CALGARY, Alberta–(BUSINESS WIRE)–E3 LITHIUM LTD. (TSXV: ETL) (FSE: OW3) (OTCQX: EEMMF), “E3”, “E3 Lithium” or the “Company”, a leader in Canadian lithium development, has completed Phase 2 of its Demonstration Facility and has commenced Phase 3 operations. E3 Lithium’s Direct Lithium Extraction (“DLE”) equipment, commissioned during Phase 1, is now being commissioned at the Demonstration Facility (the “Demo”), located east of Olds, Alberta within the Clearwater Project. With the reservoir tes