Atico Continues to Extend the Ore Body at El Roble Mine in Colombia and Reports Multiple Higher-Grade Intercepts up to 18.6m of 7.65% Cu, 2.22 g/t Au, 9.0m of 8.44% Cu, 3.58 g/t Au and 5.7m of 8.48% Cu, 7.41 g/t Au

VANCOUVER, British Columbia, Oct. 28, 2026 (GLOBE NEWSWIRE) — Atico Mining Corporation (TSX.V: ATY | OTCID: ATCMF) (“Atico” or the “Company”) is pleased to announce positive results from 32 drill holes completed in 2026 within an area of historical mining, successfully expanding the tonnage at the El Roble mine. The table below highlights some assay results in bold for drill core holes, which include 18.6m of 7.65% Cu, 2.22 g/t Au, 9.0m of 8.44% Cu, 3.58 g/t Au and 5.7m of 8.48% Cu, 7.41 g/t Au. Ore grade intercepts are reported over widths of 0.25 to 18.6 meters in areas with limited drilling with results highlighting the possibility of further extending the ore body with additional drill programs.

“Our ongoing drilling campaign at El Roble mine continues to deliver important results, intercepting new mineralization and successfully extending the boundaries of the historical massive sulfide zones,” said Fernando E. Ganoza, CEO. “These assay results reinforce our confidence that higher-grade copper and gold mineralization continues to extend beyond the historical zones. The deposit remains open at depth and along strike, confirming further potential both within and outside the previously defined mineralized shell. Drilling is expected to continue through 2026 and 2027, with the goal of further extending mineralization and increasing the mine life. We also anticipate issuing an updated reserves and resources statement for the El Roble mine by early next year, and remain encouraged by the results to date.”

El Roble Drilling Highlights Include:

Drill Hole From (m) To (m) Interval (m) Cu % Au g/t
ATDM-112 90.85 97.1 6.25 7.65 1.72
ATDM-119 15.1 22.2 7.1 3.21 7.63
ATDM-120 17.6 21.7 4.1 6.17 13.4
ATDM-121 7.9 13.6 5.7 8.48 7.41
ATDM-130 73 82.05 9.05 6.36 1.84
ATDM-140 25.65 29.1 3.45 11.7 2.55
ATDM-146 17.3 21.8 4.5 9.91 1.95
ATDM-147 18.6 23.1 4.5 16.13 1.44
ATDM-148 17.6 24.1 6.5 3.77 9.49
ATDM-150 15.9 34.5 18.6 7.65 2.22
ATDM-151 27.9 36.6 8.7 7.58 1.63
ATDM-159 53.8 58.7 4.9 7.95 4.48
ATDM-161 55 58.9 3.9 4.44 16.46
ATDM-171 28.5 37.5 9 8.44 3.58
           

Exploration Drilling Program

The goal of the 2026 underground drilling program at the El Roble mine is to define zones of mineralization within the extent of the main historic massive sulphide body that were not exploited by previous operators, to expand the historically identified resource and explore for new massive sulfide bodies. The Company began this drill infill program to test the main mineralized body and the immediately adjacent area during the first quarter of 2023 and has continued the program during 2026 with 32 drill holes for a total of 1689.3 meters of drilling.

All intervals in Table 1 include only assays of greater than 1% Cu and very high-grade copper or gold sections within these intervals do not occur.

Table 1: Exploration Drilling Results with a 1% copper cutoff include

Drill Hole From (m) To (m) Interval (m) Cu % Au g/t
ATDM-112 63.85 65.6 1.75 2.95 0.27
ATDM-112 66.7 69.8 3.1 4.7 0.61
ATDM-112 73.7 74.1 0.4 4.49 1.51
ATDM-112 76 76.6 0.6 2.41 0.57
ATDM-112 87.6 88.9 1.3 5.23 1.02
ATDM-112 90.85 97.1 6.25 7.65 1.72
ATDM-114 30 31.5 1.5 3.14 0.38
ATDM-115 64.25 64.55 0.3 3.98 0.46
ATDM-115 68.9 70.2 1.3 1.38 0.38
ATDM-115 71.4 72.4 1 6.45 0.65
ATDM-119 15.1 22.2 7.1 3.21 7.63
ATDM-120 17.6 21.7 4.1 6.17 13.4
ATDM-121 7.9 13.6 5.7 8.48 7.41
ATDM-121 14.3 16.3 2 4.33 5.35
ATDM-125 71.3 72.8 1.5 4.63 1.82
ATDM-125 74 79.2 5.2 3.75 0.46
ATDM-125 79.7 82.6 2.9 12.61 1.54
ATDM-125 84.5 85.9 1.4 4.11 1.63
ATDM-130 73 82.05 9.05 6.36 1.84
ATDM-132 32.3 32.8 0.5 1.88 4.97
ATDM-132 33.2 35.6 2.4 1.81 6.56
ATDM-136 65.7 71 5.3 5.8 0.36
ATDM-136 75.25 77.7 2.45 8.13 1.29
ATDM-139 28.8 29.6 0.8 5.58 0.72
ATDM-140 16.2 18.2 2 1.18 2.42
ATDM-140 25.65 29.1 3.45 11.7 2.55
ATDM-140 30.4 33 2.6 6.19 2.76
ATDM-141 24.9 25.15 0.25 1.81 4.33
ATDM-144 20.6 22.5 1.9 7.18 0.42
ATDM-144 26.2 27.7 1.5 4.29 1.08
ATDM-146 14.2 16.2 2 5.57 2.58
ATDM-146 17.3 21.8 4.5 9.91 1.95
ATDM-146 22.4 24.3 1.9 7.4 2.62
ATDM-147 13 16 3 3.54 4.97
ATDM-147 16.8 17.7 0.9 5.86 1.47
ATDM-147 18.6 23.1 4.5 16.13 1.44
ATDM-147 23.7 25.7 2 14.39 1.26
ATDM-147 28.2 29.5 1.3 16.1 1.08
ATDM-147 34.1 35.1 1 3.61 0.45
ATDM-148 16.1 16.9 0.8 4 6.4
ATDM-148 17.6 24.1 6.5 3.77 9.49
ATDM-148 24.8 30.8 6 5.84 2.38
ATDM-148 36.5 42.5 6 8.38 1.57
ATDM-149 78.8 79.45 0.65 7.01 1.03
ATDM-149 79.8 81.8 2 4.07 1.2
ATDM-149 84 85.5 1.5 2.88 2.59
ATDM-149 93.25 95.8 2.55 1.26 0.94
ATDM-150 15.9 34.5 18.6 7.65 2.22
ATDM-150 35.4 36.2 0.8 2.75 0.34
ATDM-150 36.9 41.4 4.5 5.69 1.17
ATDM-151 20.4 21 0.6 4.82 8.4
ATDM-151 22 26 4 4.67 4.35
ATDM-151 27.9 36.6 8.7 7.58 1.63
ATDM-152 46.3 47 0.7 4.55 6.58
ATDM-152 48.8 49.1 0.3 2.72 1.1
ATDM-154 49.1 51.5 2.4 1.77 4.06
ATDM-157 26.7 29.95 3.25 2.36 6.94
ATDM-157 31.05 32 0.95 4.11 2.77
ATDM-158 32.6 35.5 2.9 2.22 2.16
ATDM-159 46.4 48.4 2 1.3 1.27
ATDM-159 53.8 58.7 4.9 7.95 4.48
ATDM-161 53.45 54 0.55 1.92 9.83
ATDM-161 55 58.9 3.9 4.44 16.46
ATDM-161 74.25 78.2 3.95 5.47 4.76
ATDM-161 81.1 85 3.9 2.1 3.28
ATDM-162 19.55 21.35 1.8 7.08 1.54
ATDM-162 21.75 22.35 0.6 9.22 1.61
ATDM-163 46.65 47.9 1.25 2.79 4.9
ATDM-164 16 22 6 4.36 2.02
ATDM-166 50.3 51.8 1.5 4.62 0.29
ATDM-166 59.4 62 2.6 9.82 8.22
ATDM-171 28.5 37.5 9 8.44 3.58
ATDM-171 40 42 2 3.49 2.06
           

True widths are dependent on uncertainties in the local strike and dip of the mineralization and are estimated to be between 90% and 95% of the drill intercept.

Image 1: Mineralized shells based on historical massive and new bodies at the El Roble Mine with intercepts from the current drill program

Mineralized shells based on historical massive and new bodies at the El Roble Mine with intercepts from the current drill program

QA/QC

Atico Mining adheres to strict Quality Assurance and Quality Control protocols. Blanks and certified reference standards are inserted in each sample batch of drill core that is sent to the lab for analyses. Duplicate samples are also inserted into the sample stream. Twelve drill holes are HQ diameter and core samples are split in half using a diamond saw with one half saved for reference and the other half submitted for analysis. Twenty drill holes are NQ diameter core and the entire core was submitted for analysis. The drill hole number with core size and sample status is shown in Table 2. All samples are shipped via secure transport to ALS sample preparation facility in Medellin, Colombia.

Analysis is carried out at ALS, Lima, Peru for copper, silver, zinc and lead utilizing 4-acid dissolution followed by ICP-AES, Code OG62. Silver over 100 g is analyzed by fire assay with gravimetric finish (Code GRA22) using WST-SIM. Gold analysis is carried out at ALS Vancouver, Canada. Analysis is by fire assay (50 g) with gravimetric finish (Code GRA22) using WST-SIM.

El Roble Mine

The El Roble mine is a higher grade, underground copper and gold mine with nominal processing plant capacity of 1,000 tonnes per day, located in the Department of Choco in Colombia. Its commercial product is a copper-gold concentrate.

Since obtaining control of the mine on November 22, 2013, Atico has upgraded the operation from a historical nominal capacity of 400 tonnes per day.

El Roble’s reserves estimate, with an effective date of March 12, 2024, includes Proven and Probable mineral reserves of 828 thousand tonnes averaging 2.49% Cu, 2.20 g/t Au and a life of mine until Q1-2027. A full NI 43-101 technical report is available on SEDAR+. For more information on the reserves estimate refer to SEDAR+ and on the Company’s website.

Mineralization is open at depth and along strike and the Company plans to further test the limits of the deposit. On the larger land package, the Company has identified a prospective stratigraphic contact between volcanic rocks and black and grey pelagic sediments and cherts that has been traced by Atico geologists for ten kilometers. This contact has been determined to be an important control on VMS mineralization on which Atico has identified numerous target areas prospective for VMS type mineralization occurrence, which is the focus of the current surface drill program at El Roble.

Qualified Person

Garth Graves, P. Geo.

Garth Graves, P. Geo., independent consultant geologist for Atico Mining Corporation and a qualified person in accordance with National Instrument 43-101 has reviewed and approved the technical information contained in this news release.

About Atico Mining Corporation

Atico is a growth-oriented Company, focused on exploring, developing and mining copper and gold projects in Latin America. The Company generates significant cash flow through the operation of the El Roble mine and is developing its high-grade La Plata VMS project in Ecuador. The Company is also pursuing additional acquisition of advanced stage opportunities. For more information, please visit www.aticomining.com.

ON BEHALF OF THE BOARD

Fernando E. Ganoza
CEO
Atico Mining Corporation

Trading symbols: TSX.V: ATY | OTCID: ATCMF

Investor Relations
Igor Dutina
Tel: +1.604.633.9022

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

No securities regulatory authority has either approved or disapproved of the contents of this news release. The securities have not been, and will not be, registered under the United States Securities Act of 1933, as amended (the ‘‘U.S. Securities Act’’), or any state securities laws, and may not be offered or sold in the United States, or to, or for the account or benefit of, a “U.S. person” (as defined in Regulation S of the U.S. Securities Act) unless pursuant to an exemption therefrom. This press release is for information purposes only and does not constitute an offer to sell or a solicitation of an offer to buy any securities of the Company in any jurisdiction.

Cautionary Note Regarding Forward Looking Statements

This announcement includes certain “forward-looking statements” within the meaning of Canadian securities legislation. All statements, other than statements of historical fact, included herein, are forward-looking statements. Forward- looking statements involve various risks and uncertainties and are based on certain factors and assumptions. There can be no assurance that such statements will prove to be accurate, and actual results and future events could differ materially from those anticipated in such statements. Important factors that could cause actual results to differ materially from the Company’s expectations include uncertainties relating to interpretation of drill results and the geology, continuity and grade of mineral deposits; uncertainty of estimates of capital and operating costs; the need to obtain additional financing to maintain its interest in and/or explore and develop the Company’s mineral projects; uncertainty of meeting anticipated program milestones for the Company’s mineral projects; and other risks and uncertainties disclosed under the heading “Risk Factors” in the AIF of the Company dated September 4, 2024 filed with the Canadian securities regulatory authorities on the SEDAR+ website at www.sedarplus.com

A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/d1c3c909-c701-4392-bc1b-052c5604128c

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.