LONDON, Aug. 16, 2023 /PRNewswire/ — Sellafield engineers, using new equipment designed and installed by a Bechtel-Cavendish Nuclear team, have begun retrieving waste from the UK’s oldest waste storage building. The Pile Fuel Cladding Silo (PFCS) at Sellafield nuclear facility in…