Ameren subsidiary selected to develop critical, multiyear grid reliability project in northern Missouri

Project awarded based on sound design plans and lower cost ST. LOUIS, April 3, 2024 /PRNewswire/ — A subsidiary of St. Louis-based Ameren Corporation has been selected by the regional transmission operator, the Midcontinent Independent System Operator (MISO), to develop a $273 million…