, windfall or windfall profits tax, production royalties, excise tax, customs/import or export taxes/duties, asset taxes, asset transfer tax, property use or other real estate tax, together with any related fine, penalty, surcharge, or interest imposed in connection with such taxes), controls, tariffs, policies and regulations; the security of personnel and assets; political or economic developments in Canada, the United States, Chile, Brazil, Mauritania or other countries in which Kinross does business or may carry on business; business opportunities that may be presented to, or pursued by, us; our ability to successfully integrate acquisitions and complete divestitures; operating or technical difficulties in connection with mining, development or refining activities; employee relations; litigation or other claims against, or regulatory investigations and/or any enforcement actions, administrative orders or sanctions in respect of the Company (and/or its directors, officers, or employees) including, but not limited to, securities class action litigation in Canada and/or the United States, environmental litigation or regulatory proceedings or any investigations, enforcement actions and/or sanctions under any applicable anti-corruption, international sanctions and/or anti-money laundering laws and regulations in Canada, the United States or any other applicable jurisdiction; the speculative nature of gold exploration and development including, but not limited to, the risks of obtaining and maintaining necessary licenses and permits; diminishing quantities or grades of reserves; adverse changes in our credit ratings; and contests over title to properties, particularly title to undeveloped properties. In addition, there are risks and hazards associated with the business of gold exploration, development and mining, including environmental hazards, industrial accidents, unusual or unexpected formations, pressures, cave-ins, flooding and gold bullion losses (and the risk of inadequate insurance, or the inability to obtain insurance, to cover these risks). Many of these uncertainties and contingencies can directly or indirectly affect, and could cause, Kinross’ actual results to differ materially from those expressed or implied in any forward-looking statements made by, or on behalf of, Kinross, including but not limited to resulting in an impairment charge on goodwill and/or assets. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Forward-looking statements are provided for the purpose of providing information about management’s expectations and plans relating to the future. All of the forward-looking statements made in this news release are qualified by this cautionary statement and those made in our other filings with the securities regulators of Canada and the United States including, but not limited to, the cautionary statements made in the “Risk Analysis” section of our MD&A for the year ended December 31, 2025, and the “Risk Factors” set forth in the Company’s Annual Information Form dated March 26, 2026. These factors are not intended to represent a complete list of the factors that could affect Kinross. Kinross disclaims any intention or obligation to update or revise any forward-looking statements or to explain any material difference between subsequent actual events and such forward-looking statements, except to the extent required by applicable law.

Key Sensitivities

Approximately 70%-80% of the Company’s costs are denominated in U.S. dollars.

A 10% change in foreign currency exchange rates would be expected to result in an approximate $30 impact on attributable production cost of sales per equivalent ounce sold1, 12.

Specific to the Brazilian real, a 10% change in the exchange rate would be expected to result in an approximate $50 impact on Brazilian attributable production cost of sales per equivalent ounce sold1.

Specific to the Chilean peso, a 10% change in the exchange rate would be expected to result in an approximate $60 impact on Chilean attributable production cost of sales per equivalent ounce sold1.

A $10 per barrel change in the price of oil would be expected to result in an approximate $10 impact on attributable production cost of sales per equivalent ounce sold1.

A $100 change in the price of gold would be expected to result in an approximate $5 impact on attributable production cost of sales per equivalent ounce sold1 as a result of a change in royalties.

Other information

Where we say “we”, “us”, “our”, the “Company”, or “Kinross” in this news release, we mean Kinross Gold Corporation and/or one or more or all of its subsidiaries, as may be applicable.

The technical information about the Company’s mineral properties contained in this news release has been prepared under the supervision of Mr. Nicos Pfeiffer, an officer of the Company who is a “qualified person” within the meaning of National Instrument 43-101.

Source: Kinross Gold Corporation

________________________________
1   Unless otherwise stated, production figures in this news release are on an attributable basis. “Attributable” includes Kinross’ 70% share of Manh Choh production, costs, cash flows and capital expenditures. Financial figures include 100% of Manh Choh results except when denoted as attributable. Attributable figures are non-GAAP financial measures and ratios. Refer to footnote 6.
2   “Production cost of sales per equivalent ounce sold” is defined as production cost of sales, as reported on the interim condensed consolidated statements of operations, divided by total gold equivalent ounces sold.
3   Operating cash flow figures in this news release represent “Net cash flow provided from operating activities,” as reported on the interim condensed consolidated statements of cash flows.
4   “Margins” per equivalent ounce sold is defined as average realized gold price per ounce less production cost of sales per equivalent ounce sold.
5   Earnings, net earnings, and reported net earnings figures in this news release represent “Net earnings attributable to common shareholders,” as reported on the interim condensed consolidated statements of operations.
6   These figures are non-GAAP financial measures and ratios, as applicable, and are defined and reconciled on pages 15 to 22 of this news release. Non-GAAP financial measures and ratios have no standardized meaning under International Financial Reporting Standards (“IFRS”) and therefore, may not be comparable to similar measures presented by other issuers.
7   Net cash is calculated as cash and cash equivalents of $2,638.4 million less long-term debt of $739.2 million as reported on the Company’s interim condensed consolidated balance sheet as at September 30, 2026.
8   “Average realized gold price per ounce” is defined as gold revenue divided by total gold ounces sold.
9   “Capital expenditures” is “Additions to property, plant and equipment” on the interim condensed consolidated statements of cash flows.
10  “Available credit” is defined as available credit under the Company’s credit facilities and is calculated in Section 6 Liquidity and Capital Resources of Kinross’ MD&A for the three and nine months ended September 30, 2026.
11 “Total liquidity” is defined as the sum of cash and cash equivalents, as reported on the interim condensed consolidated balance sheets, and available credit under the Company’s credit facilities (as calculated in Section 6 Liquidity and Capital Resources of Kinross’ MD&A for the three and nine months ended September 30, 2026).
12 Refers to all of the currencies in the countries where the Company has mining operations, fluctuating simultaneously by 10% in the same direction, either appreciating or depreciating, taking into consideration the impact of hedging and the weighting of each currency within our consolidated cost structure.

CLEVELAND, Oct. 28, 2026 (GLOBE NEWSWIRE) — Parker Hannifin Corporation (NYSE: PH), the global leader in motion and control technologies, today announced that its Board of Directors has declared a regular quarterly cash dividend of $2.00 per share of common stock to shareholders of record as of November 13, 2026. The dividend is payable December 4, 2026.

This is the company’s 306th consecutive quarterly dividend. Parker has increased its annual dividends per share paid to shareholders for 70 consecutive fiscal years, among the top five longest-running dividend-increase records in the S&P 500 Index.

Parker Hannifin is a Fortune 250 global leader in motion and control technologies. For more than a century the company has been enabling engineering breakthroughs that lead to a better tomorrow. Learn more at www.parker.com or @parkerhannifin.

###

CONTACT: Contact:
Media –
Aidan Gormley, Director, Global Communications and Branding
216/896-3258
aidan.gormley@parker.com

Financial Analysts –
Jeff Miller, Vice President, Investor Relations 
216/896-2708
jeffrey.miller@parker.com