Figure 1

Surebet Zone cross section including GD-26-483 and GD-26-474.
Surebet Zone cross section including GD-26-483 and GD-26-474.

Figure 2

Highlights of GD-26-483.
Highlights of GD-26-483.

Figure 3

Big Bulk Zones – plan view including GD-26-440.
Big Bulk Zones – plan view including GD-26-440.

Figure 4a

VG-NE
VG-NE

Figure 4b

VG-NE
VG-NE

Figure 4c

VG-NE
VG-NE

Figure 4d

VG-NE
VG-NE

Figure 4e

VG-NE
VG-NE

Figure 4f

VG-NE
VG-NE

Figure 4g

VG-NE
VG-NE

Figure 5

Plan view of VG-NE distribution
Plan view of VG-NE distribution

Figure 6

Bonanza Zone - plan view expansion map
Bonanza Zone – plan view expansion map

Figure 7

Golden Gate Zone - plan view expansion map
Golden Gate Zone – plan view expansion map

Figure 8

Big Bulk Zone - cross section of central core zone
Big Bulk Zone – cross section of central core zone

Figure 9

Cross section conceptual view of mineralized wedge in Big Bulk Zones
Cross section conceptual view of mineralized wedge in Big Bulk Zones

Figure 10

Plan view of infill and expansion pads for 2027
Plan view of infill and expansion pads for 2027

Figure 11

Isometric View of the Surebet Discovery Ore Mineralization Model
Isometric View of the Surebet Discovery Ore Mineralization Model
  • Assay results confirm grade continuity across all major mineralized zones at the Surebet High-Grade Gold Discovery that demonstrates predictability of the mineralization model as the system was expanded by more than 1 km along the NE–SW trend and by 100 meters to the north as well as west resulting in a total footprint of the Surebet System increasing to 2.01 Km2. Assays are still pending for 55 holes drilled in 2026.
  • Surebet Zone – Drill hole GD-26-483 intersected 9.89 g/t AuEq over 12.00 meters, including 28.81 g/t AuEq over 4 meters consisting of pyrrhotite-galena-sphalerite rich quartz breccia associated with abundant Visible Gold to the Naked Eye (VG-NE), confirming continuity and high-grade nature of the Surebet Zone; see Figures 1., 2. and Table 1.
  • Multiple drill holes confirm the strong continuity and high-grade nature of all 6 mineralized zones within the Surebet System. Highlights include:
    • Surebet Zone – Drill hole GD-26-474 intersected 9.74 g/t AuEq (9.47 g/t Au and 50.18 g/t Ag) over 6.23 meters, including 13.88 g/t AuEq (13.51 g/t Au and 70.71 g/t Ag) over 4.26 meters from an interval of quartz-sulphide veining and breccia; see Figure 1 and Table 1.
    • Eldorado Zone – Drill hole GD-26-431 intersected 4.21 g/t AuEq (4.53 g/t Au and 1.48 g/t Ag) over 7.90 meters, including 5.41 g/t AuEq (5.83 g/t Au and 1.43 g/t Ag) over 5.95 meters from an interval of quartz-sulphide veining and widespread biotite alteration part of the that remains open; see Table 1.
    • Multiple Zones – Drill hole GD-26-467 intersected 2.65 g/t AuEq (2.75 g/t Au and 4.90 g/t Ag) over 11.72 meters, including 6.38 g/t AuEq (6.69 g/t Au and 8.40 g/t Ag) over 4.64 meters from an interval spanning sheared quartz breccia part of the Bonanza Zone, distributed veinlets of the Big Bulk Zone, and quartz-sulphide veining part of the Golden Gate Zone that remain open; see Table 1.
  • With 48,443 meters drilled in 97 holes utilizing 7 drill rigs turning 24 hours a day for 94 days, the 2026 drill program on the Surebet Discovery has exceeded expectations with multiple successful large step-out drill holes, maintaining 100% hit rate intersecting quartz-sulphide mineralization, and with abundant occurrences of VG-NE; see Figures 4a – g.
  • Over 200,000 meters have been drilled to date at the high-grade Surebet Gold Discovery, where 412 holes out of 483 (85%) contain VG-NE that clearly demonstrates the continuity and predictability of this expansive gold-rich system that remains open; see Figure 5.
  • The total footprint of the Surebet system has been expanded to 2.01 km2, which represents a 12% increase compared to 1.8 km2 defined prior to the 2026 drilling season; see news August 24, 2026.
    • Bonanza Zone – drilling in 2026 successfully expanded the From 1.27 km2 to 1.51 km2. It intersected mineralization in multiple step-out drill holes, resulting in the expansion of the Bonanza Zone by 750 meters to the southwest, 100 meters to the west, 100 meters to the north and 160 meters to the northeast side of the Surebet system and still remains open for expansion; see Figure 6.
    • Golden Gate Zone – drilling in 2026 successfully expanded the from 0.85 km2 To 1.17 km2. It intersected mineralization in multiple step-out drill holes, resulting in the expansion of the Golden Gate Zone by 480 meters to the northeastern side and 540 meters to the southwestern side of the Surebet system; see Figure 7.
  • Big Bulk Zones – Goliath’s 2026 drilling successfully identified the newly defined and extensive mineralized areas containing VG-NE that span the volume between the Bonanza and Golden Gate zones near the location where the structures join, extending up to 310 meters in length, 500 meters laterally, and 110 meters vertically. This new zone consists of numerous mineralized stacked veinlets forming broad intervals up to 58 meters wide and hosted in the volcanics with grades up to 3.60 AuEq, potentially amenable to low-cost bulk mining methods; see Figures 3, 8 and 9.
  • High-grade gold has been identified in 7 zones and in three distinct rock types, including: quartz-sulphide breccias and stockwork veins hosted in the sedimentary units; precious and base metals bearing veins hosted in the volcanic units; and intermediate to felsic Eocene-aged dykes. All of which contain substantial amounts of VG-NE (from fine-grained to coarse-grained gold) and remain wide open for expansion. This supports the presence of a Motherlode magmatic source at depth (a thesis developed from the work at the Colorado School of Mines), a causative intrusion responsible for the extensive 2.01 km2 high-grade gold system at the Surebet Discovery.
  • 2027 planned expansion and infill drilling areas; see Figure 10.
  • The Surebet Discovery has widespread drill holes representing more than 1,500 pierce points (2021-2025) with a vast majority having tight spacings of 25 – 50 meters.
  • The Surebet Discovery is a grassroots project that has evolved from the idea of exploring prospective untouched ground in an area recently exposed by glacial retreat and permanent snowpack abatement, to a mineralizing system consisting of 46 stacked gold-rich veins defined through over 200,000 meters of drilling, in a total of 21 months of work on the ground.

TORONTO, Oct. 07, 2026 (GLOBE NEWSWIRE) — Goliath Resources Limited (TSX-V: GOT) (OTCQB: GOTRF) (FSE: B4IF) (the “Company” or “Goliath”) is pleased to report several assays from its 2026 drill program where drill hole GD-26-483 intersected 9.89 g/t AuEq over 12.00 meters at the Surebet Discovery on its 100% owned Golddigger Property (the “Property”), Golden Triangle, British Columbia. Recent assay results confirm grade continuity across all major mineralized zones at the Surebet Gold Discovery and demonstrate the predictability of the mineralization model as the system was expanded by more than 1 km along the NE–SW trend by 100 meters to the north and west resulting in a total footprint of the Surebet System of 2.01 Km2. 100% of the drill holes completed to date on Surebet have intersected quartz-sulphide mineralization, where 412 drill holes out of 483 (or 85%) contain VG-NE, clearly demonstrating continuity and predictability of the Surebet System as well as the untapped discovery potential remaining on the property. Assays are still pending for 55 holes drilled in 2026.

Mr. Roger Rosmus, Founder & CEO of Goliath states: “Every season at Surebet delivers positive surprises. What began as a 2 kilometer surface outcrop has expanded into a remarkably continuous, high-grade gold system across stacked veins and multiple rock units within the last few years, featuring visible gold in 85% of our 483 drill holes. Our 2026 drill program, with up to 750 meters of expansion through step out holes, demonstrates rare structural predictability, proving the mineralization remains coherent throughout. Our team sees host rocks extending over a large area, suggesting we are nowhere close to the extent of the system. Additionally, newly identified broad, lower-grade zones between our high-grade Bonanza and Golden Gate zones called Big Bulk zones open compelling potential for underground bulk mining. The Surebet Discovery continues to show strong potential to become one of the most significant high-grade gold discoveries in British Columbia’s Golden Triangle in many years. We look forward to releasing additional assays from 55 holes that are still pending from our 2026 drill program.”

The 2026 drill program continues to deliver remarkable results highlighted by drill hole GD-26-483, which intersected 9.89 g/t AuEq over 12.00 meters, including 33.17 g/t Au over 2.85 meters within a pyrrhotite-galena-sphalerite rich quartz breccia associated with abundant VG-NE part the Surebet Zone. Additionally, complete multi-element assays reported for numerous drill holes confirm strong continuity across all seven mineralized zones within the system.

Highlights include: drill hole GD-26-440, which intersected the Big Bulk Zone with 24.97 meters of 0.70 g/t AuEq; drill hole GD-26-474 in the Surebet Zone intersected 9.74 g/t AuEq over 6.23 meters, including 13.88 g/t AuEq over 4.26; drill hole GD-26-431 in the Eldorado Zone intersected 4.21 g/t AuEq over 7.90 meters, including 5.41 g/t AuEq over 5.95 meters; and drill hole GD-26-467 spanning the Bonanza, Big Bulk, and Golden Gate Zones, which intersected 2.65 g/t AuEq over 11.72 meters, including 6.38 g/t AuEq over 4.64 meters and 28.21 g/t AuEq over 1.02 meters. All 2026 drill holes to date have intersected quartz-sulphide mineralization.

The 2026 drill program achieved unprecedented scale and success, completing 48,443 meters across 97 holes using 7 drill rigs operating 24 hours a day for 94 days. The program maintained a 100% hit rate intersecting quartz-sulphide mineralization and abundant occurrences of VG-NE. To date, over 200,000 meters have been drilled at Surebet across 483 holes, of which 85% contain VG-NE. As a result of multiple successful step-out drill holes, the total footprint of the Surebet system has been expanded to 2.01 Km2, representing a 12% increase from the 1.8 Km2 defined prior to the season. Specifically, the Bonanza Zone expanded from 1.27 to 1.51 Km2 growing 750 meters to the southwest, 100 meters west, 100 meters north, and 160 meters northeast, while the Golden Gate Zone expanded from 0.85 to 1.17 Km2, growing 480 meters to the northeast and 540 meters to the southwest.

Furthermore, the 2026 campaign successfully identified the Big Bulk Zone, a newly discovered mineralized area containing visible gold spanning the region between the Bonanza and Golden Gate Zones where the structures converge. The central part of the Big Bulk Zone extends for 310 meters in length, 500 meters laterally, and 110 meters vertically. Individual mineralized intervals in this zone consist of numerous stacked mineralized veinlets spanning up to 58 meters hosted within volcanics with grades up to 3.60 g/t AuEq, presenting strong potential to be amenable to low-cost bulk mining methods.

High-grade gold has been identified in 7 zones and in three distinct rock types, including: quartz-sulphide breccias and stockwork veins hosted in the sedimentary units; precious and base metals bearing veins hosted in the volcanic units; and intermediate to felsic Eocene-aged dykes. All mineralized rock types contain substantial amounts of VG-NE and remain open for expansion. These findings suggest the presence of a large-scale, multi-phased high-grade gold mineralizing event driven by a Motherlode causative intrusion responsible for the extensive 2.01 km2 high-grade gold system at Surebet Discovery that remains open.

In just 21 months of on-the-ground work, the Surebet Discovery has advanced from a grassroots showing on virgin ground exposed by glacial retreat and permanent snowpack abatement, to an extensive high-grade gold mineralizing system with significant potential. The project now consists of 46 identified stacked gold-rich veins defined by over 200,000 meters of total drilling. The system’s scale continues to get larger with every drill program, with over 1,500 pierce points with a vast majority 25 – 50 meter spacing (2021 – 2025) distributed across an area of 2.01 km².

The Company is actively updating its high-grade gold wireframe models as assay results are received. Once all data from the 2026 program has been received, compiled, and modelled, a comprehensive drill plan for the 2027 season will be designed.

Surebet Discovery Highlights

  • 100% of the drill holes completed prior to the 2026 drill season have intersected gold mineralization, clearly demonstrating remarkable grade continuity and widths, with over 1,500 diamond drill hole intercepts (pierce points 2021 – 2025); ~77% have 25 – 50 meter spacings. Demonstrating the geological team has a great understanding of the system and its predictability.
  • The consistent continuity, widths and grade of ore mineralization demonstrated by >200,000 meters of drilling in multiple stacked lodes/veins confirms that the 2.01 km2 Surebet Discovery has strong potential to become one of the most significant high-grade gold discoveries in British Columbia’s Golden Triangle in many years.
  • The most recent ore mineralization model incorporating all available data prior to the 2026 drill program identified gold-mineralized vein systems/zones: Bonanza, Surebet, Golden Gate, Whopper, and Eldorado. Collectively these zones comprise 46 gold-rich lodes/veins and multiple subvertical Eocene-aged dyke swarms (see isometric view in Figure 11 below). A good analogy to the Surebet Discovery is the Pogo Mine in Alaska.

Table 1: Gold Equivalent (AuEq) assay results.

Pad ID Hole ID   From
(m)
To (m) Interval
(m)
Au (g/t) Ag (g/t) Cu % Pb % Zn % AuEq
(g/t)
Zone
Pad10

GD-26-
483

Interval 265.00 277.00 12.00 7.90 138.61 0.34 0.22 1.16 9.89 Surebet

Including 269.00 273.00 4.00 23.66 399.83 1.03 0.63 1.23 28.81
Including 269.85 271.85 2.00 46.78 791.80 2.07 1.25 0.00 56.39
Including 269.85 270.97 1.12 67.01 519.00 1.42 1.41 0.00 70.62
Pad10

GD-26-
474

Interval 281.37 287.60 6.23 9.47 50.18 0.03 0.71 0.77 9.74 Surebet

Including 282.42 286.68 4.26 13.51 70.71 0.03 1.01 1.07 13.88
Including 282.42 283.44 1.02 44.10 147.00 0.04 2.43 1.86 43.54
PAD04

GD-26-
431

Interval 229.00 240.90 11.90 3.07 1.43 0.01 0.01 0.03 2.87 Eldorado

Including 233.00 240.90 7.90 4.53 1.48 0.01 0.01 0.03 4.21
Including 234.95 240.90 5.95 5.83 1.43 0.00 0.02 0.04 5.41
Including 238.00 240.90 2.90 11.42 1.54 0.00 0.03 0.02 10.56
Including 238.00 239.00 1.00 25.05 2.89 0.01 0.02 0.03 23.15
Pad13

GD-26-
467

Interval 406.10 417.82 11.72 2.75 4.90 0.01 0.04 0.16 2.65 Bonanza –
Big Bulk –
Golden Gate

Including 413.18 417.82 4.64 6.69 8.40 0.01 0.10 0.26 6.38
Including 416.80 417.82 1.02 29.99 24.95 0.03 0.38 0.52 28.21
Pad07 GD-26-
485
Interval 649.20 653.00 3.80 8.46 36.19 0.06 0.35 1.15 8.71 Golden Gate
Including 650.35 652.10 1.75 18.19 77.43 0.12 0.75 2.48 18.71
Pad19 GD-26-
481
Interval 340.00 346.00 6.00 4.30 7.89 0.01 0.11 0.27 4.17 Bonanza
Including 341.00 342.00 1.00 24.81 28.60 0.02 0.41 1.11 23.63
Pad19 GD-26-
466
Interval 508.33 512.82 4.49 4.18 20.64 0.05 0.12 1.45 4.58 Golden Gate
Including 508.33 509.77 1.44 12.41 59.08 0.14 0.33 4.25 13.54
Pad07

GD-26-
463

Interval 529.70 539.00 9.30 2.06 8.57 0.02 0.20 0.20 2.12 Golden Gate

Including 529.70 533.00 3.30 3.72 18.34 0.04 0.48 0.41 3.90
Including 536.00 539.00 3.00 2.19 4.65 0.01 0.07 0.14 2.14
Pad04 GD-26-
440
Interval 402.13 427.10 24.97 0.66 3.85 0.01 0.02 0.10 0.70 Big Bulk
Including 403.00 410.05 7.05 1.07 5.25 0.01 0.03 0.06 1.09
Pad16 GD-26-
468
Interval 554.00 556.99 2.99 4.63 30.05 0.07 0.24 0.49 4.91 Golden Gate
Including 555.04 556.04 1.00 13.71 88.51 0.19 0.71 1.32 14.49
Pad04 GD-26-
440
Interval 374.15 399.12 24.97 0.53 2.56 0.01 0.02 0.10 0.56 Bonanza
Including 391.00 399.12 8.12 1.12 4.47 0.02 0.02 0.17 1.16
Pad07

GD-26-
473

Interval 471.00 477.00 6.00 2.36 2.99 0.01 0.04 0.10 2.26 Bonanza

Including 471.00 475.00 4.00 3.30 2.52 0.01 0.03 0.11 3.13
Including 474.00 475.00 1.00 11.68 2.35 0.02 0.02 0.04 10.83
Pad25 GD-26-
495
Interval 249.00 252.15 3.15 4.23 0.88 0.00 0.03 0.02 3.92 Golden Gate
Including 250.15 251.30 1.15 11.54 2.24 0.01 0.08 0.04 10.69
Pad19 GD-26-
466
Interval 180.00 184.00 4.00 2.80 4.59 0.01 0.07 0.13 2.70 Eldorado
Including 180.00 181.00 1.00 10.65 14.38 0.01 0.24 0.36 10.16
Pad01 GD-26-
448
Interval 491.00 495.00 4.00 2.33 10.20 0.03 0.12 0.76 2.53 Golden Gate
Including 492.15 494.07 1.92 4.78 20.34 0.07 0.24 1.56 5.18
Pad11

GD-26-
469

Interval 274.30 280.04 5.74 1.33 12.00 0.02 0.13 0.09 1.45 Surebet

Including 274.30 278.17 3.87 1.88 15.89 0.02 0.18 0.11 2.02
Including 275.47 276.45 0.98 6.53 31.99 0.06 0.54 0.33 6.68
Pad07 GD-26-
485
Interval 657.00 661.00 4.00 1.93 12.44 0.02 0.20 0.31 2.08 Golden Gate
Including 657.00 659.00 2.00 3.74 24.26 0.05 0.40 0.59 4.04
Pad06 GD-26-
459
Interval 827.02 831.00 3.98 1.66 13.90 0.01 0.04 0.44 1.85 Golden Gate
Including 827.02 828.02 1.00 5.42 41.98 0.02 0.07 1.59 6.02
Pad19 GD-26-
466
Interval 195.00 201.00 6.00 1.08 13.13 0.01 0.32 0.30 1.31 Eldorado
Lower
Including 197.87 201.00 3.13 1.82 18.54 0.01 0.44 0.44 2.12
Pad06

GD-26-
447

Interval 213.00 219.83 6.83 0.91 9.95 0.01 0.12 0.20 1.05 Surebet

Including 214.98 219.83 4.85 1.17 13.21 0.01 0.16 0.26 1.36
Including 214.98 216.00 1.02 3.70 36.70 0.03 0.35 0.38 4.09
Pad07 GD-26-
473
Interval 628.10 631.25 3.15 1.77 7.03 0.07 0.04 1.52 2.19 Golden Gate
Including 629.25 630.40 1.15 4.63 16.73 0.18 0.07 4.09 5.74
Pad06 GD-26-
447
Interval 26.00 29.00 3.00 2.40 1.72 0.00 0.01 0.01 2.24 Whopper
Including 27.00 28.00 1.00 7.16 3.69 0.00 0.01 0.02 6.66
Pad24 GD-26-
492
Interval 222.00 225.70 3.70 1.45 6.90 0.02 0.18 1.11 1.76 Bonanza
Including 222.00 224.85 2.85 1.78 8.43 0.02 0.24 1.36 2.16
Pad07 GD-26-
473
Interval 164.77 169.00 4.23 1.33 7.03 0.01 0.17 0.28 1.42 Whopper
Including 165.75 168.00 2.25 2.47 12.33 0.01 0.32 0.52 2.64
Pad17 GD-26-
438
Interval 163.92 167.00 3.08 2.02 2.89 0.01 0.04 0.03 1.93 Eldorado
Including 164.80 166.08 1.28 4.80 5.32 0.01 0.08 0.05 4.54
Pad02 GD-26-
413
Interval 464.00 468.00 4.00 1.50 5.27 0.01 0.00 0.01 1.47 Golden Gate
Including 465.00 467.00 2.00 2.93 7.77 0.01 0.00 0.01 2.82
Pad06 GD-26-
432
Interval 251.00 252.00 1.00 5.90 0.35 0.00 0.00 0.01 5.44 Dyke
Pad05 GD-26-
435
Interval 274.19 277.00 2.81 2.03 1.12 0.00 0.00 0.02 1.90 Bonanza
Pad17 GD-26-
438
Interval 412.00 416.00 4.00 1.11 9.24 0.01 0.20 0.54 1.33 Surebet
Including 413.00 415.00 2.00 2.17 17.45 0.01 0.39 1.07 2.58
Pad15 GD-26-
442
Interval 546.85 550.85 4.00 0.33 37.40 0.01 1.17 0.87 1.22 Bonanza
Including 547.85 548.85 1.00 0.48 114.00 0.01 3.64 2.93 3.28
Pad06 GD-26-
439
Interval 188.80 192.35 3.55 0.76 31.46 0.01 0.38 0.50 1.32 Surebet
Including 189.80 191.35 1.55 1.72 70.09 0.01 0.87 1.12 2.98
Pad02 GD-26-
422
Interval 242.00 246.00 4.00 1.25 0.90 0.00 0.00 0.01 1.17 Dyke
Pad07 GD-26-
463
Interval 543.00 547.00 4.00 0.99 3.22 0.01 0.01 0.10 1.00 Golden Gate
Pad01 GD-26-
414
Interval 492.80 495.90 3.10 1.30 2.31 0.01 0.02 0.05 1.26 Bonanza
Including 493.63 494.80 1.17 2.72 3.79 0.01 0.04 0.10 2.60
Pad23 GD-26-
497
Interval 176.00 178.93 2.93 1.17 4.28 0.01 0.03 0.09 1.18 Bonanza
Including 177.00 178.00 1.00 3.38 8.88 0.02 0.06 0.23 3.33
Pad04 GD-26-
446
Interval 513.00 516.20 3.20 0.70 4.99 0.01 0.06 0.32 0.82 Bonanza
Including 514.00 515.05 1.05 2.00 12.23 0.02 0.18 0.77 2.26
 

Table 2: Collar information for drill holes reported in this news release.

Hole ID CRS Easting (m) Northing (m) Elevation (m) Azimuth (deg) Dip (deg) Length
(m)
GD-26-483 NAD83 / UTM zone 9N 457295 6163063 1699 30 73 301
GD-26-474 NAD83 / UTM zone 9N 457294 6163064 1699 79 5 649
GD-26-431 NAD83 / UTM zone 9N 456711 6162964 1630 40 85 489
GD-26-467 NAD83 / UTM zone 9N 457964 6162972 1403 240 80 513
GD-26-485 NAD83 / UTM zone 9N 457056 6163031 1659 161 63 723
GD-26-481 NAD83 / UTM zone 9N 456842 6162809 1564 112 58 673
GD-26-466 NAD83 / UTM zone 9N 456841 6162812 1565 42.2 69.1 659
GD-26-463 NAD83 / UTM zone 9N 457055 6163030 1659 180 73 726
GD-26-440 NAD83 / UTM zone 9N 456711 6162964 1631 40 85 471
GD-26-468 NAD83 / UTM zone 9N 457320 6162856 1584 222 80 651
GD-26-473 NAD83 / UTM zone 9N 457055 6163030 1659 180 59 750
GD-26-495 NAD83 / UTM zone 9N 458010 6162368 1094 245 82 309
GD-26-448 NAD83 / UTM zone 9N 457718 6162966 1489 170 75 522
GD-26-469 NAD83 / UTM zone 9N 457146 6163024 1673 150 85 525
GD-26-459 NAD83 / UTM zone 9N 457442 6163160 1708 175 75 855
GD-26-447 NAD83 / UTM zone 9N 457445 6163162 1708 80 65 462
GD-26-492 NAD83 / UTM zone 9N 457973 6162662 1177 343 45 302
GD-26-438 NAD83 / UTM zone 9N 456992 6163124 1670 330.1 47 472
GD-26-413 NAD83 / UTM zone 9N 457178 6161752 932 205.4 69.9 606
GD-26-432 NAD83 / UTM zone 9N 457441 6163165 1709 335 45 309
GD-26-435 NAD83 / UTM zone 9N 456773 6162468 1395 150 50 434
GD-26-442 NAD83 / UTM zone 9N 457189 6163130 1704 310 79 600
GD-26-439 NAD83 / UTM zone 9N 457444 6163164 1709 38 58 369
GD-26-422 NAD83 / UTM zone 9N 457182 6161754 932 103.2 47.1 426
GD-26-414 NAD83 / UTM zone 9N 457719 6162968 1490 115 81 578
GD-26-497 NAD83 / UTM zone 9N 457846 6162680 1209 260 70 345
GD-26-446 NAD83 / UTM zone 9N 456710 6162966 1631 0 47 558
 

Table 3: Five main modelled gold rich zones plus the dykes prior to the 2026 drilling, see isometric view in Figure 11 below.

Zone Number of
lodes/veins
Dimensions Key Intercept Status
Bonanza 5 1.8 km x 1.8 km x 19 m 8.35 g/t AuEq over 23 m Remains Open
Surebet 9 1.2 km x 1.0 km x 19 m 21.08 g/t AuEq over 23 m Remains Open
Golden Gate 18 1.6 km x 1.5 km x 14 m 34.52 g/t AuEq over 39 m Remains Open
Whopper 12 1.0 km x 1.0 km x 6 m 32.67 g/t AuEq over 4 m Remains Open
Eldorado 2 1.0 km x 900 m x 5 m 13.93 g/t AuEq over 5.75 m Remains Open
Gold-rich dykes   1.4 km x 890 m x 25 m 12.03 g/t AuEq over 10 m Remains Open
  • 85% of the holes (412 out of 483) drilled to date at the Surebet Discovery contain VG-NE and 100% have intersected quartz-sulphide mineralization. See news releases dated: July 7, 2025, June 23, 2025, January 7, 2025, January 13, 2025, February 10, 2025, February 18, 2025, February 27, 2025, December 12, 2024, July 30, 2024, January 20, 2026, December 2, 2025, November 17, 2025, October 27, 2025, September 22, 2025, September 8, 2025, August 26, 2025, July 28, 2025, July 15, 2026, August 6, 2026, August 10, 2026, August 11, 2026, August 21, 2026, August 24, 2026, August 31, 2026, September 10, 2026, September 16, 2026, September 18, 2026 and September 22, 2026; see Figure 5 above.
  • High-grade gold has been identified in 7 zones and in three distinct rock types, including: quartz-sulphide breccias and stockwork veins hosted in the sedimentary units; precious and base metals bearing veins hosted in the volcanic units; and intermediate to felsic Eocene-aged dykes. All mineralized rock types contain substantial amounts of VG-NE (from fine-grained to coarse-grained gold) and remain open for expansion.
  • Metallurgical testing conducted on a composite core sample resulted in metal recoveries of 92.2% for Au, 86.5% for Ag, 94.2% for Pb and 96.9% for Zn achieved through a combination of simple gravity and flotation circuits. The gravity-only recoveries amount to 48.8% Au and 10.3% Ag with a crush size of 327 micrometer (no cyanide leaching required to recover the gold and silver). The metallurgical testing completed to date shows a benign rock composition without deleterious elements (see news release March 1, 2023).
  • The best hole drilled to date from the gold-rich stacked quartz-sulphide breccias and stockwork veins hosted in the sedimentary units is GD-23-157 that assayed 21.08 g/t AuEq (18.95 g/t Au and 95.31 g/t Ag) over 23.00 meters, including 33.75 g/t AuEq (30.39 g/t Au and 150.42 g/t Ag) over 14.00 meters, including 50.27 g/t AuEq (45.27 g/t Au and 225.42 g/t Ag) over 9.00 meters (see news release dated August 15, 2023). More details on the QA/QC protocol can be found in the section titled “QA/QC Protocol” below.
  • The best hole drilled to date from the precious and base metals bearing veins hosted in the volcanic units is GD-24-260 from the Golden Gate Zone that assayed 34.52 g/t AuEq (34.47 Au and 3.96 Ag) over 39.00 meters, including 132.93 g/t AuEq (132.78 Au and 12.98 Ag) over 10.00 meters, and 166.04 g/t AuEq (165.84 Au and 16.07 Ag) over 8.00 meters (see news release dated January 13, 2025). More details on the QA/QC protocol can be found in the section titled “QA/QC Protocol” below.
  • The best hole drilled to date from the Big Bulk Zone, previously reported as the volcanic wedge zone, is GD-24-291 that assayed 1.97 g/t AuEq (1.92 Au and 1.85 Ag) over 33 meters (see news release dated August 31, 2026). This zone is composed of dense networks of thin mineralized veinlets interpreted to represent distributed fractures filled by mineralized fluids within structural interaction damage zones developed around the Bonanza–Golden Gate junctions. More details on the QA/QC protocol can be found in the section titled “QA/QC Protocol” below.
  • The best hole drilled to date from the Eocene-aged dykes is GD-22-58 that assayed 12.03 g/t AuEq (11.84 g/t Au and 15.61 g/t Ag) over 10.00 meters including 19.91 g/t AuEq (19.62 g/t Au and 25.61 g/t Ag) over 6.00 meters, including 23.82 g/t AuEq (23.47 g/t Au and 30.54 g/t Ag) over 5.00 meters, plus a second separate interval down hole of 8.59 g/t AuEq (8.35 g/t Au and 20.74 g/t Ag) over 5.00 meters (see news release dated March 13, 2025). More details on the QA/QC protocol can be found in the section titled “QA/QC Protocol” below.
  • A study completed by the Colorado School of Mines confirms a new interpretation of the ore forming process at Surebet and suggests a common magmatic source for the high-grade gold system hosted in three distinct rock types. Until this study, researchers and explorers in the Golden Triangle had not recognized the high-grade gold discovery potential in the Eocene-aged dykes (see news release March 13, 2025), which is showing the potential that these discoveries could be a geological breakthrough in the Golden Triangle of British Columbia.
  • Based on positive grassroots exploration and drill results in recent years, Goliath now controls 91,518 hectares (226,146 acres), spanning 56 kilometers of the Red Line geologic trend providing for additional discovery potential.
  • The Golddigger Property is located adjacent to tidewater with a barge route to Prince Rupert (190 km south) and close to existing infrastructure including the town of Kitsault proximal to a permitted mine site on private property.

About Golddigger Property

The Golddigger Property is 100% owned and covers an area of 91,518 hectares in a highly prospective geological setting of the Eskay Rift and controls 56km of the Red Line in the Golden Triangle of British Columbia. This area has hosted some of Canada’s greatest gold mines including Eskay Creek, Premier and Snip. Other significant and well-known deposits in the Golden Triangle include Brucejack, Copper Canyon, Galore Creek, Granduc, KSM, Red Chris, and Schaft Creek. Goliath controls 56 kilometers of the Red Line which is a geologic contact between Triassic age Stuhini rocks and Jurassic age Hazelton rocks used as key markers when exploring for gold-copper-silver mineralization.

The Surebet discovery has shown predictable continuity and good metallurgy with gold recoveries of 92.2% from gravity and flotation at a 327-micrometer crush, including 48.8% recovery of free gold from gravity alone (no cyanide required to recover the gold). The metallurgical testing completed to date shows no presence of deleterious elements (see news release dated March 1, 2023).

The Property is in a favourable location in close proximity to the communities of Alice Arm and Kitsault where there is a permitted mill site on private property. It is situated adjacent to tide water with direct barge access to Prince Rupert (190 kilometers via the Observatory inlet/Portland inlet). The town of Kitsault is accessible by road (190 kilometers from Terrace, 300 kilometers from Prince Rupert) and has a barge landing, dock, and infrastructure capable of housing at least 300 people, including high-tension power.

Additional infrastructure in the area includes the Dolly Varden Silver Mine Road (only 7 kilometers to the East of the Surebet discovery) with direct road access to Alice Arm barge landing (18 kilometers to the south of the Surebet discovery) and high-tension power (25 kilometers to the east of Surebet discovery). The city of Terrace (population 16,000) provides access to railway, major highways, and airport with supplies (food, fuel, lumber, etc.), while the town of Prince Rupert (population 12,000) is located on the West Coast of British Columbia and houses an international container seaport also with direct access to railway and an airport.

Qualified Person

Mr. Rein Turna P. Geo is the qualified person as defined by National Instrument 43-101, for Goliath Resources Limited projects, and supervised the preparation of, and has reviewed and approved, the technical information in this release. Mr. Turna is an Independent Director of the Company.

About CASERM (Center to Advance the Science of Exploration to Reclamation in Mining)

Goliath Resources is a paying member and active supporter of the Center to Advance the Science of Exploration to Reclamation in Mining (CASERM), which is one of the world’s largest research centers in the mining sector. CASERM is a collaborative research venture between Colorado School of Mines and Virginia Tech that is supported by a consortium of mining and exploration companies, analytical instrumentation and software companies, and federal agencies aiming to transform the way geoscience data is acquired and used across the mining value chain. The center forms part of the I-UCRC program of the National Science Foundation. Research focuses on the integration of diverse geoscience data to improve decision making across the mine life cycle, beginning with the exploration for subsurface resources continuing through mine operation as well as closure and environmental remediation. Over the past three years, Goliath Resources’ membership in CASERM has allowed a high level of research to be performed on the Surebet Discovery.

About Goliath Resources Limited

Goliath Resources is an explorer of precious metals projects in the highly prospective Golden Triangle of Northwestern British Columbia. All of its projects are in high quality geological settings and geopolitical safe jurisdictions amenable to mining in Canada. Goliath is a member and active supporter of CASERM which is an organization that represents a collaborative venture between Colorado School of Mines and Virginia Tech. In 2025, Goliath completed its largest drill program to date for a total of 64,364 meters and has recently completed a fully funded drill program in 2026 comprised of 48,443 meters; assays are pending for 55 holes. The Company’s key strategic cornerstone shareholders include Crescat Capital, a Global Commodity Group (Singapore), McEwen Inc. (NYSE: MUX) (TSX: MUX), Waratah Capital Advisors, Rob McEwen, Eric Sprott and Larry Childress.

For more information please contact:

Goliath Resources Limited
Mr. Roger Rosmus
Founder and CEO
Tel: +1.416.488.2887
roger@goliathresources.com
www.goliathresourcesltd.com

Disclaimer

The reader is cautioned that grab samples are spot samples which are typically, but not exclusively, constrained to mineralization. Grab samples are selective in nature and collected to determine the presence or absence of mineralization and are not intended to be representative of the material sampled.

Quality Assurance / Quality Control (QA/QC) Protocol

Core Samples Handling & Sampling

Oriented HQ-diameter or NQ-diameter diamond drill core from the drill program is placed in core boxes by the drill crew contracted by the Company. Core boxes are transported by helicopter to the staging area and then transported by truck to the core shack. The core is then re-orientated, meterage blocks are checked, meter marks are labelled, Recovery and RQD measurements taken, and primary bedding and secondary structural features including veins, dykes, cleavage, and shears are noted and measured. The core is then described and transcribed in MX DepositTM. Drill holes were planned using Leapfrog Geo™ and QGIS™ software and data from the 2017-2025 exploration programs. Drill core containing quartz breccia, stockwork, veining and/or sulphide(s), or notable alteration is selectively sampled in lengths of 0.5 to 1.5 meters. Samples are selected from continuous intervals of mineralization and/or other relevant geological features, including shoulder samples that extend for 3 meters into adjacent unmineralized and/or unaltered country rock. Along barren core intervals devoid of mineralization or significant geological features, one 1 meter sample is collected every ten meters. Core samples are cut lengthwise in half: one-half remains in the box and the other half is inserted in a clean plastic bag with a sample tag. The bagged samples are then weighed and secured with a zip tie. Certified reference materials (CRMs), blanks and duplicates are added in the sample stream at a rate of 10%. To ensure analytical anonymity, CRM identification labels are removed prior to submission to the laboratory. Additional out-of-sequence blanks are introduced immediately following core samples that contain visible gold to the naked eye (VG-NE) or visibly high-grade sulphide mineralization.

Surface Samples Handling & Sampling

Grab, channels, chip and talus samples were collected by foot with helicopter assistance. Prospective areas included, but were not limited to, proximity to MINFile locations, placer creek occurrences, regional soil anomalies, and potential gossans based on high-resolution satellite imagery. The rock grab and chip samples were extracted using a rock hammer, or hammer and chisel to expose fresh surfaces and to liberate samples weighing anywhere between 0.5 and 5.0 kilograms. All sample sites were flagged with biodegradable flagging tape and marked with the sample number. All sample site locations were recorded using handheld GPS units (accuracy 3-10 meters) and sample ID, easting, northing, elevation, type of sample (outcrop, subcrop, float, talus, chip, grab, etc.) and a description of the rock were recorded on all-weather paper. Samples are then inserted in a clean plastic bag with a sample tag for transport and shipping to the geochemistry lab. QA/QC samples including blanks, certified reference materials, and duplicate samples are inserted regularly into the sample sequence at a rate of 10%.

Samples Analysis

All samples are transported in rice bags sealed with numbered security tags. The rice bags are transported from the core shacks to the MSALABS facilities in Terrace, BC. MSALABS is certified with both AC89-IAS and ISO/IEC Standard 17025:2017. The core samples undergo preparation via drying, crushing to ~70% of the material passing a 2 mm sieve and riffle splitting. The sample splits are weighed and transferred into plastic jars, each containing between 300 g and 500 g of crushed sample material. A 250 g split is pulverized to ensure at least 85% of the material passes through a 75 µm sieve. The crushed samples are transported to the MSALABS PhotonAssayTM facility in Prince George, where gold concentrations are quantified via photon assay analysis (method CPA-Au1). Samples that result in gold concentrations ≥5 ppm are analyzed to extinction. Photon assay uses high-energy X-rays (photons) to excite atomic nuclei within the jarred samples, inducing the emission of secondary gamma rays, which are measured to quantify gold concentrations. The assays from all jars are combined on a weight-averaged basis. Multielement analyses are carried out at the MSALABS facilities in Surrey, BC, where 250 g of pulverized splits are analyzed via IMS-230 and ICF6xx methods. The IMS-230 method uses 4-acid digestion (a combination of hydrochloric, nitric, perchloric and hydrofluoric acids) followed by inductively coupled plasma emission spectrometry to quantify concentrations of 48 elements. Samples with over-limit results for Ag, Cu, Pb and Zn undergo ore-grade analysis via the ICF-6xx method (where ‘xx’ denotes the target metal). This method employs 4-acid digestion followed by inductively coupled plasma emission spectrometry.

Gold Equivalent (AuEq) Calculation

Gold Equivalent (AuEq) values incorporate metal recovery factors based on preliminary metallurgical testwork, which excluded copper. It was assumed that copper can be recovered with zinc at the same recovery rate. The recovery factors used in the AuEq calculations are: Gold 92.2%; Silver 86.5%; Copper 96.9%; Lead 94.2%; Zinc 96.9%. AuEq metal values are calculated using: 4,222.08 Au USD/oz, Ag 67.76 USD/oz, Cu 6.43 USD/lbs, Pb 1,967.13 USD/ton and Zn 3,578.25 USD/ton (updated on August 4, 2026) using the formula below:

There is potential for economic recovery of gold, silver, copper, lead, and zinc based on other mining and exploration projects in the same Golden Triangle Mining Camp where Goliath’s project is located, such as the Homestake Ridge Gold Project (Auryn Resources Technical Report, Updated Mineral Resource Estimate and Preliminary Economic Assessment on the Homestake Ridge Gold Project, prepared by Minefill Services Inc. Bothell, Washington, dated May 29, 2020). Here, AuEq values were calculated using 3-year running averages for metal price, and included provisions for metallurgical recoveries, treatment charges, refining costs, and transportation. Recoveries for Gold were 85.5%, Silver at 74.6%, Copper at 74.6% and Lead at 45.3%. It will be assumed that Zinc can be recovered with Copper at the same recovery rate of 74.6%. The quoted reference of metallurgical recoveries is not from Goliath’s Golddiggers Project, Surebet Zone mineralization, and there is no guarantee that such recoveries will ever be achieved, unless detailed metallurgical work such as in a Feasibility Study can be eventually completed on the Golddigger Project.

Reported Drill Intervals and Assays

Drill core intervals are reported as drill lengths, where the true width is estimated to be 80-90% of the length. The widths of the mineralized intervals were defined to reflect both the assay results and the mineralized veining observed in drill core. Veining constrains the local width of the mineralized zone, while assay results define the grade distribution within that zone. Reported intervals are therefore intended to represent geologically meaningful zone widths at the point of intersection.

The reported assays of drill intervals were calculated as length-weighted average grades using the individual sample assay results and their corresponding sample lengths. The average grade for each interval was determined by dividing the sum of the products of each sample grade and sample length by the total sampled interval length (Σ[grade × sample length] / Σ[sample length]). This method accounts for variations in sample length and provides a representative average grade over the reported interval.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange), nor the OTCQB Venture Market accepts responsibility for the adequacy or accuracy of this release.

Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words “could”, “intend”, “expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Goliath’s current belief or assumptions as to the outcome and timing of such future events. Actual future results may differ materially. In particular, this release contains forward-looking information relating to, among other things, the ability of the Company to complete financings and its ability to build value for its shareholders as it develops its mining properties. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to Goliath. Although such statements are based on management’s reasonable assumptions, there can be no assurance that the proposed transactions will occur, or that if the proposed transactions do occur, will be completed on the terms described above.

The forward-looking information contained in this release is made as of the date hereof and Goliath is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.

This announcement does not constitute an offer, invitation, or recommendation to subscribe for or purchase any securities and neither this announcement nor anything contained in it shall form the basis of any contract or commitment.  In particular, this announcement does not constitute an offer to sell, or a solicitation of an offer to buy, securities in the United States, or in any other jurisdiction in which such an offer would be illegal.

The securities referred to herein have not been and will not be registered under the United States Securities Act of 1933, as amended (the “U.S. Securities Act”), or any state securities laws and may not be offered or sold within the United States or to or for the account or benefit of a U.S. person (as defined in Regulation S under the U.S. Securities Act) unless registered under the U.S. Securities Act and applicable state securities laws or an exemption from such registration is available.

BETHESDA, Md., Oct. 07, 2026 (GLOBE NEWSWIRE) — Eagle Bancorp, Inc. (the “Company”) (NASDAQ: EGBN), the Bethesda-based holding company for EagleBank, one of the largest community banks in the Washington D.C. area, today announced that it will host a teleconference call for the financial community on October 22, 2026, at 10:00 a.m. (EDT). On this call, Eagle Bancorp Inc.’s Chief Executive Officer Steve Curley and Chief Financial Officer Eric Newell will discuss earnings for the third quarter 2026 financial results. Those results will be released after the close of business on October 21, 2026.

Interested parties will need to register at the below-noted URL in order to listen and participate in the call. Once a participant registers with a valid email, they will receive a dial-in phone number and unique PIN number which will be needed to access the call. The call will also be available live via webcast on the Company’s website, which is www.EagleBankCorp.com. A replay of the call will be available on the Company’s website through November 5, 2026.

Participant Call Registration Link:
Conference Registration

Webcast Link:
Eagle Bancorp 3rd Quarter 2026 Earnings Conference Call

Caution About Forward-Looking Statements

This press release contains forward-looking statements within the meaning of the Securities Exchange Act of 1934, as amended, including statements of goals, intentions, and expectations as to future trends, plans, events or results of Company operations and policies and regarding general economic conditions. These forward-looking statements are based on current expectations that involve risks, uncertainties, and assumptions. Because of these uncertainties and the assumptions on which the forward-looking statements are based, actual future operations and results in the future may differ materially from those indicated herein. Readers are cautioned against placing undue reliance on any such forward-looking statements. For details on factors that could affect these expectations, see the risk factors and other cautionary language included in the Company’s Annual Report on Form 10-K for the year ended December 31, 2025, and other filings with the SEC. Except as required by law, the Company does not undertake to update forward-looking statements contained in this release.

About Eagle Bancorp, Inc. and EagleBank
Eagle Bancorp, Inc. is the holding company for EagleBank, which commenced operations in 1998. EagleBank is headquartered in Bethesda, Maryland, and conducts full service commercial banking through 12 offices, located in Suburban, Maryland, Washington, D.C. and Northern Virginia. EagleBank focuses on building relationships with businesses, professionals and individuals in its marketplace.

EagleBank Contact
Eric Newell, Chief Financial Officer, Eagle Bancorp, Inc.
240.497.1796

TEL AVIV, Israel, Oct. 07, 2026 (GLOBE NEWSWIRE) — Radware® (NASDAQ: RDWR), a global leader in application security and delivery solutions for multi-cloud environments, will announce its third quarter 2026 financial results on Wednesday, October 28, 2026.

Conference Call Details
Radware management will host a conference call on Wednesday, October 28, 2026, at 8:30 a.m. EDT to discuss the company’s third quarter 2026 results, as well as its outlook for the fourth quarter of 2026.
Investors are invited to join the call by registering via the following link: Q3 2026 earnings call registration link.

A replay of the call will be available within approximately 24 hours of the live event on the Investors section of Radware’s website at: https://www.radware.com/ir/financial-reports/.

About Radware
Radware® (NASDAQ: RDWR) is a global leader in application security and delivery solutions for multi-cloud environments. The company’s cloud application, infrastructure, and API security solutions use AI-driven algorithms for precise, hands-free, real-time protection from the most sophisticated web, application, and DDoS attacks, API abuse, and bad bots. Enterprises and carriers worldwide rely on Radware’s solutions to address evolving cybersecurity challenges and protect their brands and business operations while reducing costs. For more information, please visit the Radware website.

Radware encourages you to join our community and follow us on: Facebook, LinkedIn, Radware Blog, X, and YouTube.

©2026 Radware Ltd. All rights reserved. Any Radware products and solutions mentioned in this press release are protected by trademarks, patents, and pending patent applications of Radware in the U.S. and other countries. For more details, please see: https://www.radware.com/LegalNotice/. All other trademarks and names are property of their respective owners.

Radware believes the information in this document is accurate in all material respects as of its publication date. However, the information is provided without any express, statutory, or implied warranties and is subject to change without notice.

The contents of any website or hyperlinks mentioned in this press release are for informational purposes and the contents thereof are not part of this press release.

Safe Harbor Statement
This press release contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 and other U.S. securities laws. Any forward-looking statements made herein that are not statements of historical fact, including statements about Radware’s plans, objectives, expectations, beliefs, projections, future financial performance, business strategies, market opportunities, and developments in our industry, are forward-looking statements. In some cases, forward-looking statements can be identified by words such as “believe,” “expect,” “anticipate,” “intend,” “estimate,” “plan,” “project,” “forecast,” “target,” and similar expressions, as well as future or conditional verbs such as “will,” “should,” “would,” “may,” and “could.”

Because such statements deal with future events, they are subject to various risks and uncertainties that could cause actual results to differ materially from those expressed or implied in such forward-looking statements. Factors that could cause or contribute to such differences include, but are not limited to: the impact of global market and economic conditions; our dependence on independent distributors; disruptions in our supply chain, including shortages of components or manufacturing capacity; our reliance on a limited number of vendors; our ability to attract, train and retain qualified personnel; intense competition in the cybersecurity and application delivery markets; our ability to develop new solutions and enhance existing solutions; risks related to defects, vulnerabilities or failures in our products or services, including cybersecurity incidents affecting our systems or those of our customers; risks associated with the use of artificial intelligence technologies, including evolving regulatory frameworks, litigation exposure and reputational considerations; risks related to our information technology systems, including failures, disruptions or security breaches; outages, interruptions, or delays in hosting or cloud-based services; risks related to the interoperability of our products; risks associated with our global operations; and geopolitical risks, including instability in the Middle East and Israel.

These factors are not exhaustive. For a more detailed description of the risks and uncertainties affecting Radware, please refer to Radware’s Annual Report on Form 20-F and other reports filed with or furnished to the Securities and Exchange Commission (SEC) from time to time.

Forward-looking statements speak only as of the date on which they are made, and, except as required by applicable law, Radware undertakes no obligation to update or revise any forward-looking statements to reflect events or circumstances after the date of such statements. Radware’s public filings are available from the SEC’s website at www.sec.gov or on Radware’s website at www.radware.com.

CONTACTS
Investor Relations:
Yisca Erez, +972-72-3917211, ir@radware.com

Media Contact:
Gina Sorice, GinaSo@radware.com

MONTREAL, Oct. 07, 2026 (GLOBE NEWSWIRE) — Stella-Jones Inc. (TSX:SJ).

Open to: Investors, analysts and all interested parties
Date: Wednesday, November 4, 2026
Time: 10:00 AM Eastern Standard Time (EST)
Live Webcast: https://meetings.lumiconnect.com/400-423-513-760
Call: Local – Toronto: +1 (416) 855-9085 
Toll Free – North America: +1 (800) 990-2777 
Conference ID: 62617
   

The press release will be published before market opens the day of the conference call through Globe Newswire. Please log on or dial in 15 minutes before the conference begins.

If you are unable to attend at this time, you may access a web recording of the meeting at the following link: https://meetings.lumiconnect.com/400-423-513-760. This recording will be available on Wednesday, November 4, 2026 as of 1:00 PM EST until 11:59 PM EST on Wednesday, November 11, 2026.

Media wishing to quote an analyst should contact the analyst personally for permission.

About Stella-Jones

Stella-Jones Inc. (TSX: SJ) is a leading North American manufacturer of products focused on supporting infrastructure essential to the electrical distribution and transmission network, and the operation and maintenance of railway transportation systems. It supplies the continent’s major electrical utility companies with treated wood poles and crossarms, steel lattice towers and steel transmission poles, as well as North America’s Class 1, short line and commercial railroad operators with treated wood railway ties. It also supports infrastructure with industrial products, namely timbers for railway bridges, crossings and construction, marine and foundation pilings, and coal tar-based products. Additionally, the Company manufactures and distributes premium treated residential lumber and accessories to Canadian and American retailers for outdoor applications, with a significant portion of the business devoted to servicing Canadian customers through its national manufacturing and distribution network.

Stella-Jones – Head Office
3100 de la Côte-Vertu Blvd., # 300
Saint-Laurent, Québec H4R 2J8
Tel.: (514) 934-8666
Fax: (514) 934-5327
 

Contact

Investor Relations
David Galison
Vice-President, Investor Relations
Tel.: (647) 618-2709
dgalison@stella-jones.com
Media
Stephanie Corrente
Director, Corporate Communications
Tel.: (514) 934-8666
communications@stella-jones.com

Includes 5.3 Metres Averaging 8.31% Cu and 51.0 g/t Ag

MONTRÉAL, Oct. 07, 2026 (GLOBE NEWSWIRE) — Osisko Metals Incorporated (the “Company” or “Osisko Metals”) (TSX: OM; OTCQX: OMZNF; FRANKFURT: 0B51) is pleased to announce additional new analytical results from the ongoing 2026 drill program at the Gaspé Copper Project, located in the Gaspé Peninsula of Eastern Québec. New results are presented below (see Table 1), including 38 mineralized intercepts from 12 drill holes. Reported “infill” intercepts are located within the 2026 MRE model (see April 14, 2026 news release), focused on upgrading Inferred Mineral Resources to Measured or Indicated categories, as applicable. “Expansion” intercepts are located outside the 2026 MRE model and comprise either i) in-pit expansion, which offers potential to convert in-pit waste into additional resources within the 2026 MRE Whittle pit; or ii) out-of-pit expansion, consisting of mineralization located outside the 2026 MRE Whittle pit, which may potentially lead to the definition of new resources. Some of the reported intercepts may have contiguous shallower infill as well as deeper in-pit expansion (noted as “Both”). Maps showing hole locations are available at www.osiskometals.com.

Osisko Metals Chief Executive Officer Robert Wares commented: “This new set of holes includes excellent results from infill drilling within the 2026 MRE model, particularly from holes 30-1251 and 30-1258. Hole 30-1251 intersected impressive high-grade mineralization in porcellanite above the historic E Zone underground workings, returning 94.4 metres averaging 1.47% Cu.”

Wares continued: “It has been our experience over the years that great deposits are full of great surprises. Hole 30-1258 appears to be just one of those types of surprises, having intersected 121 metres averaging 0.71% Cu hosted in a previously unknown porphyry intrusion below the E Zone skarn horizon at the south end of Copper Mountain. This new porphyry intrusion contains significant copper stockwork and veining, and it represents the first evidence of porphyry-hosted mineralization south of the main pit area. It may be indicative of a potential third, previously unknown (and untested) mineralized porphyry centre in the Gaspé Copper system, distinct from the two historically known porphyries in the main pit area and at the Porphyry Mountain DPEX target. Additional drilling will be designed to further test this interpretation.”

20261007 Osisko Metals news release Figure 1/plan view

20261007 Osisko Metals news release Figure 2/long section

Highlights

  • 94.4 metres averaging 1.47% Cu (infill) in DDH 30-1251, includes 5.3 metres averaging 8.31% Cu and 51.0 g/t Ag and 185.5 metres averaging 0.41% Cu in a shallower interval
  • 121.0 metres averaging 0.71% Cu (infill) in DDH 30-1258, includes 9.5 metres averaging 4.97% Cu and 56.3 g/t Ag
  • 106.5 metres averaging 0.60% Cu (out-of-pit expansion) in DDH 30-1250, includes 15.9 metres averaging 1.92% Cu and 11.0 g/t Ag
  • 218.8 metres averaging 0.35% Cu (infill) in DDH 30-1256
  • 66.0 metres averaging 0.45% Cu (out-of-pit expansion) in DDH 30-1259
  • 56.4 metres averaging 0.61% Cu (infill) in DDH 30-1255

Table 1: Infill and Expansion Drilling Results

DDH No. From (m) To (m) Length (m) Cu % Ag g/t Mo % CuEq* % Type**
30-1248 38.0 55.0 17.0 0.19 1.60 <0.005 0.20 Expansion 2
and 151.1 204.0 52.9 0.21 1.43 <0.005 0.21 Expansion 2
and 234.0 254.0 20.0 0.31 2.60 <0.005 0.31 Expansion 2
and 300.0 344.0 44.0 0.22 1.92 <0.005 0.22 Expansion 2
30-1249 153.0 175.5 22.5 0.24 1.96 <0.005 0.24 Expansion 2
and 250.8 271.5 20.7 0.20 1.15 <0.005 0.20 Expansion 2
and 292.3 378.0 85.7 0.24 1.53 <0.005 0.24 Expansion 2
30-1250 169.5 198.0 28.5 0.28 1.80 <0.005 0.28 Expansion 2
and 216.0 322.5 106.5 0.60 3.90 0.006 0.62 Expansion 2
(including) 237.6 253.5 15.9 1.92 11.0 0.009 1.96 Expansion 2
and 510.0 562.8 52.8 0.29 2.54 0.011 0.33 Expansion 2
30-1251 11.3 76.0 64.7 0.21 1.77 <0.005 0.21 Infill
and 104.0 289.5 185.5 0.41 2.68 <0.005 0.42 Infill
and 324.0 355.5 31.5 0.16 1.63 0.032 0.27 Infill
and 429.0 523.4 94.4 1.47 8.78 <0.005 1.49 Infill
(including) 487.5 492.8 5.3 8.31 51.0 <0.005 8.35 Infill
30-1252 159.0 187.5 28.5 0.48 4.84 0.007 0.51 Infill
and 207.0 246.0 39.0 0.18 2.37 <0.005 0.19 Infill
30-1253 376.5 462.0 85.5 0.21 1.39 <0.005 0.21 Expansion 2
30-1254 115.6 132.0 16.4 0.34 2.21 <0.005 0.34 Expansion 2
and 175.3 196.5 21.2 0.50 2.75 <0.005 0.50 Expansion 2
and 229.3 279.5 50.2 0.27 1.76 <0.005 0.28 Expansion 2
and 306.0 361.5 55.5 0.25 2.06 <0.005 0.26 Expansion 2
and 393.3 445.5 52.2 0.26 3.11 <0.005 0.27 Expansion 2
30-1255 51.0 130.5 79.5 0.24 2.24 <0.005 0.25 Infill
and 158.0 189.0 31.0 0.30 2.59 <0.005 0.30 Infill
and 215.1 232.5 17.4 0.36 3.55 <0.005 0.37 Infill
and 260.1 316.5 56.4 0.61 4.42 <0.005 0.61 Infill
30-1256 73.7 292.5 218.8 0.35 3.03 <0.005 0.36 Infill
30-1257 145.5 169.7 24.2 0.17 1.03 <0.005 0.17 Infill
and 229.0 267.0 38.0 0.25 1.58 <0.005 0.25 Infill
30-1258 54.0 189.0 135.0 0.32 2.28 <0.005 0.32 Infill
and 232.0 387.0 155.0 0.22 1.66 0.012 0.26 Infill
and 411.0 471.0 60.0 0.20 1.61 0.011 0.24 Infill
and 494.0 615.0 121.0 0.71 8.80 0.028 0.81 Infill
(including) 596.5 606.0 9.50 4.97 56.3 0.084 5.30 Infill
30-1259 6.7 61.2 54.5 0.12 1.53 <0.005 0.12 Expansion 1
and 85.5 126.0 40.5 0.20 2.13 <0.005 0.21 Expansion 1
and 163.0 216.0 53.0 0.20 1.98 <0.005 0.20 Expansion 2
and 253.5 345.5 92.0 0.28 2.50 <0.005 0.28 Expansion 2
and 422.5 488.5 66.0 0.45 3.03 <0.005 0.46 Expansion 2

* See explanatory notes below on copper equivalent values and Quality Assurance/Quality Controls.
** Infill refers to intercepts within the current MRE model; Expansion 1 refers to in-pit intercepts outside of the current MRE model; Expansion 2 refers to out-of-pit intercepts outside of the current MRE model. “Both” indicates drill holes that have
contiguous shallower infill as well as deeper in-pit expansion intercepts.

Additional comments

Drill holes 30-1248, 30-1249, 30-1253 and 30-1254, all located south and southwest of the Needle Mountain pit, tested areas where little mineralization was expected from historical drilling. All holes, with the exception of 30-1253, yielded multiple decametric mineralized intersections with grades ranging from 0.19% Cu to 0.50% Cu.

Drill hole 30-1250, located on the north slope of Needle Mountain, is an expansion hole that threaded through pillars of the C Zone underground workings, intersecting higher grades around and within the C Zone skarn horizon.

Drill hole 30-1259 is located on top of Needle Mountain East, approximately 320 metres south of the southern limit of the 2026 MRE model and near the southern extremity of the 2026 Whittle pit model. It is an expansion hole that intersected five decametric mineralized intervals with grades ranging from 0.12% Cu to 0.45% Cu. Mineralization was extended in this area to a vertical depth of 420 metres, indicating that the deposit is still open to the south, beyond the peak of Needle Mountain East.

Drill holes 30-1251, 30-1252, 30-1255, 30-1256, 30-1257 and 30-1258, all located near Copper Brook at the southern portion of the 2026 MRE model, are infill holes that intersected mineralization in line with the 2026 MRE block model, with the exception of higher-than-expected grades in 30-1251 and 30-1258, as discussed above.

Mineralization at Gaspé Copper is of porphyry copper/skarn type and occurs as disseminations and stockworks of chalcopyrite with pyrite or pyrrhotite and minor bornite and molybdenite. One prograde and at least five retrograde vein/stockwork mineralizing events have been recognized at Copper Mountain, which overprint earlier, stratiform, carbonate replacement skarn and porcellanite-hosted mineralization throughout the Gaspé Copper system. Porcellanite is a historical mining term used to describe bleached, pale green to white potassic-altered hornfels. Subvertical stockwork mineralization dominates at Copper Mountain whereas prograde bedding-parallel mineralization, which is mostly stratigraphically controlled, dominates in the area of lower Copper Mountain, Needle Mountain, Needle East, and Copper Brook. High molybdenum grades (up to 0.5% Mo) were locally obtained in both the C Zone and E Zone skarns away from Copper Mountain.

Table 2: Drill hole locations

DDH No. Azimuth (°) Dip (°) Length (m) UTM E UTM N Elevation
30-1248 70 -70 399 316035 5424899 746
30-1249 81 -70 378 315475 5425000 813
30-1250 0 -90 618 315596 5425747 575
30-1251 0 -90 531 316459 5425738 575
30-1252 0 -90 285 316143 5425532 587
30-1253 77 -72 462 315690 5424770 860
30-1254 59 -56 450 316035 5424899 746
30-1255 0 -90 348 316632 5425499 577
30-1256 0 -90 402 316535 5425842 595
30-1257 0 -90 267 316040 5425828 567
30-1258 0 -90 615 316184 5425801 576
30-1259 303 -60 493 316523 5424995 760
             

The 2022 to 2024 Osisko Metals drill programs were focused on defining open-pit resources within the Copper Mountain stockwork mineralization (see May 6, 2024 MRE press release). Extending the resource model south of Copper Mountain into the poorly-drilled prograde skarn/porcellanite portion of the system subsequently led to a significantly increased resource, mostly in the Inferred category (see November 14, 2024 MRE press release), and additional drilling in 2025 led to an additional significant increase in resources, mostly in the Measured and Indicated categories (see April 14, 2026 MRE press release).

The current drill program is designed to convert the bulk of the remaining 2026 MRE Inferred resources to Measured and Indicated categories, as well as test the expansion of the overall resource laterally to the west, and to the south/southwest towards Needle East and Needle Mountain respectively.

Explanatory note regarding copper-equivalent grades

Copper Equivalent (CuEq) grades are presented for illustrative purposes only to express the combined value of copper, molybdenum, and silver as a single copper grade. CuEq grades are calculated using long-term metal prices of US$4.50/lb copper, US$20.00/lb molybdenum, and US$45.00/oz silver, and incorporate assumptions for metallurgical recoveries, payable metal factors, smelting and refining charges, transportation costs, and royalties. Hence the CuEq calculation is essentially based on net smelter return (NSR) values. NSR for each metal is estimated by applying metallurgical recoveries, payable factors, metal prices, and applicable smelting, refining, transportation, and penalty charges to the in-situ metal grades. CuEq grades are derived using a linear regression relationship established between copper grade and copper NSR, and then calculated by substituting total NSR (Cu + Mo + Ag) for copper NSR in the regression equation. The simplified formula is expressed as CuEq (%) = Cu (%) + 3.40327 × Mo (%) + 0.00008 × Ag (g/t)

Qualified Person

The scientific and technical content of this news release has been reviewed and approved by Mr. Bernard-Olivier Martel, P. Geo. (OGQ 492), an independent “qualified person” as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

Quality Assurance / Quality Control

Mineralized intervals reported herein are calculated using an average 0.12% CuEq lower cut-off over contiguous 20-metre intersections (shorter intervals as the case may be at the upper and lower limits of reported intervals). Intervals of 10 metres or less are generally not reported unless considered material. True widths are estimated at 80 – 90 % of the reported core length intervals.

Osisko Metals adheres to a strict QA/QC program for core handling, sampling, sample transportation and analyses, including insertion of blanks and standards in the sample stream. Drill core is drilled in HQ or NQ diameter and securely transported to its core processing facility on site, where it is logged, cut and sampled. Samples selected for assay are sealed and shipped to ALS Canada Ltd.’s preparation facility in Sudbury. Sample preparation details (code PREP-31DH) are available on the ALS Canada website. Pulps are analyzed at the ALS Canada Ltd. facility in North Vancouver, BC. All samples are analyzed by four acid digestion followed by both ICP-AES and ICP-MS for Cu, Mo and Ag.

About Osisko Metals

Osisko Metals Incorporated is a Canadian exploration and development company creating value in the critical metals sector, with a focus on copper and zinc. The Company acquired a 100% interest in the past-producing Gaspé Copper mine from Glencore Canada Corporation in July 2023. The Gaspé Copper mine site is located near Murdochville in Québec’s Gaspé Peninsula. The Company is currently focused on resource expansion of the Gaspé Copper deposits, with current pit-constrained Measured and Indicated Mineral Resources of 1.83 Bt averaging 0.32% CuEq and Inferred Mineral Resources of 239 Mt averaging 0.46% CuEq (in compliance with NI 43-101). For more information, see Osisko Metals’ April 14, 2026 news release entitled “Osisko Metals Announces Significant Increase in Mineral Resource at Gaspé Copper”. Gaspé Copper hosts the largest undeveloped copper resource in eastern North America, strategically located near existing infrastructure in the mining-friendly province of Québec.

In addition to the Gaspé Copper project, the Company is working with Appian Capital Advisory LLP through the Pine Point Mining Limited joint venture to advance one of Canada‘s largest past-producing zinc mining camps, the Pine Point project, located in the Northwest Territories. The current mineral resource estimate for the Pine Point project consists of Indicated Mineral Resources of 49.5 Mt averaging 5.52% ZnEq and Inferred Mineral Resources of 8.3 Mt averaging 5.64% ZnEq (in compliance with NI 43-101). For more information, see Osisko Metals‘ June 25, 2024 news release entitled “Osisko Metals releases Pine Point mineral resource estimate: 49.5 million tonnes of indicated resources at 5.52% ZnEq”. The Pine Point project is located on the south shore of Great Slave Lake, NWT, close to infrastructure, with paved road access, an electrical substation and 100 kilometres of viable haul roads.

For further information on this news release, visit www.osiskometals.com or contact:

Don Njegovan, President
Email: info@osiskometals.com
Phone: (416) 500-4129

Cautionary Statement on Forward-Looking Information

This news release contains “forward-looking information” within the meaning of applicable Canadian securities legislation based on expectations, estimates and projections as at the date of this news release. Any statement that involves predictions, expectations, interpretations, beliefs, plans, projections, objectives, assumptions, future events or performance (often, but not always, using phrases such as “expects”, or “does not expect”, “is expected”, “interpreted”, “management’s view”, “anticipates” or “does not anticipate”, “plans”, “budget”, “scheduled”, “forecasts”, “estimates”, “potential”, “feasibility”, “believes” or “intends” or variations of such words and phrases or stating that certain actions, events or results “may” or “could”, “would”, “might” or “will” be taken, occur or be achieved) are not statements of historical fact and may be forward-looking information and are intended to identify forward-looking information. This news release contains forward-looking information pertaining to, among other things: the tax treatment of the FT Units; the timing of incurring the Qualifying Expenditures and the renunciation of the Qualifying Expenditures; the ability to advance Gaspé Copper to a construction decision (if at all); the ability to increase the Company’s trading liquidity and enhance its capital markets presence; the potential re-rating of the Company; the ability for the Company to unlock the full potential of its assets and achieve success; the ability for the Company to create value for its shareholders; the advancement of the Pine Point project; the anticipated resource expansion of the Gaspé Copper system and Gaspé Copper hosting the largest undeveloped copper resource in eastern North America.

Forward-looking information is not a guarantee of future performance and is based upon a number of estimates and assumptions of management, in light of management’s experience and perception of trends, current conditions and expected developments, as well as other factors that management believes to be relevant and reasonable in the circumstances, including, without limitation, assumptions about: the ability of exploration results, including drilling, to accurately predict mineralization; errors in geological modelling; insufficient data; equity and debt capital markets; future spot prices of copper and zinc; the timing and results of exploration and drilling programs; the accuracy of mineral resource estimates; production costs; political and regulatory stability; the receipt of governmental and third party approvals; licenses and permits being received on favourable terms; sustained labour stability; stability in financial and capital markets; availability of mining equipment and positive relations with local communities and groups. Forward-looking information involves risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results to differ materially from such forward-looking information are set out in the Company’s public disclosure record on SEDAR+ (www.sedarplus.ca) under Osisko Metals’ issuer profile. Although the Company believes that the assumptions and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be placed on such information, which only applies as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise any forward- looking information, whether as a result of new information, future events or otherwise, other than as required by law.

Photos accompanying this announcement are available at:

https://www.globenewswire.com/NewsRoom/AttachmentNg/b953d22f-24c1-454d-9f93-860dcd8f6e94

https://www.globenewswire.com/NewsRoom/AttachmentNg/5cc35aa6-b733-4246-9830-8ced07d31bf4

Radware previously named a Major Player in 2024

MAHWAH, N.J., Oct. 07, 2026 (GLOBE NEWSWIRE) — Radware® (NASDAQ: RDWR), a global leader in application security and delivery solutions for multi-cloud environments, today announced that it has been named a Leader in the IDC MarketScape: Worldwide Web Application and API Protection Platforms 2026 Vendor Assessment (Doc #US54130626, September 2026).

According to the IDC MarketScape, “An AI-based engine continuously maps API call sequences and workflow logic from live traffic, automatically generating and tuning policies to detect business logic abuse that schema validation and static rules miss.” Furthermore, “The company recently introduced the Radware AI Xploit Shield, which provides customized, automatically generated signatures.”

“Being named a Leader in the IDC MarketScape reflects the continued evolution of our application security strategy,” said Gabi Malka, chief operating officer at Radware. “As AI transforms both how applications are built and attacked, we continue to invest in AI-driven application and API protection designed to help organizations address increasingly complex environments.”

Radware’s cloud security platform provides web application and API security, bot and agent trust management, AI security, client-side protection and DDoS protection across cloud, on-premises and hybrid environments.

To access the IDC MarketScape: Worldwide Web Application and API Protection Platforms 2026 Vendor Assessment excerpt, visit here.

About IDC MarketScape
IDC MarketScape vendor assessment model is designed to provide an overview of the competitive fitness of technology and service suppliers in a given market. The research utilizes a rigorous scoring methodology based on both qualitative and quantitative criteria that results in a single graphical illustration of each supplier’s position within a given market. IDC MarketScape provides a clear framework in which the product and service offerings, capabilities and strategies, and current and future market success factors of IT and telecommunications vendors can be meaningfully compared. The framework also provides technology buyers with a 360-degree assessment of the strengths and weaknesses of current and prospective vendors.

About Radware

Radware® (NASDAQ: RDWR) is a global leader in AI and application security and delivery solutions for multi-cloud environments. The company’s cloud application, infrastructure, API and AI security solutions use AI-driven algorithms for precise, behavior-based, real-time protection against sophisticated web, application and DDoS attacks, API abuse, business logic threats and malicious bots. Radware delivers end-to-end API security, including discovery, posture management, testing and runtime protection, along with advanced protection for AI agents and models. Enterprises and carriers worldwide rely on Radware to address evolving cyberthreats, protect their brands and business operations, and reduce costs. For more information, please visit the Radware website.

Radware encourages you to join our community and follow us on Facebook, LinkedIn, the Radware Blog, X and YouTube. Any Radware products and solutions mentioned in this press release are protected by trademarks, patents and pending patent applications of Radware in the U.S. and other countries. For more details, please see https://www.radware.com/LegalNotice/. All other trademarks and names are property of their respective owners.

Radware believes the information in this document is accurate in all material respects as of its publication date. However, the information is provided without any express, statutory or implied warranties and is subject to change without notice. The contents of any website or hyperlinks mentioned in this press release are for informational purposes and are not part of this press release.

Safe Harbor Statement

This press release contains “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 and other U.S. securities laws. Any statements that are not statements of historical fact, including statements about Radware’s plans, objectives, expectations, beliefs, projections, future financial performance, business strategies, market opportunities and developments in its industry, are forward-looking statements. In some cases, forward-looking statements can be identified by words such as “believe,” “expect,” “anticipate,” “intend,” “estimate,” “plan,” “project,” “forecast” and “target,” and similar expressions, as well as future or conditional verbs such as “will,” “should,” “would,” “may” and “could.” For example, statements in this press release about the capabilities, benefits, availability and intended use of Radware’s AI-driven application and API protection solutions, including the Radware AI Xploit Shield, and related competitive differentiation and market positioning, and statements made by management regarding Radware’s strategy and investments, are forward-looking statements.

Because such statements deal with future events, they are subject to various risks and uncertainties that could cause actual results to differ materially from those expressed or implied. Factors that could cause or contribute to such differences include global market and economic conditions; dependence on independent distributors; supply-chain disruptions; reliance on a limited number of vendors; the ability to attract and retain qualified personnel; intense competition; the ability to develop and enhance solutions; defects, vulnerabilities or failures in products and services; risks associated with artificial intelligence technologies and evolving regulatory frameworks; information-technology failures or security breaches; hosting or cloud-service disruptions; interoperability risks; global operations; and geopolitical risks, including instability in the Middle East and Israel.

These factors are not exhaustive. For a more detailed description of risks and uncertainties affecting Radware, please refer to Radware’s Annual Report on Form 20-F and other reports filed with or furnished to the U.S. Securities and Exchange Commission from time to time. Forward-looking statements speak only as of the date on which they are made, and, except as required by applicable law, Radware undertakes no obligation to update or revise them. Radware’s public filings are available from the SEC’s website or on Radware’s website.

Media Contact:

Gina Sorice
GinaSo@radware.com

Investor Contact:

Yisca Erez
YiscaE@radware.com

New SoloVitals and SoloScribe capabilities bring contactless vitals and ambient documentation directly into clinical workflows

NEW YORK, Oct. 07, 2026 (GLOBE NEWSWIRE) — Teladoc Health (NYSE: TDOC), the global leader in virtual care, today announced two new AI-powered capabilities within Solo, its enterprise smart care platform for hospitals and health systems. SoloVitals and SoloScribe are designed to help health systems bring timely patient insights into the care environment, while reducing technology fragmentation and helping care teams stay focused on patient care.

“Health systems are under intense pressure to do more, yet they are spending more time navigating a growing number of platforms, tools and vendors, each requiring different technology and processes. Teladoc Health is extending care teams with embedded, clinically-validated AI, without the added complexity,” said Joby McKenzie, General Manager, North American Health Systems at Teladoc Health.

SoloVitals is an AI-powered contactless vital sign measurement solution that can capture heart rate and respiration rate without physically touching a patient. Using a patient’s existing camera-equipped device, such as a smart phone or tablet, SoloVitals analyzes subtle facial skin color changes through remote photoplethysmography (rPPG) technology to generate measurements. This capture provides clinicians with clinically-validated vital sign measurement during remote consultations to support better care decisions.

SoloScribe is an ambient AI documentation scribe that creates structured clinical notes in Solo, helping clinicians remain focused on the patient while documentation stays embedded in the virtual care workflow. SoloScribe supports both direct-to-patient and telemedicine device-based visits and creates a templated summary that is transferred into the EHR. This helps hospitals scale AI-assisted documentation across eligible clinicians, programs and workflows through one integrated Solo experience.

Both capabilities are embedded within Teladoc Health’s Solo platform, rather than requiring multiple disconnected point solutions. This creates a more scalable approach to AI-enabled care delivery that helps extend clinical teams, surface timely patient insights, and simplify technology management.

“When we embed practical AI directly into clinical workflows through one connected platform, we are helping to provide faster access to patient information, reduce administrative burdens, and enable hospitals to scale innovation without adding new infrastructure. This allows clinicians to remain focused on their patients and not on the technology or processes surrounding a care interaction,” said Danny Sanchez, Vice President of Technology and Innovation at Teladoc Health.

Teladoc Health’s Solo technology is installed in more than 15,000 care locations globally and offers deep integrations with EHR platforms such as Epic and Oracle Health using HL7 and FHIR standards.

SoloScribe is now generally available, and SoloVitals is available to select customers in private preview, with full general release expected in December 2026. For more information about Teladoc Health’s enterprise solutions for hospitals and health systems, click here.

About Teladoc Health
Teladoc Health (NYSE: TDOC) is the global leader in virtual care. The company is delivering and orchestrating care across patients, care providers, platforms, and partners — transforming virtual care into a catalyst for how better health happens. Through our relationships with health plans, employers, providers, health systems and consumers, we are enabling more access, driving better outcomes, extending provider capacity and lowering costs. Learn more at teladochealth.com.

Media:
Kaitlin Rogers
pr@teladochealth.com
704-604-9060

TAIPEI, Taiwan, Oct. 07, 2026 (GLOBE NEWSWIRE) — Gogoro Inc. (“Gogoro,” the “Company” or “we”) (Nasdaq: GGR), a global technology leader in battery swapping ecosystems, today announced a second round of new equity investments by entities controlled by Mr. Chung-Yao Yin, a director of the Company (“Mr. Yin”) and certain strategic investors (collectively, the “Investors”). The aggregate amount of the new equity investments is expected to be approximately $61.8 million.

Pursuant to separate share purchase agreements that the Company has entered into with the Investors, the Company will issue and sell an aggregate of 24,936,057 ordinary shares of the Company, par value US$0.002 per share (the “Ordinary Shares”) to the Investors at a subscription price of US$2.48 per share, which was determined based on an agreed pricing mechanism and in compliance with applicable regulatory requirements. Upon completion of these new equity investments, Mr. Yin will fully discharge his obligation under the undertaking he provided to the Company’s lenders led by Mega International Commercial Bank Co., Ltd. as announced by the Company in September 2025.

The Investors include Gold Sino Asset Limited (“Gold Sino”) and Peng-Lin Investment Limited (“Peng-Lin”), both of which are controlled by Mr. Yin, and Ruen Hua Dyeing & Weaving Co., Ltd. (“Ruen Hua”) and Yi Tai Investment Co., Ltd. (“Yi Tai”). Upon completion of these new equity investments, Gold Sino is expected to beneficially own approximately 45.0% of the Company’s outstanding Ordinary Shares, Peng-Lin approximately 8.8%, and Ruen Hua and its affiliates approximately 21.9%.

These new equity investments are expected to further strengthen the Company’s capital base and support its continued business development and long-term growth strategy.

These new equity investments were approved by the audit committee and the board of directors of the Company. The Company will issue Ordinary Shares that are not registered under the U.S. Securities Act of 1933, as amended (the “Securities Act”), to the Investors, and will grant the Investors certain customary registration rights with respect to such shares. Closing of these new equity investments is subject to certain customary closing conditions including any required clearance with Nasdaq. The Company expects that the remittance of these new equity investments will occur on or before October 13, 2026.

About Gogoro

Founded in 2011 to rethink urban energy, Gogoro is the world’s leader in battery-swapping electric mobility, setting new standards for sustainable mobility. Powering nearly 700,000 riders and over 900 million battery swaps across more than 2,700 GoStation locations, the Gogoro Network redefines how cities move. Recognized globally in 2024, including Fortune’s “Change the World,” Fast Company’s “Asia-Pacific’s Most Innovative Company,” MIT Technology Review’s “15 Climate Tech Companies to Watch,” and Frost & Sullivan’s “Global Company of the Year” for battery swapping, Gogoro continues to disrupt the status quo and accelerate the shift to cleaner, smarter mobility, and lead the way in reimagining how cities move.

Forward-Looking Statements

This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements generally relate to future events or Gogoro’s future financial or operating performance. In some cases, you can identify forward-looking statements because they contain words such as “may,” “will,” “should,” “expects,” “plans,” “anticipates,” “going to,” “could,” “intends,” “target,” “projects,” “contemplates,” “believes,” “estimates,” “predicts,” “potential” or “continue” or the negative of these words or other similar terms or expressions that concern Gogoro’s expectations, strategy, priorities, plans or intentions. Forward-looking statements in this communication include, but are not limited to, statements regarding Gogoro’s ability to close the new equity investments, strengthen its capital base, continue business development, strengthen its financial discipline, operational execution, and long-term growth strategy; Gogoro’s future plans and growth strategy; and statements by Gogoro’s chief executive officer and current and future chief financial officer. Gogoro’s expectations and beliefs regarding these matters may not materialize, and actual results in future periods are subject to risks and uncertainties that could cause actual results to differ materially from those projected, including risks related to Gogoro incurring operating losses historically and expecting to incur significant expenses and continuing losses; Gogoro’s declining cash position, dependence on a director associated with its largest shareholder to procure equity financing and ability to raise additional funds; future operating and financial results being subject to significant uncertainty; Gogoro not being able to execute on its strategy; challenges associated with strategic collaborations or alliances; Gogoro’s failure to execute its growth strategy or manage growth effectively; Gogoro’s failure to develop new products or technologies; Gogoro’s failure to manage its supply chain; delays in launching the production of Gogoro’s products and features; Gogoro’s exposure to fluctuations in currency exchange rates; Gogoro facing strong competition; changes to fuel economy standards or the success of alternative fuels; Gogoro’s dependence on the rapid adoption of and demand for ePTWs and battery swapping services; rapid technological change in the ePTW market; the timely release of new products by Gogoro; Gogoro’s ability to protect its technology and intellectual property; risks related to maintaining and expanding Gogoro’s international operations; macroeconomic factors including inflation and consumer confidence; and risks related to the Taiwan scooter market. The forward-looking statements contained in this communication are also subject to other risks and uncertainties, including those more fully described in Gogoro’s filings with the Securities and Exchange Commission (“SEC”), including in Gogoro’s Form 20-F for the year ended December 31, 2025, which was filed on March 31, 2026 and in its subsequent filings with the SEC, copies of which are available on the SEC’s website at www.sec.gov. The forward-looking statements in this communication are based on information available to Gogoro as of the date hereof, and Gogoro disclaims any obligation to update any forward-looking statements, except as required by law.

Gogoro Media Contact:   Gogoro Investor Contact:
press@gogoro.com   ir@gogoro.com

TAIPEI, Taiwan, Oct. 07, 2026 (GLOBE NEWSWIRE) — Gogoro Inc. (“Gogoro,” the “Company” or “we”) (Nasdaq: GGR), a global technology leader in battery swapping ecosystems, today announced the appointment of Peter Ming-Tuan Huang, Su-Ming Lin and Jason Yu-Hsien Chang to its Board of Directors, effective October 7, 2026. Following the appointments, Gogoro’s Board of Directors will consist of seven directors.

“We are pleased to welcome Peter, Dr. Lin and Jason to Gogoro’s Board of Directors,” said Tamon Tseng, the Chairman of the Board. “Each brings a distinct set of experiences and perspectives that will strengthen our Board. Peter brings extensive leadership and operating experience from building and managing large-scale businesses in Taiwan and China, together with significant investment management experience. Dr. Lin brings deep expertise in accounting, corporate governance, capital markets and public-company oversight. Jason brings substantial experience in investment management across multi-asset, alternative investment, fixed-income, credit and derivatives strategies. We look forward to their contributions as Gogoro continues to execute on its strategy and expand its battery-swapping and electric mobility ecosystem.”

Peter Ming-Tuan Huang

Mr. Huang is an experienced business leader and investment professional with more than four decades of experience in Taiwan and mainland China. He is the founder of Taiwan RT-Mart and China RT-Mart and previously served as Chief Executive Officer and Chairman of the Board of Sun Art Retail Group, a Hong Kong-listed company.

Mr. Huang spent more than 20 years building China RT-Mart from its founding into a leading retail business with annual revenue approaching RMB 100 billion. During his career, he has held senior executive positions with Ruentex Global, RT-Mart Taiwan, RT-Mart China and Sun Art Retail Group. He currently serves as Chief Executive Officer of Ruentex Group and Chairman of Hefei Jinghe Huixin Private Equity Fund Management Co., Ltd.

Mr. Huang has nearly 20 years of experience in investment management and has served as a limited partner in multiple investment funds. He holds a Master’s Degree in Business Administration from National Taiwan University and a Bachelor’s Degree in Industrial Management from National Taiwan University of Science and Technology.

Su-Ming Lin

Dr. Su-Ming Lin is an accounting and corporate governance expert with extensive academic, public-sector and public-company experience. He is an Emeritus Professor of the College of Management at National Taiwan University and previously served as Vice Dean of the College of Management, Chair of the Department of Accounting and Director of the Graduate Institute of Accounting at National Taiwan University.

Dr. Lin holds a Ph.D. in Accounting from Arizona State University, a Master’s Degree in Management from National Taiwan University and a Bachelor’s Degree in Public Finance from National Chengchi University. He has passed the CPA examinations in both Taiwan and the United States.

Throughout his career, Dr. Lin has served in a number of public-sector, financial and corporate governance roles, including as a member of the Taipei City Government Administrative Appeal Review Committee, the Taxation Reform Task Force of the Ministry of Finance, and the Tax Reform Commission of the Executive Yuan. He has also served as an advisor to the National Federation of Certified Public Accountant Associations, R.O.C., a Supervisor of Land Bank of Taiwan, a Director and Resident Supervisor of Chang Hwa Commercial Bank, and a Director of Taipei Exchange (“TPEx”).

Dr. Lin currently serves as an independent director of Taiwan Fertilizer Co., Ltd., AP BioSciences Inc., Sunny Friend Environmental Technology Co., Ltd. and Chunghwa Telecom Co., Ltd. He also serves as a member of the Compensation Committee of Nan Shan Life Insurance Company.

The Board has determined that Dr. Lin qualifies as an “audit committee financial expert” under applicable SEC rules. Upon joining Gogoro’s Board of Directors as an independent director, Dr. Lin will also serve as the third member of Gogoro’s Audit Committee and Compensation Committee, effective upon his appointments.

Jason Yu-Hsien Chang

Mr. Chang is an investment management professional with nearly two decades of experience across multi-asset, alternative investment, fixed-income, credit and derivatives strategies. He currently serves as Senior Portfolio Manager in the Investment Department of Ruentex Group, a position he has held since August 2026.

Prior to joining Ruentex Group, Mr. Chang spent 15 years at Nan Shan Life Insurance, where he most recently served as Head of Multi-Asset Investment in the Alternative Investment Department. Previously, he served as a Portfolio Manager in Nan Shan Life Insurance’s Fixed Income Department. Earlier in his career, he served as a Proprietary Trader in Credit & Derivatives at KGI Securities. Mr. Chang holds a Master of Science in Financial Engineering and a Bachelor of Business Administration in Risk Management and Insurance from National Chengchi University.

About Gogoro

Founded in 2011 to rethink urban energy, Gogoro is the world’s leader in battery-swapping electric mobility, setting new standards for sustainable mobility. Powering nearly 700,000 riders and over 900 million battery swaps across more than 2,700 GoStation locations, the Gogoro Network redefines how cities move. Recognized globally in 2024, including Fortune’s “Change the World,” Fast Company’s “Asia-Pacific’s Most Innovative Company,” MIT Technology Review’s “15 Climate Tech Companies to Watch,” and Frost & Sullivan’s “Global Company of the Year” for battery swapping, Gogoro continues to disrupt the status quo and accelerate the shift to cleaner, smarter mobility, and lead the way in reimagining how cities move.

Forward-Looking Statements

This communication contains forward-looking statements within the meaning of Section 27A of the Securities Act of 1933, as amended, and Section 21E of the Securities Exchange Act of 1934, as amended. Forward-looking statements generally relate to future events or Gogoro’s future financial or operating performance. In some cases, you can identify forward-looking statements because they contain words such as “may,” “will,” “should,” “expects,” “plans,” “anticipates,” “going to,” “could,” “intends,” “target,” “projects,” “contemplates,” “believes,” “estimates,” “predicts,” “potential” or “continue” or the negative of these words or other similar terms or expressions that concern Gogoro’s expectations, strategy, priorities, plans or intentions. Forward-looking statements in this communication include, but are not limited to, statements regarding Gogoro’s ability to strengthen its financial discipline, operational execution, and long-term growth strategy; Gogoro’s future plans and growth strategy; and statements by Gogoro’s chief executive officer and current and future chief financial officer. Gogoro’s expectations and beliefs regarding these matters may not materialize, and actual results in future periods are subject to risks and uncertainties that could cause actual results to differ materially from those projected, including risks related to Gogoro incurring operating losses historically and expecting to incur significant expenses and continuing losses; Gogoro’s declining cash position, dependence on a director associated with its largest shareholder to procure equity financing and ability to raise additional funds; future operating and financial results being subject to significant uncertainty; Gogoro not being able to execute on its strategy; challenges associated with strategic collaborations or alliances; Gogoro’s failure to execute its growth strategy or manage growth effectively; Gogoro’s failure to develop new products or technologies; Gogoro’s failure to manage its supply chain; delays in launching the production of Gogoro’s products and features; Gogoro’s exposure to fluctuations in currency exchange rates; Gogoro facing strong competition; changes to fuel economy standards or the success of alternative fuels; Gogoro’s dependence on the rapid adoption of and demand for ePTWs and battery swapping services; rapid technological change in the ePTW market; the timely release of new products by Gogoro; Gogoro’s ability to protect its technology and intellectual property; risks related to maintaining and expanding Gogoro’s international operations; macroeconomic factors including inflation and consumer confidence; and risks related to the Taiwan scooter market. The forward-looking statements contained in this communication are also subject to other risks and uncertainties, including those more fully described in Gogoro’s filings with the Securities and Exchange Commission (“SEC”), including in Gogoro’s Form 20-F for the year ended December 31, 2025, which was filed on March 31, 2026 and in its subsequent filings with the SEC, copies of which are available on the SEC’s website at www.sec.gov. The forward-looking statements in this communication are based on information available to Gogoro as of the date hereof, and Gogoro disclaims any obligation to update any forward-looking statements, except as required by law.

Gogoro Media Contact: Gogoro Investor Contact:
press@gogoro.com ir@gogoro.com

Term Sheet Provides Up to 100 Years of Site Tenure at key Strategic U.S Defense Infrastructure Installation and Advances Development of Fully Integrated U.S. Graphite Supply Chain

GOUVERNEUR, N.Y., Oct. 07, 2026 (GLOBE NEWSWIRE) — Titan Mining Corporation (NYSE-A:TII, TSX:TI) (“Titan” or the “Company”), a U.S.-focused critical minerals producer and developer, today announced that its wholly owned subsidiary, Empire State Mines, LLC (“ESM”), and the U.S. Department of the Army (“Army”) have executed a term sheet establishing the principal commercial terms for an Enhanced Use Lease (“EUL”) to develop a critical minerals processing facility on U.S. Army property.

The term sheet contemplates development of the proposed facility on approximately 97 acres of underutilized Army property at Anniston Army Depot in Alabama, providing Titan with a pathway to establish downstream graphite processing capacity within an existing strategic U.S. defense installation. Development would leverage established infrastructure, site access and coordinated utilities planning to support the fast-track construction of the facility.

Additional diligence continues at the Pine Bluff Arsenal in Arkansas and Fort Drum in New York.

Under the proposed framework, ESM would develop, finance, build, own and operate a commercial-scale graphite processing facility designed to produce value-added natural graphite products, including Purified Micronized Graphite (“PMG”) in phase I and Coated Spherical Purified Graphite (“CSPG”) following customer qualifications, supporting U.S. defense, industrial and energy supply chains.

HIGHLIGHTS

  • Long-Term Strategic Framework: Initial 50-year lease term with two additional 25-year renewal options exercisable by ESM and the Army, providing the potential for up to 100 years of operating tenure, subject to the terms of the definitive EUL.
  • Strategic U.S Defense Infrastructure: The proposed facility would be developed on approximately 97 acres at Anniston Army Depot, providing a long-term platform for domestic graphite processing within an existing U.S. defense installation and the opportunity to leverage established infrastructure and coordinated utility planning.
  • Army Right of First Offer: The proposed framework provides the Army with a right of first offer to purchase certain uncommitted PMG and CSPG produced at the facility, subject to applicable federal procurement requirements. The right is limited to a maximum of 10% of annual facility production and does not apply to product committed under qualifying offtake, supply or project-financing arrangements.
  • Commercial Framework Aligned with Domestic Production: Project consideration would consist of fair market value base rent together with applicable participation rent following commencement of commercial operations, with the Army expressing a preference for consideration to be provided through qualifying in-kind infrastructure improvements undertaken at or for the benefit of the Army.
  • Project Financing Flexibility: The proposed framework is designed to accommodate project financing and provide customary protections for approved project lenders, supporting Titan’s ability to finance development of the proposed facility.
  • Development Flexibility: The framework incorporates mechanisms to adjust development milestones for specified permitting, regulatory and other project circumstances outside ESM’s control.
  • Advancing U.S. Graphite Independence: The proposed facility would extend Titan’s domestic graphite platform downstream into purified and coated graphite products critical to U.S. defense, advanced manufacturing and energy applications.

Rita Adiani, President and Chief Executive Officer, commented:

“Agreeing to this commercial framework with the U.S. Army is a significant milestone in Titan’s strategy to build a fully integrated American graphite supply chain. Developing within an existing Army installation provides important infrastructure and strategic advantages and creates a pathway to establish large-scale domestic graphite processing without having to develop an entirely new industrial site from the ground up.

Importantly, this is more than securing a site. The proposed framework combines long-duration site control, strategic U.S. defense infrastructure and financing flexibility with Kilbourne’s domestic natural flake graphite resource, our existing operating infrastructure and expertise in New York, and our growing customer qualification programs. Together, these elements provide a pathway to build a secure American graphite supply chain from mine through value-added purified graphite products.

With the potential for up to 100 years of site tenure, we are establishing the foundation for a long-term domestic processing platform capable of supporting U.S. defense, advanced manufacturing and energy supply chains for decades to come.”

Dr. Jeff Waksman, Principal Deputy Assistant Secretary of the Army for Installations, Energy and Environment, commented:

“The ability to process critical minerals on U.S. soil is a national-defense priority required for munitions, missiles, sensors, batteries, and the platforms our Soldiers depend on. Leveraging our legal authorities and land, the U.S. Army is able to help nurture and expedite the growth of critical minerals industrial base which equips and sustains America’s Soldiers without putting any taxpayer dollars at risk.”

NEXT STEPS

The parties will now continue work toward execution of the definitive EUL and completion of the remaining project-development requirements.

Execution of the EUL remains subject to customary conditions, including agreement on the development and energy operating plans, environmental and regulatory matters, appraisal and valuation matters, project financing and Titan Board approval, as well as applicable Army and Congressional processes.

Titan continues to advance the Kilbourne Graphite Project in parallel, including its ongoing Feasibility Study, customer qualification programs and commercial development activities.

About Titan Mining Corporation

Titan is an Augusta Group company which produces zinc concentrate at its 100%-owned Empire State Mine located in New York State. Titan is also the United States’ first end-to-end producer of natural flake graphite in 70 years and is advancing graphite and germanium initiatives at its Empire State Mine to strengthen domestic critical minerals supply chains. The Company has also received support from the U.S. Export-Import Bank (EXIM) under its Make More in America Initiative. Titan’s goal is to deliver shareholder value through operational excellence, development, and exploration. We have a strong commitment towards developing critical minerals assets which enhance the security of the domestic supply chain. For more information on the Company, please visit our website at www.titanminingcorp.com.

Media & Investor Contact

Irina Kuznetsova
Director, Investor Relations
Phone: (778) 870-7735
Email: info@titanminingcorp.com

Cautionary Note Regarding Forward-Looking Information

Certain statements and information contained in this news release constitute “forward-looking statements”, and “forward-looking information” within the meaning of applicable securities laws (collectively, “forward-looking statements”). These statements appear in a number of places in this news release and include statements regarding our intent, or the beliefs or current expectations of our officers and directors, including statements regarding: all terms of the commercial framework and terms for the EUL; that Titan will build a secure American graphite supply chain from mine through value-added purified graphite products; the parties will now continue work toward execution of the definitive EUL and completion of the remaining project-development requirements; future execution of the EUL; and that Titan will continue to advance the Kilbourne Graphite Project in parallel, including its ongoing Feasibility Study, customer qualification programs and commercial development activities.. When used in this news release words such as “to be”, “believe”, “targeted”, “could”, “will”, “planned”, “expected”, “potential”, and similar expressions are intended to identify these forward-looking statements. Although the Company believes that the expectations reflected in such forward-looking statements and/or information are reasonable, undue reliance should not be placed on forward-looking statements since the Company can give no assurance that such expectations will prove to be correct. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to vary materially from those anticipated in such forward-looking statements, including risks relating to cost increases for capital and operating costs; risks of shortages and fluctuating costs of equipment or supplies; risks relating to fluctuations in the price of zinc, graphite and germanium; the inherently hazardous nature of mining-related activities; potential effects on our operations of environmental regulations in New York State; risks due to legal proceedings; and risks related to operation of mining projects generally; risks relating to changes in trade measures affecting graphite, including the absence of antidumping and countervailing duty orders on active anode material following the U.S. International Trade Commission’s negative determinations, and changes to Section 301 or other tariffs; risks that customer qualification programs are not completed successfully or that non-binding arrangements do not result in definitive agreements; reliance on a limited number of customers and on third-party processing capacity; risks associated with government contracting, Enhanced Use Leases and government-supported financing programs, including that the Conditional Selection Notices may not result in finalized Business Terms Agreements, Enhanced Use Leases or construction and operation of the Kilbourne graphite purification plant on U.S. Army property; risks that the Feasibility Study is delayed or its results do not support development, or that Board approval, permits or financing for a construction decision are not obtained; risks that germanium recovery testing does not establish a technically or economically viable commercial opportunity; risks that the Company does not achieve its 2026 production, cost or Adjusted EBITDA guidance, resume N2D zone operations, commission equipment or complete planned drilling on the anticipated timelines; risks that pending assay results do not meet expectations; risks that the conditions to the EUL are not satisfied; and the risks, uncertainties and other factors identified in the Company’s periodic filings with Canadian securities regulators and the United States Securities and Exchange Commission. Such forward-looking statements are based on various assumptions, including assumptions made with regard to our forecasts and expected cash flows; our projected capital and operating costs; our expectations regarding mining and metallurgical recoveries; mine life and production rates; that laws or regulations impacting mining activities will remain consistent; our approved business plans; our mineral resource estimates and results of the preliminary economic assessment; our experience with regulators; political and social support of the mining industry in New York State; our experience and knowledge of the New York State mining industry and our expectations of economic conditions and the price of zinc, graphite and germanium; demand for graphite and germanium; exploration results; the ability to secure adequate financing (as needed); the continued availability of the EXIM facility and that the expression of interest of up to $120 million converts into committed financing; that the Kilbourne Feasibility Study will remain on schedule and produce results supporting development; that the Board will approve a construction decision and required permits and financing will be available on acceptable terms; that Business Terms Agreements with the U.S. Army will be finalized on acceptable terms; the applicable Enhanced Use Lease opportunities will proceed and all required conditions will be satisfied; that customer qualification programs and commercial-scale processing will be completed successfully; that the customer agreements are indicative of potential commercial demand and will support the continued development of the Company’s commercial order book; that germanium recovery testing will support a technically and economically viable commercial opportunity; that planned operations, equipment commissioning, drilling and geotechnical work will proceed on schedule and pending assay results will support the Company’s exploration objectives; that production, costs, zinc prices and other operating and market conditions will support the Company’s 2026 guidance; the continuity of U.S. federal policy support for domestic critical minerals production; the availability of third-party processing capacity on commercially acceptable terms; the Company maintaining its current strategy and objectives; and the Company’s ability to achieve its growth objectives. While the Company considers these assumptions to be reasonable, based on information currently available, they may prove to be incorrect. Except as required by applicable law, we assume no obligation to update or to publicly announce the results of any change to any forward-looking statement contained herein to reflect actual results, future events or developments, changes in assumptions or changes in other factors affecting the forward-looking statements. If we update any one or more forward-looking statements, no inference should be drawn that we will make additional updates with respect to those or other forward-looking statements. You should not place undue importance on forward-looking statements and should not rely upon these statements as of any other date. All forward-looking statements contained in this news release are expressly qualified in their entirety by this cautionary statement.

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.