#FORM 8.3

PUBLIC OPENING POSITION DISCLOSURE/DEALING DISCLOSURE BY
A PERSON WITH INTERESTS IN RELEVANT SECURITIES REPRESENTING 1% OR MORE
Rule 8.3 of the Takeover Code (the “Code”)

1.        KEY INFORMATION

(a)   Full name of discloser: Man Group PLC
(b)   Owner or controller of interests and short positions disclosed, if different from 1(a):
        The naming of nominee or vehicle companies is insufficient. For a trust, the trustee(s), settlor and beneficiaries must be named.
 
(c)   Name of offeror/offeree in relation to whose relevant securities this form relates:
        Use a separate form for each offeror/offeree
Rotork Plc
(d)   If an exempt fund manager connected with an offeror/offeree, state this and specify identity of offeror/offeree:  
(e)   Date position held/dealing undertaken:
        For an opening position disclosure, state the latest practicable date prior to the disclosure
16/09/2026
(f)   In addition to the company in 1(c) above, is the discloser making disclosures in respect of any other party to the offer? NO

2.        POSITIONS OF THE PERSON MAKING THE DISCLOSURE

If there are positions or rights to subscribe to disclose in more than one class of relevant securities of the offeror or offeree named in 1(c), copy table 2(a) or (b) (as appropriate) for each additional class of relevant security.

(a)      Interests and short positions in the relevant securities of the offeror or offeree to which the disclosure relates following the dealing (if any)

Class of relevant security:

0.5p ordinary
  Interests

Short positions
Number % Number %
(1)   Relevant securities owned and/or controlled:        
(2)   Cash-settled derivatives:

15,048,634 1.84 11,271 0.00
(3)   Stock-settled derivatives (including options) and agreements to purchase/sell:        

        TOTAL:

15,048,634 1.84 11,271 0.00

All interests and all short positions should be disclosed.

Details of any open stock-settled derivative positions (including traded options), or agreements to purchase or sell relevant securities, should be given on a Supplemental Form 8 (Open Positions).

(b)      Rights to subscribe for new securities (including directors’ and other employee options)

Class of relevant security in relation to which subscription right exists:  
Details, including nature of the rights concerned and relevant percentages:  

3.        DEALINGS (IF ANY) BY THE PERSON MAKING THE DISCLOSURE

Where there have been dealings in more than one class of relevant securities of the offeror or offeree named in 1(c), copy table 3(a), (b), (c) or (d) (as appropriate) for each additional class of relevant security dealt in.

The currency of all prices and other monetary amounts should be stated.

(a)        Purchases and sales

Class of relevant security Purchase/sale

Number of securities Price per unit

(b)        Cash-settled derivative transactions

Class of relevant security Product description
e.g. CFD
Nature of dealing
e.g. opening/closing a long/short position, increasing/reducing a long/short position
Number of reference securities Price per unit
0.5p ordinary Equity swap Reducing a long position 1,752 4.8425 GBP

(c)        Stock-settled derivative transactions (including options)

(i)        Writing, selling, purchasing or varying

Class of relevant security Product description e.g. call option Writing, purchasing, selling, varying etc. Number of securities to which option relates Exercise price per unit Type
e.g. American, European etc.
Expiry date Option money paid/ received per unit

(ii)        Exercise

Class of relevant security Product description
e.g. call option
Exercising/ exercised against Number of securities Exercise price per unit

(d)        Other dealings (including subscribing for new securities)

Class of relevant security Nature of dealing
e.g. subscription, conversion
Details Price per unit (if applicable)

4.        OTHER INFORMATION

(a)        Indemnity and other dealing arrangements

Details of any indemnity or option arrangement, or any agreement or understanding, formal or informal, relating to relevant securities which may be an inducement to deal or refrain from dealing entered into by the person making the disclosure and any party to the offer or any person acting in concert with a party to the offer:

None

(b)        Agreements, arrangements or understandings relating to options or derivatives

Details of any agreement, arrangement or understanding, formal or informal, between the person making the disclosure and any other person relating to:
(i)   the voting rights of any relevant securities under any option; or
(ii)   the voting rights or future acquisition or disposal of any relevant securities to which any derivative is referenced:

None

(c)        Attachments

Is a Supplemental Form 8 (Open Positions) attached? NO

Date of disclosure: 17/09/2026
Contact name: Graham Keene
Telephone number: +44 20 7144 2259

Public disclosures under Rule 8 of the Code must be made to a Regulatory Information Service.

The Panel’s Market Surveillance Unit is available for consultation in relation to the Code’s disclosure requirements on +44 (0)20 7638 0129.

The Code can be viewed on the Panel’s website at www.thetakeoverpanel.org.uk.

  • Providencia drillhole PVD16 returns 83 meters at 1.74 g/t gold from 9 meters depth, including multiple higher-grade intervals
  • Widest high-grade intercept to date includes 4.88 g/t gold over 9 meters, 12.57 g/t gold over 2 meters, 2.65 g/t gold over 12 meters, and a peak of 32.2 g/t gold over 0.5 meters
  • Highlights potential to expand mineralization footprint southwards
  • High-grade mineralization extends to surface, remains open both laterally and at depth

VANCOUVER, British Columbia , Sept. 17, 2026 (GLOBE NEWSWIRE) — Pan Global Resources Inc. (“Pan Global” or the “Company”) (TSXV: PGZ; OTCQB: PGZFF; FRA: 2EU) is pleased to announce exceptional assay results from drillhole PVD16 at the Providencia target (“Providencia”), part of the Company’s 100%-owned Cármenes Project (“Cármenes”) in northern Spain. These results mark the widest high-grade intercept to date in the ongoing Phase 3 drill campaign.

The results reveal a network of steeply-dipping, northerly-trending higher grade gold zones and associated copper, cobalt, nickel platinum and palladium mineralization. The mineralization is within a broader 500 meter (m) x 200 m carbonate breccia system.

Key Highlights from Drillhole PVD16:

  • 83 meters averaging 1.74 g/t gold from 9 meters (downhole) including:
    • 4.88 g/t Au, 0.04% Cu, 0.06% Ni, 0.08% Co, 3.0 g/t Ag, 0.27 g/t Pt and 0.19 g/t Pd over 9 m
    • 12.57 g/t Au over 2 m
    • 5.88 g/t Au over 2 m
    • 2.65 g/t Au over 12 m with a bonanza grade of 32.2 g/t Au over 0.5 m
  • High-grade gold mineralization extends to surface and remains open along strike and at depth
  • Confirms continuation and expansion of gold mineralization beyond previous intercepts, including the 3.9 g/t gold over 15 meters recently reported in drillhole PVD15
  • Gold grades notably increase to the east and south of the historical Providencia mine, indicating potential to expand mineralization footprint southwards
  • Provides further confirmation of potential for significant scale and a high-grade gold zone within, and peripheral to, a multiphase hydrothermal breccia system

“These exceptional results from PVD16 confirm both the scale and continuity of high-grade mineralization at Providencia. The intercept of 83 meters at 1.74 grams per tonne gold from near surface dramatically enhances our confidence in the gold potential of this mineralized system. Results from the on-going Phase 3 drill program increase our confidence that the mineralized zones remain open for expansion in several directions, underscoring potential for a significant discovery,” said Tim Moody, President and CEO of Pan Global.

“As we advance drilling and refine our geological models, our focus is now on testing for extensions of the mineralization at depth, expanding the footprint and identifying additional high-grade zones at Providencia and other high-priority targets in the Cármenes Project.”

Pan Global remains well-capitalized to support expansion of the exploration programs at both Cármenes and the flagship Escacena Project.

Next Steps:

  • Drilling is ongoing at Providencia with two holes remaining in Phase 3
  • Assay results are pending for four additional completed drillholes at Providencia
  • Following completion, drilling will commence at the nearby Profunda Target
  • Surface sampling and geological mapping continues to advance regional targets within Cármenes

Figure 1 – Drillhole PVD16 cross-section with assay results and interpreted higher grade zones; selected nearby results projected onto the section

Figure 1 – Drillhole PVD16 cross-section with assay results

Figure 2 – Providencia target map with drillhole and selected channel sample results, and drillhole PVD16 cross-section A-A’ location (Fig. 1)

Figure 2 – Providencia target map with select drillhole and sample results

Table 1 – Providencia Drillhole PVD16 Results Summary

Drillhole From To Interval1 Au Ag Cu Ni Co
m m m g/t g/t ppm ppm ppm
PVD16 9.0 92.0 83.0 1.74 0.7 85 129 110
including 9.0 18.0 9.0 4.88 3.0 415 579 780
including 12.0 18.0 6.0 7.00 4.4 575 813 1128
including 19.5 21.0 1.5 1.65 0.5 657 1240 635
including 32.0 34.0 2.0 12.57 0.5 33 21 14
including 46.0 48.0 2.0 5.88 0.5 35 15 4
including 55.0 67.0 12.0 2.65 0.8 88 3 3
including 59.7 60.2 0.5 32.20 3.3 59 488 93
including 71.0 83.0 12.0 1.42 0.3 16 14 5
including 90.0 92.0 2.0 5.01 1.6 78 277 41
                 

PVD16 Platinum and Palladium

Drillhole From To Interval1 Pt Pd Pt+Pd
m m m g/t g/t g/t
PVD16 9.0 18.0 9.0 0.27 0.19 0.45
including 12.0 18.0 6.0 0.36 0.26 0.62
  59.7 60.2 0.5 1.4 0.7 2.2
             

Notes:

  1. All reported drill intervals are down-hole lengths. Insufficient drilling has been completed to determine true widths.
  2. The 83-meter continuous interval includes a 1.5-meter interval of missing core resulting from localized core loss during drilling from 18.0 m to 19.5 m. In accordance with QA/QC and industry best practices for public disclosure, the missing interval is assigned an internal dilution value of 0.00 g/t gold within the length-weighted average calculation.
  3. All sub-intervals calculated using a 0.5 g/t lower cut-off and allow three meters consecutive internal dilution. No top-cut is applied.

Table 2 – Drillhole Collar Information

Hole ID Easting1 Northing1 Azimuth (º) Dip (º) Length (m)
PVD16 287606 4761229 224 -28 224.58

1 Coordinate system: UTM30N ERTS89

About the Cármenes Project

The Cármenes Project is located on the southeastern extension of the Rio Narcea Gold Belt approx. 55 km north of León and comprises five Investigation Permits over 5,653 hectares held 100% by Pan Global. The project is approx. 70 km east of Orvana Mineral’s operating El Valle-Boinás/Carlés copper-gold-silver mines and 30 km west of the Salamón Gold Project where the Company was recently notified it was successful in its public tender bid pending an appeal. The Cármenes Project area is highly prospective for multiple bodies or “clusters” of carbonate-hosted hydrothermal breccia style copper, nickel, cobalt, and gold mineralization. The area includes the former Profunda and Providencia mines that last operated in the 1930s, producing concentrates of copper and cobalt with nickel. The Company’s maiden drill program in 2025 at the Providencia target yielded a new gold discovery.

About Pan Global Resources

Pan Global Resources Inc. is actively exploring for copper-rich mineral deposits along with gold and other metals. Copper has compelling supply-demand fundamentals and outlook for strong long-term prices as a critical metal for global electrification and energy transition. Gold is also attracting record prices.

The Company’s flagship Escacena Project, hosting La Romana and Cañada Honda copper-tin-gold mineral resources, is in the prolific Iberian Pyrite Belt in southern Spain, where a favourable permitting track record, excellent infrastructure, mining and professional expertise, and support for copper as a Strategic Raw Material by the European Commission collectively define a tier-one low-risk jurisdiction for mining investment.

The Company’s second project, at Cármenes in northern Spain, is an area with a long mining history and excellent infrastructure. The Pan Global team comprises proven talent in exploration, discovery, development, and mining operations. Pan Global Resources is committed to operating safely and with utmost respect for the environment and our partnered communities. The Company is a member, and operates under the principles, of the United Nations Global Compact.

To learn more about Pan Global Resources, please visit the Company’s Curation Connect showcase and explore AI-generated responses to your enquiries at https://app.curationconnect.com/company/Pan-Global-Resources-44037?utm_source=pg_mediareleases

Qualified Persons

Álvaro Merino, Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has approved the scientific and technical information for this media release. Mr. Merino is not independent of the Company.

Sampling, QA/QC and Analytical Procedures

Core size was HQ (63 mm) and all samples were ½ core. Nominal sample size was 1 m core length and ranged from 0.5 to 2 m. Sample intervals were defined using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples, and Certified Reference materials inserted every 25 samples in each batch.

Samples were placed in sealed bags and delivered to the ALS sample preparation facility in Seville in Spain and assayed at the ALS facility in Ireland. All samples were crushed and split (method CRU-31, SPL22Y) and pulverized using (method PUL-31). Gold, platinum and palladium analysis was by 50 gm fire assay with ICP finish (method Au-ICP-24) and multi element analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP-61). Over grade base metal results were assayed using a 4-acid digest ICP AES (method OG-62).

FOR MORE INFORMATION PLEASE CONTACT:

Jason Mercier, VP Investor Relations and Communications
jason@panglobalresources.com / investors@panglobalresources.com
Tel: +1-236-886-9518
www.panglobalresources.com

Forward-looking statements

Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. It is important to note that actual outcomes and the Company’s actual results could differ materially from those in such forward-looking statements. The Company believes that the expectations reflected in the forward-looking information included in this media release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and uncertainties include, but are not limited to, economic, competitive, governmental, environmental, and technological factors that may affect the Company’s operations, markets, products, and prices. Readers should refer to the risk disclosures outlined in the Company’s Management Discussion and Analysis of its audited financial statements filed with the British Columbia Securities Commission.

The forward-looking information contained in this media release is based on information available to the Company as of the date of this media release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.

NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.

Photos accompanying this announcement are available at: 

https://www.globenewswire.com/NewsRoom/AttachmentNg/1e63bbe6-0460-4105-b6a3-7322d28861cb

https://www.globenewswire.com/NewsRoom/AttachmentNg/0656c128-bdb3-4d64-ad4e-b884ff24494a

Lassila & Tikanoja Plc
Stock exchange release
17 September 2026 at 2.15 PM EEST

Composition of Lassila & Tikanoja Plc’s Nomination Board

Lassila & Tikanoja Plc’s three largest shareholders, who are determined on the basis of the shareholder register held by Euroclear as per 1 September 2026 and who are shareholders acting according to the principles otherwise mentioned in the Charter, are entitled to appoint their representatives to the company’s Nomination Board.

According to the Charter of the Nomination Board, a group of shareholders may agree on the appointment of a joint representative to the Nomination Board. The following two groups of shareholders have agreed on the appointment of a joint representative: Evald and Hilda Nissi Foundation and Bergholm Heikki as the first group and Chemec Oy, CH-Polymers Oy, Maijala Eeva, Maijala Investment Oy, Maijala Juhani, Maijala Juuso, Maijala Miikka, Maijala Mikko, Maijala Roope and Maijala Tuula as the second group.

Lassila & Tikanoja Plc’s three largest shareholders as per 1 September 2026, who are entitled to appoint a representative to Lassila & Tikanoja Plc’s Shareholders’ Nomination Board, are the above-mentioned groups of shareholders and Nordea Nordic Small Cap Fund.

The following persons have been appointed as their representatives in Lassila & Tikanoja’s Nomination Board:

  • Juhani Lassila – Chairman of the Board, Evald and Hilda Nissi Foundation, group of shareholders (approximately 11.5% of shares and votes)
  • Miikka Maijala – CEO, Clinius Oy, group of shareholders (approximately 9.4% of shares and votes)
  • Josefin Degerholm – CEO, Nordea Funds Ltd, Nordea Nordic Small Cap Fund (approximately 5.3% of shares and votes)

The Chairman of Lassila & Tikanoja Plc’s Board of Directors, Jukka Leinonen, acts as the fourth member of the Nomination Board. The Chairman of the Nomination Board is Juhani Lassila.
 
The Nomination Board prepares proposals for board members and board remuneration for the next Annual General Meeting.

LASSILA & TIKANOJA PLC

Joni Sorsanen
CFO

Additional information:
Joni Sorsanen, CFO, tel. +358 50 443 3045

Lassila & Tikanoja is a leading Nordic circular economy company committed to unleashing the potential of circularity together with its customers and partners. Our services include waste management and recycling, hazardous waste and remediation services as well as industrial services and water treatment. Our goal is to strengthen an efficient infrastructure in society and promote the sustainable use of materials by transforming waste streams into valuable raw materials. L&T employs approximately 2,300 people in Finland and Sweden and is listed on Nasdaq Helsinki.

Distribution:
Nasdaq Helsinki
Major media
www.lt.fi/en

Average annual production of 100 koz of gold over a 16.2-year mine life – After-tax NPV5% of C$1,565 M and after-tax IRR of 37.3% at spot gold of US$4,300/oz – NPV5% to initial capital ratio of 3.6x

Highlights

Robust Economics

  • After-tax NPV5% of C$1,001 M and after-tax IRR of 26.6% at a base case gold price of US$3,600/oz and an exchange rate of 1.38 C$/US$.
  • At a spot gold price of US$4,300/oz, after-tax NPV5% increases to C$1,565 M and after-tax IRR increases to 37.3%.
  • After-tax payback of 4.3 years and NPV5% to initial capital ratio of 3.6x.
  • Life-of-mine after-tax free cash flow of C$2,772 M over a 16.2-year mine life.
  • Initial CAPEX of C$275.8 M and AISC of US$2,137/oz.

Production and Operating Profile

  • Average annual gold production of 100koz over the life of mine.
  • Total recovered gold production of 1,610koz.
  • Metallurgical recovery of 95%, supported by the 2026 metallurgical testwork program and a conventional flowsheet with crushing, grinding, gravity concentration and cyanide leaching.
  • Processing scenario: 3,000 tpd toll milling (year 1), 3,000 tpd on-site processing (years 2-4), 4,300 tpd on-site processing following expansion (year 5+).
  • Mining scenario considers solely underground method of longitudinal longhole stoping with ramp extraction utilizing a peak mining rate of 4,300 tpd.

VAL-D’OR, Quebec, Sept. 17, 2026 (GLOBE NEWSWIRE) — Cartier Resources Inc. (″Cartier″ or the ″Company″) (TSXV: ECR; FSE: 6CA; OTCQB: ECRFF) is pleased to announce the results of the updated Preliminary Economic Assessment (″PEA″) on its 100%-owned Cadillac Project, located in Val-d’Or (Abitibi, Quebec, Canada). The updated PEA was prepared in accordance with National Instrument 43-101 – Standards of Disclosure for Mineral Projects (″NI 43-101″) by Evomine Consulting Inc., and replaces the PEA published on April 13, 2023, on what was then named the Chimo Mine Project. It incorporates the updated mineral resource estimate announced on December 18, 2025, the metallurgical results announced on May 14, 2026, and a materially different gold price environment.

Philippe Cloutier, President and CEO of Cartier, stated: “The positive results of the study demonstrate the project’s economic viability at the PEA level while highlighting several opportunities for further optimization. Importantly, the project has been designed as a fully underground mining operation, minimizing its surface footprint and supporting a responsible development approach. With low initial CAPEX requirements, we now have additional strategic solutions that offer flexibility to advance development. We remain confident in the project’s strong potential and our ability to create additional value for stakeholders,”

Ronan Déroff, Vice President Exploration of Cartier, added: “The current PEA is only the beginning. With ~35,000 metres of drilling completed in 2025–2026 yet to be incorporated, and compelling new gold discoveries emerging at the Contact and Hope Sectors, we believe Cadillac offers substantial resource-growth potential and significant exploration upside along the 15-km Cadillac Fault — all of which remains outside the current economic model.”

Financial analysis

The economic analysis was performed using a 5% discount rate, a base case gold price of US$3,600/oz and an exchange rate of 1.38 C$/US$. On a pre-tax basis, the project generates an NPV5% of C$1,679 M, an IRR of 35.5% and a payback period of 3.0 years. On an after-tax basis, the project generates an NPV5% of C$1,001 M, an IRR of 26.6% and a payback period of 4.3 years. A summary of project economics is presented in Table 1.

Table 1: Summary of project economics

Description Unit Value
Exchange rate CA$/US$ 1.38
Gold price US$/oz 3,600
Mineralized material mined kt 23,145
Mineralized material grade g/t 2.28
Mineralized material ounces koz 1,698
Recovery % 95%
Recovered gold oz 1,610
Mine life years 16.2
Discount rate % 5.0%
Operating costs    
Mining operating cost CA$/t proc. 95.1
Processing operating cost CA$/t proc. 29.8
Waste and water management operating cost CA$/t proc. 1.5
General and administration operating cost CA$/t proc. 10.1
Total operating costs CA$/t proc. 136.4
AISC    
Total operating costs US$/oz 1,450
Selling costs US$/oz 5
Royalty costs US$/oz 47
Cash costs US$/oz 1,502
Sustaining capital costs US$/oz 635
All-In Sustaining Costs US$/oz 2,137
Capital costs    
Initial capital costs CA$M 275.8
Growth capital costs CA$M 277.1
Sustaining capital costs CA$M 1,062.0
Closure capital costs CA$M 40.0
Economics    
Pre-tax Net Present Value CA$M 1,679.4
Pre-tax Internal Rate of Return % 35.5%
Pre-tax Payback Period years 3.0
After-tax Net Present Value CA$M 1,001.2
After-tax Internal Rate of Return % 26.6%
After-tax Payback Period years 4.3

Table 2, Table 3, and Table 3 highlight the after-tax impact of performing a sensitivity analysis on gold price, capital costs and operating costs.

Table 2: Gold price sensitivity

Gold Price (US$/Oz) NPV (M CA$) IRR (%) Payback Period
3,000 497.2 16.4% 6.2
3,600 (base case) 1,001.2 26.6% 4.3
4,200 1,485.8 35.9% 2.8
4,800 1,961.7 44.9% 2.2
5,400 2,429.8 53.5% 1.9
6,000 2,896.0 62.0% 1.7


Table 3: Capital cost sensitivity

Capital costs NPV (M CA$) IRR (%)

Payback Period

-20% 1,165 35.1% 2.8
-10% 1,083 30.5% 3.4
Base Case 1,001 26.6% 4.3
+10% 918 23.4% 4.7
+20% 833 20.5% 5.1


Table 4: Operating cost sensitivity

Operating costs NPV (M CA$) IRR (%)

Payback Period

-20% 1,230 31.1% 3.4
-10% 1,116 28.9% 3.7
Base Case 1,001 26.6% 4.3
+10% 883 24.3% 4.5
+20% 762 21.8% 4.8


Capital and operating cost estimates

Initial capital is estimated at C$275.8 M, growth capital costs are estimated at C$277.1 M and sustaining capital at C$1,102.0 M, as detailed in Table 5. Total operating costs over the life-of-mine is estimated at C$3,148.2 M representing C$136.4/tonne processed, as detailed in Table 6.

Table 5: Capital cost summary

Cost Area Initial Capital Costs
(M CA$)
Growth Capital
Costs (M CA$)
Sustaining Capital
Costs (M CA$)
Total Capital Costs
(M CA$)
Infrastructure 40.9 – 52.5 93.4
Electrical and communication 27.9 – 8.1 36.0
Waste and water management 9.2 – 58.7 68.0
Mine – underground 91.3 – 720.2 811.5
Process plant 9.0 230.2 – 239.2
Indirect costs 29.8 9.0 84.0 122.7
Contingency 37.9 37.8 138.5 214.2
Capitalized revenue -30.2 – – -30.2
Capitalized operating costs 60.0 – – 60.0
Closure – – 40.0 40.0
Total 275.8 277.1 1,102.0 1,654.9


Table 6: Operating cost summary

Cost Area Total (M CA$) Unit cost (CA$/tonne processed) Unit cost (US$/oz payable)
Underground mining 2,193.7 95.1 1,010.3
Mineralized material transportation 15.1 0.7 6.9
Processing 672.3 29.1 309.6
Waste and water management 34.6 1.5 15.9
General and administrative 232.5 10.1 107.1
Total 3,148.2 136.4 1,449.9


Mine design and production schedule

The PEA presents an underground mining operation that uses conventional longitudinal longhole stoping at a peak mining rate of 4,300 tpd over a 16.2-year mine life. A total of 23.1 Mt of mineralized material at an average grade of 2.3 g/t representing 1,698 koz of gold will be extracted. The mineralized material will be loaded by load-haul-dump (LHD) machines and hauled to the surface by trucks via ramps. For backfilling, a combination of pastefill, cemented rockfill and dry rockfill will be used. The mine will be split into five separate areas with each area having their dedicated mining infrastructure as illustrated in Figure 1.

Figure 1: Mine design

Mine design


Metallurgy and processing

To complete the process plant design and determine metallurgical performance, a series of tests were performed on six variability samples: two from each of the three main zones, Chimo, East Chimo, and West Nordeau. The samples were selected from exploration drill core and are considered representative of the mineral resources. The test program included mineralogy, geochemistry, grindability, gold recovery, and tailings detoxification. The results indicate that, based on the average resource grade, a gold recovery of 95% could be achieved at a grind size P80 of 50 µm. The tests also established the required grinding energy, gold recovery equipment criteria, and reagent dosage design criteria.

The processing strategy considers toll milling to an off-site process plant for the pre-production period and the first year of production at a rate of 3,000 tpd. An on-site, 3,000 tpd process plant will become available to process material as of the second year of production and until the fourth year of production when it will be expanded to 4,300 tpd for the remainder of the life-of-mine. Figure 2 below shows the process flowsheet and identifies the additional equipment required for the expansion in red.

Figure 2: Process flowchart

Process flowchart

All Phase 1 equipment will be designed to handle the life-of-mine throughput, while the added equipment will provide the additional grinding power and cyanidation residence time required to complete gold dissolution.

Based on this flowsheet and feed throughput, the capital and operating costs of the gold extraction process plant were estimated to support the economic analysis. The plant was designed to achieve the projected 95% gold recovery in both phases.

Supporting infrastructure

Infrastructure requirements to support the project have been evaluated and the overall site layout has been developed to optimize operational efficiency, safety, and environmental management, while accounting for topography and minimizing the surface impact in the Project area. The required infrastructure for the project includes the following:

  • Underground mine portals, lateral development and vertical development
  • Waste rock and overburden management facilities
  • Tailing management facility
  • ROM stockpiles
  • Water management infrastructure
  • Electrical powerlines and substations
  • Mine offices, dry and maintenance facility
  • Other supporting infrastructure

Figure 3 and Figure 4 illustrate the surface infrastructure general arrangement and the infrastructure on the main industrial pad for the project.

Figure 3: Surface infrastructure general arrangement

Surface infrastructure general arrangement

Figure 4: Main industrial pad infrastructure

Main industrial pad infrastructure

Environmental, permitting and social considerations

The development of the Cadillac project continues under an approach focused on sustainable development, respect for stakeholders, and environmental protection. In 2026, Stantec completed a literature review of the project’s physical, biological, and social components in order to document and characterize the potential environmental issues associated with its footprint. The results of this review contributed to the selection and location of the infrastructure presented in the updated PEA, and will also be used to plan the next steps, including field inventories. In addition, an environmental geochemical characterization of the waste rock, ore, and tailings generated during processing was initiated in August 2026. This study is essential to the development of the Cadillac project, as it will help optimize the management of these materials and mining water management in order to limit impacts on the receiving environment. It will be conducted in accordance with the guidelines of Directive 019 and the Guide de caractérisation des résidus miniers et du minerai (GCRMM) issued by the Ministère de l’Environnement, de la Lutte contre les changements climatiques, de la Faune et des Parcs (MELCCFP).

Mineral Resource Estimate

The updated PEA is based on the mineral resource estimate announced on December 18, 2025, and detailed in the technical report filed on January 27, 2026 which is summarized in Table 7.

Table 7: Mineral Resource Estimate

All sectors /
Category

Open Pit Resources Underground Resources Total
Cut-off Grade = 0.30g/t Au Cut-off Grade = 1.00g/t Au
Tonnes (t) Grade
(Au g/t)
Gold (oz) Tonnes (t) Grade
(Au g/t)
Gold (oz) Tonnes (t) Grade
(Au g/t)
Gold (oz)
Measured 1,770,000 2.16 123,300 4,210,000 2.80 379,300 5,988,000 2.61 502,600
Indicated 1,730,000 1.52 84,500 2,240,000 2.51 180,600 3,965,000 2.08 265,200
Measured &
Indicated
3,500,000 1.84 207,800 6,450,000 2.70 559,900 9,953,000 2.40 767,800
Inferred 4,740,000 1.13 172,600 30,450,000 2.29 2,244,200 35,185,000 2.14 2,416,900
  1. The independent qualified persons for the MRE, as defined by National Instrument (“NI”) 43-101 guidelines, is Pierre Luc Richard, P.Geo., of PLR Resources Inc., with contributions from Stephen Coates, P.Eng., of Evomine Consulting for cut-off grade estimation and open pit and underground stope optimization solids.
  2. These Mineral Resources are not mineral reserves as they have no demonstrated economic viability. No economic evaluation of these Mineral Resource has been produced. The quantity and grade of reported Inferred Resources in this MRE are uncertain in nature and there has been insufficient drilling to define these Inferred Resources as Indicated. However, it is reasonably expected that the majority of Inferred Mineral Resources could be upgraded to Indicated category with continued drilling.
  3. The Qualified Persons are not aware of any known environmental, permitting, legal, title-related, taxation, socio-political, marketing or other relevant issues that could materially affect the Mineral Resource Estimate.
  4. Calculations used metric units (metres, tonnes). Metal contents in the above table are presented in gram per tonne and troy ounces. Metric tonnages and ounces were rounded, and any discrepancies in total amounts are due to rounding errors.
  5. CIM definitions and guidelines for Mineral Resource Estimates have been followed.

Notes Accompanying the Mineral Resource Estimate

  • Resources are presented as undiluted and in situ for the open-pit scenario within 5m x 5m x 5m blocks and include internal dilution for the underground scenario and are considered to have reasonable prospects for economic extraction. The constraining pit shell was developed using overall pit slopes of 50 degrees. The pit optimization to develop the mineral resource-constraining pit shells was done using the pseudoflow algorithm in Deswik software. The stope optimization to develop the underground mineral resource was done using Deswik.SO software.
  • The MRE wireframe was prepared using Leapfrog Edge v.2025.1.1 and is based on 4,477 drill holes, totalling 535,360 meters drilled and 167,978 assays. The cut-off date for the drill hole database was February 17, 2025.
  • Composites of 1.0 metre were created inside the mineralization domains. High-grade capping was done on the composited assay data. Based on individual statistical study for each zone, composites were capped between 5.0 g/t Au and 110.0 g/t Au for the high-grade zones, and between 1.0 g/t Au and 5.0 g/t Au for the low-grade zones.
  • Pit constrained Mineral Resources for the base case are reported at a cut-off grade of 0.30 g/t Au; DSO-constrained Mineral Resources for the base case are reported at a cut-off grade of 1.00 g/t Au and include internal dilution (must-take). The cut-off grades will be re-evaluated in light of future prevailing market conditions and costs.
  • Specific gravity values were estimated using data available in the drill hole database. Density values between 2.80 and 2.88 were applied to the model for hard rock and 2.00 for overburden.
  • Grade model resource estimation was calculated from drill hole data using an Ordinary Kriging interpolation method in a sub-blocked model using blocks measuring 5 m x 5 m x 5 m in size and sub-blocks down to 0.625m x 0.625m x 0.625m. Ordinary kriging (OK), inverse square distance (ID2), Nearest neighbour (NN) interpolation methods were tested, resulting in no material difference in the Mineral Resource Estimates.
  • The Measured, Indicated and Inferred Mineral Resource categories are constrained to areas where drill spacing is less than 12.5m, 25m and 100 metres respectively and show reasonable geological and grade continuity. An additional requirement for the Measured category is the close proximity of underground infrastructure. Cookie cutters were used to define categories based on the above parameters. Based on historical mining and geological knowledge of the deposit, drill spacing was increased up to 140m in the shoot direction to define inferred resources for some zones.

Independence and Responsibilities

The updated PEA was prepared by independent consulting firms with the respective responsibilities set out in Table 8.

Table 8: Consulting Firms and Areas of Responsibility

Consulting firm Area of responsibility
Evomine Consulting Inc.
Lead consultant and integrator
  • Study management and integration
  • Mine design and production schedule
  • Supporting infrastructure
  • Capital and operating cost estimates
  • Financial analysis
Geodoz Conseil Inc.
  • Environmental, permitting and social considerations
  • Closure cost estimates
PLR Resources Inc.
  • Mineral resource estimate
Soutex Inc.
  • Metallurgy and processing
  • Process capital and operating cost estimates


Qualified Person

The PEA was prepared by consultants who are independent of Cartier, each of whom are Qualified Persons (″QP″) as defined by NI 43-101 as defined by National Instrument 43-101 – Standards of Disclosure for Mineral Projects (″NI 43-101″). Each of the QPs have reviewed and confirmed that this news release fairly and accurately reflects, in the form and context in which it appears, the information contained in the respective sections of the PEA for which they are responsible. The following acted as QPs under NI 43-101 in the context of the PEA:

  • Alexandre Burelle, P.Eng. of Evomine Consulting Inc. responsible for Mining Methods, Project Infrastructure, Economic Analysis, and inputs for Capital and Operating Costs.
  • Stephen Coates, P.Eng. of Evomine Consulting Inc. responsible for Introduction, Reliance on Other Experts, Market Studies and Contracts, and Other Relevant Data and Information.
  • Maude Lévesque Michaud, P.Eng, M.Sc.A. of Geodoz Conseil Inc. responsible for Environmental Studies, Permitting and Social or Community Impact and inputs for Capital and Operating Costs.
  • Pierre-Luc Richard, P.Geo. of PLR Resources Inc. responsible for Property Description and Location, Accessibility, Climate, Local Resources, Infrastructure and Physiography, History, Geological Setting and Mineralization, Deposit Types, Exploration, Drilling, Sample Preparation, Analyses and Security, Data Verification, Mineral Resource Estimates, and Adjacent Properties.
  • Pierre Roy, P.Eng., M.Sc., of Soutex Inc. responsible for Mineral Processing, and Metallurgical Testing, Recovery Methods and inputs for Capital and Operating Costs.
  • The scientific and technical content of this press release has been reviewed and approved by Mr. Ronan Déroff, P.Geo., M.Sc., Vice President Exploration of Cartier, who is a QP under NI 43-101.

Technical Report Filing

A technical report prepared in accordance with NI 43-101 in support of the updated PEA will be filed on SEDAR+ at www.sedarplus.ca and on the Company’s website within 45 days of the date of this news release.

About Cadillac Project

The Cadillac Project, covering 14,000 hectares along a 15-kilometre stretch of the Cadillac Fault, is one of the largest consolidated land packages in the Val-d’Or mining camp. Cartier’s flagship asset integrates the historic Chimo Mine and East Cadillac projects, creating a dominant position in a world-class gold mining district. With excellent road access, year-round infrastructure and nearby milling capacity, the project is well positioned for rapid advancement and value creation. The Cadillac property contains total gold resources of 767,800 ounces in the measured and indicated category (10.0 Mt at 2.4 g/t Au) and 2,416,900 ounces in the inferred category (35.2 Mt at 2.1 g/t Au) across all sectors. An updated PEA for the Cadillac Project demonstrated an after-tax NPV5% of C$1,001 M and IRR of 26.6% at US$3,600/oz Gold.

About Cartier Resources Inc.

Cartier Resources Inc., founded in 2006 and headquartered in Val-d’Or (Quebec) is a gold exploration company focused on building shareholder value through discovery and development in one of Canada’s most prolific mining camps. The Company combines strong technical expertise, a track record of successful exploration, and a fully funded program to advance its flagship Cadillac Project. Cartier’s strategy is clear: unlock the full potential of one of the largest undeveloped gold landholdings in Quebec.

Non-IFRS Financial Measures

This news release includes certain performance measures commonly used in the mining industry that are not defined under IFRS. These measures have no standardized meaning under IFRS and may not be comparable to similar measures used by other companies. They are provided for additional information only and should not be considered in isolation or as a substitute for IFRS measures. As the project is at the PEA stage and not in production, no historical reconciliations to IFRS measures are available.

Forward-Looking Statements

This news release contains ″forward-looking information″ and ″forward-looking statements″ within the meaning of applicable Canadian securities legislation. Forward-looking statements include, but are not limited to, statements regarding the results and assumptions of the updated PEA, projected production, capital and operating costs, net present value, internal rate of return and payback period, the timing and filing of the technical report, the timing and results of future exploration, resource conversion, permitting and development activities, and the Company’s plans and objectives. Forward-looking statements are based on assumptions that management considers reasonable, including assumptions as to gold prices, exchange rates, metallurgical recoveries, the availability of third-party milling capacity, capital and operating cost estimates, the accuracy of mineral resource estimates, the ability to obtain required permits and financing, and the absence of material adverse changes in the economic and regulatory environment. Actual results may differ materially. The PEA is preliminary in nature and includes Inferred Mineral Resources that are considered too speculative geologically to have the economic considerations applied to them that would enable them to be categorized as Mineral Reserves, and there is no certainty that the results of the PEA will be realized. Risks and uncertainties include, but are not limited to, fluctuations in the price of gold and in exchange rates, the inability to convert mineral resources into mineral reserves, the preliminary nature of metallurgical results, variations in capital and operating costs from estimates, delays in obtaining permits or third-party agreements, changes in the availability and cost of financing, the duty to consult and accommodate First Nations, and the other risk factors described in the Company’s continuous disclosure documents filed on SEDAR+ at www.sedarplus.ca. Readers should not place undue reliance on forward-looking statements, which speak only as of the date of this news release. The Company disclaims any obligation to update forward-looking information except as required by law.

For further information, contact:
Philippe Cloutier, P. Geo.
President and CEO
Telephone: 819-856-0512
philippe.cloutier@ressourcescartier.com
www.ressourcescartier.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/58418ab4-a237-4a57-8ca4-84bdb8b464b3
https://www.globenewswire.com/NewsRoom/AttachmentNg/0bfe1fa0-9202-4095-b09c-a7da75c365eb
https://www.globenewswire.com/NewsRoom/AttachmentNg/53b5cc9e-07f7-41ea-826a-2b115be72327
https://www.globenewswire.com/NewsRoom/AttachmentNg/a2f7db64-bd52-47f8-a45e-fa4b1e68a673

FORESIGHT TECHNOLOGY VCT plc

LEI: 21380013CXOR8N6OD977

17 SEPTEMBER 2026

NAV ANNOUNCEMENT

The Board of Foresight Technology VCT plc announces that the unaudited Net Asset Value for the FWT share class as at 30 June 2026 was 88.4p per share.

For further information, please contact:

Company Secretary
Foresight Group LLP
Contact: Stephen Thayer Tel: 0203 667 8100

Investor Relations
Foresight Group LLP
Contact: Andrew James Tel: 0203 667 8181

Realkredit Danmark will open new mortgage-coverd bonds (SDRO’s).

The new mortgage-covered bonds will be admitted to trading on Nasdaq Copenhagen.

The new mortgage-covered bonds are covered by the “Base prospectus for mortgage-covered bonds and mortgage bonds issued by Realkredit Danmark A/S.”

The base prospectus is available on Realkredit Danmark’s website at www.rd.dk/Investor.

The final terms are hereby published.

Please contact Hella Gebhardt Rønnebæk on tel. +45 45 13 20 68 if you have any questions.

Attachments

BETHESDA, Md., Sept. 17, 2026 (GLOBE NEWSWIRE) — Gain Therapeutics, Inc. (Nasdaq: GANX) (“Gain” or the “Company”), a clinical-stage biotechnology company leading the discovery and development of the next generation of allosteric small molecule therapies, today announced that Gene Mack, President and CEO, will participate in an industry panel and one-on-one meetings at the ROTH Fifth Annual Healthcare Opportunities Conference, held September 29th at the Metropolitan Club in New York, NY.

Presentation Information

Presentation Title: Frontiers in Neuroscience

Date: Tuesday, September 29, 2026

Time: 11:00 a.m. ET

Registered attendees can request one-on-one meetings with Gain management via their ROTH sales representative.

If you are unable to attend the conference and would like to schedule a meeting with Gain management, please contact ir@gaintherapeutics.com.

About Gain Therapeutics, Inc.
Gain Therapeutics, Inc. is a clinical-stage biotechnology company leading the discovery and development of next-generation allosteric therapies. Gain’s lead drug candidate, rexaceract, is currently being evaluated for the treatment of Parkinson’s disease with or without a GBA1 mutation in a Phase 1b clinical trial. Rexaceract has further potential in Gaucher’s disease, dementia with Lewy bodies, and Alzheimer’s disease. Gain has multiple undisclosed preclinical assets targeting lysosomal storage disorders, metabolic diseases, and solid tumors.

Gain’s unique approach enables the discovery of novel allosteric small molecule modulators that can restore or disrupt protein function. Deploying its highly advanced Magellan™ platform, Gain is accelerating drug discovery and unlocking novel disease-modifying treatments for untreatable or difficult-to-treat disorders including neurodegenerative diseases, rare genetic disorders and oncology.

Forward-Looking Statements
This release contains “forward-looking statements” made pursuant to the safe harbor provisions of the Private Securities Litigation Reform Act of 1995. These statements are typically preceded by words such as “believes,” “expects,” “anticipates,” “intends,” “will,” “may,” “should,” or similar expressions. These forward-looking statements reflect management’s current knowledge, assumptions, judgment and expectations regarding future performance or events. Although management believes that the expectations reflected in such statements are reasonable, they give no assurance that such expectations will prove to be correct or that those goals will be achieved, and you should be aware that actual results could differ materially from those contained in the forward-looking statements. Forward-looking statements are subject to a number of risks and uncertainties, including, but not limited to, statements regarding: the development of the Company’s current or future product candidates; expectations regarding the timing of patient enrollment and the completion and timing of results from a Phase 1b clinical study for rexaceract, including any extension studies; the timing of any submissions to the FDA or other regulatory bodies and agencies; the timing of the commencement of the Phase 2 clinical study for rexaceract; the ability for the Company to enroll patients in its planned Phase 2 clinical study for rexaceract; the Company’s ability to replicate positive results from earlier preclinical studies or clinical trials in current or future clinical trials; the Company’s business development activities, strategic collaborations, licensing opportunities and financing activities; the advancement, prioritization and timing of the Company’s pipeline programs, including GT-04686; and the potential therapeutic and clinical benefits of the Company’s product candidates. For a further description of the risks and uncertainties that could cause actual results to differ from those expressed in these forward-looking statements, as well as risks relating to the Company’s business in general, please refer to the Company’s Form 10-K for the year ended December 31, 2025 and other filings made with the SEC. All forward-looking statements are expressly qualified in their entirety by this cautionary notice. You are cautioned not to place undue reliance on any forward-looking statements, which speak only as of the date of this release. We have no obligation, and expressly disclaim any obligation, to update, revise or correct any of the forward-looking statements, whether because of new information, future events or otherwise.

Investors:
Gain Therapeutics, Inc. 
Apaar Jammu 
Director, Investor Relations and Public Relations
ajammu@gaintherapeutics.com

LifeSci Advisors LLC
Chuck Padala
Managing Director
chuck@lifesciadvisors.com

Media:
Russo Partners LLC
Nic Johnson and Elio Ambrosio
nic.johnson@russopartnersllc.com
elio.ambrosio@russopartnersllc.com
(760) 846-9256

TORONTO, Sept. 17, 2026 (GLOBE NEWSWIRE) — Talisker Resources Ltd. (“Talisker” or the “Company”) (TSX: TSK, OTCQB: TSKFF) is pleased to report results from its final test program completed at the Saskatchewan Research Council (“SRC“), in collaboration with TOMRA Mining and Stacy Freudigmann P.Eng from Canenco Consulting Corp. (“Canenco”). The program evaluated TOMRA’s X-Ray Transmission (“XRT“) sorting technology and TOMRA’s laser sorting technology as part of the Company’s ongoing efforts to optimize the planned sorting circuit for the Bralorne Gold Project.

The test results demonstrated that the XRT sorter alone delivered strong performance by:

  • Rejecting 57% to 67% of waste material;
  • Increasing gold grades by 2.0x to 2.5x respectively; and
  • Recovering 87% to 84% of total contained gold respectively.

The addition of a downstream laser sorter increased overall gold recovery to greater than 95%. However, the additional recovered material was subeconomic. Adding the laser sorter into the sorting circuit would increase the mass of shipped material and dilute the overall grade of the sorted product, reducing the economic benefits of mass rejection during the Company’s Direct Shipping Ore (“DSO”) phase.

As a result of these findings, Talisker has elected to simplify the sorting circuit by removing the laser sorter from the plant design. The revised XRT-only flowsheet is expected to:

  • Maximize waste rejection and reduce overall tonnes shipped and processed to reduce transportation costs;
  • Significantly increase gold grades;
  • Reduce capital equipment and construction costs by approximately $4 million CAD;
  • Lower operating costs; and
  • Simplify plant design and operation.

The results validate the Company’s strategy of prioritizing mass reduction and grade enhancement to improve the economics of DSO shipments for the Bralorne Gold Project.

Table 1: Test 02 Results, XRT set to maximizing gold upgrade values.

Feed Grade XRT Product
Grade
XRT Gold
Upgrade
XRT
Gold Recovery
XRT Waste
Rejection
Cumulative
XRT and Laser
Product Grade
Cumulative
XRT and
Laser
Gold Upgrade
Cumulative
XRT and
Laser Gold
Recoveries
Cumulative
XRT and
Laser %
Waste Rejection
4.91 g/t Au 12.5
g/t Au
2.5x, or 154%
increase
84% 67% 8.13
g/t Au
1.66x, or 66%
increase
94.9% with Laser 43%


Table 2:
Test 03 Results, XRT set to maximizing gold recoveries.

Feed Grade XRT Product
Grade
XRT Gold
Upgrade
XRT
Gold Recovery
XRT Waste
Rejection
Cumulative
XRT and Laser
Product Grade
Cumulative
XRT and
Laser
Gold Upgrade
Cumulative
XRT and
Laser Gold
Recoveries
Cumulative
XRT and
Laser Waste
Rejection
6.49 g/t Au 13.1
g/t Au
2.0x, or 102%
increase
87% 57% 8.66
g/t Au
1.33x, or 33%
increase
>97.8% with Laser 27%

The XRT image above is interpreted as showing quartz as red pixels, sulphides as continuous black pixel patterns, and localized purple pixel clusters that correspond to visible gold. This interpretation is consistent with Bralorne geology, where sulphides occur in continuous bands while gold occurs in discrete, nuggety concentrations, making the purple pixels the most likely indicator of gold mineralization.

Figure 1: The XRT image above is interpreted as showing quartz as red pixels, sulphides as continuous black pixel patterns, and localized purple pixel clusters that correspond to visible gold. This interpretation is consistent with Bralorne geology, where sulphides occur in continuous bands while gold occurs in discrete, nuggety concentrations, making the purple pixels the most likely indicator of gold mineralization.

Testing Program Overview

The objective of the sorting test program was to evaluate the ability of the XRT sensor-based sorting technology to:

  • Reduce the overall mass of mineralized material extracted from the mine by removing subeconomic waste material prior to transportation;
  • Increase the average gold grade of shipped material; and
  • Lower trucking, shipping and processing costs for the Company’s DSO operations.

Mass reduction of mineralized material is a key component of Talisker’s DSO strategy, enabling the Company to reject subeconomic material prior to shipment to maximize the value of mineralized material delivered to customers.

SRC sorted approximately 5 tonnes of bulk material for dynamic XRT and laser testing. The material was crushed to pass 60 mm and screened into a sortable fraction of >22mm/<60mm and a fines fraction <22 mm. Fines smaller than 22 mm bypass sorting and proceed directly to shipping, while the 22-60 mm fraction is run through the sorters.

The >22 mm/<60 mm size fraction was divided into three independent test batches aimed at optimizing the design and operating strategy of the Bralorne sorting facility.

  • Test 01 utilized a cascade sorting approach with multiple XRT sorting stages to evaluate the correlation of gold grade with TOMRA’s sorting algorithms, density thresholds, and the performance of the CONTAIN™ AI software. The results from Test 01 were then used to calibrate the XRT for Tests 02 and 03.
  • Tests 02 and 03 assessed operational scenarios using XRT sorting as the primary sorting technology, with rejected material subsequently run through a laser sorter to recover additional quartz vein-hosted gold mineralization.
  • Test 02 was configured to maximize gold grade upgrading while maintaining strong recoveries.
  • Test 03 was configured to maximize gold recovery while maintaining significant waste rejection.

Understanding Mass Balances and Gold Recoveries

The primary objective of ore sorting is to maximize waste rejection while maintaining strong gold recoveries, thereby reducing the mass of material that must be transported and processed. This is particularly important during the Company’s DSO phase, where economics are driven by shipping the highest-value material possible while minimizing transportation costs. The results of Tests 02 and 03 demonstrated that the XRT sorter captures the majority of high-grade gold contained within the ore, achieving recoveries of 84% to 87% while rejecting 57 – 67% of subeconomic waste. Although the addition of a laser sorter increased total gold recoveries to greater than 95%, the additional recovered material was predominantly subeconomic. As a result, the laser sorter added mass to the XRT sorted product, diluted the overall grade of the sorted product, and reduced the benefits of waste rejection, making the XRT-only configuration the preferred option for the current DSO operating strategy.

The XRT test results demonstrate the potential for XRT sorting to significantly reduce mining dilution at the Bralorne Gold Project. To date, the average true vein width is approximately 0.90 m, while the average width of lateral development faces is approximately 3.30 m. As a result, 70% to 80% of the material mined within a development heading consists of lower-grade vein halo and wall rock material surrounding a high-grade vein core that makes up 20% to 30% of total volume. In the example shown, a 0.51 m wide vein grading 61.0 g/t Au is diluted by surrounding vein halo material grading less than 1.14 g/t Au, reducing the weighted average grade of the face to 9.13 g/t Au across 3.53 m. The XRT sorter is interpreted to selectively recover the dense sulphide-bearing material within the vein core, where gold is primarily concentrated, while rejecting a significant portion of the lower-density, low-grade halo material. This effectively reduces dilution, increases the grade of the sorted product, and improves the efficiency of transporting and processing mineralized material during the DSO phase.

Lateral development face illustrating the impact of dilution on grade. The central quartz vein returned 61.0 g/t Au over a true width of 0.51 m, while the surrounding vein halo material returned low grades of less than 1.14 g/t Au. When the full development width of 3.53 m is considered, the weighted average grade decreases to 9.13 g/t Au, demonstrating the significant impact of dilution from low-grade wall rock and vein halo material. The XRT sorter is interpreted to preferentially reject much of this low-grade vein halo while retaining the high-grade vein core, thereby reducing dilution and enhancing the recovery of dense sulphide-associated gold mineralization

Figure 2: Lateral development face illustrating the impact of dilution on grade. The central quartz vein returned 61.0 g/t Au over a true width of 0.51 m, while the surrounding vein halo material returned low grades of less than 1.14 g/t Au. When the full development width of 3.53 m is considered, the weighted average grade decreases to 9.13 g/t Au, demonstrating the significant impact of dilution from low-grade wall rock and vein halo material. The XRT sorter is interpreted to preferentially reject much of this low-grade vein halo while retaining the high-grade vein core, thereby reducing dilution and enhancing the recovery of dense sulphide-associated gold mineralization.

Economic Implications

The test work demonstrated the potential to reject a significant proportion, 57% to 67% of the sorter feed as waste rock, prior to transportation and processing, thereby reducing crushing, trucking, shipping, and downstream processing costs. The economic benefit of the sorter is two-fold.

  • The sorter increases the average gold grade for shipping which has the potential to improve the third-party milling payable,
  • While simultaneously reducing the total tonnage requiring transportation and processing.

Based on the test results, the XRT sorter alone achieved the primary objectives of the sorting program by maximizing waste rejection, increasing gold grades, and reducing the mass of material requiring transportation and processing. As a result, Talisker has elected to remove the laser sorter from the initial plant design, reducing capital expenditures by approximately CAD $4 million while simplifying the flowsheet and lowering operating costs. The Company may evaluate the future addition of a scavenger laser sorter should operating conditions, throughput requirements, or economic factors warrant further recovery optimization.

The integration of ore sorting supports Bralorne’s long-term development strategy by significantly reducing the volume of mineralized material requiring downstream transportation and processing. This has the potential to reduce the size, capital intensity, and operating costs of a future on-site milling facility, while providing greater flexibility for phased project development and capital allocation.

Understanding TOMRA’s Technology

The test utilized the TOMRA COM 1200 Tertiary X-ray Transmission (XRT) sorter equipped with a high-resolution X-ray sensor and TOMRA’s CONTAIN™ and OBTAIN ™ AI software. The XRT system scans individual rock particles and analyzes differences in atomic density and internal mineralization characteristics to distinguish mineralized material from waste rock. A key advantage of the XRT sorter is its ability to penetrate and evaluate the entire rock particle rather than relying solely on surface characteristics. When used in conjunction with the CONTAIN™ AI pattern recognition software, the system can identify subtle internal mineralization patterns and make highly accurate sorting decisions. The Bralorne Gold Project is particularly well suited to XRT sorting due to the significant density contrast between high-density sulphide minerals associated with gold mineralization and the lower-density host rock, enabling effective separation of mineralized material from subeconomic waste.

TOMRA COM 1200 Tertiary XRT sorter at the Saskatchewan Research Council. Image courtesy of, and copyright ©, Saskatchewan Research Council (SRC).

Figure 3: TOMRA COM 1200 Tertiary XRT sorter at the Saskatchewan Research Council. Image courtesy of, and copyright ©, Saskatchewan Research Council (SRC).

The rejected material from the XRT sorter was subsequently processed through the TOMRA PRO Secondary Laser sorter, equipped with advanced laser sensing technology. The laser system scans individual rock particles and analyzes their surface characteristics, including color, texture, and reflectivity, to distinguish between mineralized scattering quartz particles and waste rock. Unlike the XRT sorter, which evaluates the internal characteristics of a rock particle, the Laser sorter is limited to examining surface features and does not penetrate through the rock. The Laser sorter is particularly well suited for identifying quartz vein material exposed on the surface of particles, enabling additional recovery of mineralized material that may not be captured through density-based sorting alone.

TOMRA PRO Secondary Laser sorter at the Saskatchewan Research Council. Image courtesy of, and copyright ©, Saskatchewan Research Council (SRC).

Figure 4: TOMRA PRO Secondary Laser sorter at the Saskatchewan Research Council. Image courtesy of, and copyright ©, Saskatchewan Research Council (SRC).

Stacy Freudigmann, P.Eng. and QP from Canenco Commented, “The XRT results strongly justify the elimination of the laser sorter from the Bralorne Gold Project’s sorting plant and achieves the Company’s objective of significantly reducing the mass for shipping and third-party processing while the Company is in its direct shipping phase.”

Terry Harbort, CEO of Talisker stated, “These results confirm we can achieve substantial waste rejection and significant gold grade increases while maintaining strong recoveries. The ability to eliminate the laser sorter and save approximately $4 million in capital costs, simplify the plant design and operations, and reduce operating costs further strengthens the economics of the Bralorne Gold Project.”

For further information, please contact:

Lindsay Dunlop
Vice President, Investor Relations
lindsay.dunlop@taliskerresources.com
+1 647 274 8975

Qualified Person

The technical information pertaining to metallurgy and sorting technology contained in this news release has been reviewed and approved by Stacy Freudigmann, P.Eng. with Canenco Consulting Corp., who is a Qualified Person as defined under Canadian National Instrument 43-101, Standards of Disclosure for Mineral Projects. Mr. Freudigmann is an independent third-party in accordance with NI 43-101.

The technical information pertaining to geology contained in this news release has been reviewed and approved by Patrick Weaver, P.Geo. Talisker’s Chief Production Geologist who is a Qualified Person as defined under Canadian National Instrument 43-101, Standards of Disclosure for Mineral Projects. Mr. Weaver is not independent of the Company in accordance with NI 43-101.

About TOMRA

TOMRA Mining is a global leader in sensor-based sorting technologies. The company supplies advanced XRT, laser, and AI-enabled sorting systems designed to increase resource efficiency, reduce energy consumption, lower processing costs, and improve mine sustainability through pre-concentration and waste rejection technologies.

About Talisker Resources Ltd.

Talisker (taliskerresources.com) is a junior resource company involved in the exploration and development of gold projects in British Columbia, Canada. Talisker’s flagship asset is the high-grade, fully permitted Bralorne Gold Project where the Company is producing at the Mustang Mine. Talisker projects also include the Ladner Gold Project, an historic high-grade gold mine near Hope, British Columbia, with significant exploration potential, and the Spences Bridge Project, where the Company has a significant landholding in the emerging Spences Bridge Gold Belt, as well as several other early-stage Greenfields projects.

Caution Regarding Forward Looking Statements

Certain statements contained in this press release constitute forward-looking information. These statements relate to future events or future performance. The use of any of the words “could”, “intend”, “expect”, “believe”, “will”, “projected”, “estimated” and similar expressions and statements relating to matters that are not historical facts are intended to identify forward-looking information and are based on Talisker’s current belief or assumptions as to the outcome and timing of such future events. Various assumptions or factors are typically applied in drawing conclusions or making the forecasts or projections set out in forward-looking information. Those assumptions and factors are based on information currently available to Talisker. Although such statements are based on reasonable assumptions of Talisker’s management, there can be no assurance that any conclusions or forecasts will prove to be accurate. In particular, the Company advises that it does not have defined mineral reserves and it has not based its production decision on a feasibility study of mineral reserves demonstrating economic and technical viability, and, as a result, there may be an increased uncertainty of achieving any particular level of recovery of minerals or the cost of such recovery, including increased risks associated with developing a commercially mineable deposit.

Forward looking information involves known and unknown risks, uncertainties and other factors which may cause the actual results, performance, or achievements to be materially different from any future results, performance or achievements expressed or implied by the forward-looking information. Such factors include risks inherent in the exploration, development and operation of mineral deposits, including risks relating to changes in project parameters as plans continue to be redefined, risks relating to variations in grade or recovery rates, risks relating to changes in mineral prices and the worldwide demand for and supply of minerals, risks related to increased competition and current global financial conditions, access and supply risks, reliance on key personnel, operational risks regulatory risks, including risks relating to the acquisition of the necessary licenses and permits, financing, capitalization and liquidity risks, title and environmental risks and risks relating to the failure to receive all requisite shareholder and regulatory approvals. Furthermore, historically, projects that are in production without defined mineral reserves have a much higher risk of economic and technical failure. There is no guarantee that production will proceed as anticipated or at all or that anticipated production costs will be achieved.

The forward-looking information contained in this release is made as of the date hereof, and Talisker is not obligated to update or revise any forward-looking information, whether as a result of new information, future events or otherwise, except as required by applicable securities laws. Because of the risks, uncertainties and assumptions contained herein, investors should not place undue reliance on forward-looking information. The foregoing statements expressly qualify any forward-looking information contained herein.

Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/45ce18ed-4af0-4ee9-8db1-2e3477569eaf
https://www.globenewswire.com/NewsRoom/AttachmentNg/a1c617b7-f5b6-4263-b8e4-ef6d837f80f4
https://www.globenewswire.com/NewsRoom/AttachmentNg/01336446-b0f1-47b2-a5bf-93acf0ef3f8d
https://www.globenewswire.com/NewsRoom/AttachmentNg/996da112-e98c-4f26-9aca-8270dbc7c148

BOSTON, Sept. 17, 2026 (GLOBE NEWSWIRE) — Tiziana Life Sciences, Ltd. (Nasdaq: TLSA) (“Tiziana” or the “Company”), a biotechnology company developing breakthrough immunomodulation therapies with its lead development candidate, intranasal foralumab, a fully human, anti-CD3 monoclonal antibody, today announced the signing of a Memorandum of Understanding (MOU) with the King Abdullah International Medical Research Center (KAIMRC) of King Saud bin Abdulaziz University for Health Sciences (KSAU-HS), Ministry of National Guard – Health Affairs, and the Foundation for Neurologic Diseases. Under the MOU, the parties intend to collaborate on a clinical trial evaluating a combination of Tiziana’s proprietary intranasal foralumab and existing anti-CD20 therapy in patients with relapsing-remitting multiple sclerosis (RRMS) who are responding poorly to anti-CD20 therapy alone, which could be due to untreated neuroinflammation. In three clinical studies to date, intranasal foralumab has been shown to reduce neuroinflammation.

The MOU was signed by Ivor Elrifi, CEO of Tiziana Life Sciences during an event on the main stage at the Riyadh Global Medical Biotechnology Summit (RGMBS) in Riyadh, Kingdom of Saudi Arabia, on Wednesday, September 16, 2026.

KAIMRC is a biomedical and clinical research center operating under the Ministry of National Guard – Health Affairs that pursues translational research and national research capability in alignment with Saudi Vision 2030 and the National Biotechnology Strategy. The Foundation for Neurologic Diseases is a research organization with recognized expertise in neuroimmunology and multiple sclerosis research.

“This MOU marks an important step in fostering international scientific collaboration in neuroimmunology and immunomodulation research,” said Ivor Elrifi, Chief Executive Officer of Tiziana Life Sciences. “We are pleased to partner with KAIMRC along with the Foundation for Neurologic Diseases to explore opportunities that align with our mission of advancing innovative therapies for neurodegenerative and neuroinflammatory diseases, including a clinical trial of foralumab in combination with anti-CD20 therapy for RRMS patients having suboptimal responses to anti-CD20 treatment alone. This represents an additional Multiple Sclerosis type beyond our ongoing non-active Secondary Progressive MS (na-SPMS) program, and does not change our efforts toward na-SPMS, where the Phase 2 trial remains blinded with results expected in October this year. Signing the agreement at RGMBS in Riyadh underscores the growing global interest in collaborative approaches to address these significant unmet medical needs.”

About Foralumab

Foralumab, a fully human anti-CD3 monoclonal antibody, is a biological drug candidate that has been shown to stimulate T regulatory cells when dosed intranasally. At present, 14 patients with Non-Active Secondary Progressive Multiple Sclerosis (na-SPMS) have been dosed in an open-label intermediate sized Expanded Access (EA) Program (NCT06802328) with either an improvement or stability of disease seen within 6 months in all patients. In addition, intranasal foralumab is currently being studied in a Phase 2a, randomized, double-blind, placebo-controlled, multicenter, dose-ranging trial in patients with non-active secondary progressive multiple sclerosis (NCT06292923), as well as additional Phase 2 trials in AD and MSA.

Intranasal foralumab is the only fully human anti-CD3 monoclonal antibody (mAb) currently in clinical development. Immunomodulation by intranasal foralumab represents a novel avenue for the treatment of neuroinflammatory and neurodegenerative human diseases.[1],[2]

About Tiziana Life Sciences

Tiziana Life Sciences is a clinical-stage biopharmaceutical company developing breakthrough therapies using transformational drug delivery technologies to enable alternative routes of immunotherapy. Tiziana’s innovative intranasal approach has the potential to provide an improvement in efficacy as well as safety and tolerability compared to intravenous (IV) delivery. Tiziana’s lead candidate, intranasal foralumab, which is the only fully human anti-CD3 mAb currently in clinical development, has demonstrated a favorable safety profile and clinical response in patients in studies to date. Tiziana’s technology for alternative routes of immunotherapy has been patented with several applications pending and is expected to allow for broad pipeline applications.

For more information about Tiziana Life Sciences and its innovative pipeline of therapies, please visit www.tizianalifesciences.com.

Forward-Looking Statements

Statements in this press release may be “forward-looking statements” within the meaning of Section 27A of the U.S. Securities Act of 1933, as amended, and Section 21E of the U.S. Securities Exchange Act of 1934, as amended, that concern matters that involve risks and uncertainties that could cause actual results to differ materially from those anticipated or projected in the forward-looking statements. These forward-looking statements are not historical facts but rather are based on the Company’s current expectations, estimates, and projections about its industry; its beliefs; and assumptions. Words such as ‘anticipates,’ ‘expects,’ ‘intends,’ ‘plans,’ ‘believes,’ ‘seeks,’ ‘estimates,’ and similar expressions are intended to identify forward-looking statements. These forward-looking statements reflect the current beliefs and expectations of Tiziana’s management and include statements regarding the closing of the Offering. These statements are not guarantees of future performance and are subject to known and unknown risks, uncertainties, and other factors, some of which are beyond the Company’s control, are difficult to predict, and could cause actual results to differ materially from those expressed or forecasted in the forward-looking statements. The Company cautions security holders and prospective security holders not to place undue reliance on these forward-looking statements, which reflect the view of the Company only as of the date of this announcement. Actual results may differ materially from those indicated by such forward-looking statements as a result of various important factors, including: the uncertainties related to market conditions and other factors described more fully in the section entitled ‘Risk Factors’ in Tiziana’s Annual Report on Form 20-F for the year ended December 31, 2025, and other periodic reports filed with the SEC from time to time. The forward-looking statements made in this announcement relate only to events as of the date on which the statements are made. The Company will not undertake any obligation to release publicly any revisions or updates to these forward-looking statements to reflect events, circumstances, or unanticipated events occurring after the date of this announcement except as required by law or by any appropriate regulatory authority.

For further inquiries:

Tiziana Life Sciences Ltd
Paul Spencer, Business Development, and Investor Relations
+44 (0) 207 495 2379
email: info@tizianalifesciences.com

[1] https://www.pnas.org/doi/10.1073/pnas.2220272120

[2] https://www.pnas.org/doi/10.1073/pnas.2309221120

Company to use The Bracket™ platform to monitor trading patterns, identify potential abnormalities and support market transparency

New York, NY, Sept. 17, 2026 (GLOBE NEWSWIRE) — Mixed Martial Arts Group Limited (NYSE American: MMA) (“MMA” or the “Company”), doing business as MMA.INC, today announced that it has entered into a service agreement with Generation IACP Inc. to provide enhanced monitoring, analysis and reporting of trading activity in the Company’s ordinary shares.

The engagement forms part of MMA.INC’s broader commitment to market integrity, strong corporate governance and the protection of shareholder interests.

Through Generation IACP’s The Bracket™ platform, professional traders will conduct ongoing analysis of trading patterns, market-participant behaviour and significant institutional share movements. Generation IACP will apply proprietary methodologies designed to identify potential abnormalities and activity associated with aggressive selling, short selling, anonymous trading and potentially prohibited trading practices.

The engagement will give MMA.INC’s Board and management more timely and granular insight into the trading of the Company’s shares, strengthen the Company’s ability to identify activity warranting further scrutiny and provide an evidentiary basis for determining whether additional action is appropriate.

Nick Langton, Founder and Chief Executive Officer of MMA.INC, said:

“Protecting shareholder interests requires active oversight of how our securities trade, careful scrutiny of unusual activity and a readiness to act when credible evidence emerges.

“MMA.INC will not be a passive observer where trading activity raises legitimate concerns. Under this engagement, trading in our shares will be subject to enhanced professional monitoring and rigorous, data-driven analysis. Market participants should understand that anomalous activity may be identified, analyzed and documented.

“Our position is straightforward: we support a fair, transparent and orderly market for MMA shares. If this work produces substantiated evidence of misconduct, we will act promptly and firmly through every appropriate market, legal, regulatory or enforcement channel available to the Company.”

MMA.INC intends to evaluate all material findings with its legal and other advisers. Where warranted, the Company may refer relevant information to market operators, broker-dealers, regulators or other enforcement authorities and pursue any additional measures considered appropriate to protect the Company and its shareholders.

The Company has not reached any conclusion that unlawful trading has occurred. The purpose of the engagement is to establish the facts through rigorous professional analysis and ensure MMA.INC is equipped to respond decisively to any credible evidence identified.

About Generation IACP Inc. and The Bracket™

Generation IACP Inc. is a Canadian investment dealer and member of the Canadian Investment Regulatory Organization. Its issuer-services platform, The Bracket™, provides publicly listed companies with market surveillance, trading analytics and timely reporting designed to improve their understanding of market activity and identify anomalous trading patterns.

For more information, visit www.bracketreport.com.

About Mixed Martial Arts Group Limited

Mixed Martial Arts Group Limited (NYSE American: MMA), doing business as MMA.INC, is building the participation and technology platform for the global martial arts and combat sports industry, connecting practitioners, gyms, coaches, content, commerce and payments.

As of July 2026, MMA.INC’s platform assets included 5 million+ social media followers, 680,000 user profiles, 107,694 registered student profiles, 27,651 monthly active users and 15,326 published gym profiles, including 996 verified and 389 paying academies. The platform also recorded approximately 80,000 monthly check-ins and an annualized payments run rate of approximately US$21 million based on May 2026 processing volumes.

  • A Connected Participation Platform: MMA.INC brings together gym software, payments, training, community, content and commerce through assets including BJJLink, TrainAlta, Hype and MixedMartialArts.com.
  • A Growing Participation Network: Over the prior 18 months, registered student profiles increased approximately 101%, monthly active users approximately 89% and paying academies approximately 260%.
  • Built to Aggregate the Sector: MMA.INC’s strategy is to connect the fragmented martial arts participation economy through a unified digital identity and ecosystem designed to deepen engagement and expand monetization across software, payments, programs, memberships, partnerships and commerce.

For more information, visit www.mma.inc

Cautionary Statement Regarding Forward-Looking Statements

This press release contains forward-looking statements within the meaning of the U.S. Private Securities Litigation Reform Act of 1995 and Sections 27A of the Securities Act of 1933 and 21E of the Securities Exchange Act of 1934. Words such as “believe,” “may,” “estimate,” “anticipate,” “intend,” “plan,” “could,” “target,” “potential,” “will,” “expect” and similar expressions are intended to identify forward-looking statements. These statements include, without limitation, statements regarding the anticipated scope, benefits and results of the Company’s engagement with Generation IACP; the ability of the monitoring and analysis to identify anomalous or potentially improper trading activity; the Company’s evaluation of any findings; any market, legal, regulatory or enforcement action the Company may take; and MMA.INC’s strategy, plans and objectives, growth and monetization of its platform, increased penetration of existing users, students, gyms and other platform assets, development and adoption of products and programs, partnerships, geographic expansion, acquisitions, strategic investments, payment volumes, and future revenue, margins, operating performance and financial condition. Forward-looking statements are based on management’s current expectations, assumptions and estimates and are subject to known and unknown risks and uncertainties that may cause actual results to differ materially. These include, among others, the Company’s ability to manage growth; the adoption and commercialization of its products and services; its dependence on gyms, academies, members, partners and key relationships; competition; execution and integration risks associated with acquisitions; regulatory developments; macroeconomic conditions; access to capital; and the risks described in the Company’s Annual Report on Form 20-F and subsequent reports on Form 6-K filed with or furnished to the U.S. Securities and Exchange Commission. There can be no assurance that the engagement with Generation IACP will identify improper or unlawful activity, identify any responsible party, produce conclusive findings, result in any referral, investigation or legal or regulatory action, or affect the trading market or price of the Company’s ordinary shares. Available trading data may be incomplete or inconclusive, and trading patterns that appear unusual may result from lawful activity. There can be no assurance that any forward-looking outcome will be achieved. MMA.INC’s products and business lines are at varying stages of development, commercialization and adoption, and certain products, services or features may be modified, delayed or discontinued. Forward-looking statements speak only as of the date on which they are made, and the Company undertakes no obligation to update or revise any forward-looking statement except as required by applicable law.

Media Contacts

Mixed Martial Arts Group Limited
E: andrew@mma.inc

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.